Attachment 2 - Quality Assurance Surveillance Plan.pdf

PDF 329 KB Posted

Attached to
Solicitation Notice: Repair of the F-15 Digital Mapping System (DMS) Advanced Display Core Processor (ADCP)
Solicitation number
FA853827RB004
Issued by

About this file

This is a Quality Assurance Surveillance Plan (QASP) for the repair of F-15E Advanced Display Core Processor (ADCP) and Digital Mapping System (DMS) under Purchase Request FD2060-25-00023, dated August 10, 2026. The QASP establishes government procedures for monitoring contractor performance to ensure compliance with contract standards through continuous oversight, including what will be monitored, how monitoring will occur, who conducts monitoring, and documentation methods. The contractor is responsible for delivering repairs that meet contract standards via its Quality Control Plan (QCP), while the government provides surveillance structure through this living document that allows flexibility based on contractor performance.

The QASP identifies six primary performance objectives with corresponding surveillance methods: (1) Quality of repair, requiring assets repaired per TO 00-35D-54 with no more than one failure and four valid Problem/Quality Discrepancy Reports (PQDRs/QDRs) per contract year, monitored weekly by the Contracting Officer's Representative (COR); (2) Delivery of repairs requiring no more than four late deliveries per year with average turnaround time (TAT) of 21 calendar days and 10 business days for surge/MICAP requirements, monitored monthly via LDMS metrics; (3) Quality of Contractor Data Requirements List (CDRL) deliverables limited to one rejection per year, monitored by Multi-Functional Team (MFT) members; (4) Timely receipt of CDRL deliverables with no more than one late submission per year; (5) Adherence to Contractor Quality Management System requiring 100% compliance with QCP submission within 60 days of award; and (6) Timely responses to Requests for Information (RFI) from the Procurement Contracting Officer requiring acknowledgment within two business days and response within 10 business days. All surveillance documentation is maintained in the Procurement Integrated Enterprise Environment (PIEE) through Joint Appointment Module (JAM) and Surveillance and Performance Module (SPM). The plan establishes corrective action procedures progressing from negative COR Status Reports to Corrective Action Reports (CARs), with contractor performance evaluated against five-tier rating scale (Exceptional, Very Good, Satisfactory, Marginal, Unsatisfactory) for Contractor Performance Assessment Reporting System (CPARS) reporting, as the contract exceeds $1,000,000. The MFT meets quarterly to review performance, with positive incentives for exceeding requirements including decreased surveillance and favorable CPARs, and negative incentives including increased surveillance and unfavorable CPARs.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PR: FD2060-25-00023 QASP REVISION: 0 1

Quality Assurance Surveillance Plan for

Repair of the F-15E Advanced Display Core Processor (ADCP) and Digital Mapping

System (DMS)

Purchase Request: FD2060-25-00023

10 August 2026

PR: FD2060-25-00023 QASP REVISION: 0 2

1.0 Purpose

The Quality Assurance Surveillance Plan (QASP) is a government-developed document used to determine if the contractor’s performance meets the performance standards contained in the contract. The QASP establishes procedures on how this assessment/inspection process will be conducted. It provides the details associated with a continuous oversight process, to include:

• What will be monitored

• How monitoring will take place

• Who will conduct the monitoring

• How monitoring efforts and results will be documented

1.1 The contractor is responsible for implementing and delivering performance that meets contract standards using its Quality Control Plan (QCP). The QASP provides the structure for the government’s surveillance of the contractor’s performance and their Quality

Assurance/Quality Control (QA/QC) actions to ensure they meet contract standards. It is the government’s responsibility to be objective, fair and consistent in evaluating contractor performance.

1.2 The QASP is not part of the contract nor is it intended to duplicate the contractor’s QCP.

This QASP is a living document. Flexibility in the QASP is required to allow for an increase or decrease in the level of surveillance necessary based on contractor performance. Copies of the

QASP and any revisions may be provided to the contractor to facilitate open communication. In addition, the QASP should recognize and accommodate unforeseen or uncontrollable circumstances which might occur that are outside the control of the contractor/subcontractor.

The QASP should ensure early identification and resolution of performance issues to minimize impact on mission performance.

1.3 Objective(s)

This QASP describes the services required to continue the Depot Avionics Partnering for

Honeywell and the USAF to combine their resources to provide superior support for the ADCP and DMS to the F-15E War Fighter. It identifies the scope of Honeywell’s repair program for the

Honeywell F-15E Advance Display Core Processor (ADCP) and the Digital Mapping System

(DMS) under the Depot Avionics Partnering (DAP) Initiative. The objective of this program is to provide support for both systems and its repair requirements. The repair program from FY2027 to FY2032 will provide the depot with repair capability and continuous technical support for the

F-15E ADCP and DMS during the contract timeframe. Contractor shall develop, implement and manage the repair program through the follow-on ADCP and DMS repair contract. A Direct

Sales Partnering Agreement (DSPA) will be established to facilitate repairs with 402 EMXG at

Robins AFB. The program will include Contractor Repair Technical Assistance and Maintenance of government furnished equipment (GFE), Program Management, Parts Obsolescence

Management, and Adequate Parts Management to support required Turn-Around Time (TAT).

1.4 Result(s)

PR: FD2060-25-00023 QASP REVISION: 0 3

The QASP is used for managing contractor performance assessment by ensuring that systematic quality assurance methods validate that contractor quality control efforts are timely, effective, and are delivering the results specified in the contract or task order. The QASP directly corresponds to the performance objectives and standards specified in the Performance Work

Statement (PWS). It provides specific details on how the Government will survey, observe, test, sample, evaluate, and document contractor performance results to determine if the contractor has met the required performance standards for the objectives in the PWS. Successful completion of the objectives for the performance of the contract constitutes success of the program.

1.5 Authority

Authority for issuance of this QASP is provided under Revolutionary FAR Overhaul (RFO) Part

46, Inspection of Services clauses, which provides for inspection, acceptance and documentation of the service called for in the contract or task order. If commercial, quality assurance will be applied in accordance with commercial items clause.

2.0 Performance Assessment/Services Summary

The matrix below details the method of surveillance and frequency the Contractor Officer

Representative (COR) will use to validate and inspect performance objectives. Inspection of each objective will be documented in the COR file. Performance objectives define the desired outcomes and performance thresholds define the level of service required under the contract to successfully meet the performance objective. The inspection methodology defines how, when, and what will be assessed in measuring performance.

2.1 Method of Surveillance

Performance

Objectives

PWS

Paragraph

Number

Performance Threshold Method of

Surveillance

Quality of repair 4.5.4 Assets shall be repaired in accordance with TO 00-35D-

54.

Repaired assets shall pass inspection with no more than one failure per contract year.

There shall be no more than 4 valid PQDRs and/or QDRs per contract year.

There shall be no more than 4 valid PQDRs and/or QDRs per contract year.

Method: 100% Inspection

Surveillance will be conducted weekly by the COR monitoring issuance of PQDRs and/or QDRs.

Surveillance will be documented semi-annually by the COR in

COR Status Report.

PR: FD2060-25-00023 QASP REVISION: 0 4

Delivery of Repair 4.5.1, 4.5.2 Repaired assets shall be delivered in accordance with the schedule defined by the contract/order.

There shall be no more than 4 late delivery(ies) per contract year The contractor shall notify the government if the delivery of any asset will not meet the scheduled delivery date and negotiate a revised delivery date. The late asset shall be delivered by the revised delivery date acceptable to the government.

The average TAT for repairs shall be completed within 21 calendar days. The TAT for a

Surge/MICAP requirement is within 10 business days from receipt of notification and/or receipt of asset at the repair facility, whichever occurs later.

Surveillance will be conducted by the COR. The COR will measure and survey contractor performance by pulling and reviewing monthly metric reports, including TAT data, tracked directly within LDMS.

The COR will actively monitor contractor performance and review TAT

Surveillance will be document

COR Status Report.

Quality of

CDRL

deliverable

4.2.1 There shall be no more than

one rejection of any deliverable. There shall be no more than 1 total rejection(s) of deliverables per contract year. The

Government will reject a deliverable if 2 or more technical errors or 3 or more minor errors are found within the deliverable. The rejected deliverable shall be corrected and resubmitted within 5 business days of notification of Government rejection.

Surveillance will be conducted by the MFT member(s) reviewing deliverables upon receipt.

Surveillance will be documented semi-annually by the COR in the PAR or the

SPM COR Status Report.

PR: FD2060-25-00023 QASP REVISION: 0 5

Receipt of CDRL deliverable

4.2.2 There shall be no more than 1

late submission(s) of deliverables per contract year. The Contractor shall notify the Government if the delivery of any data/document will not meet the scheduled delivery date and negotiate a revised delivery date. The data/document shall be delivered by the revised delivery date acceptable to the Government.

applicable MFT member(s) monitoring receipt of deliverables.

Surveillance will be documented semi-annually by the COR in the

PAR or the SPM COR Status

Report.

Adherence to

Contractor

Quality

Management

System (QMS)

5.9 100% compliance with the

QMS is required.

Within 60 days of award, the

Contractor shall submit a

Quality Control Plan (QCP) the COR reviewing the contractor’s QMS to ensure that it is effective in bringing the desired results (performance is equal to or greater than the SS metrics).

Surveillance will be documented semi-annually by the COR in the

PAR or the SPM COR Status

Report.

Timely responses to requests for information (RFI) from the PCO

4.3.5 Timely responses to requests for

information (RFI) from the PCO shall be conducted. The Supplier shall acknowledge receipt within two business days, evaluate time needed to collect data within three business days, and submit response or establish a USAF-approved suspense date within 10 business days.

Surveillance will be conducted, at a minimum, semi-annually by the

PCO monitoring timely responses to RFI.

Surveillance will be document the PAR or the SPM COR

Status Report

2.2 COR Surveillance File Documentation

The COR will establish and maintain an online file containing training and surveillance documentation in the Procurement Integrated Enterprise Environment (PIEE) via the Joint

PR: FD2060-25-00023 QASP REVISION: 0 6

Appointment Module (JAM) and Surveillance and Performance Module (SPM). At a minimum, the following documentation will be maintained in JAM/SPM by the COR or CO, as applicable.

a. Joint Appointment Module (JAM)

• Training and Appointment

❖ WarU CLC 222, Contracting Officers Representative (COR) Online Training

❖ SAF GCA, OGE Form 450 Filers Annual Ethics Training

❖ WarU DOD 0020, Combatting Trafficking in Persons for Acquisition & Contracting

Personnel

❖ QAPC-Led Training Certificate

❖ Contract Specific Training

❖ WarU CLC 206, CORs in a Contingency Environment (if applicable)

❖ Confirmation of reviewing JAM/SPM Training (Memo)

❖ Refresher training (16 CLPs every three years)

❖ Confirmation of filing the annual OGE 450

• Complete COR Experience (Agency & Technical Experience)

• Designation of Contracting Officer’s Representative

• Termination of Contracting Officer’s Representative

b. Surveillance & Performance Monitoring Module (SPM)

• QA Surveillance Plan

❖ QASP, QASP revision(s)

• SPM Smart Forms

❖ COR Status Report (Surveillance, equivalent to PAR)

❖ Annual COR File Inspection Checklist

❖ Contract Discrepancy Report (equivalent to CAR)

❖ Trip Report (if applicable)

❖ Contractor Progress Report Review

❖ Correspondence Report

❖ Surveillance Schedule

❖ Surveillance Checklist

❖ Memorandum for the Record

• Manually Uploaded Documents (examples):

❖ Other Surveillance Document

- Performance Assessment Reports (PARs)

- Corrective Action Reports (CARs)

- Annual COR File Inspection Checklist(s)

❖ Deliverables (CDRLs, including Contractor Status Reports)

❖ Safety Plan (Contractor)

❖ Integrated Master Schedule

- Master/Delivery Schedules

❖ Other

- Contract, including modifications (if not in EDA)

- PWS, including revisions (if not in EDA)

PR: FD2060-25-00023 QASP REVISION: 0 7

- DD Form 254 (if not in EDA)

- CDRLs (Form 1423 - if not in EDA)

- Customer Complaint Records

- Documentation of Contractor payment (if not processed in WAWF)

- Trip Reports

- CAV-AF Repair Item Actions Report(s)

- Surveillance Schedule/Checklist

2.3 Plan for Corrective Action

2.3.1 Unsatisfactory Contractor performance will result in the COR issuing a negative SPM

Smart Form “COR Status Report”/PAR to the Contractor. The Contractor will be required to respond by the suspense date. The Contractor shall explain the deficiency and identify the corrective action they shall take to resolve the deficiency and prevent recurrence.

2.3.2 If repetitive negative COR Status Report/PARs are issued without satisfactory resolution, the COR will initiate the CAR process. However, the MFT reserves the right to issue a CAR at any time based on the severity of the Contractor non-compliance. The COR will prepare and sign the CAR, and forward to the CO for signature. The CO will set a suspense date and submit the CAR to the Contractor for corrective action. The Contractor shall sign and return the CAR by the established suspense date with a corrective action plan to the CO for acceptance by the

MFT. The plan shall include identification of the root cause and a get-well-date. The corrective action will be tracked and documented until the deficiency is resolved to the satisfaction of the

MFT. The COR will upload the CAR in SPM to become part of the contract file. If the CAR process fails to resolve the deficiency, the MFT has the prerogative to issue an interim

Contractor Performance Assessment Report (CPAR), and the CO has the right to invoke the

Inspection of Supply/Services clause(s) identified in the contract/order.

2.3.3 CORs will establish a tracking system for corrective actions that includes date COR submitted CAR to PM/SAL, date reviewed by PM/SAL, date reviewed by CO, date issued by

CO, contractor’s identified root cause, proposed corrective action, contractor follow-up actions, and get-well date.

2.4 Acceptance of Services

2.4.1 The Contractor shall submit/process payment requests and receipt/acceptance documents via Wide Area Workflow (WAWF). Services will be accepted by the COR.

2.4.2 CDRL deliverables shall be submitted using WAWF and/or directly to the MFT member identified on the CDRL. The CDRL will determine submittal requirements; however, separately priced data must be submitted and accepted in WAWF for the Contractor to receive payment, and both separately priced and non-separately priced data must be accepted in WAWF in order for the contract line item to be closed out.

3.0 Roles and Responsibilities of Multi-Functional Team (MFT)

PR: FD2060-25-00023 QASP REVISION: 0 8

3.1 General Responsibilities

3.1.1 The MFT is responsible for ensuring the acquisition utilizes Performance-Based Service(s)

Acquisition (PBSA) methods including establishment of performance thresholds, procedures to evaluate Contractor performance and positive/negative incentives to encourage the highest quality of services.

3.1.2 The MFT is responsible for conducting surveillance of Contractor performance to ensure

Government requirements, including quality of services, cost and schedule, are met. The MFT will provide the results of their surveillance to the COR for input into the COR Status Reports, and to the MFT member updating the CPARS.

3.1.3 For contracts requiring higher-level quality requirements, the MFT is responsible for developing metrics in tracking the effectiveness of the contractors QCP/Quality Management

System (QMS) tie to the SS, QASP, and CPARS. Ensure contracts requiring higher-level contract quality requirements include a SS performance objective that encompasses MFT goals related to quality and directly relates to the CPARS category of “Quality”.

3.1.4 The MFT ensures contract oversight focuses on the adequacy and adherence of the contractor to their proposed QMS. The MFT shall focus on whether the COR or contractor is first in detecting defects and trends, who (COR or contractor) accomplishes more inspections, and, whether the contractor is proactively pursuing key QMS functions to ensure quality related problems or defects do not recur.

3.2 Contracting Officer’s Representative (COR)

3.2.1 The COR is responsible for providing continuous technical oversight of the contractor’s performance. The COR will use the QASP as the primary tool for conducting surveillance of the contractor’s performance. The COR shall keep a surveillance file that accurately documents the contractor’s actual performance. The purpose is to ensure that the contractor meets the performance standards contained in the contract.

3.2.2 Works with the MFT in conducting and documenting surveillance on Contractor performance. Reports unethical conduct and instances of fraud, waste and/or abuse to the CO.

Inspects and accepts/rejects deliverables during contract/order performance and at close-out to ensure contract/order terms and conditions are met. Develop an inspection schedule that shall comprise of at least ten percent of non-services summary items, as a recommended best practice.

Monitors control and disposition of Government property. Monitors Contractor payment and verifies it is commensurate with Contractor performance. Documents Contractor performance via SPM COR Status Reports, and CARs. Issues COR Status Reports, at a minimum, semiannually, and negative PAR(s) or CAR(s), as required.

3.2.2.1 If issuing a negative PAR, the COR will forward to the CO and the Contractor for signature. After all signatures have been obtained, the COR will attach the signed PAR to the applicable COR Status report in SPM.

PR: FD2060-25-00023 QASP REVISION: 0 9

3.2.2.2 After CO Approval of COR Status Report, in SPM. The COR will print the report in pdf format and email it to the contractor. If the contractor responds to a negative report, the COR should upload the email correspondence with the contractor into SPM.

3.2.3 Registers in PIEE as a COR. Self-nominates in JAM as the designated COR for the contract. If required, files the annual Office of Government Ethics (OGE) Form 450, Confidential Financial Disclosure Report. Establishes and maintains a COR File – training documentation is maintained in JAM, and surveillance documentation is maintained in SPM.

3.2.4 Establish a System for Award Management (SAM) Individual Account after designation as a COR to search and view Service Contract Reporting (SCR) information. After the contractor has submitted the SCR, the COR or Program Manager will review contractor reported information for reasonableness and consistency. If SCR revisions are required, the COR will notify the contractor no later than November 15. By November 30, the contractor shall revise the report, or document the rationale.

3.2.5 Ensure contractor’s QCP/QMS complies with contract requirements. CORs need to place special emphasis in ensuring the contractor’s QMS is being followed as written, plus is effective in bringing about the desired results – performance equal to or greater than the SS metrics, plus an inspection and corrective action program that identifies and fixes issues without having to be identified by the Government.

3.3 Contracting Officer’s Representative (COR) Supervisor

3.3.1 Upon the CO’s request for COR support, selects a qualified nominee. Confirms the COR nominee has no personal conflicts of interest and verifies that the COR has the appropriate clearance for the contract/order. If required, ensures the COR files the annual OGE Form 450.

Ensures the COR takes initial, annual and any additional training required by the contracting activity. Ensures the COR completes 16 hours of refresher training every three years after completion of WarU CLC 222, Contracting Officer’s Representative Online Training.

3.3.2 Registers for the SPM Manager Role via PIEE to obtain access to the COR’s Online file in

SPM. Ensures the COR registers in PIEE, and self-nominates as the designated COR for the contract in JAM. Upon email notification of the COR self-nomination, approves the nomination via email link. Conducts regular reviews of the COR Online File to ensure surveillance documentation is timely and complete and conducts an annual review of the COR’s Profile to ensure the COR’s technical experience is complete and up-to-date. Considers performance of

COR duties in their annual appraisal.

3.4 Contracting Officer (CO)

3.4.1 Only individual authorized to enter into contracts and determines if a COR is required. If the requiring activity has not initiated a COR nomination in JAM, the CO submits a Request for

Contracting Officer’s Representative Support memorandum to the requiring activity.

Determines whether a COR is required to file an OGE Form 450. Provides Contract-Specific

Training to the COR.

PR: FD2060-25-00023 QASP REVISION: 0 10

3.4.2 Upon notification of COR Supervisor approval of the COR’s nomination, reviews the nomination in JAM, and completes the Smart Form Designation Letter. The contract must be awarded and in EDA to complete the designation process in JAM. The CO shall provide a copy of the designation memo to the Contractor. Upon notification of transfer/retirement of the COR, the CO shall complete the Termination Letter in JAM. The CO shall provide a copy of the termination memo to the Contractor, and designate the replacement COR.

3.4.3 Reviews the COR reports on contractor performance in SPM and approves/rejects COR

Status Reports/Smart forms in SPM. Reviews the COR Profile and COR Online File, six months from award and annually thereafter. Documents the results of their review on the Annual COR

File Inspection Checklist (ACFIC) and attach to ACFIC smart form. Checklist must be signed by the CO, COR and COR Supervisor prior to uploading to SPM.

3.5 Quality Assurance Program Coordinator (QAPC)

3.5.1 Supports the MFT in the development of the contract/order quality assurance requirements specifically ensuring the requirements are clearly stated and enforceable. Prior to contract/order award, provides training to CORs and COR management. Ensures training requirements are accomplished in accordance with DoDI 5000.72, DoD Standards for COR Certification.

Monitor records of all COR training records and conducts reviews of SPM records for assigned organizations.

3.5.2 Provides functional, not technical, support for JAM/SPM users including assistance with registration and role activation.

3.6 Contractor

3.6.1 Participates as a member of the MFT upon approval of the Justification & Approval (J&A) or Sole Source Justification (SSJ) if the acquisition is sole source, and upon contract/order award, if it is competitive.

3.6.2 The Contractor shall ensure the quality of services through a quality and/or inspection system. In order to meet the government’s quality requirements, a contractor’s QCP/QMS should be robust enough and resourced adequately to execute four key quality functions: 1)

Detection of quality program problems and defects; 2) Identification of root causes for quality related problems/defects; 3) Correction of root causes related to detected problems/defects; and,

4) Follow-up to ensure quality related problems/defects do not recur; a mature QMS requires the contractor be the proactive party on quality issues. The goal is to obtain performance reflective of continuous improvement with no reliance on COR’s surveillance to detect problems/defects, determine root causes, or ensure quality related problems/defects do not recur.

3.6.3 Signs and returns a negative PAR with corrective action identified by the suspense date.

Signs and returns a CAR with a corrective action plan by the suspense date.

PR: FD2060-25-00023 QASP REVISION: 0 11

3.6.4 Responsible for ensuring personnel, information, system, property, facility and, if applicable, international security requirements are met in accordance with the DD Form 254, Department of Defense Contract Security Classification Specification, and applicable government regulations specified in the contract/order.

3.6.5 Report the total amount invoiced and contractor labor hours expended on the services performed during the previous fiscal year. Prime contractor labor hours, including any required

Tier 1 subcontractor information, shall be reported in the System for Award Management

(SAM). The reporting period for contractors is open from October to November for reporting against the prior fiscal year.

4.0 Management Strategy

4.1 The MFT will meet and record minutes quarterly to review contractor’s performance. The

COR will issue COR Status Reports, documenting both satisfactory and unsatisfactory

Contractor performance, at a minimum, semi-annually.

4.2 If repetitive negative COR Status Reports or a single negative COR Status Report identifying critical Contractor non- compliance are issued without satisfactory resolution, the CO or

Contract Specialist (CS) will issue a CAR. However, the MFT, through approval of the CO, reserves the right to issue a CAR at any time based on the severity of the Contractor non-compliance. If the CAR process fails to resolve the unsatisfactory contractor performance, the

CO has the right to invoke the Inspection of Supply/Services clause(s) identified in the contract/order.

4.3 Incentives

4.3.1 If Contractor performance meets or exceeds contractual requirements, positive incentives may include, but are not limited to, decreased surveillance (by revision to the QASP/Method of

Surveillance), favorable CPARs and exercising options.

4.3.2 If Contractor performance does not meet contractual requirements, negative incentives may include, but are not limited to, increased surveillance, unfavorable CPARs, not exercising options and Government recourse authorized by the Inspection of Supply/Services clause(s) identified in the contract/order.

5.0 Annual COR File Inspection: The CO, with participation from the COR and the COR

Supervisor, shall conduct a review of the COR’s files within six months of contract award and annually thereafter to ensure accuracy and completeness. The CO will document the results of the review in SPM using the ACFIC Smart Form. The COR and COR Supervisor will acknowledge any discrepancies via signature on local checklist by signing the local checklist.

The CO/CS, will attach the completed local checklist to the ACFIC Smart Form in SPM.

6.0 Contractor Performance Assessment Reporting System (CPARS): The total estimated value of the contract exceeds $1,000,000.00; therefore, CPARS reporting is required.

PR: FD2060-25-00023 QASP REVISION: 0 12

6.1 The MFT will evaluate Contractor performance. The Assessing Official Representative

(AOR) will review the PARs and other information contained in the COR Online File to prepare and substantiate the CPAR. CPARS will be updated, at a minimum annually, documenting

Contractor performance for the contract/order. The MFT should refer to the latest CPARS

Guidance for CPAR processes and timelines, https://www.cpars.gov/. Users can refer to Table

4.9 for the CPARs Timeline, and “Table 1 for the Business Sector, Dollar Threshold and

Reviewing Official” information.

6.2 In evaluating the quality of contractor’s performance, the following performance ratings are used in documenting past performance. The areas rated may include: Quality, Schedule, Cost

Control (if applicable), Management, Small Business Subcontracting (if applicable), and

Regulatory Compliance.

Performance

Rating

Criteria

Exceptional Performance meets contractual requirements and exceeds many to the government’s benefits. The contractual performance of the element or sub-element being assessed was accomplished with no problems and contractor actions were highly effective.

Very Good Performance meets contractual requirements and exceeds some to the government benefits. The contractual performance was accomplished with few minor problems for which corrective actions taken by the contractor were effective.

Satisfactory Performance meets contractual requirements. The contractual performance contains some minor problems for which corrective actions taken by the contractor were satisfactory.

Marginal Performance does not meet some contractual requirements. The contractual performance reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear marginally effective or were not fully implemented.

Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

7.0 Safety Requirements

7.1 Mishap Notification/Investigation: The Contractor shall report mishaps in accordance with the safety requirements identified in the PWS. The Contractor shall ensure the Safety Office, COR, and CO are notified of mishaps.

7.2 MFT Surveillance: MFT member(s) will report any potential safety hazards or actual mishaps to the COR. The COR will monitor Contractor reporting and review any mishap notifications. The COR will address safety and/or health issues in the PAR or CAR, as applicable.

8.0 Trafficking in Persons: IAW R-DFARS PGI 222.17, Combatting Trafficking in Persons

(CTIP), the COR will monitor the contractor’s performance regarding trafficking in persons, https://www.cpars.gov/sysreq.htm

PR: FD2060-25-00023 QASP REVISION: 0 13

such that non-compliance with RFO clause 52.222-50, Combatting Trafficking in Persons, is brought to the immediate attention of the CO. The CO shall report that the contractor, subcontractor, or employee has failed to comply with the requirements of RFO clause 52.222-50.

The CO may use any of the remedies outlined in R-DFARS PGI 222.1704 to report the violations. The COR should refer to the U.S. Department of State website, at https://www.state.gov/, for the latest guidance of monitoring trafficking in persons.

9.0 Signatures

By signing below, you are appointed to the MFT for this acquisition and accept the above responsibilities.

Quality Assurance Program Coordinator

Contracting Officer Representative

COR Supervisor

Contracting Officer https://www.state.gov/bureaus-offices/under-secretary-for-foreign-assistance-humanitarian-affairs-and-religious-freedom/office-to-monitor-and-combat-trafficking-in-persons/

2026-08-10T08:16:18-0400
MALLONEE.MARK.R.1033504523
2026-08-10T09:41:53-0400
OHERN.KIRSTA.G.1243843878
2026-08-10T10:02:33-0400
RANSAW.CRAIG.JERMAINE.1018601687
2026-08-10T10:17:39-0400
JONES.JOSEPH.MICHAEL.1544672165

File details come from the government source that posted it. Updated .