About this file

This solicitation requests proposals for a Sniper Comprehensive Advanced Targeting Pod (CATP) follow-on contract to provide engineering, production, integration, configuration management, testing, hardware and software upgrades, and logistics support services. The Air Force Materiel Command Lifecycle Management Center intends to award a 7-year sole source contract to Lockheed Martin Corporation to manage, support, and sustain the Sniper system and ensure availability and reliability. The period of performance includes a basic ordering period plus four additional one-year ordering periods and two one-year option periods. All responsible sources may submit capability statements for consideration, but the government reserves sole discretion to determine whether competition is warranted. Place of performance will be at Robins Air Force Base or contractor facilities. Foreign participation is prohibited at the prime contract level.

View the file

Other files for this federal contract opportunity

Other files attached to Sniper Comprehensive Advanced Targeting Pod (CATP) 2 Support and Sustainment, newest first.
File Type Posted
WD_Houston_GA_15-4495.pdf PDF
WD_Marion_FL_15-4549.pdf PDF
DD1653_Transportation.pdf PDF
WD_SantaBarbara_CA_15-5648.pdf PDF
AFMC158_Packaging.pdf PDF
CDRLs_ 1 Sep 21.pdf PDF
WD_Tioga_NY_15-4146.pdf PDF
WD_Orange_FL_15-4553.pdf PDF
CATP2_PWS.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 1447 (REV. 8/2016)

PREVIOUS EDITION NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.214(d)

23. ACCOUNTING AND APPROPRIATION DATA

SEE SCHEDULE

24. TOTAL AWARD AMOUNT (For Government Use Only)

TELEPHONE NUMBER

UNIQUE ENTITY

IDENTIFIER

CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER

NO COLLECT CALLS

4. SOLICITATION NUMBER

FA8540-21-R-0011

6.SOLICITATION ISSUE DATE

8. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR

SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOSB PROGRAM

HUBZONE SMALL

BUSINESS EDWOSB

SERVICE-DISABLED VETERAN-

OWNED SMALL BUSINESS NAICS: 811219

8(A) SIZE STANDARD: $22.00

DATE SIGNED

28. UNITED STATES OF AMERICA (Signature of Contracting Officer)

26. AWARD OF CONTRACT: YOUR OFFER ON SOLICITATION NUMBER

SHOWN IN BLOCK 4 INCLUDING ANY ADDITIONS OR CHANGES WHICH

ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

ROUTINE

Subject to the terms and conditions stated herein, the Contractor agrees to hold its offered prices firm for 120 days.

SEE LINE ITEM SCHEDULE

22.

AMOUNT

16. AUTHORITY FOR USING OTHER THAN 10 USC 2304 41 USC 253

FULL AND OPEN COMPETITION (c) (1 ) (c) ( )

DATE SIGNED

27. SIGNATURE OF OFFEROR/CONTRACTOR

20.

UNIT

21.

UNIT PRICE

19.

QUANTITY

13. CONTRACTOR OFFEROR CODE FACILITY CODE

11. IF OFFER IS ACCEPTED BY THE GOVERNMENT WITHIN * ___ CALENDAR DAYS (60 CALENDAR

DAYS UNLESS OFFEROR INSERTS A DIFFERENT PERIOD) FROM THE DATE SET FORTH IN BLOCK 9

ABOVE, THE CONTRACTOR AGREES TO HOLD ITS OFFERED PRICES FIRM FOR THE ITEMS

SOLICITED HEREIN AND TO ACCEPT ANY RESULTING CONTRACT SUBJECT TO THE TERMS AND

CONDITIONS STATED HEREIN. *120

RATING

DO: A7

3. AWARD/EFFECTIVE DATE

FA8540

2. CONTRACT NUMBER

X

17.

ITEM NUMBER

12. ADMINISTERED BY CODE

Ceiling

SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK: 14 EFT:T

SCD:B

NAME AND TITLE OF SIGNER (Type or Print) NAME OF CONTRACTING OFFICER

5. SOLICITATION TYPE

SEALED BIDS NEGOTIATED

(IFB) (RFP)

15. PROMPT PAYMENT DISCOUNT

25. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 1

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SETFORTH

OR OTHERWISE IDENTIFIED ABOVE AND ON ANY CONTINUATION SHEETS SUBJECT

THE TERMS AND CONDITIONS SPECIFIED HEREIN.

10. ITEMS TO BE PURCHASED (Brief Description)

SUPPLIES SERVICES Other Electronic and Precision Equipment Repair and Maintenance

9. (Agency Use)

Offers will be received at the issuing office until the date and time specified below. All official United States Postal Service mail and classified material will be delivered to the address shown in block 7. Deliver all parcels to: AFLCMC/WNKE ATTN: Buyer named above, 235 Byron Street, Suite 19A Robins AFB, GA 31098-1611.

31-DEC-2021 5:00PM

X

18.

SCHEDULE OF SUPPLIES/SERVICES

14. PAYMENT WILL BE MADE BY CODE

(SEE ESP CLAUSE 252.232-7003.)

X

7. ISSUED BY CODE

AVIONICS, AFLCMC/WNKE

235 BYRON ST STE 19A

BLDG 300 CML PHN 478 926 7462

ROBINS AFB GA 31098-1670

BUYER: Cheri L. Thetford/WNKE cheri.thetford@us.af.mil Phone: (478) 926- 8446 Fax: (000) 000-0000

X

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)SOLICITATION/CONTRACT

BIDDER/OFFEROR TO COMPLETE BLOCKS 11, 13, 15, 21, 22, & 27.

JU

STANDARD FORM 1447 (REV. 8/2016) BACK

NO RESPONSE FOR REASONS CHECKED

TYPE OR PRINT NAME AND TITLE OF SIGNER

SIGNATURENAME AND ADDRESS OF FIRM (Include Zip Code)

WE DO NOT DESIRE TO BE RETAINED ON THE MAILING LIST FOR FUTURE PROCUREMENT OF THE TYPE OF

ITEMS INVOLVED

WE DO

OTHER (Specify)

UNABLE TO IDENTIFY THE ITEM(S)

CANNOT COMPLY WITH SPECIFICATIONS CANNOT MEET DELIVERY REQUIREMENT

DO NOT REGULARILY MANUFACTURE OR SELL THE TYPE

OF ITEMS INVOLVED

DATE AND LOCAL TIME 31 DEC 2021 5:00 PM

SOLICITATION NUMBER FA854021R0011

FROM: AFFIX

STAMP

HERE

TO:

ATTN: Cheri L Thetford/WNKE

AVIONICS, AFLCMC/WNKE

235 BYRON ST STE 19A

BLDG 300 CML PHN 478 926 7462

ROBINS AFB GA 31098-1670

FA8540-21-R-0011

PART I - THE SCHEDULE

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

B.1 GENERAL: This Request for Proposal (RFP) is issued with the intent to establish a contract for the Sniper Comprehensive Advanced Targeting Pod (CATP). The Contractor shall furnish all necessary personnel, labor, supplies, materials, and travel (except as otherwise authorized by the Contracting Officer) to perform the requirements described herein. Performance shall be in accordance with all provisions, individual Contract Line Item (CLIN) requirements, clauses, and RFP attachments.

B.2 CONTRACT TYPE: The intended contract will be an Indefinite Delivery, Indefinite Quantity (IDIQ) type contract in accordance with FAR 16.504. Contract CLIN types utlized are Firm-Fixed-Price (FFP) and Cost-Plus-Fixed-Fee (CPFF), with the type cited on each individual CLIN in Section B, Schedule.

B.3 ORDERING PERIODS/OPTIONS: In accordance with clause FAR 52.216-7006, Ordering, orders may be issued hereunder for a period of five (5) years from the effective date of the contract against the CLINs included in Section B, Schedule. In addition, two one-year option periods are anticipated for a total 7-year contract. The ordering periods and option periods associated with each CLIN series are defined as follows:

Ordering Periods:

000X - Contract effective date through 365 calendar days after effective date 100X - 366 calendar days after effective date through 730 calendar days after effective date 200X - 731 calendar days after effective date through 1,095 calendar days after effective date 300X - 1,096 calendar days after effective date through 1,460 calendar days after effective date 400X - 1,461 calendar days after effective date through 1,825 calendar days after effective date

Option Periods:

500X - 1,826 calendar days after effective date through 2,190 calendar days after effective date 600X - 2,191 calendar days after effective date through 2,555 calendar days after effective date

B.4 PLACE OF PERFORMANCE: Performance location issued hereunder shall be in accordance with individual delivery orders.

B.5 MINIMUM/MAXIMUM VALUE: The contractor shall furnish to the Government, when and if ordered, the items of supplies or services specified in Section B, Schedule, up to and including the "Maximum" negotiated amount of contract for all orders issued hereunder. The Government shall order at least the "Minimum" amount of $5,000,000 in conjunction with the award of the Basic IDIQ contract.

The quantities of supplies or services specified in the Schedule are estimates only and are not purchased by this contract. Except as the contract may otherwise provide, if the Government's requirements do not result in orders in the quantities described as "estimated" or "maximum" in the schedule, that fact shall not constitute the basis for an equitable price adjustment.

B.6 AUTHORITY TO ISSUE ORDERS: Only Contracting Officers assigned to AFLCMC/WNKE or AFLCMC/WNY may issue orders under this contract.

BASIC ORDERING PERIOD

Availability Support (Fixed)

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

Availability Support - Fixed IAW the PWS Sec 4.6.1, Sec 4.6.2, Para 4.6.4, Para 4.6.6, Para 4.6.8, Para 4.6.9, Para 4.6.11, Associated Document(s) Line Item(s)

FD20602133102 0001

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

AS9100 9100 AS9100D

Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

12 MO TBC

Proposed Period of Performance

12 MO

Availability Support (Variable)

Item No.

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

232,000 HR

Availability Support - Variable IAW the PWS Para 4.6.3, Sec 4.6.7, Para 4.6.10.2, Para 4.6.10.6

Availability Support (Variable)

Associated Document(s) Line Item(s)

FD20602133102 0001

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

232,000 HR TBC

Proposed Period of Performance

232,000 HR

Pod Container Repair (Major)

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 EA

Pod Container Repair (Major) IAW the PWS Para 4.6.10.1 Associated Document(s) Line Item(s)

FD20602133102 0002

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Pod Container Repair (Major)

Required Delivery

+ TBC 1 EA TBC

Proposed Delivery

+ TBC 1 EA

Pod Container Repair (Minor)

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 EA

Pod Container Repair (Minor) IAW the PWS Para 4.6.10.1 Associated Document(s) Line Item(s)

FD20602133102 0003

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Delivery

+ TBC 1 EA TBC

Proposed Delivery

+ TBC 1 EA

Site Activation (CONUS)

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 EA

Site Activation (CONUS) IAW the PWS Para 4.6.10.2, Para 4.6.10.3, Para 4.6.10.4, Para 4.6.10.5, Para 4.6.10.6 Associated Document(s) Line Item(s)

Site Activation (CONUS)

FD20602133102 0004

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ TBC 1 EA TBC

Proposed Period of Performance

+ TBC 1 EA

Site Activation (OCONUS)

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 EA

Site Activation (OCONUS) IAW the PWS Para 4.6.10.2, Para 4.6.10.3, Para 4.6.10.4, Para 4.6.10.5, Para 4.6.10.6 Associated Document(s) Line Item(s)

FD20602133102 0005

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

None

Site Activation (OCONUS)

Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ TBC 1 EA TBC

Proposed Period of Performance

+ TBC 1 EA

Field Service Engineer (CONUS Week)

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 WK

Field Service Engineer (CONUS Week) IAW the PWS Sec 4.6.7, Para 4.6.10.2 Associated Document(s) Line Item(s)

FD2133102 0006

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ TBC 1 WK TBC

Proposed Period of Performance

+ TBC 1 WK

Field Service Engineer (CONUS Day)

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 DA

Field Service Engineer (CONUS Day) IAW the PWS Sec 4.6.7, Para 4.6.10.2 Associated Document(s) Line Item(s)

FD20602133102 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ TBC 1 DA TBC

Proposed Period of Performance

+ TBC 1 DA

Field Service Engineer (OCONUS Week)

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 WK

Field Service Engineer (OCONUS Week) IAW the PWS Sec 4.6.7, Para 4.6.10.2 Associated Document(s) Line Item(s)

FD20602133102 0008

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required

Field Service Engineer (OCONUS Week)

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ TBC 1 WK TBC

Proposed Period of Performance

+ TBC 1 WK

Field Service Engineer (OCONUS Day)

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 DA

Field Service Engineer (OCONUS Day) IAW the PWS Sec 4.6.7, Para 4.6.10.2 Associated Document(s) Line Item(s)

FD20602133102 0009

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of

+ TBC 1 DA TBC

Field Service Engineer (OCONUS Day)

Proposed Period of Performance

+ TBC 1 DA

Additional Depot Stand-Up

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

Additional Depot Stand-Up IAW the PWS Para 4.6.5.15 Associated Document(s) Line Item(s)

FD20602133102 0010

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 LO TBC

Proposed Period of Performance

1 LO

Agile Software Sustainment

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

Agile Software Sustainment IAW the PWS Para 4.4.1, Para 4.4.4, Para 4.4.8, Para 4.4.9, Para 4.4.10

FD20602133102 0011

Agile Software Sustainment

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW1423 1 LO TBC

Proposed Period of Performance

+ IAW1423 1 LO

Enhancements and Development Efforts

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

Enhancements and Development Efforts IAW the PWS Para 4.4.1, Para 4.4.2, Para 4.4.4, Para 4.4.5, Para 4.4.6, Para 4.4.7, Para 4.4.8, Para 4.4.9, Para 4.4.10 Associated Document(s) Line Item(s)

FD20602133102 0012

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

None Type / Ship To Quantity (U/I) To be cited on individual orders

Enhancements and Development Efforts

Required Delivery

+ IAW1423 1 LO TBC

Proposed Delivery

+ IAW1423 1 LO

Upgrade Kits

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 EA

*Note quantities will vary based on individual Delivery Orders. Prices will be established on negotiated pricing table(s).

Upgrade Kits IAW the PWS Para 4.4.5, Sec 4.7 Associated Document(s) Line Item(s)

FD20602133102 0013

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Buy American Act/Balance of Payments Program

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

+ TBC ORIGIN

Type / Ship To PACRN Mark For

+ TBC PAA

Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Delivery

+ TBC 1 EA TBC

Proposed Delivery

+ TBC 1 EA

*Note: Early and incremental deliveries are authorized, if at no additional cost to the Government.

Reserved

Item No.

Reserved Associated Document(s) Line Item(s)

FD20602133102 0014

Priority: R ROUTINE

Reserved

Item No.

Reserved Associated Document(s) Line Item(s)

FD20602133102 0015

Priority: R ROUTINE

Digital Data Recorder

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 EA

Digital Data Recorder IAW the PWS Para 4.4.5, Para 4.6.12 Associated Document(s) Line Item(s)

FD20602133102 0016

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Physical Item Markings:

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

+ TBC ORIGIN

NONE

Digital Data Recorder

Type / Ship To PACRN Mark For

+ TBC PAA

Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Delivery

+ TBC 1 EA TBC

Proposed Delivery

+ TBC 1 EA

Support Equipment Replenishment

Item No.

*Note: Quantites for all SubCLINs under parent CLIN X018 will vary based on individual delivery orders.

Prices will be established on negotiated pricing table(s).

Support Equipment Replenishment IAW the PWS Para 4.4.5, Para 4.6.12 Associated Document(s) Line Item(s)

FD20602133102 0017

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Buy American Act/Balance of Payments Program IUID Required: Yes

Portable Maintenance Aid (PMA)

Item No.

0018AA

Firm Fixed Price Quantity U/I Unit Price Amount

1 EA

Portable Maintenance Aid (PMA) IAW the PWS Para 4.4.5, Para 4.6.12

FD20602133102 0018

Portable Maintenance Aid (PMA)

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

+ TBC ORIGIN

Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

+ TBC PAA

Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Delivery

+ TBC 1 EA TBC

Proposed Delivery

+ TBC 1 EA

Roll Brake Release Box

Item No.

0018AB

Firm Fixed Price Quantity U/I Unit Price Amount

1 EA

Roll Brake Release Box (RBRB) IAW the PWS Para 4.4.5, Para 4.6.12 Associated Document(s) Line Item(s)

FD20602133102 0019

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Roll Brake Release Box

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

+ TBC ORIGIN

Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

+ TBC PAA

Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Delivery

+ TBC 1 EA TBC

Proposed Delivery

+ TBC 1 EA

Fastener Tool Kit (FTK)

Item No.

0018AC

Firm Fixed Price Quantity U/I Unit Price Amount

1 EA

Fastener Tool Kit (FTK) IAW the PWS Para 4.4.5, Para 4.6.12 Associated Document(s) Line Item(s)

FD20602133102 0020

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

+ TBC ORIGIN

Class I ODS Substance Application/Use Quantity

Type / Ship To PACRN Mark For

Fastener Tool Kit (FTK)

+ TBC PAA

Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Delivery

+ TBC 1 EA TBC

Proposed Delivery

+ TBC 1 EA

Common Tools Kit (CTK)

Item No.

0018AD

Firm Fixed Price Quantity U/I Unit Price Amount

1 EA

Common Tools Kit (CTK) IAW the PWS Para 4.4.5, Para 4.6.12 Associated Document(s) Line Item(s)

FD20602133102 0021

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

+ TBC ORIGIN

Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

+ TBC PAA

Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Delivery

+ TBC 1 EA TBC

Proposed Delivery

Common Tools Kit (CTK)

+ TBC 1 EA

Initial LRU Spares

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

Initial LRU Spares IAW the PWS Para 4.4.5, Sec 4.6.5 Associated Document(s) Line Item(s)

FD20602133102 0022

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

+ TBC ORIGIN

Type / Ship To PACRN Mark For

+ TBC PAA

Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ TBC 1 LO TBC

Proposed Period of Performance

+ TBC 1 LO

Special Studies and Analysis

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

Special Studies and Analysis

Special Studies and Analysis IAW the PWS Para 4.4.1, Sec 4.4.2, Para 4.4.3, Para 4.8 Associated Document(s) Line Item(s)

FD20602133102 0023

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW1423 1 LO TBC

Proposed Period of Performance

+ IAW1423 1 LO

Over and Above (CPFF)

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

Over and Above (CPFF) IAW the PWS Para 4.6.13 Associated Document(s) Line Item(s)

FD20602133102 0024

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Over and Above (CPFF)

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

+ TBC ORIGIN

Type / Ship To PACRN Mark For

+ TBC PAA

Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Delivery

+ TBC 1 LO TBC Non-MilStrip

Proposed Delivery

+ TBC 1 LO

Over and Above (FFP)

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

Over and Above (FFP) IAW the PWS Para 4.6.13 Associated Document(s) Line Item(s)

FD20602133102 0025

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

TYPE / SHIP TO CODE F.O.B.

+ TBC ORIGIN

Type / Ship To PACRN Mark For

+ TBC PAA

Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required

+ TBC 1 LO TBC

Over and Above (FFP)

Proposed Delivery

+ TBC 1 LO

Cyber Security Support (IA)

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

Cyber Security Support (IA) IAW the PWS Sec 4.4.2, Para 4.4.3, Sec 4.5 Associated Document(s) Line Item(s)

FD20602133102 0026

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW1423 1 LO TBC

Proposed Period of Performance

+ IAW1423 1 LO

Development

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

Development IAW the PWS Para 4.4.1, Sec 4.4.2, Para 4.4.4, Para 4.4.5, Para 4.4.6, Para 4.4.7

Development

FD20602133102 0027

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 LO TBC

Proposed Period of Performance

1 LO

Engineering Services

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

Engineering Services IAW the PWS paragraph 4.4 Associated Document(s) Line Item(s)

FD20602133102 0028

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Engineering Services

Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 LO TBC

Proposed Period of Performance

1 LO

Pod Demilitarization

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 EA

Pod Demilitarization IAW the PWS Para 4.6.10.7 Associated Document(s) Line Item(s)

FD20602133102 0029

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 EA TBC

Proposed Period of Performance

1 EA

Pod Repair T&E

Pod Repair T&E

Firm Fixed Price Quantity U/I Unit Price Amount

1 EA

Pod Repair T&E IAW the PWS Para 4.6.13, Para 4.6.14 Associated Document(s) Line Item(s)

FD20602133102 0030

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 EA TBC

Proposed Period of Performance

1 EA

Data (CDRLs A001-A044)

Item No.

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

Data (CDRLs A001-A044) IAW the PWS paragraph 4.2, 4.3 Associated Document(s) Line Item(s)

FD20602133102 0031

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Standard Inspection

Data (CDRLs A001-A044)

Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Delivery

+ IAW1423 1 LO TBC

Proposed Delivery

+ IAW1423 1 LO

Obsolescence Support

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

Obsolescence Support IAW the PWS Sec 4.4.2, Para 4.4.4, Para 4.4.6, Sec 4.6.5.14, Para 4.7.2 Manufacturer Part Number 98255 871226-2 Associated Document(s) Line Item(s)

FD20602133102 0032

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 LO TBC

Proposed Period of Performance

1 LO

Bid And Proposal

Bid And Proposal

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

Bid And Proposal IAW the PWS Para 4.4, Sec 4.5, Sec 4.6, Sec 4.7, Para 4.8 Associated Document(s) Line Item(s)

FD20602133102 0033

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 LO TBC

Proposed Period of Performance

1 LO

ORDERING PERIOD 2

Availability Support (Fixed)

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

Availability Support - Fixed IAW the PWS Sec 4.6.1, Sec 4.6.2, Para 4.6.4, Para 4.6.6, Para 4.6.8, Para 4.6.9, Para 4.6.11, Associated Document(s) Line Item(s)

FD20602133102 0001

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Availability Support (Fixed) individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

12 MO TBC

Proposed Period of Performance

12 MO

Availability Support (Variable)

Item No.

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

232,000 HR

Availability Support - Variable IAW the PWS Para 4.6.3, Sec 4.6.7, Para 4.6.10.2, Para 4.6.10.6 Associated Document(s) Line Item(s)

FD20602133102 0001

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

232,000 HR TBC

Proposed Period of

232,000 HR

Pod Container Repair (Major)

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 EA

Pod Container Repair (Major) IAW the PWS Para 4.6.10.1 Associated Document(s) Line Item(s)

FD20602133102 0002

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Delivery

+ TBC 1 EA TBC

Proposed Delivery

+ TBC 1 EA

Pod Container Repair (Minor)

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 EA

Pod Container Repair (Minor) IAW the PWS Para 4.6.10.1 Associated Document(s) Line Item(s)

FD20602133102 0003

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Pod Container Repair (Minor) individual orders issued hereunder

_ Req No / Pri

Required Delivery

+ TBC 1 EA TBC

Proposed Delivery

+ TBC 1 EA

Site Activation (CONUS)

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 EA

Site Activation (CONUS) IAW the PWS Para 4.6.10.2, Para 4.6.10.3, Para 4.6.10.4, Para 4.6.10.5, Para 4.6.10.6 Associated Document(s) Line Item(s)

FD20602133102 0004

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ TBC 1 EA TBC

Proposed Period of

Site Activation (OCONUS)

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 EA

Site Activation (OCONUS) IAW the PWS Para 4.6.10.2, Para 4.6.10.3, Para 4.6.10.4, Para 4.6.10.5, Para 4.6.10.6 Associated Document(s) Line Item(s)

FD20602133102 0005

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ TBC 1 EA TBC

Proposed Period of Performance

+ TBC 1 EA

Field Service Engineer (CONUS Week)

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 WK

Field Service Engineer (CONUS Week) IAW the PWS Sec 4.6.7, Para 4.6.10.2 Associated Document(s) Line Item(s)

FD2133102 0006

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination

Field Service Engineer (CONUS Week)

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ TBC 1 WK TBC

Proposed Period of Performance

+ TBC 1 WK

Field Service Engineer (CONUS Day)

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 DA

Field Service Engineer (CONUS Day) IAW the PWS Sec 4.6.7, Para 4.6.10.2 Associated Document(s) Line Item(s)

FD20602133102 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of

+ TBC 1 DA TBC

Field Service Engineer (CONUS Day)

Proposed Period of Performance

+ TBC 1 DA

Field Service Engineer (OCONUS Week)

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 WK

Field Service Engineer (OCONUS Week) IAW the PWS Sec 4.6.7, Para 4.6.10.2 Associated Document(s) Line Item(s)

FD20602133102 0008

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ TBC 1 WK TBC

Proposed Period of Performance

+ TBC 1 WK

Field Service Engineer (OCONUS Day)

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 DA

Field Service Engineer (OCONUS Day) IAW the PWS Sec 4.6.7, Para 4.6.10.2

Field Service Engineer (OCONUS Day)

Associated Document(s) Line Item(s)

FD20602133102 0009

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ TBC 1 DA TBC

Proposed Period of Performance

+ TBC 1 DA

Additional Depot Stand-Up

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

Additional Depot Stand-Up IAW the PWS Para 4.6.5.15 Associated Document(s) Line Item(s)

FD20602133102 0010

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Additional Depot Stand-Up

Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 LO TBC

Proposed Period of Performance

1 LO

Agile Software Sustainment

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

Agile Software Sustainment IAW the PWS Para 4.4.1, Para 4.4.4, Para 4.4.8, Para 4.4.9, Para 4.4.10 Associated Document(s) Line Item(s)

FD20602133102 0011

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW1423 1 LO TBC

Proposed Period of Performance

+ IAW1423 1 LO

Enhancements and Development Efforts

Enhancements and Development Efforts

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

Enhancements and Development Efforts IAW the PWS Para 4.4.1, Para 4.4.2, Para 4.4.4, Para 4.4.5, Para 4.4.6, Para 4.4.7, Para 4.4.8, Para 4.4.9, Para 4.4.10 Associated Document(s) Line Item(s)

FD20602133102 0012

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

None Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Delivery

+ IAW1423 1 LO TBC

Proposed Delivery

+ IAW1423 1 LO

Upgrade Kits

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 EA

*Note quantities will vary based on individual Delivery Orders. Prices will be established on negotiated pricing table(s).

Upgrade Kits IAW the PWS Para 4.4.5, Sec 4.7 Associated Document(s) Line Item(s)

FD20602133102 0013

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

+ TBC ORIGIN

Type / Ship To PACRN Mark For

+ TBC PAA

Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Delivery

+ TBC 1 EA TBC

Proposed Delivery

Reserved

Reserved Associated Document(s) Line Item(s)

FD20602133102 0014

Priority: R ROUTINE

Reserved

Item No.

Reserved Associated Document(s) Line Item(s)

FD20602133102 0015

Priority: R ROUTINE

Digital Data Recorder

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

Digital Data Recorder

1 EA

Digital Data Recorder IAW the PWS Para 4.4.5, Para 4.6.12 Associated Document(s) Line Item(s)

FD20602133102 0016

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

+ TBC ORIGIN

Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

+ TBC PAA

Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Delivery

+ TBC 1 EA TBC

Proposed Delivery

+ TBC 1 EA

Support Equipment Replenishment

Item No.

*Note: Quantites for all SubCLINs under parent CLIN X018 will vary based on individual delivery orders.

Prices will be established on negotiated pricing table(s).

Support Equipment Replenishment IAW the PWS Para 4.4.5, Para 4.6.12

FD20602133102 0017

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Buy American Act/Balance of Payments Program

1018AA

Firm Fixed Price Quantity U/I Unit Price Amount

1 EA

Portable Maintenance Aid (PMA) IAW the PWS Para 4.4.5, Para 4.6.12 Associated Document(s) Line Item(s)

FD20602133102 0018

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

+ TBC ORIGIN

Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

+ TBC PAA

Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Delivery

+ TBC 1 EA TBC

Proposed

Roll Brake Release Box

Item No.

1018AB

Firm Fixed Price Quantity U/I Unit Price Amount

1 EA

Roll Brake Release Box (RBRB) IAW the PWS Para 4.4.5, Para 4.6.12 Associated Document(s) Line Item(s)

FD20602133102 0019

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

+ TBC ORIGIN

Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

+ TBC PAA

Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Delivery

+ TBC 1 EA TBC

Proposed Delivery

+ TBC 1 EA

Fastener Tool Kit (FTK)

Item No.

1018AC

Firm Fixed Price Quantity U/I Unit Price Amount

1 EA

Fastener Tool Kit (FTK) IAW the PWS Para 4.4.5, Para 4.6.12 Associated Document(s) Line Item(s)

FD20602133102 0020

Priority: R ROUTINE

Fastener Tool Kit (FTK)

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

+ TBC ORIGIN

Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

+ TBC PAA

Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Delivery

+ TBC 1 EA TBC

Proposed Delivery

+ TBC 1 EA

Common Tools Kit (CTK)

Item No.

1018AD

Firm Fixed Price Quantity U/I Unit Price Amount

1 EA

Common Tools Kit (CTK) IAW the PWS Para 4.4.5, Para 4.6.12 Associated Document(s) Line Item(s)

FD20602133102 0021

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Common Tools Kit (CTK)

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

+ TBC ORIGIN

Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

+ TBC PAA

Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Delivery

+ TBC 1 EA TBC

Proposed Delivery

+ TBC 1 EA

Initial LRU Spares

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

Initial LRU Spares IAW the PWS Para 4.4.5, Sec 4.6.5 Associated Document(s) Line Item(s)

FD20602133102 0022

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

TYPE / SHIP TO CODE F.O.B.

+ TBC ORIGIN

Type / Ship To PACRN Mark For

+ TBC PAA

Initial LRU Spares

Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ TBC 1 LO TBC

Proposed Period of Performance

+ TBC 1 LO

Special Studies and Analysis

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

Special Studies and Analysis IAW the PWS Para 4.4.1, Sec 4.4.2, Para 4.4.3, Para 4.8 Associated Document(s) Line Item(s)

FD20602133102 0023

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW1423 1 LO TBC

Proposed Period of Performance

+ IAW1423 1 LO

Over and Above (CPFF)

Over and Above (CPFF)

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

Over and Above (CPFF) IAW the PWS Para 4.6.13 Associated Document(s) Line Item(s)

FD20602133102 0024

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

TYPE / SHIP TO CODE F.O.B.

+ TBC ORIGIN

Type / Ship To PACRN Mark For

+ TBC PAA

Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Delivery

+ TBC 1 LO TBC Non-MilStrip

Proposed Delivery

+ TBC 1 LO

Over and Above (FFP)

Item No.

Firm Fixed…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .