About this file

CDRL_A001

View the file

Other files for this federal contract opportunity

Other files attached to Repair Services in support of Traffic Collision Avoidance System (TCAS), newest first.
File Type Posted
PWS.pdf PDF
158.pdf PDF
Pre_Qual.pdf PDF
AppxC.pdf PDF
DD1423_A004.pdf PDF
DD1423_A003.pdf PDF
FA853912R01236.pdf PDF
Wages.pdf PDF
1653.pdf PDF
DD1423_A002.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of11 2

FD20601201236

Rockwell CollinsTCAS

A001

CONTRACT DATA REQUIREMENTS LIST Form Approved

OMB NO.0704-D188

(1 Data Item)

Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. Contract Line Item No.: B. Exhibit: C. Category:

TDP TM OTHER X

D. System/Item: E. Contract/Pr No.: F. Contractor:

1. Data Item No.: 2. Title of Data Item: 3. Subtitle:

Commercial Asset Visibility Air Force CAVAF

4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:

DI-MGMT-81634B PWS Paragraph 3.2 FA8539

7. DD250 Req: 9. Dist.Statement Required:

10. Frequency: 12. Date of First Submission:

14. Distribution:

LT

8. APP Code:

N/A A

11. As of Date: 13. Date of Subsequent Submission:

See Block 16

See Block 16

See Block 16

a. Addressee:

b. Copies:

Final

Draft Reg Repro See Block 16

16. Remarks:

NAME:

NAME:

Allred, Donna E

Branham, Douglas W

DATE:

DATE:

28 NOV 2012

23 MAR 2012

1. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF web site or CICA XML IAW the referenced DID IAW and/or CAV AF CFM SOW. This information will be accessed by the program office PMS and by 406 SCMS/GUMAAB in order to ascertain production status.

2. Transactions and data will be submitted by the contractor daily IAW CAV AF User Guide, Version 8.0 or higher. The Contractor shall obtain a valid DoD PKI certificate to log into CAV AF.

Each user shall be required to have an Identity Certificate only; an encryption certificate is not required.

3. Training will be provided by 406 SCMS/GUMAAB, (478) 327-6602 or 327-6603.

4. This DD Form 1423-1 applies to Contractor Furnished Material (CFM) type contracts.

Block 10:

a. Contractor reporting requirements to CAV AF shall be accomplished daily and/or within 24 hrs of a supply or maintenance action occurrence IAW Contractor Users Guide.

b. The method of communication from the contractor to the Air Logistics Center (ALC) will be mechanized using the CAV AF Online web site IAW CAV AF Contractor Users Guide.

Block 11: Data shall be current within 24 hours of last End Item maintenance occurrence.

Block 12: Date of first submission shall be within 24 hours following a supply or maintenance transaction after the contract award date and government training as specified in IAW CAV AF Users Guide.

Block 13: Same as remarks regarding Block 10 above.

1. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF web site or CICA XML IAW the referenced DID IAW and/or CAV AF CFM SOW. This information will be accessed by the program office PMS and by 406 SCMS/GUMAAB in order to ascertain production status.

DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of21 2

FD20601201236

Rockwell CollinsTCAS

CONTRACT DATA REQUIREMENTS LIST Form Approved

OMB NO.0704-D188

(1 Data Item)

Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. Contract Line Item No.: B. Exhibit: C. Category:

TDP TM OTHER X

D. System/Item: E. Contract/Pr No.: F. Contractor:

G. Prepared By: H. Date I. Approved By: J. Date:

16. Remarks:

2. Transactions and data will be submitted by the contractor daily IAW CAV AF User Guide, Version 8.0 or higher. The Contractor shall obtain a valid DoD PKI certificate to log into CAV AF.

Each user shall be required to have an Identity Certificate only; an encryption certificate is not required.

3. Training will be provided by 406 SCMS/GUMAAB, (478) 327-6602 or 327-6603.

4. This DD Form 1423-1 applies to Contractor Furnished Material (CFM) type contracts.

Block 10:

a. Contractor reporting requirements to CAV AF shall be accomplished daily and/or within 24 hrs of a supply or maintenance action occurrence IAW Contractor Users Guide.

b. The method of communication from the contractor to the Air Logistics Center (ALC) will be mechanized using the CAV AF Online web site IAW CAV AF Contractor Users Guide.

Block 11: Data shall be current within 24 hours of last End Item maintenance occurrence.

Block 12: Date of first submission shall be within 24 hours following a supply or maintenance transaction after the contract award date and government training as specified in IAW CAV AF Users Guide.

Block 13: Same as remarks regarding Block 10 above.

Lamb, Emory J

407 SCMS / GULB

478-926-0127

30 NOV 2012 //DIGITALLY SIGNED//

COORDINATORS:

407 SCMS / GULBC

SILLENCE.NICOLLE.M.1228987545

478-926-7824 / 468-7824

30 NOV 2012

File details come from the government source that posted it. Updated .