Attachment 3 - Contract Data Requirements List.pdf

PDF 448 KB Posted

Attached to
Solicitation Notice: Repair of the F-15 Digital Mapping System (DMS) Advanced Display Core Processor (ADCP)
Solicitation number
FA853827RB004
Issued by

About this file

This document is a Contract Data Requirements List (DD Form 1423, FEB 2024) for contract FD2060-25-00023 between the federal government (409 SCMS as the requiring office) and Honeywell for F-15 DMS and ADCP support and maintenance services. The CDRL specifies eleven distinct data deliverables required throughout the contract period, each with specific submission frequencies, formats, and distribution requirements.

The key deliverables include: (1) Monthly Status Reports due every 30 days beginning 30 days post-award, documenting UUT repairs, STE status, data deliverables, contract issues, and expenditure data; (2) Meeting Minutes submitted within 10 days following semi-annual Program Management Reviews; (3) Depot Maintenance Workload 50/50 Reports submitted annually; (4) SURGE Production Plan due as part of initial proposal and finalized within 30 days post-award; (5) Engineering Change Proposals submitted as-required in DD Form 1692 format; (6) Risk Management Framework Package due 60 days after award; (7) Item Unique IUID Marking Plan due within 60 days of contract receipt; (8) Obsolescence Alert Notices submitted within 5 days of discovery; (9) Accident/Incident Reports due within 24 hours of a serious mishap; (10) Environmental, Safety and Occupational Health Plan due within 10 working days post-award; and (11) Quality Program Plan submitted after award. All submissions must be made electronically to designated Program Manager, Engineer, and Contracting Officer points of contact. Distribution is authorized to Department of Defense and U.S. DoD contractors only for most deliverables. The form is marked UNCLASSIFIED and was prepared and approved by Kirsta OHern and David Amely Thomas on August 13, 2026.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNCLASSIFIED

DD FORM 1423, FEB 2024 UNCLASSIFIED

PREVIOUS EDITION MAY BE USED.

CONTRACT DATA REQUIREMENTS LIST

A. CONTRACT LINE ITEM NO.

0012-4012

B. EXHIBIT

A/B/C/D/E

C. CATEGORY:

TDP TM OTHER X

D. SYSTEM/ITEM

F-15 DMS and ADCP

E. CONTRACT/PR NO.

FD2060-25-00023

F. CONTRACTOR

Honeywell

1. DATA ITEM NO.

A001-E001

2. TITLE OF DATA ITEM

Monthly Status Report

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-80368A

5. CONTRACT REFERENCE

PWS 4.2.3

6. REQUIRING OFFICE

409 SCMS

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

Monthly

12. DATE OF FIRST SUBMISSION

S ee block 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

See block 16

13. DATE OF SUBSEQUENT

SUBMISSION

Every 30 days

Draft

Final

Reg Repro

16. REMARKS

Name: Kirsta OHern Date:

Format. Contractor format, compatible with government applications, is acceptable

Blk. 4: Reports shall cover the support provided by the Contractor during the last monthly period. The report shall document the status of UUT repairs, status of the STE and any other status that could affect this effort. The report should also include data deliverables, contract issues/actions and expenditure data, as well as anticipated task requirements during the next reporting period.

Blk. 10- 13: Report due 30 days post award and every 30 days thereafter.

Block 14: Submissions shall be made electronically to the PM and PCO. Contractor shall request point of contracts (POC) names and e-mails addresses prior to submission.

PM 1 1

PCO 1 1

15.TOTAL 2 2

G. PREPARED BY

LMS: Kirsta OHern

H. SIGNATURE

OHERN.KIRSTA.G Digitally signed by

OHERN.KIRSTA.G.1243843878

.1243843878 Date: 2026.08.13 11:12:16 -04'00'

I. APPROVED BY J. SIGNATURE

Digitally signed by

AMELY.THOMAS.DAVID.10256658

Date: 2026.08.13 12:00:07 -04'00'

0012-4012

B. EXHIBIT

A/B/C/D/E

C. CATEGORY:

TDP TM OTHER X

D. SYSTEM/ITEM

F-15 DMS and ADCP

E. CONTRACT/PR NO.

FD2060-25-00023

F. CONTRACTOR

Honeywell

1. DATA ITEM NO.

A002-E002

2. TITLE OF DATA ITEM

Meeting Minutes

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-ADMIN-81250C

5. CONTRACT REFERENCE

PWS 4.3.2

6. REQUIRING OFFICE

409 SCMS

7. DD 250 REQ

LT

See Block 16

See Block 16

12. DATE OF FIRST SUBMISSION

See block 16

8. APP CODE

A

11. AS OF DATE

See block 16

13. DATE OF SUBSEQUENT

Reg Repro

16. REMARKS

Name: Kirsta OHern Date:

Format. Contractor format, compatible with government applications, is acceptable

Block 9: Approval for public release: distribution unlimited

Block 10-13: Program Management Reviews (PMR's) shall occur semi-annually. The contractor shall submit Meeting Minutes within 10 days following PMR.

Block 14b: Submissions shall be made electronically to the PM,Engineer and PCO. Contractor shall request point of contracts (POC) names and e-mails addresses prior to submission.

Program Mananger 1 Engineer 1 Contracting Officer 1

15.TOTAL 3

LMS: Kirsta OHern

H. SIGNATURE

OHERN.KIRSTA. Digitally signed by

OHERN.KIRSTA.G.1243843878

G.1243843878 Date: 2026.08.13 11:12:38 -04'00'

I. APPROVED BY J. SIGNATURE

Digitally signed by

AMELY.THOMAS.DAVID.10256658

Date: 2026.08.13 12:00:36 -04'00'

0012-4012

B. EXHIBIT

A/B/C/D/E

C. CATEGORY:

TDP TM OTHER X

D. SYSTEM/ITEM

F-15 DMS and ADCP

E. CONTRACT/PR NO.

FD2060-25-00023

F. CONTRACTOR

Honeywell

1. DATA ITEM NO.

A003-E003

2. TITLE OF DATA ITEM

Depot Maintenance Workload 50/50 Report

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-81749B

5. CONTRACT REFERENCE

PWS Reference 4.3.4

6. REQUIRING OFFICE

409 SCMS

7. DD 250 REQ

LT

See block 16

12. DATE OF FIRST SUBMISSION

8. APP CODE

A

11. AS OF DATE

See block 16

13. DATE OF SUBSEQUENT

Reg Repro

16. REMARKS

Name: Kirsta OHern Date:

Format. Contractor format, compatible with government applications, is acceptable. The 50/50 Report shall include all costs required under the contract to include work performed by government personnel.

Block 9: Distribution authorized to Department of Defense and U.S DoD contractors only (Administrative or Operational Use, 28 August 2020)

Block 10-13: 50/50 Report shall be submitted annually while the contract is active.

Block 14: Submissions shall be made electronically to the PM, Engineer and PCO. Contractor shall request point of contracts (POC) names and e-mails addresses prior to submission.

Program Mananger 1

LMS: Kirsta OHern

H. SIGNATURE

OHERN.KIRSTA.G.12 Digitally signed by

OHERN.KIRSTA.G.1243843878

43843878 Date: 2026.08.13 11:12:52 -04'00'

I. APPROVED BY J. SIGNATURE

Digitally signed by

AMELY.THOMAS.DAVID.1025665

Date: 2026.08.13 12:01:15 -04'00'

B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER X

D. SYSTEM/ITEM

F-15 DMS and ADCP

E. CONTRACT/PR NO.

FD2060-25-00023

F. CONTRACTOR

Honeywell

1. DATA ITEM NO.

A004

2. TITLE OF DATA ITEM

SURGE Production Plan

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-80969A

5. CONTRACT REFERENCE

PWS Reference 4.5.3.2

6. REQUIRING OFFICE

409 SCMS

7. DD 250 REQ

LT

See block 16

12. DATE OF FIRST SUBMISSION

8. APP CODE

A

11. AS OF DATE

See block 16

13. DATE OF SUBSEQUENT

Reg Repro

16. REMARKS

Name: Kirsta OHern Date:

Format. Contractor format, compatible with government applications, is acceptable. The SURGE Plan shall include:

1. Maximum Rate of Production

2. List of Items

3. Contract Number

4. Impact Of surging on other Goverment contracts

5. Identify additional Labor requirements

Block 9: Distribution authorized to Department of Defense and U.S DoD contractors only (Administrative or Operational Use, 28 August 2020)

Block 10-13: Surge Production Plan initial submission is due as a part of the contractor's proposal to allow for negotiation of pre-priced Surge Option repair CLINs. The finalized report shall be submitted no more than 30 days post award.

Block 14: Submissions shall be made electronically to the PM and PCO. Contractor shall request point of contracts (POC) names and e-mails addresses prior to submission.

Program Mananger 1

15.TOTAL 2

LMS: Kirsta OHern

H. SIGNATURE

OHERN.KIRSTA. Digitally signed by

OHERN.KIRSTA.G.1243843878

G.1243843878 Date: 2026.08.13 11:13:05 -04'00'

I. APPROVED BY J. SIGNATURE

Digitally signed by

AMELY.THOMAS.DAVID.1025665

Date: 2026.08.13 12:01:55 -04'00'

0012-4012

B. EXHIBIT

A/B/C/D/E

C. CATEGORY:

TDP TM OTHER X

D. SYSTEM/ITEM

F-15 DMS and ADCP

E. CONTRACT/PR NO.

FD2060-25-00023

F. CONTRACTOR

Honeywell

1. DATA ITEM NO.

A005-E005

2. TITLE OF DATA ITEM

Engineering Change Proposal

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-80639E

5. CONTRACT REFERENCE

PWS Reference 4.6.1

6. REQUIRING OFFICE

409 SCMS

7. DD 250 REQ

LT

ASREQ

12. DATE OF FIRST SUBMISSION

ASREQ

8. APP CODE

N/A

11. AS OF DATE

ASREQ

13. DATE OF SUBSEQUENT

Reg Repro

16. REMARKS

Name: Kirsta OHern Date:

Format. Contractor format, compatible with government applications, is acceptable but must contain all information required by DD form 1692. An electronic version of DD Form 1692, Engineering Change Proposal (ECP), is available online at https://www.esd.whs.mil/dd/.

Block 9: Distribution authorized to Department of Defense and U.S DoD contractors only (Administrative or Operational Use, 28 August 2020)

Block 14b: Submissions shall be made electronically to the PM,Engineer and PCO. Contractor shall request point of contracts (POC) names and e-mails addresses prior to submission.

PM 1

PCO 1

LMS: Kirsta OHern

H. SIGNATURE

OHERN.KIRSTA.G Digitally signed by

OHERN.KIRSTA.G.1243843878

.1243843878 Date: 2026.08.13 11:13:18 -04'00'

I. APPROVED BY J. SIGNATURE

Digitally signed by

AMELY.THOMAS.DAVID.1025665

Date: 2026.08.13 12:02:31 -04'00' https://www.esd.whs.mil/dd/

0012-4012

B. EXHIBIT

A/B/C/D/E

C. CATEGORY:

TDP TM OTHER X

D. SYSTEM/ITEM

F-15 DMS and ADCP

E. CONTRACT/PR NO.

FD2060-25-00023

F. CONTRACTOR

Honeywell

1. DATA ITEM NO.

A006-E006

2. TITLE OF DATA ITEM

Risk Management Framework Package

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-82001A

5. CONTRACT REFERENCE

PWS Reference 4.6.2.1

6. REQUIRING OFFICE

409 SCMS

7. DD 250 REQ

DD

See block 16

12. DATE OF FIRST SUBMISSION

60 DAC

8. APP CODE

A

11. AS OF DATE

See block 16

13. DATE OF SUBSEQUENT

Reg Repro

16. REMARKS

Name: Kirsta OHern Date:

Format. The RMF package artifacts shall be delivered in a format approved by the Government’s Authorizing Official (AO) or Information Systems Security Manager (ISSM). The RMF package artifacts shall contain the necessary artifacts required by the AO, or ISSM to successfully achieve Platform IT (PIT) Designation, Platform IT Risk Approval (PRA), Interim Authority to Test (IATT), or Authority to Operate

(ATO).

Block 9: Distribution authorized to Department of Defense and U.S DoD contractors only (Administrative or Operational Use, 28 August 2020)

Block 10-13: The contractor shall develop a Risk Management Framework plan 60 days after contract award delineating how they will continuously monitor and manage risk throughout the period of performance and submit for Government approval. The Government will provide comments/concurrence with 20 days of receipt. Once Government comments are received the contractor shall submit a revised report within 15 days.

Block 14: Submissions shall be made electronically to the information System Security manager, Program manager, Engineer. Contractor shall request point of contact names and email addresses prior to submission.

ISSM 1 1 0

PM 1 1 0

Eng 1 1 0

15.TOTAL

LMS: Kirsta OHern

H. SIGNATURE

OHERN.KIRSTA. Digitally signed by

OHERN.KIRSTA.G.1243843878

G.1243843878 Date: 2026.08.13 11:13:35 -04'00'

I. APPROVED BY J. SIGNATURE

Digitally signed by

AMELY.THOMAS.DAVID.1025665

Date: 2026.08.13 12:03:10 -04'00

0012-4012

B. EXHIBIT

A/B/C/D/E

C. CATEGORY:

TDP TM OTHER X

D. SYSTEM/ITEM

F-15 DMS and ADCP

E. CONTRACT/PR NO.

FD2060-25-00023

F. CONTRACTOR

Honeywell

1. DATA ITEM NO.

A007-E007

2. TITLE OF DATA ITEM

Item Unique IUID Marking Plan

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-81803A

5. CONTRACT REFERENCE

PWS Reference 4.8.1

6. REQUIRING OFFICE

409 SCMS

7. DD 250 REQ

DD

See block 16

12. DATE OF FIRST SUBMISSION

8. APP CODE

A

11. AS OF DATE

See block 16

13. DATE OF SUBSEQUENT

Reg Repro

16. REMARKS

Name: Kirsta OHern Date:

Format. Contractor format is acceptable.

Block 7: WAWF accepter: The Government will accept the receiving report through WAWF. The contractor shall submit the receiving report upon final submission to DODAAC FA8538. The Government will indicate approval or disapproval through WAWF within 60 days of submittal.

Block 9: Distribution authorized to Department of Defense and U.S DoD contractors only (Administrative or Operational Use, 28 August 2020)

Block 10-13: One time report shall be provided within 60 days after receipt of contract and after receipt of this CDRL

Block 14: Submissions shall be made electronically to the PM and PCO. Contractor shall request point of contracts (POC) names and e-mails addresses prior to submission.

PM 1

LMS: Kirsta OHern

H. SIGNATURE

OHERN.KIRSTA Digitally signed by

OHERN.KIRSTA.G.1243843878

.G.1243843878 Date: 2026.08.13 11:13:50 -04'00'

I. APPROVED BY J. SIGNATURE

Digitally signed by

AMELY.THOMAS.DAVID.102566

Date: 2026.08.13 12:03:46 -04'00

0012-4012

B. EXHIBIT

A/B/C/D/E

C. CATEGORY:

TDP TM OTHER X

D. SYSTEM/ITEM

F-15 DMS and ADCP

E. CONTRACT/PR NO.

FD2060-25-00023

F. CONTRACTOR

Honeywell

1. DATA ITEM NO.

A008-E008

2. TITLE OF DATA ITEM

Obsolescence Alert Notice

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-81941

5. CONTRACT REFERENCE

PWS Reference 4.16.2, 4.16.3

6. REQUIRING OFFICE

409 SCMS

7. DD 250 REQ

LT

ASREQ

12. DATE OF FIRST SUBMISSION

8. APP CODE

N/A

11. AS OF DATE

See block 16

13. DATE OF SUBSEQUENT

Reg Repro

16. REMARKS

Name: Kirsta OHern Date:

Format. Contractor format, compatible with government applications, is acceptable

Block 9: Distribution authorized to Department of Defense and U.S DoD contractors only (Administrative or Operational Use, 28 August 2020)

Block 10-13: The Contractor will notify the Government of the DMS issue within five (5) days of discovery and will provide a resolution plan for approval via email.

Block 14: Submissions shall be made electronically to the PM, Engineer and PCO. Contractor shall request point of contracts (POC) names and e-mails addresses prior to submission.

PM 1 1

PCO 1 1

15.TOTAL 3 2

LMS: Kirsta OHern

H. SIGNATURE

OHERN.KIRSTA Digitally signed by

OHERN.KIRSTA.G.1243843878

.G.1243843878 Date: 2026.08.13 11:14:11 -04'00'

I. APPROVED BY J. SIGNATURE

Digitally signed by

AMELY.THOMAS.DAVID.10256658

Date: 2026.08.13 12:04:36 -04'00'

0012-4012

B. EXHIBIT

A/B/C/D/E

C. CATEGORY:

TDP TM OTHER X

D. SYSTEM/ITEM

F-15 DMS and ADCP

E. CONTRACT/PR NO.

FD2060-25-00023

F. CONTRACTOR

Honeywell

1. DATA ITEM NO.

A009-E009

2. TITLE OF DATA ITEM

Accident Incident Report

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-SAFT-81563

5. CONTRACT REFERENCE

PWS Reference 5.5.2

6. REQUIRING OFFICE

409 SCMS

7. DD 250 REQ

DD

ASREQ

12. DATE OF FIRST SUBMISSION

8. APP CODE

A

11. AS OF DATE

See block 16

13. DATE OF SUBSEQUENT

Reg Repro

16. REMARKS

Name: Kirsta OHern Date:

Format. Contractor format, compatible with government applications, is acceptable

Block 9: Distribution authorized to Department of Defense and U.S DoD contractors only (Administrative or Operational Use, 28 August 2020)

Block 10-13: Report within 4 business hours serious accident or incident (i.e. explosion, fire, flood, pressure rupture, major malfunction) which will adversely affect capability to meet contractual obligations. The report shall be made within 24 hrs of mishap.

Block 14: Submissions shall be made electronically to the PM, PCO. Contractor shall request point of contracts (POC) names and e-mails addresses prior to submission.

PM 1

LMS: Kirsta OHern

H. SIGNATURE

OHERN.KIRSTA. Digitally signed by

OHERN.KIRSTA.G.1243843878

G.1243843878 Date: 2026.08.13 11:14:31 -04'00'

I. APPROVED BY J. SIGNATURE

Digitally signed by

AMELY.THOMAS.DAVID.10256658

Date: 2026.08.13 12:05:16 -04'00'

0012-4012

B. EXHIBIT

A/B/C/D/E

C. CATEGORY:

TDP TM OTHER X

D. SYSTEM/ITEM

F-15 DMS and ADCP

E. CONTRACT/PR NO.

FD2060-25-00023

F. CONTRACTOR

Honeywell

1. DATA ITEM NO.

A00A-E00A

2. TITLE OF DATA ITEM

Environmental, Safety and Occupational Health (ESOH) Plan

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-SAFT-82313

5. CONTRACT REFERENCE

PWS Reference 5.5.3

6. REQUIRING OFFICE

409 SCMS

7. DD 250 REQ

DD

ASREQ

12. DATE OF FIRST SUBMISSION

8. APP CODE

A

11. AS OF DATE

See block 16

13. DATE OF SUBSEQUENT

Reg Repro

16. REMARKS

Name: Kirsta OHern Date:

Format. Contractor format, compatible with government applications, is acceptable. Contractor shall submit a Safety and Health Plan in accordance with the elements listed in Appendix C.

Block 10-13: Block 7: The Government will accept the Receiving Report through WAWF. Contractor shall submit the Receiving Report upon final submission.

Block 8, 10-12: Contractor shall submit a Health and Safety Plan within 10 working days after contract award. Written Government acceptance/comments will be within 10 working days after receipt of data.

Contractor final submission shall be submitted within 10 working days of receiving Government comments.

Acceptance by the Government is required prior to formal distribution.

Block 9: Distribution authorized to the Department of Defense and U.S. DoD contractors only.

Block 11, 13: If, during the performance of this contract, changes to the Safety and Health Plan are required, submit the revised Safety and Health Plan to AFSC/PZAAB and the Safety Office, 78 ABW/SEG.

Procedures identified for Blocks 8, 10-12 will apply.

Block 14: Submissions shall be made electronically to the PM, PCO. Contractor shall request point of contracts (POC) names and e-mails addresses prior to submission.

PM 1 1 0

PCO 1 1 0

78 ABW 1 1

15.TOTAL 3 3

LMS: Kirsta OHern

H. SIGNATURE

OHERN.KIRSTA. Digitally signed by

OHERN.KIRSTA.G.1243843878

G.1243843878 Date: 2026.08.13 11:14:57 -04'00'

I. APPROVED BY J. SIGNATURE

Digitally signed by

AMELY.THOMAS.DAVID.102566

Date: 2026.08.13 12:06:11 -04'00

0012-4012

B. EXHIBIT

A/B/C/D/E

C. CATEGORY:

TDP TM OTHER X

D. SYSTEM/ITEM

F-15 DMS and ADCP

E. CONTRACT/PR NO.

FD2060-25-00023

F. CONTRACTOR

Honeywell

1. DATA ITEM NO.

A00B-E00B

2. TITLE OF DATA ITEM

Quality Program Plan

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-QCIC-81722

5. CONTRACT REFERENCE

PWS Reference 5.9

6. REQUIRING OFFICE

409 SCMS

7. DD 250 REQ

DD

ASREQ

12. DATE OF FIRST SUBMISSION

8. APP CODE

A

11. AS OF DATE

See block 16

13. DATE OF SUBSEQUENT

Reg Repro

16. REMARKS

Name: Kirsta OHern Date:

Format. Contractor format, compatible with government applications, is acceptable.

Block10-13: The Quality Control Plan (QCP) is submitted after award in accordance with the DD1423 and is approved by the Contracting Officer Representative (COR) before any work begins. The Plan shall be comprehensive, detailed, and logical if the contractor's quality control program is to be effective and shall include a site safety checklist when applicable. The Plan shall demonstrate that the contractor has fully considered the specific contract requirements and specified level of quality. If changes to the plan are necessary, the changes must be made and accepted by the Government Contracting Officer, prior to implementation.

Block 14: Submissions shall be made electronically to the PM, PCO. Contractor shall request point of contracts (POC) names and e-mails addresses prior to submission.

PM 1 1 0

PCO 1 1 0

15.TOTAL 2 2

LMS: Kirsta OHern

H. SIGNATURE

OHERN.KIRSTA.G Digitally signed by

OHERN.KIRSTA.G.1243843878

.1243843878 Date: 2026.08.13 11:15:20 -04'00'

I. APPROVED BY J. SIGNATURE

Digitally signed by

AMELY.THOMAS.DAVID.10256658

Date: 2026.08.13 12:07:30 -04'00'

File details come from the government source that posted it. Updated .