25-00004 PWS Rev1 - 7 March 2025.pdf

PDF 274 KB Posted

Attached to
C-5 Trunnion Bearing, Overhaul
Solicitation number
FA8538-25-R-0004_RFP
Issued by

About this file

This Performance Work Statement (PWS) details the remanufacturing requirements for the C-5 Main Landing Gear (MLG) Trunnion Bearing Assembly, National Stock Number 3120-00-766-2056UC, Part Number 4F23832-103A. The contractor will be responsible for inspecting, functionally testing, and depot-level repairing eight (8) bearing assemblies per aircraft during the C-5 Programmed Depot Maintenance (PDM) cycle at Robins Air Force Base. The work involves installing a remanufactured Spherical Bearing (P/N: 4F9004-101A) into an existing serviceable Housing Assembly (P/N: 4F23215-103A), with strict quality requirements including passing government DCMA final breakaway torque inspections and maintaining no more than one Product Quality Deficiency Report (PQDR) or Quality Deficiency Report (QDR) per contract year.

The contract will have a five-year period of performance, with the contractor required to provide quarterly reports detailing unit status, repair progress, and serial number tracking. Key technical requirements include using new balls for remanufacturing, conducting detailed inspections per specific military standards, and performing structural strength tests that can withstand ultimate radial loads of 875,000 pounds and axial loads of 87,500 pounds. The contractor must also maintain an ISO 9001:2000 certified quality program, comply with specific packaging and marking standards, and have a comprehensive Supply Chain Risk Management (SCRM) plan addressing continuity of operations, foreign influence, and cybersecurity protections.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PR: FD2060-25-00004 PWS REVISION: 1 1

Performance Work Statement for

C-5 MLG Trunnion Bearing Assembly

Purchase Request: FD2060-25-00004

07 March 2025

PR: FD2060-25-00004 PWS REVISION: 1 2

1.0 Description of Services

1.1 Objective(s): This Performance Work Statement (PWS) describes the services required to remanufacture the C-5 Main Landing Gear, Trunnion Bearing Assembly, NSN: 3120-00-766- 2056UC, Part No., 4F23832-103A, resulting in the installation of a re-manufactured Spherical Bearing, P/N: 4F9004-101A, into the existing serviceable condition, Housing Assembly, P/N:

4F23215-103A. Contractor shall provide all resources needed to inspect, accomplish functional testing and depot level repair of the commodities covered by this PWS to meet contract delivery schedules. Repaired assets shall be made serviceable and be tested to the Original Equipment Manufacturer’s Acceptance Test Procedures (ATPs). The Contractor shall (1) repair all units on contract for which a reparable carcass has been provided within the contract delivery schedules with no more than one exceptions per order, (2) make accurate and timely data reporting of the stage of unit in the repair process, (3) provide quarterly report detailing number of units on hand, number of units in work, and stage of unit in the repair process by serial number. Data shall be submitted per Contract Data Requirements List (CDRL).

1.2 Benefit to United States Air Force (USAF): This acquisition will benefit the United States Air Force (USAF) by providing serviceable, Main Landing Gear Trunnion Bearings that support requirements for the C-5 Heavy Duty Cargo Mission.

1.3 Background: This item is required for 100% change-outs for C-5 Programmed Depot Maintenance (PDM) at Robins AFB, Ga. at a quantity of eight (8) ea. per aircraft. This is a C-5 Engineering Requirements Review Type item. Regular preventive maintenance on Eight-Year, PDM cycles is accomplished at Robins to provide better reliability and maintainability for the C- 5 Heavy Duty Cargo Mission.

2.0 Services Summary

Performance Objective PWS Reference

Performance Threshold

Quality of repair

4.5 Re-manufactured assets shall pass Gov’t DCMA

final breakaway torque inspections with no more than one failure per quarter. There shall be no more than one PQDRs and/or QDRs per contract year.

3.0 Government Property

3.1 Contractor Responsibility: The Contractor shall be responsible for Government property in accordance with the Federal Acquisition Regulation (FAR) and as specified in the contract/order.

3.2 Government Property to be Provided: Government property to be provided includes the unserviceable condition assets furnished for re-manufacture.

3.3 Reporting of Government Property: The Contractor shall have a system of internal controls to manage (control, use, preserve, protect, repair, and maintain) Government property in its

PR: FD2060-25-00004 PWS REVISION: 1 3

possession in accordance with FAR 52.245-1, and its property management system shall be adequate to satisfy the requirements of this clause. The contractor shall record receipt and return of all Government Furnished Property (GFP), as well as the reporting of shipment, consumption, disposal, or transfer to another contract, in the GFP Module in Procurement Integrated Enterprise Environment (PIEE), https://piee.eb.mil, as stipulated by DFARS 252.245-7005. This reporting requirement does not change any liability provisions or other reporting requirements that may exist under the contract. GFP training and guidance is located at the DoD Procurement Toolbox at https://dodprocurementtoolbox.com/.

3.4 Loss of Government Property

3.4.1 Definition of Loss of Government Property: “Loss of Government property” means unintended loss of or damage to Government property including property that cannot be found after a reasonable search, loss due to inadequate storage, loss due to lack of security, theft, damage requiring repair to restore the item to usable condition, or damage that renders the property useless for its intended purpose or Beyond Economical Repair (BER). Loss of Government property does not include manufacturing defects, obsolescence, normal wear and tear, or purposeful destructive testing. Unless otherwise stated in the contract/order, loss of Government property does not include normal and reasonable inventory adjustments, i.e., losses of low priority consumable material, such as common hardware, as agreed to by the Contractor and the Government Property Administrator.

3.4.2 Reporting Loss of Government Property: The Contractor shall report loss of Government property in the GFP Module located in PIEE, https://piee.eb.mil/piee-landing/.

3.5 Return or Retention of Government Property: All property provided by the Government remains the property of the Government and shall be returned to the Government as directed, but no later than completion of the contract/order, unless the Procuring Contracting Officer (PCO) directs the Contractor to retain the property for continued use under a successor contract. All Government property shall be returned to the Government in the condition provided unless approved in advance by the PCO. All material generated under the contract/order becomes the property of the Government and shall be returned to the Government as directed, but no later than completion of the contract/order, unless the PCO directs the Contractor to retain the material for continued use under a successor contract.

4.0 Technical Requirements

4.1 Contract/Order Period of Performance: The period of performance for the contract/order will extend for five (5) years after the contract is issued.

4.1.1 Place of Performance: These services will be performed at the contractor’s facility.

4.2 Pre-qualification: If the Contractor is already a qualified source of remanufacture, no pre-qualification samples are required.

PR: FD2060-25-00004 PWS REVISION: 1 4

4.2.1 Qualification Testing – Unqualified Source(s)

If the Contractor is not a qualified source, qualification test shall be conducted on two (2) bearing assemblies. The contractor shall produce two (2) remanufactured assets as pre-qualification samples from two (2) unserviceable assets provided by the Government and make them available at their facility for the C-5 Engineer to witness the qualification testing or submit them to an independent third-party testing laboratory with the results being forwarded to AFLCMC/WLSEAB, C-5 Engineering, for evaluation. This shall be accomplished within 180 calendar days after contract award

The contractor shall submit a Test Plan as part of their Qualification Test Procedure, to WR- ALC/AFLCMC/WLSEAB, C-5 Engineering, prior to performance of qualification testing. The contractor shall submit the Test Plan within sixty calendar (60) days after contract award.

The Contractor shall conduct qualification tests on the C-5 MLG Trunnion Bearing in accordance with the following paragraphs of MIL-B-8942A, 4.5.1, 4.6.1, 4.6.2, 4.6.4, 4.6.5, 4.6.6, 4.6.7, 4.6.8 The contractor shall document the results in a qualification test report for each pre-qualification sample for Government approval following testing. The Government reserves the right to witness all testing performed by the contractor. Work products shall contain no more than one technical error and no more than five typographical errors. Errors must be corrected, and the report shall be resubmitted no later than (NLT) fifteen (15) working days after Government comments.

Bearing assembly of – Full Qualification of bearing shall require demonstration of bearing assembly of testing in the final delivery version of part number 4F23832-103A. [CDRL Reference in paragraph 4.4, DI-NDTI-80603A, Qualification Test Procedure; CDRL, DI- NDTI-80809B, Test/Inspection Report]

4.3 Technical Instructions: Upon receipt, the contractor shall perform a visual inspection of each unserviceable, and reparable C-5 MLG Trunnion Bearing Assembly, ensuring proper identification and completeness. The contractor will be responsible for the inspection, test, and repair of all line replaceable units. The work requirements will be accomplished in accordance with (IAW) paragraphs (a) through (j) listed below:

a. Identify housing as P/N: 4F23215-103A, as stamped on housing, or for conformance to Drawing 4F23215.

b. Inspect housing for gross anomalies that will prevent refurbishment.

c. If no gross anomalies are found, use proper swage cutter to remove swaged lip.

d. Carefully remove used spherical bearings from the housing without damaging the housing.

PR: FD2060-25-00004 PWS REVISION: 1 5

e. Clean titanium housing per STP57-401.

f. Remove any nicks, dings, and/or burrs on flange. Nicks and dings on the flange of the titanium housing are acceptable if they don’t protrude outward to interfere with the fit of the housing in the aircraft, and if the dings are smoothed to take out sharp edges or outward protrusions.

g. Dye penetrate inspect per STP53-201.

h. Dimensionally inspect critical dimensions per Drawings 4F23215 and DS30001.

i. If housing passes all inspections, install a remanufactured spherical bearing, P/N 4F90004-101A per drawing 4F23832. If there is a question of housing serviceability, please contact the cognizant C-5 System Engineer, AFLCMC/WLSEAB.

j. Apply dry film lubricant to threads per MIL-PRF-46010G and Lockheed drawing 4F23215.

4.3.1 Additional Technical Requirements provided by C-5 Engineering:

A. SCOPE

This specification establishes performance, design and construction requirements, and qualification provisions for a spherical bearing which is self-aligning and self-lubricating by incorporating tetrafluoroethylene, (TFE), in a liner between the inner ring (ball) and outer ring (race) for use in the temperature range -65°F to + 250°F. The bearing assembly shall provide a means for attaching a main landing gear trunnion to an air vehicle.

B. APPLICABLE DOCUMENTS:

The provisions of the following documents, of the exact issue shown, form a part of this specification to the extent specified herein. In the event of conflict between the provisions of documents referenced herein and the detail contents of this specification, the requirement of this specification shall govern Note: This document is incomplete without the attachment of LMCO drawing 4F90004, and 4F23832.

SPECIFICATION:

MILITARY:

MIL-B-8942A: Bearings, plain, TFE lined, self-aligning

MIL-H-6088E: Heat treatment of aluminum alloys: process for Aircraft applications (Replaced by SAE AMS-H-6088 and AMS 2772, AMS 2770)

PR: FD2060-25-00004 PWS REVISION: 1 6

MIL-I-6870E: Inspection requirements, non-destructive, for aircraft and missile material and part (Replaced by MIL-HDBK-6870C)

FEDERAL: SAE-AMS-QQ-A-367: Aluminum alloy forging, heat treat

STANDARDS: MIL-STD-IOA: Surface roughness, waviness and lay (Replaced by ASME B46.1)

C. REQUIREMENTS:

Performance: The bearing assembly shall provide mounting for the main landing gear trunnion.

Design: The bearing assembly shall conform to the requirements of MIL-B-8942A in its entirety except:

1) Throughout the specification (MIL-B-8942A) replace the expression “the applicable MS" with "Lockheed drawing 4F90004”

2) Delete the following paragraphs: 3.3, 3.5.4, 3.5.5, 3.7, 4.3.1, 4.3.3, 4.4.2, 4.5.2, 4.6.3, (except as specified in paragraphs 3.1.23 of LMCO drawing 4F90004) 4.6.3.1, 5.1, 5.2, 5.3, 6.l, 6.2 and 6.3 or corresponding replacement specification.

Structural Strength

Ultimate design load - The bearing assembly shall withstand an ultimate radial load of 875,000 pounds an axial load of 87,500 pounds. The bearing shall withstand either load independently or both loads simultaneously.

Limit design load - the bearing assembly shall withstand a limit radial load of 585,000 pounds and an axial load of 58,000 pounds.

The bearing assembly shall be installed, gripped, and instrumented per paragraph 4.6.3 of MIL-B-8942A and subjected to the following load cycle test.

NO CYCLES RADIAL LOAD ROTATIONAL

CYCLE

RATE

12,000 351,000Lb 0° 10 cycles/min

After the conclusion of the load cycle test, the bearing shall conform to the no-load break away torque requirements as follows: The preload torque of the bearing shall be 200 to 1000 inch-pounds.

Material - The ball shall be 7075-T6 Al alloy, the race shall be 2014-T4 AL alloy (2024-T4 AL Alloy per QQ-A-200/3 may be used in lieu of 2014-T4. 2024-T4 is not to be used if 2014-T4 is available) (if forged, forge per QQ-A-367), heat treated per AMS 2772 and AMS 2770. The TFE

PR: FD2060-25-00004 PWS REVISION: 1 7

liner per MIL-B-8942A, shall be installed in such a manner that the bearing will conform to all requirements of this specification.

Marking-the bearing assembly shall be marked per MIL-STD-130N DOD Standard Practice Identification Marking of US Military Property

Quality program - The bidder shall be at a minimum, ISO 9001:2000 certified.

Packaging – Pack per MIL-STD-2073-1E, Standard Practice for Military Packaging and MIL- STD-129R Military Marking for Shipment and Storage

4.4 Contract Data Requirements List (CDRL)

Document Identifier Base Year

Ordering Period

Ordering Period

Ordering Period

Ordering Period

DID Title PWS Reference

(s)

A001 B001 C001 D001 E001 DI-

MGMT-

81838

Commercial Asset Visibility Air Force (CAVAF) Reporting / Government Furnished Material Report

4.5.9

A002 B002 C002 D002 E002 DI-PSSS-

81995A

Contract Depot Maintenance (CDM) Monthly Production Report

4.5.9

A003 B003 C003 D003 E003 DI-

MGMT-

80441D

Government Property (GP) Inventory Report

4.5.9

A004 B004 C004 D004 E004 DI-

MGMT-

81804A

IUID Marking Activity, Validation and Verification Report

4.5.7.2.3

A005 B005 C005 D005 E005 DI-NDTI-

80603A

Qualification Test Procedure

4.2.1

A006 B006 C006 D006 E006 DI-NDTI-

80809B

Test/Inspection Report

4.2.1

A007 B007 C007 D007 E007 DI-SAFT-

81563

Accident/Incident Report

5.5.2

A008 B008 C008 D008 E008 DI-SESS-

80640E

Request for Variance

(RFV)

4.5.1

4.4.1 Quality of CDRL Deliverable: There shall be no more than one rejection of any deliverable. There shall be no more than two (2) total rejection(s) of deliverables per contract year. The Government will reject a deliverable if one (1) or more technical errors or two (2) or

PR: FD2060-25-00004 PWS REVISION: 1 8

more minor errors are found within the deliverable. A technical error is defined as the format not being in accordance with the CDRL or the content not being accurate and complete in accordance with the CDRL, PWS or contract. A minor error is exemplified by a typographical error, a grammatical error, etc. The rejected deliverable shall be corrected and resubmitted within 30 business days of notification of Government rejection.

4.4.2 Receipt of CDRL Deliverable: CDRL deliverables shall be submitted via Wide Area WorkFlow (WAWF) and submitted directly to the MFT member identified on the CDRL. There shall be no more than two (2) late submission(s) of deliverables per contract year. The Contractor shall notify the Government if the delivery of any data/document will not meet the scheduled delivery date and negotiate a revised delivery date. The data/document shall be delivered by the revised delivery date acceptable to the Government.

4.5 Quality of Repair: Contractor shall provide all resources needed to inspect, accomplish functional testing and depot level repair of the commodities covered by this PWS to meet contract delivery schedules. Repaired assets shall be made serviceable and be tested to the Original Equipment Manufacturer’s Acceptance Test Procedures (ATPs). The Contractor shall repair all units on contract for which a reparable carcass has been provided within the contract delivery schedules with no more than one exception per order; Remanufactured assets shall pass Gov’t DCMA final breakaway torque inspections with no more than one failure per quarter. At a minimum, 95% of repaired assets shall pass initial inspection. Remaining 5% (or less) of failed assets shall pass on the second attempt. There shall be no more than one PQDR and/or QDR per contract year. This data shall be made available to the government representative for each unit being submitted for government inspection/acceptance.

4.5.1 Request For Variance (RFV): If during the remanufacturing process an unforeseen deviation from source data scenario is encountered, this RFV requirement shall be followed. If DCMA is assigned to the contract, the Contractor shall coordinate the submission of the RFV via with the assigned DCMA Office for review and recommendation. Upon completion of DCMA coordination, the Contractor shall send The DD Form 1694 and any accompanying RFV documentation by email, or in cases where files are larger than 5MB in size by the DoDSAFE file exchange website (https://safe.apps.mil/) to the to the PCO and Program Manager, who will coordinate with C5 Engineering AFLCMC/WLSE) on review actions. When necessary, final approval of the RFV shall come from the AFLCMC/WLSE C5 Configuration Control Board (CCB), at which time that final decision will be provided back to the Contractor. Due to the potential coordination cycle required for an RFV, the Government has up to 45 calendar days to provide a response or final decision back to the Contractor. Initial contract submission shall be considered a Draft pending approval by the Requiring Office. Upon approval, subsequent submissions shall be considered as Final Regular submissions. The DD Form 1694, a DD Form 1694 Continuation Sheet, and DD Form 1694 Instructions can be found athttps://www.dtic.mil/whs/directives/forms/index.htm and https://www.esd.whs.mil/DD/.[CDRL Reference in paragraph 4.4, REQUEST FOR

VARIANCE DI-SESS-80640E]

4.5.2 Notification for non-reusable titanium housings: The cognizant C-5 Government System Engineer, (AFLCMS/WLSEAB), shall be notified of any MLG Trunnion Bearing, titanium

PR: FD2060-25-00004 PWS REVISION: 1 9

housings, received at the contractor, which are not in compliance with manufacturing drawings 4F23215 and DS3001 and that cannot be re-used in the re-manufacture of the end item, C-5 Trunnion Bearing Assembly.

4.5.3 Making New Balls Requirement: The contractor shall re-manufacture the C-5 MLG, Trunnion Bearings Assembly with using New Balls. No re-worked balls will be utilized on this contract due to the U.S. Government has required the contractor to first attempt to utilize re-worked balls before making new balls to satisfy the re-manufacturing requirements, for the last two contracts, or, for approximately the last ten years. Many of the trunnion bearings have cycled back through the supply system to the contractor with a significant quantity of the balls now being seen as marked with “Do Not Re-Use”. Those bearing balls cannot be re-worked for a second time due to the required dimensions of the ball, IAW the drawings. Thus, the Government requires new balls to be utilized in the remanufacturing process for this contract.

4.5.4 The contractor is expected to furnish all resources required for successful remanufacture of the MLG Trunnion Bearing Assemblies, including facilities, manpower, all support, and test equipment, as well as preferred and/or obsolescence related replacement components.

4.5.5 Beyond Economical Repair (BER): Recommendation for condemnation as Beyond Economical Repair (BER). After coordination by DCMA Quality Assurance Representative (QAR) the contractor will forward requests for approval to condemn units they consider to BER to the PCO for government disposition. Supporting documentation/rationale should be included to expedite processing of the requests and disposition by the government. Replacement carcasses will be provided by the government for those items dispositioned to be condemned and these replacements will be included in the total items to be repaired at no additional cost to the government. Disposal includes pulling of usable parts and using for repairs of other reparable like items.

4.5.6 Over and Above (O&A): For units that are received as damaged and require repair beyond the scope of normal depot repair, the contractor shall request written authorization to proceed and O&A funding from the PCO/ACO (Administrative Contracting Officer) prior to accomplishing repairs. The request shall include a detailed list of the O&A parts and repairs to be performed and their costs so that they can be negotiated and funded as needed.

4.5.7 Item Unique Identification

4.5.7.1 Marking Requirement: Unique Item Identification is required for all items to be delivered to the Department of Defense (DoD) that meet the criteria established by the FAR. The bearing assembly shall be marked per MIL-STD-130N DOD Standard Practice Identification Marking of US Military Property .

4.5.7.2 Reporting in IUID Registry

4.5.7.2.1 Transmission of Government property must be recorded in the IUID Registry. The Government is required to record the transfer of GFP to the Contractor. The Contractor is

PR: FD2060-25-00004 PWS REVISION: 1 10

required to record the receipt of GFP from the Government. The Contractor is required to record the return of GFP to the Government.

4.5.7.2.2 The Government or contractor/subcontractor personnel responsible for causing a “life cycle event” (i.e., abandoned, consumed, destroyed by accident, destroyed by combat, donated, exchanged – repair, exchanged – sold, exchanged – warranty, expended – experimental/target, expended – normal use, leased, loaned, lost, reintroduced, retired, scrapped, sold – foreign government, sold – historic, sold – nongovernment, sold – other federal, sold – state/local, and stolen) will update the item record in the IUID Registry.

4.5.7.2.3 IUID Marking Activity and Verification Report: The contractor shall provide an IUID Marking Activity and Verification Report. A key attribute for the report is the Verification column which indicates pass/fail for each item’s Data Matrix Symbol Quality. [CDRL Reference in paragraph 4.4, Item Unique Identification (IUID) Marking Activity, Validation and Verification Report DI-MGMT-81804A]

4.5.8 Packaging: The Contractor shall package and mark material in accordance with the contract/order Air Force Materiel Command (AFMC) Form 158, Packaging Requirements, and applicable Government regulations. The Contractor shall ensure that classified material is packaged, marked, and delivered in accordance with DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM).

4.5.9 Commercial Asset Visibility-Air Force (CAV-AF): The Contractor is required to comply with all CAVAF requirements identified in the CDRLs and attachments to the contract and shall report production in CAV-AF. Additionally, upon completion of the repair, the contractor is required to print the DD1348-1 (in triplicate) from CAVAF. One copy is to be placed inside the box with the returnable repair asset, one outside the box and one copy will be electronically uploaded to WAWF as part of the Receiving Report (DD250). The Contractor shall provide data on the actions conducted for each unit and report as actions occur, provide a monthly production report, and annual government Property Inventory Report [CDRL in paragraph 4.4, DI- MGMT-81995A, CDM Monthly Production Report, CDRL in paragraph 4.4 DI-MGMT- 81838, Commercial Asset Visibility (CAV) Reporting, CDRL in paragraph 4.4, DI- MGMT-80441D, Government Property (GP) (Annual) Inventory Report]

4.6 Government required Urgent MICAP and SURGE Delivery Schedule: The contractor will be notified of MICAP and SURGE related requirements. These urgent type requirements shall be worked on a top priority basis and assets delivered within 150 calendar days after receipt of a delivery order, or receipt of reparable assets from the Government, whichever is later. If a delivery order and the repairable assets are already in place at the contractor, Government required delivery is 120 calendar days after the contractor is notified of the urgent requirement by the Government Contacting Officer. This may result in the contractor increasing production above normal, routine work requirements. Contractor shall explore all possible options with their sub-contractor(s) to expedite the known long-lead time materials such as the aluminum races to improve delivery times.

PR: FD2060-25-00004 PWS REVISION: 1 11

4.7 Supply Chain Risk Management: Contractor must provide a comprehensive Supply Chain Risk Management (SCRM) Plan in accordance with the instructions to offeror prior to award.

This plan must be maintained during performance of this contract, will be incorporated into the contract at award, and must illustrate executable processes for identifying supply chain risks as early as possible. The SCRM plan will address the broad spectrum of supply chain risks that have the potential to jeopardize the integrity of products, services, people, and technologies;

compromise intellectual property; disrupt the flow of product, materiel, information, and finances needed for continued Air Force operations; and/or drive materiel cost increases to the program. The plan and processes apply to the Contractor and their suppliers, subcontractors, associated integrators, and vendors, spanning the entirety of the supply chain from raw material stage to delivery of a finished product.

4.7.1 SCRM Plan:

The SCRM plan must clearly address the following:

(a) Continuity of Operations (COOP) – Contractor will develop and/or update a Continuity of Operations Procedure/Plan (COOP), which outlines the processes and actions to prepare for, and respond to, planned/unplanned supply chain challenges.

(b) Foreign Influence – The Contractor will disclose any Foreign Ownership, Control, or Influence (FOCI) for the purpose of initial or continued facility clearance eligibility. A Standard Form 328 Certificate Pertaining to Foreign Interest must be submitted to the Government cognizant security office.

(c) Cybersecurity -The Contractor will implement a cybersecurity protection of supply chain information plan and provide a copy to the U. S. Government. As part of this process, the Contractor will conduct early and continuous monitoring throughout the life of the agreement to prevent or reduce impacts of cyber vulnerabilities where adversaries are able to exploit, steal, alter, manipulate, interrupt, or destroy system functionality, information, or technology. The plan must:

(i) Include a description of how the Contractor and any of the Contractor’s subcontractors will provide to the government a system security plan (or extract thereof) in accordance with the NIST Special Publication (SP) 800-171, “Protecting Controlled Unclassified Information in Nonfederal Systems and Organizations” in effect at the time the solicitation is issued or as authorized by the contracting officer, to describe the Contractor’s unclassified information system(s)/network(s) where covered defense information associated with the execution and performance of this contract is processed, is stored, or transmits.

(ii) Include a description of how Contractor will protect the supply chain from exploitation due to the insertion of counterfeits/malware, unauthorized production, tampering, theft, insertion of malicious software and hardware, functionality alteration, and any other elements that would allow adversaries to gain unauthorized access to data, alter data, interrupt communications, or otherwise disrupt operations.

Inform the U. S. Government of any instances of unauthorized access and/or compromise, such as those listed in item “b” to the Contractor’s digital information and parts and components.

5.0 General Information

PR: FD2060-25-00004 PWS REVISION: 1 12

5.1 Continuation of Mission-Essential Services During a Crisis: The Functional Commander/Director has determined these services are not mission-essential and will not continue in the event of a crisis.

5.2 Security Requirements

5.2.1 Security Regulations: The Contractor shall ensure personnel, information, system, property, facility and, if applicable, international security requirements are met. The Contractor shall ensure contractor/subcontractor personnel who perform work on a Government facility comply with the security requirements of the facility. The Contractor shall comply with the following security regulations: DoD 5200.2-R, Personnel Security Program; DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM); DoDD 5205.02E, DoD Operations Security (OPSEC) Program; DoD Manual 5205.02-M, DoD Operations Security (OPSEC) Program Manual; and AFI 31-101, Integrated Defense.

5.2.2_Operations Security (OPSEC): The purpose of OPSEC is to reduce the vulnerability of USAF missions to adversary collection and exploitation of critical information. DoDD 5205.02E and DoD Manual 5205.02-M require contractors supporting DoD activities use OPSEC to protect critical information for specified contracts, subcontracts, and information used in the performance of duties in support of Air Force requirements/missions. The Contractor shall ensure Contractor personnel who perform work on (or in) a Government facility comply with the OPSEC procedures and training requirements of the facility as specified in AFI 10-701.

5.2.3 Communications Security (COMSEC): The Contractor shall use only secure communications methods and/or equipment to transmit or otherwise transfer classified information and/or Controlled Unclassified Information (CUI) in accordance with DoD 5220.22- M. Applicable equipment shall be safeguarded, maintained, and operated in accordance with DoD 5220.22-M.

5.2.4 Security Clearance: It is not expected contractor/subcontractor personnel will require security clearances for proper accomplishment of contract/order requirements.

Contractor/subcontractor personnel shall not be authorized access to classified information and/or Controlled Unclassified Information (CUI) and classified items or be permitted to work on classified projects and/or programs without an appropriate security clearance and a need-to-know.

5.2.5 Access to Government System(s): The Government will provide contractor/subcontractor personnel access to system(s) necessary to perform tasks under the contract/order. The Contractor shall ensure contractor/subcontractor personnel who require access to an unclassified or classified Government Automated Information System (AIS) have the respective background check or security investigation conducted. At a minimum, the Contractor shall ensure contractor/subcontractor personnel who require access to an unclassified AIS have a National Agency Check with Inquiries (NACI) conducted. Upon completion/termination of the contract/order or transfer/termination of contractor/subcontractor personnel, the Contractor shall ensure the system account(s) are closed.

PR: FD2060-25-00004 PWS REVISION: 1 13

5.2.6 Access to Government Facility or Military Installation: The contractor will not require access to a Government Facility or Military Installation to perform the Remanufacturing services required.

5.3 Environmental Management System (EMS): These services shall not be performed at a Government facility; therefore, the EMS requirement does not apply.

5.4 Agency Affirmative Procurement Programs: This acquisition does not require the purchase of Environmental Protection Agency (EPA)-designated products or United States Department of Agriculture (USDA)-designated products; therefore, the requirement does not apply.

5.5 Safety Requirements

5.5.1. Contractor Environmental, Safety, and Occupational Health Compliance: The Contractor shall comply with Government Safety and Health regulations including, but not limited to, Public Law 91-596, Occupational Safety and Health Act (OSHA), and DoD Directive 4715.01E, Environmental, Safety, and Occupational Health (ESOH). The Contractor shall establish and maintain a safety and health program detailed in a written Contractor’s Safety and Health Plan (SHP). The Contractor shall require all subcontractors to comply with required safety, health and fire standards.

5.5.2_ Mishap Notification/Investigation: In accordance with DAFI 91-204, Safety Investigations and Reports, the Contractor shall report mishaps involving damage or injury to USAF assets/interests. The Contractor shall ensure the USAF is notified of mishaps. The Contractor shall contact the Contracting Officer (CO) or the Contracting Officer’s Representative (COR), if available, or another MFT member by telephone within eight (8) hours of any damage to government property where the dollar value exceeds $600,000.00, and within two workdays for any damage to government property less than $600,000.00 during the execution of the contract. Mishap notifications shall contain, as a minimum, the following information:

a. Contract, contract number, name and title of person(s) reporting

b. Date, time and exact location of accident/incident

c. Brief narrative of accident/incident (events leading to accident/incident)

d. Cause of accident/incident, if known

e. Estimated cost of accident/incident (material and labor to repair/replace)

f. Nomenclature of equipment and personnel involved in accident/incident

g. Corrective actions (taken or proposed)

h. Other pertinent information

If requested by the designated CO or COR, the Contractor shall immediately secure the mishap scene (and damaged property) and impound pertinent maintenance and training records until released by the Government’s safety office. Such release shall be accomplished through the Contracting Officer. The Contractor shall cooperate and assist Government personnel in the investigation of the mishap and submit an Accident/Incident Report within 48 hours of the mishap [CDRL Reference in paragraph 4.4, Accident/Incident Report, DI-SAFT-81563].

PR: FD2060-25-00004 PWS REVISION: 1 14

5.6 Inspection of Services: In accordance with the Inspection of Supply/Services clause(s) identified in the contract/order, the Government reserves the right to inspect Contractor performance.

5.7 Service Contract Reporting: In accordance with 10 United States Code 2330(a), and DFARS 252.204-7023 (Reporting Requirements for Contracted Services), the Contractor shall provide a Service Contract Report for each contract/order that meets the DoD Contract Reporting criteria and has obligations in excess of $3,000,000. The Contractor shall report the total amount invoiced and contractor labor hours expended on the services performed during the previous fiscal year. Prime contractor labor hours, including any required Tier 1 subcontractor information, shall be reported in the System for Award Management (SAM). The Contractor shall report annually, by October 31, on the services performed during the preceding government fiscal year. SAM will only enable reporting for entities with contracts that meet the SCR criteria and thresholds. Additional information and user manuals for government personnel and Contractors is available at https://www.sam.gov. SCR eligibility, reporting rules and criteria is located on the DoD Procurement Toolbox at https://dodprocurementtoolbox.com/site-pages/service-contract-reporting-scr.

5.8 Invoicing/Payment and Receipt/Acceptance: The Contractor shall submit/process payment requests and receipt/acceptance documents via WAWF.

5.9 Contractor’s Quality Program: The Contractor’s quality program shall be established and maintained IAW FAR 52.246-11, Higher-Level Contract Quality Requirement. The Contractor’s quality program shall meet all requirements of International Organization for Standardization (ISO) 9001:2000 and is to be approved by the cognizant Government representatives.

5.10 Trafficking in Persons: The Contractor shall comply in accordance with the FAR and applicable supplements and shall be in compliance with all applicable guidance and clauses listed in the contract as it relates to Trafficking in Persons. Additional information about Trafficking in Persons is available at the site for the Department of State’s Office to Monitor and Combat Trafficking in Persons. http://www.state.gov/j/tip

6.0 Plan for Corrective Action

6.1 Unsatisfactory Contractor performance will result in the issuance of a negative PAR. The program office will set a suspense date and forward the PAR to the Procuring Contracting Officer (PCO) for submission to the Contractor. The PCO will submit the PAR to the Contractor for corrective action. The Contractor shall explain the deficiency and identify the corrective action they shall take to resolve the deficiency and prevent recurrence. The Contractor shall sign and return a negative PAR to the PCO by the suspense date.

6.2 If repetitive negative PARs or a single negative PAR identifying critical Contractor non-compliance are issued without satisfactory resolution, the program office will initiate the corrective action report (CAR) process. However, the Multi-Functional Team (MFT) reserves the right to issue a CAR at any time based on the severity of the Contractor non-compliance. The https://www.sam.gov/ https://dodprocurementtoolbox.com/site-pages/service-contract-reporting-scr https://dodprocurementtoolbox.com/site-pages/service-contract-reporting-scr

PR: FD2060-25-00004 PWS REVISION: 1 15

PCO will set a suspense date and submit the CAR to the Contractor for corrective action. The Contractor shall sign and return the CAR, with a corrective action plan, to the PCO for acceptance by the Multi-Functional Team (MFT) by the suspense date. The corrective action will be tracked and documented until the deficiency is resolved to the satisfaction of the MFT. The CAR will become part of the PCO contract file. If the CAR process fails to resolve the deficiency, the PCO has the right to invoke the Inspection of Supply/Services clause(s) identified in the contract/order.

7.0 Contractor Responsibilities

7.1 The Contractor shall ensure the quality of services through a quality and/or inspection system. In order to meet the government’s quality requirements, a contractor’s QMS should be robust enough and resourced adequately to execute four key quality functions: 1) Detection of quality program problems and defects; 2) Identification of root causes for quality related problems/defects; 3) Correction of root causes related to detected problems/defects; and, 4) Follow-up to ensure quality related problems/defects do not recur; a mature QMS requires the contractor be the proactive party on quality issues. The goal is to obtain performance reflective of continuous improvement with no reliance on DCMA’s surveillance to detect problems/defects, determine root causes, or ensure quality related problems/defects do not recur.

7.2 Maintains an inspection process acceptable to the Government and records of inspections, which shall be made available to the Government as long as the contract requires in accordance with the Inspection of Supply/Services clause(s) identified in the contract/order.

7.3 Responsible for ensuring personnel, information, system, property, facility and, if applicable, international security requirements are met in accordance with the DD Form 254, Department of Defense Contract Security Classification Specification, and applicable Government regulations.

7.4 Signs and returns a positive PAR within five business days. Signs and returns a negative PAR with corrective action identified by the suspense date. Signs and returns a CAR with a corrective action plan by the suspense date.

8.0 Contractor Performance Assessment Reporting System (CPARS): The total estimated value of the contract exceeds $1,000,000.00; therefore, CPARS reporting is required.

8.1 The MFT will evaluate Contractor performance. The Program Manager will, at a minimum, review the PARs and other information contained in the COR Online File to prepare and substantiate the CPAR. CPARS will be updated, at a minimum annually, documenting Contractor performance for the contract/order. More frequent updates may be made, as required, to document a significant improvement or decline in the level of Contractor performance.

8.2 The Contractor shall have input into the CPAR prior to it being finalized. For each reporting period, the Program Manager will provide the Contractor a draft CPAR with no ratings, only justifications, to examine for seven calendar days. After MFT review of the Contractor’s

PR: FD2060-25-00004 PWS REVISION: 1 16

response, the CPAR will be coordinated through management up to the Division level. Once approved, the CPAR will be sent to the Contractor via CPARS for the official 60 calendar day review. The Contractor shall have the option to concur or non-concur, with comments, via

CPARS.

8.3 In evaluating the quality of contractor’s performance, the following performance ratings are used in documenting past performance. The areas rated may include Quality of Service, Business Relations, Management, Cost Control (if applicable), and Schedule.

Performance Rating

Criteria

Exceptional Performance meets contractual requirements and exceeds many to the government’s benefits. The contractual performance of the element or sub-element being assessed was accomplished with no problems and contractor actions were highly effective.

Very Good Performance meets contractual requirements and exceeds some to the government benefits. The contractual performance was accomplished with few minor problems for which corrective actions taken by the contractor were effective.

Satisfactory Performance meets contractual requirements. The contractual performance contains some minor problems for which corrective actions taken by the contractor were satisfactory.

Marginal Performance does not meet some contractual requirements. The contractual performance reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear marginally effective or were not fully implemented.

Unsatisfactory Performance does not meet most contractual requirements, and recovery is not likely in a timely manner. The contractual performance contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

PR: FD2060-25-00004 PWS REVISION: 1 17

9.0 Appendices

9.1 Appendix A, Reference(s)

Publication Title of Publication

Date of Publication

Sections(s) that Apply

How to Obtain

32 CFR Part

National Industrial Security Program Operating Manual

(NISPOM).

24 Feb 2021 32 CFR Part 117 https://www.ecfr.gov/current/title-32/subtitle-A/chapter- I/subchapter-D/part-117

DoDD 4715.1E

Environment, Safety, and Occupational Health (ESOH)

19 March

DoDD 4715.1E https://www.esd.whs.mil/Directives/issuances/dodm/

Public Law 91-596

Occupational Safety and Health Act of 1970

29 Dec 1970 Entire https://uscode.house.gov/statutes/pl/91/596.pdf

DAFI 91-

Safety Investigations and Reports

10 March

Entire Document https://milreg.com/File.aspx?id=3298

DoDD 5205.02E

DoD Operations Security (OPSEC) Program

20 June, 2012 DoDD 5205.02E https://www.esd.whs.mil/Directives/issuances/dodm/

DoD Manual 5205.02-M

DoD Operations Security (OPSEC) Program Manual

3 Nov 2008 DoD Manual 5205.02-M https://www.esd.whs.mil/Directives/issuances/dodm/

FAR Federal Acquisition Regulation

Varies FAR 52.245-1, FAR

52.246-11 https://www.acquisition.gov/

DFAR Defense Federal Acquisition Regulation Supplement

Varies DFARS 252.245- 7005 , https://www.acquisition.gov/dfars Part 252 - SOLICITATION PROVISIONS AND CONTRACT CLAUSES | Acquisition.GOV

DFAR Defense Federal Acquisition Regulation Supplement

Varies DFAR 252.204-

Part 252 - SOLICITATION PROVISIONS AND CONTRACT CLAUSES | Acquisition.GOV

MIL-STD-

129R

Department of Defense / Standard Practice / Military Marking for Shipment and Storage

25-Feb-2023 Entire Document https://quicksearch.dla.mil/qsSearch.aspx

MIL-STD-

130N

Department of Defense Standard Practice

16-Nov-2012 Entire Document https://quicksearch.dla.mil/qsSearch.aspx https://www.acquisition.gov/dfars https://www.acquisition.gov/dfars/part-252-solicitation-provisions-and-contract-clauses#DFARS_252.245-7005 https://www.acquisition.gov/dfars/part-252-solicitation-provisions-and-contract-clauses#DFARS_252.245-7005

PR: FD2060-25-00004 PWS REVISION: 1 18

Identification Marking of

MIL-STD-

2073-1E

Standard Practice for Military Packaging

27-Jun-2024 Entire Document https://quicksearch.dla.mil/qsSearch.aspx

MIL-B-

8942A

Bearing, Plain, TFE Lined, self-aligning

10-Feb-1978 & 15-Nov-

Entire Document https://quicksearch.dla.mil/qsSearch.aspx

MIL-

HDBK-

6870C

Nondestructive Inspection Program Requirements for Aircraft and Missile Materials and Parts

09-Sept-2020 Entire Document https://quicksearch.dla.mil/qsSearch.aspx

SAE-AMS-

QQ-A-367E

Aluminum Alloy Forgings

01-Sept-2000 Entire Document https://www.sae.org/standards/content/amsqqa367/

SAE-AMS-

H-6088

Heat Treatment of Aluminum Alloys

30-Jun-1997 Entire Document https://www.sae.org/standards/content/amsh6088b/

STP 53-201 Penetrant General Requirements

07-April-

Entire Document

Provided in Data Package

STP 57-401 Cleaning of Titanium & Titanium Alloys

15-Dec-1989 Entire Document

Provided in Data Package

DS30001 Design Standard :

Casting and Forgings

15-Feb-1979 Entire Document

Provided in Data Package

ASME

B46.1

American National Standards Institute: Surface Texture (Roughness, Waviness, Lay)

2019 https://webstore.ansi.org/standards/asme/asmeb462019

MIL-PRF-

46010H

Lubricant, Solid Film, Heat Cured, Corrosion Inhibiting

13-Nov-2019 Entire Document https://quicksearch.dla.mil/qsSearch.aspx

4F23832 Assembly of Bearing-Trunnion

MLG

As referenced in the PWS

Provided in Data Package

4F23215 Retainer – Bearing, MLG Trunnion

As referenced in the PWS

Provided in Data Package

4F90004 Envelope Drawing Specification Control Type

As referenced in the PWS

Provided in Data Package

File details come from the government source that posted it. Updated .