2864996_CDRL1_REPORT.pdf
PDF 137 KB Posted
- Attached to
- Repair of the APQ-166
- Solicitation number
- FA8539-20-R-0001
About this file
CDRLs DD1423
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IUID.pdf | ||
| 2894279_PKGRQMT_REPORT.pdf | ||
| 2894616_TRNSPDATA_REPORT.pdf | ||
| FA853920R0001.pdf | ||
| WD.pdf | ||
| PWS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188(1 Data Item)
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188).
Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
APQ-166
E. CONTRACT / PR NO.
FD20602000021
F. CONTRACTOR
IEI
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
Commercial Asset Visibility Air Force (CAVAF)/Government Furnished Material Report
3. SUBTITLE
GFM End Item Reporting
4. AUTHORITY
DI-MGMT-81634C
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS Para 4.7
6. REQUIRING OFFICE
407 SCMS/GULB
7. DD 250 REQ
DD
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
A
10. FREQUENCY
See Block 16
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Rogers, Tiffany SNAME: 05 JUN 2019DATE:
NOTE: Changes to office symbols and/or e-mail addresses, when necessary shall be made by letter through the Government CO/ACO without further revision to this CDRL.
1. Block 5: Contract Reference: PWS Paragraph 4.7 and CAV AF Reporting Requirements Document
2. Block 4: All reporting shall be submitted in the English Language.
3. Blocks 10, 11, 12, 13:
a. Date of first submission shall be within 24 hours following a supply or maintenance transaction, after the contract award date.
b. Contractor reporting requirements to CAV AF shall be submitted daily and/or within 24 hours of a supply or maintenance action occurrence IAW the CAV AF Reporting Requirements Document.
c. Data shall be current within 24 hours of the last End Item maintenance occurrence.
4. Blocks 7, 8, 14:
a. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF website or CICA XML.
b. The contractor shall submit a DD Form 250 (Material Inspection and Receiving Report) electronically via the Internet to iRAPT (WAWF) website address: https://wawf.eb.mil, using DODAAC FA8251. MARK FOR: Address in block 14A.
c. A Letter of Transmittal shall be submitted in the month the delivery order is completed, covering all reports transmitted for that order. Submit the Letter to the following email address:
Program Manager: Lt. Andrew Lobo (E-mail: andrew.lobo.2@us.af.mil) Production Management Specialist Tiffany Rogers (tiffany.rogers.8@us.af.mil)
COORDINATORS:
15. TOTAL
G. PREPARED BY
Adams, Andrew C
407 SCMS / GUBA
478-327-5034
H. DATE
19 SEP 2019
I. APPROVED BY
//DIGITALLY SIGNED//
LOBO.ANDREW.D.1530365774
407 SCMS / GULB 478-926-3668 / 468-3668
J. DATE
19 SEP 2019
Page 1 of 11DD FORM 1423-1, FEB 2001 Version 2Generated by PRPS using Jasper Reports on 24 Sep 2019
PREVIOUS EDITION MAY BE USED.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
APQ-166
E. CONTRACT / PR NO.
FD20602000021
F. CONTRACTOR
IEI
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
Government Property Inventory Report
3. SUBTITLE
Annual Government Property Physical Inventory Report
4. AUTHORITY
DI-MGMT-80441C
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS Para 4.7.1
6. REQUIRING OFFICE
407 SCMS/GULB
7. DD 250 REQ
LT
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ANNLY
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Rogers, Tiffany SNAME: 05 JUN 2019DATE:
NOTE: Changes to office symbols and/or e-mail addresses, when necessary shall be made by letter through the Government CO/ACO without further revision to this CDRL.
1. Block 4:
a. All reports shall be submitted in the English Language.
2. Blocks 10, 11, 12, 13:
a. This report will be provided annually. Reporting Period is one year.
b. The data is representative of the Contractor's Internal Property Control System and shall be current as of the last day of the annual reporting period. If requested outside of an annual cadence, the data shall be current as of the date requested.
c. The report shall be delivered within seven (7) calendar days of the end of the first reporting period and annually thereafter, or within seven (7) calendar days of government request.
3. Block 9:
a. DISTRIBUTATION STATEMENT "D": Distribution authorized to the Department of Defense and U.S. DoD contractors only; Specific Authority (identification of valid documented authority). Date of Determination: 5 JUN 2019.
Other requests for this document shall be referred to 407 SCMS/GULB.
b. EXPORT CONTROL WARNING: All technical documents/data (printed, digital/electronic) that are determined to contain export-controlled technical data, shall be marked with the following statement:
EXPORT CONTROL WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate IAW provisions of DoD Directive 5230.25.
c. DESTRUCTION NOTICE: For classified documents, follow the procedures, in DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), Section 5-705, or DoD 5200.1-R, Information Security Program Chapter VI. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.
4. Block 7, 14: Submit the Annual Government Property Physical Inventory Report to the following email address:
Program Manager: Lt. Andrew Lobo (E-mail: andrew.lobo.2@us.af.mil) Production Management Specialist Tiffany Rogers (tiffany.rogers.8@us.af.mil)
COORDINATORS:
15. TOTAL
G. PREPARED BY
Adams, Andrew C
407 SCMS / GUBA
478-327-5034
H. DATE
19 SEP 2019
I. APPROVED BY
//DIGITALLY SIGNED//
LOBO.ANDREW.D.1530365774
407 SCMS / GULB 478-926-3668 / 468-3668
J. DATE
19 SEP 2019
Page 2 of 11DD FORM 1423-1, FEB 2001 Version 2Generated by PRPS using Jasper Reports on 24 Sep 2019
A. CONTRACT LINE ITEM NO.
B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
APQ-166
E. CONTRACT / PR NO.
FD20602000021
F. CONTRACTOR
IEI
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM
Contract Government Furnished Material (GFM) Requisition and Inventory Report
3. SUBTITLE
Requisition and Inventory Report
4. AUTHORITY
DI-MGMT-82128
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS Para 4.7.2
6. REQUIRING OFFICE
407 SCMS/GULB
7. DD 250 REQ
LT
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ANNLY
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Rogers, Tiffany SNAME: 05 JUN 2019DATE:
NOTE: Changes to office symbols and/or e-mail addresses, when necessary shall be made by letter through the Government CO/ACO without further revision to this CDRL.
1. Block 4: All reporting shall be in the English Language.
2. Blocks 10, 11, 12, 13:
a. Data shall be current as of the last date of the reporting period (end of the month)
b. The first report shall be submitted no later than five (5) business days after the close of the first reporting period (previous month's last calendar date).
c. Subsequent reports shall be submitted no later than five (5) business days of the close of the reporting period (previous month's last calendar date).
3. Block 9:
a. DISTRIBUTATION STATEMENT "D": Distribution authorized to the Department of Defense and U.S. DoD contractors only; Specific Authority (identification of valid documented authority). Date of Determination: 5 JUN 2019.
Other requests for this document shall be referred to 407 SCMS/GULB.
b. EXPORT CONTROL WARNING: All technical documents/data (printed, digital/electronic) that are determined to contain export-controlled technical data, shall be marked with the following statement:
EXPORT CONTROL WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate IAW provisions of DoD Directive 5230.25.
c. DESTRUCTION NOTICE: For classified documents, follow the procedures, in DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), Section 5-705, or DoD 5200.1-R, Information Security Program Chapter VI. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.
4. Block 7, 14: Submit the Requisition and Inventory Reports to the following email address:
Program Manager: Lt. Andrew Lobo (E-mail: andrew.lobo.2@us.af.mil) Production Management Specialist Tiffany Rogers (tiffany.rogers.8@us.af.mil)
COORDINATORS:
15. TOTAL
G. PREPARED BY
Adams, Andrew C
407 SCMS / GUBA
478-327-5034
H. DATE
19 SEP 2019
I. APPROVED BY
//DIGITALLY SIGNED//
LOBO.ANDREW.D.1530365774
407 SCMS / GULB 478-926-3668 / 468-3668
J. DATE
19 SEP 2019
Page 3 of 11DD FORM 1423-1, FEB 2001 Version 2Generated by PRPS using Jasper Reports on 24 Sep 2019
A. CONTRACT LINE ITEM NO.
B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
APQ-166
E. CONTRACT / PR NO.
FD20602000021
F. CONTRACTOR
IEI
1. DATA ITEM NO.
A004
2. TITLE OF DATA ITEM
Contract Depot Maintenance (CDM) Production Report
3. SUBTITLE
CDM Production Monthly Status Report
4. AUTHORITY
DI-PSSS-81995
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS Para 4.7.3
6. REQUIRING OFFICE
407 SCMS/GULB
7. DD 250 REQ
LT
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
MTHLY
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Rogers, Tiffany SNAME: 05 JUN 2019DATE:
NOTE: Changes to office symbols and/or e-mail addresses, when necessary shall be made by letter through the Government CO/ACO without further revision to this CDRL.
1. Block 4:
a. All reporting shall be submitted in the English Language.
b. The Contractor's CAV AF Reporting shall reflect their inventory property control management system data records which shall represent timely and accurate accountability of AF inventory assets at the physical location(s) of the contractor's repair facility (including subcontractor facilities); shop floor, bond room and/or receiving/shipping docks, etc. for each repair.
c. The Contractor shall report by contract delivery order on all applicable categories, totals and on-hand balances, providing TABLE I (DI-PSSS-81995) for EACH repair location, including subcontractor facilities, for the contracts maintenance occurrence actions during the reporting period.
d. The Contractor shall report on production, providing TABLE I (DI-PSSS-81995) for EACH repair location, including subcontractor facilities, for which the contractor produced assets during the reporting period.
2. Blocks 10, 11, 12, 13:
a. The reports shall be provided monthly within 5 (five) business days of the previous month's last calendar date.
b. Reports shall continue to be submitted by the contractor unless the requirement is terminated by the 407 SCMS/GULB, Program Manager (PM) or the Production Management Specialist (PMS),
c. The Final Report submitted following the final reporting period on the contract shall be annotated "Final Report"
3. Block 9:
a. DISTRIBUTATION STATEMENT "D": Distribution authorized to the Department of Defense and U.S. DoD contractors only; Specific Authority (identification of valid documented authority). Date of Determination: 5 JUN 2019.
Other requests for this document shall be referred to 407 SCMS/GULB
b. EXPORT CONTROL WARNING: All technical documents/data (printed, digital/electronic) that are determined to contain export-controlled technical data, shall be marked with the following statement:
EXPORT CONTROL WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate IAW provisions of DoD Directive 5230.25.
c. DESTRUCTION NOTICE: For classified documents, follow the procedures, in DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), Section 5-705, or DoD 5200.1-R, Information Security Program Chapter VI. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.
4. Block 7, 14: Submit the CDM Production Monthly Status Reports to the following email address:
Program Manager: Lt. Andrew Lobo (E-mail: andrew.lobo.2@us.af.mil) Production Management Specialist Tiffany Rogers (tiffany.rogers.8@us.af.mil)
COORDINATORS:
15. TOTAL
G. PREPARED BY
Adams, Andrew C
407 SCMS / GUBA
478-327-5034
H. DATE
19 SEP 2019
I. APPROVED BY
//DIGITALLY SIGNED//
LOBO.ANDREW.D.1530365774
407 SCMS / GULB 478-926-3668 / 468-3668
J. DATE
19 SEP 2019
Page 4 of 11DD FORM 1423-1, FEB 2001 Version 2Generated by PRPS using Jasper Reports on 24 Sep 2019
A. CONTRACT LINE ITEM NO.
B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
APQ-166
E. CONTRACT / PR NO.
FD20602000021
F. CONTRACTOR
IEI
1. DATA ITEM NO.
A005
2. TITLE OF DATA ITEM
Item Unique Identification (IUID) Marking Plan
3. SUBTITLE
N/A
4. AUTHORITY
DI-MGMT-81803
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS Para 4.3.1.3
6. REQUIRING OFFICE
407 SCMS/GULB
7. DD 250 REQ
LT
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
See Block 16
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Ellis, Jonathan ANAME: 29 JUL 2019DATE:
Block 7: The Government will accept the IUID Marking Plan through WAWF. The contractor shall submit the IUID Marking Plan upon final submission to DODAAC FB2065, Attention: andrew.lobo.2@us.af.mil (PM) to account for data previously submitted by letters of transmittal. The Government will approve/disapprove the IUID Marking Plan in WAWF within 30 calendar days after receipt.
Block 10-13: The contractor shall submit a complete IUID Marking Plan within 30 calendar days after contract award.
The Government will approve/disapprove the IUID Marking Plan, and notify the contractor within 10 calendar days of receipt. If rejected, the contractor shall have 10 calendar days to correct any error and return a corrected IUID Marking Plan to the Government for review.
Block 14: Document submission shall be provided electronically in Portable Document Format (PDF) to the points of contact (POCs) listed below. Changes to the POC Distribution List shall be made by a letter from the Procurement Contracting Officer (PCO) or the Administrative Contracting Officer (ACO) without further revision to this Contract Data Requirements List (CDRL).
CDRL POC Distribution List:
Lt. Andrew Lobo 407 SCMS/ GULBA, Logistics Manager andrew.lobo.2@us.af.mil Jonathan Ellis 407 SCMS/GUEAE, Electronics Engineer jonathan.ellis.6@us.af.mil
Rogers, Tiffany SNAME: 05 JUN 2019DATE:
NOTE: Changes to office symbols and/or e-mail addresses, when necessary shall be made by letter through the Government CO/ACO without further revision to this CDRL.
Block 9: Distribution authorized to U.S. Government agencies only. Other requests for this document shall be referred to
407 SCMS/GULB.
Block 10-13: The contractor shall submit a complete IUID Marking Plan within 30 calendar days after contract award.
The Government will review and determine acceptance or rejection and notify contractor within 10 calendar days of receipt. If rejected, the contractor shall have 10 calendar days to correct any error and return a corrected IUID Marking Plan to the Government for review.
Block 7, 14: Forward one electronic copy in PDF format to the following email address:
Program Manager: Lt. Andrew Lobo (E-mail: andrew.lobo.2@us.af.mil) Engineer: Jonathan Ellis (E-mail: jonathan.ellis.6@us.af.mil)
COORDINATORS:
15. TOTAL
G. PREPARED BY
Adams, Andrew C
407 SCMS / GUBA
478-327-5034
H. DATE
19 SEP 2019
I. APPROVED BY
//DIGITALLY SIGNED//
LOBO.ANDREW.D.1530365774
407 SCMS / GULB 478-926-3668 / 468-3668
J. DATE
19 SEP 2019
Page 5 of 11DD FORM 1423-1, FEB 2001 Version 2Generated by PRPS using Jasper Reports on 24 Sep 2019
A. CONTRACT LINE ITEM NO.
B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
APQ-166
E. CONTRACT / PR NO.
FD20602000021
F. CONTRACTOR
IEI
1. DATA ITEM NO.
A006
2. TITLE OF DATA ITEM
Item Unique Identification (IUID) Marking Activity, Validation and Verification Report
3. SUBTITLE
N/A
4. AUTHORITY
DI-MGMT-81804
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS Para 4.3.2.2
6. REQUIRING OFFICE
407 SCMS/GULB
7. DD 250 REQ
LT
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
See Block 16
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Ellis, Jonathan ANAME: 29 JUL 2019DATE:
Block 7: The Government will accept the IUID Marking Activity, Validation/Verification Report through WAWF. The contractor shall submit the IUID Marking Activity, Validation/Verification Report upon final submission to DODAAC FB2065, Attention: andrew.lobo.2@us.af.mil (PM) to account for data previously submitted by letters of transmittal. The Government will approve/disapprove the IUID Marking Plan in WAWF within 30 calendar days after receipt.
Block 10-13: The contractor shall submit a complete IUID Marking Activity, Validation/Verification Report within 240 calendar days after contract award. The Government will approve/disapprove the IUID Marking Activity, Validation/Verification Report, and notify the contractor within 10 calendar days of receipt. If rejected, the contractor shall have 10 calendar days to correct any error and return a corrected IUID Marking Activity, Validation and Verification Report to the Government for review.
Block 14: Document submission shall be provided electronically in Portable Document Format (PDF) to the points of contact (POCs) listed below. Changes to the POC Distribution List shall be made by a letter from the Procurement Contracting Officer (PCO) or the Administrative Contracting Officer (ACO) without further revision to this Contract Data Requirements List (CDRL).
CDRL POC Distribution List:
Lt. Andrew Lobo 407 SCMS/ GULBA, Logistics Manager andrew.lobo.2@us.af.mil Jonathan Ellis 407 SCMS/GUEAE, Electronics Engineer jonathan.ellis.6@us.af.mil
Rogers, Tiffany SNAME: 05 JUN 2019DATE:
NOTE: Changes to office symbols and/or e-mail addresses, when necessary shall be made by letter through the Government CO/ACO without further revision to this CDRL.
Block 4: IUID Marking Activity and Verification Report can be combined with the monthly status report.
Block 9: Distribution authorized to U.S. Government agencies only. Other requests for this document shall be referred to
407 SCMS/GULB.
Block 11: As of the last day of the previous month
Block 12: Due no later than 15 days after the end of the monthly repair period
Block 13: Monthly
Block 7, 14: Forward one electronic copy in PDF format to the following email address:
Program Manager: Lt. Andrew Lobo (E-mail: andrew.lobo.2@us.af.mil) Engineer: Jonathan Ellis (E-mail: jonathan.ellis.6@us.af.mil)
COORDINATORS:
15. TOTAL
G. PREPARED BY
Adams, Andrew C
407 SCMS / GUBA
478-327-5034
H. DATE
19 SEP 2019
I. APPROVED BY
//DIGITALLY SIGNED//
LOBO.ANDREW.D.1530365774
407 SCMS / GULB 478-926-3668 / 468-3668
J. DATE
19 SEP 2019
Page 6 of 11DD FORM 1423-1, FEB 2001 Version 2Generated by PRPS using Jasper Reports on 24 Sep 2019
A. CONTRACT LINE ITEM NO.
B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
APQ-166
E. CONTRACT / PR NO.
FD20602000021
F. CONTRACTOR
IEI
1. DATA ITEM NO.
A007
2. TITLE OF DATA ITEM
Counterfeit Prevention Plan
3. SUBTITLE
N/A
4. AUTHORITY
DI-MISC-81832
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS Para 4.6
6. REQUIRING OFFICE
407 SCMS/GULB
7. DD 250 REQ
DD
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
See Block 16
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Ellis, Jonathan ANAME: 29 JUL 2019DATE:
Block 7: The Government will accept the Counterfeit Prevention Plan through WAWF. The contractor shall submit the Counterfeit Prevention Plan upon final submission to DODAAC FB2065, Attention: andrew.lobo.2@us.af.mil (PM) to account for data previously submitted by letters of transmittal. The Government will approve/disapprove the Counterfeit Prevention Plan in WAWF within 30 calendar days after receipt.
Block 10-13: The contractor shall submit a complete Counterfeit Prevention Plan within 30 calendar days after contract award. The Government will approve/disapprove, and notify the contractor within 10 calendar days of receipt. If disapprove, the contractor shall have 10 calendar days to correct any error and return a corrected Counterfeit Prevention Plan to the Government for review.
Block 14: Document submission shall be provided electronically in Portable Document Format (PDF) to the points of contact (POCs) listed below. Changes to the POC Distribution List shall be made by a letter from the Procurement Contracting Officer (PCO) or the Administrative Contracting Officer (ACO) without further revision to this Contract Data Requirements List (CDRL).
CDRL POC Distribution List:
Lt. Andrew Lobo 407 SCMS/ GULBA, Logistics Manager andrew.lobo.2@us.af.mil Jonathan Ellis 407 SCMS/GUEAE, Electronics Engineer jonathan.ellis.6@us.af.mil
Rogers, Tiffany SNAME: 05 JUN 2019DATE:
NOTE: Changes to office symbols and/or e-mail addresses, when necessary shall be made by letter through the Government CO/ACO without further revision to this CDRL.
Block 7: The Government will accept the receiving report through WAWF. The contractor shall submit the receiving report upon final submission to DODAAC FB2065, Attention: andrew.lobo.2@us.af.mil (Program Manager) to account for data previously submitted by letters of transmittal. The Government will approve/disapprove within 30 calendar days after receipt.
Block 9: Distribution authorized to U.S. Government agencies only. Other requests for this document shall be referred to
407 SCMS/GULB.
Block 10-13: The contractor shall submit a complete Counterfeit Prevention Plan within 30 calendar days after contract award. The Government will review and determine acceptance or rejection and notify contractor within 10 calendar days of receipt. If rejected, the contractor shall have 10 calendar days to correct any error and return a corrected Counterfeit Prevention Plan to the Government for review.
Block 14: Forward one electronic copy in PDF format to the following email address:
Engineer: Jonathan Ellis (E-mail: jonathan.ellis.6@us.af.mil)
COORDINATORS:
15. TOTAL
G. PREPARED BY
Adams, Andrew C
407 SCMS / GUBA
478-327-5034
H. DATE
19 SEP 2019
I. APPROVED BY
//DIGITALLY SIGNED//
LOBO.ANDREW.D.1530365774
407 SCMS / GULB 478-926-3668 / 468-3668
J. DATE
19 SEP 2019
Page 7 of 11DD FORM 1423-1, FEB 2001 Version 2Generated by PRPS using Jasper Reports on 24 Sep 2019
A. CONTRACT LINE ITEM NO.
B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
APQ-166
E. CONTRACT / PR NO.
FD20602000021
F. CONTRACTOR
IEI
1. DATA ITEM NO.
A008
2. TITLE OF DATA ITEM
Contractor's Progress, Status, and Management Report
3. SUBTITLE
N/A
4. AUTHORITY
DI-MGMT-80227
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS Para 5.11
6. REQUIRING OFFICE
407 SCMS/GULB
7. DD 250 REQ
LT
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
B
10. FREQUENCY
QRTLY
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Rogers, Tiffany SNAME: 05 JUN 2019DATE:
NOTE: Changes to office symbols and/or e-mail addresses, when necessary shall be made by letter through the Government CO/ACO without further revision to this CDRL.
Block 9: Distribution authorized to U.S. Government agencies only. Other requests for this document shall be referred to
407 SCMS/GULB.
Block 12: 30 days after contract award
Block 13: Quarterly; prior to the 5th working day of January (OCT-DEC data), April (JAN-MAR data), July (APR-JUN data), and October (JUL-SEP data).
Block 14: Forward one electronic copy in PDF format to the following email address:
Program Manager: Lt. Andrew Lobo (E-mail: andrew.lobo.2@us.af.mil) Production Management Specialist (PMS): Tiffany Rogers (E-mail: tiffany.rogers.8@us.af.mil) Item Management Specialist (IM): Jonathan Martin (E-mail: jonathan.martin.21@us.af.mil)
COORDINATORS:
15. TOTAL
G. PREPARED BY
Adams, Andrew C
407 SCMS / GUBA
478-327-5034
H. DATE
19 SEP 2019
I. APPROVED BY
//DIGITALLY SIGNED//
LOBO.ANDREW.D.1530365774
407 SCMS / GULB 478-926-3668 / 468-3668
J. DATE
19 SEP 2019
Page 8 of 11DD FORM 1423-1, FEB 2001 Version 2Generated by PRPS using Jasper Reports on 24 Sep 2019
A. CONTRACT LINE ITEM NO.
B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
APQ-166
E. CONTRACT / PR NO.
FD20602000021
F. CONTRACTOR
IEI
1. DATA ITEM NO.
A009
2. TITLE OF DATA ITEM
Quality Program Plan
3. SUBTITLE
N/A
4. AUTHORITY
DI-QCIC-81722
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS Para 5.9
6. REQUIRING OFFICE
407 SCMS/GULB
7. DD 250 REQ
DD
8. APP CODE
A
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ONE/R
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Ellis, Jonathan ANAME: 29 JUL 2019DATE:
Block 10-13: The contractor shall submit the document within 30 calendar days after contract award. The Government will approve/disapprove the document and notify the contractor within 10 calendar days of receipt. If disapprove, the contractor shall have 10 calendar days to modify the document and return it to the Government for review.
Block 14: Document submission shall be provided electronically in Portable Document Format (PDF) to the points of contact (POCs) listed below. Changes to the POC Distribution List shall be made by a letter from the Procurement Contracting Officer (PCO) or the Administrative Contracting Officer (ACO) without further revision to this Contract Data Requirements List (CDRL).
CDRL POC Distribution List:
Lt. Andrew Lobo 407 SCMS/ GULBA, Logistics Manager andrew.lobo.2@us.af.mil Jonathan Ellis 407 SCMS/GUEAE, Electronics Engineer jonathan.ellis.6@us.af.mil
Rogers, Tiffany SNAME: 05 JUN 2019DATE:
NOTE: Changes to office symbols and/or e-mail addresses, when necessary shall be made by letter through the Government CO/ACO without further revision to this CDRL.
Block 4: Contractor format acceptable.
Block 9: Distribution authorized to the Department of Defense and U.S. DoD contractors only for Administrative and Operational use, 4 June 2019. Other requests for this document shall be referred to the Program Manager Russ Edge, 409
SCMS/GULB
Block 10-13: One submission is required for contract. The government will have 30 calendar days to review and provide comments, subsequently the contractor will have 60 calendar days to correct and resubmit.
Block 7, 14: Forward one electronic copy in PDF format to the following email address:
Program Manager: Lt. Andrew Lobo (E-mail: andrew.lobo.2@us.af.mil) Engineer: Jonathan Ellis (E-mail: jonathan.ellis.6@us.af.mil)
COORDINATORS:
15. TOTAL
G. PREPARED BY
Adams, Andrew C
407 SCMS / GUBA
478-327-5034
H. DATE
19 SEP 2019
I. APPROVED BY
//DIGITALLY SIGNED//
LOBO.ANDREW.D.1530365774
407 SCMS / GULB 478-926-3668 / 468-3668
J. DATE
19 SEP 2019
Page 9 of 11DD FORM 1423-1, FEB 2001 Version 2Generated by PRPS using Jasper Reports on 24 Sep 2019
A. CONTRACT LINE ITEM NO.
B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
APQ-166
E. CONTRACT / PR NO.
FD20602000021
F. CONTRACTOR
IEI
1. DATA ITEM NO.
A010
2. TITLE OF DATA ITEM
Engineering Change Proposal (ECP)
3. SUBTITLE
N/A
4. AUTHORITY
DI-CMAN-80639C
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS Para 4.12.1
6. REQUIRING OFFICE
407 SCMS/GUEAE
7. DD 250 REQ
DD
8. APP CODE
A
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
See Block 16
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Ellis, Jonathan ANAME: 08 AUG 2019DATE:
Block 10-13: The contractor shall submit the Engineering Change Proposal (ECP) as needed. The Government will approve/disapprove the document and notify the contractor within 10 calendar days of receipt. If disapproved, the contractor shall have 10 calendar days to modify the document and return it to the Government for review.
Block 14: Document submission shall be provided electronically in Portable Document Format (PDF) to the points of contact (POCs) listed below. Changes to the POC Distribution List shall be made by a letter from the Procurement Contracting Officer (PCO) or the Administrative Contracting Officer (ACO) without further revision to this Contract Data Requirements List (CDRL).
CDRL POC Distribution List:
Lt. Andrew Lobo 407 SCMS/ GULBA, Logistics Manager andrew.lobo.2@us.af.mil Jonathan Ellis 407 SCMS/GUEAE, Electronics Engineer jonathan.ellis.6@us.af.mil
Rogers, Tiffany SNAME: 08 AUG 2019DATE:
NOTE: Changes to office symbols and/or e-mail addresses, when necessary shall be made by letter through the Government CO/ACO without further revision to this CDRL.
Block 7: The Government will accept the receiving report through WAWF. The contractor shall submit the receiving report upon final submission to DODAAC FB2065, Attention: andrew.lobo.2@us.af.mil (Program Manager) to account for data previously submitted by letters of transmittal. The Government will approve/disapprove within 30 calendar days after receipt.
Block 9: DISTRIBUTATION STATEMENT "B": Distribution authorized to U.S. Government agencies only for Administrative or Operational Use, 8 AUG 2019. Other requests for this document shall be referred to 407
SCMS/GULB.
Block 10, 11, 12, 13: As required, upon each occurrence.
Block 14: Document submission shall be provided electronically in Portable Document Format (PDF) to the points of contact (POCs) listed below:
Lt. Andrew Lobo 407 SCMS/ GULBA, Logistics Manager andrew.lobo.2@us.af.mil Jonathan Ellis 407 SCMS/GUEAE, Electronics Engineer jonathan.ellis.6@us.af.mil
407 SCMS/GUEAE
235 Byron St. Ste. 19A Robins AFB, GA 31098
COORDINATORS:
407 SCMS/GUEAE
235 Byron St. Ste. 19A Robins AFB, GA 31098
1 1 0
1 1 015. TOTAL
Page 10 of 11DD FORM 1423-1, FEB 2001 Version 2Generated by PRPS using Jasper Reports on 24 Sep 2019
G. PREPARED BY
Adams, Andrew C
407 SCMS / GUBA
478-327-5034
H. DATE
19 SEP 2019
I. APPROVED BY
//DIGITALLY SIGNED//
LOBO.ANDREW.D.1530365774
407 SCMS / GULB 478-926-3668 / 468-3668
J. DATE
19 SEP 2019
Page 11 of 11DD FORM 1423-1, FEB 2001 Version 2Generated by PRPS using Jasper Reports on 24 Sep 2019
File details come from the government source that posted it.