Amendment - FA8534-24-R-0001-0001.pdf
PDF 10 MB Posted
- Attached to
- 463L Legacy Cargo Pallets Federal contract opportunity
- Solicitation number
- FA8534-24-R-0001
About this file
This is Amendment 0001 to solicitation FA8534-24-R-0001 issued by the Air Force Materiel Command for 463L Legacy Cargo Pallet repair services. The amendment adds two new attachments to the solicitation: A-E001_CDRL_Attachment-CAVAF_Reporting_Instructions and A-E015_CDRL_Attachment-Monthly_Production_Template.
The underlying solicitation is for a 5-year Firm Fixed Price Requirements contract (1 base year plus four 1-year options) for repair services of 463L Cargo Pallets. The Best Estimated Quantity (BEQ) is 16,800 pallets per year, with a total BEQ of 84,000 pallets across all periods. The contract requires delivery to begin 30 days after receipt of funded orders with a minimum monthly output of 750 pallets. The solicitation will be issued sole source to AAR Mobility Systems (CAGE: 80298) on January 29, 2025, with responses due February 28, 2025. The contractor must include DD1348-1 documentation with shipped assets for DCMA quality assurance purposes.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A-E015 CDRL Attachment - Monthly Production Template.xlsx | XLSX spreadsheet | |
| A-E001 CDRL Attachment - CAVAF Reporting Instructions.pdf | ||
| Exhibit_A_CDRLs.pdf | ||
| FA8534-24-R-0001.pdf | ||
| QASP_Signed - FD2060-24-30585.pdf | ||
| Atch_1-PWS_Legacy_Pallet_Repair_2024.pdf | ||
| 463L_Cargo_Pallet_Drawing_Package.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
J
2. AMENDMENT/MODIFICATION NO.
FA8534-24-R-0001-0001
3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO (If applicable)
6. ISSUED BY CODE
AGILE AIRBASE, AFLCMC/ROKC
235 BYRON ST BLDG 300 STE 19A
ROBINS AFB GA 31098-1670
BUYER: Wesley C. Hardy/ROKC wesley.hardy@us.af.mil
7. ADMINISTERED BY (If other than item 6) CODEFA8534
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE
X
9A. AMENDMENT OF SOLICITATION NO.
FA853424R0001
9B. DATED (SEE ITEM 11)
29-JAN-2025
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods. ( a ) By completing Items 8 and 15, and returning copies of the amendment; ( b ) By acknowledging receipt of this amendment on each copy of the offer submitted; or ( c ) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
15A. NAME AND TITLE OF SIGNER (Type or print)
15B. CONTRACTOR/OFFEROR
BY ________________________________________________________
(Signature of person authorized to sign)
15C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16B. UNITED STATES OF AMERICA
BY ____________________________________________________
(Signature of Contracting Officer)
16C. DATE SIGNED
FACILITY CODE
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
30-105 STANDARD FORM 30 (REV. 10-83)
PRESCRIBED BY GSA
FAR (48 CFR) 53.243
X
X X
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
FA8534-24-R-0001-0001
Continuation of block 14. DESCRIPTION OF AMENDMENT/MODIFICATION
The purpose of this amendment is to:
1. Add the following attachments to the solicitation:
A-E001_CDRL_Attachment-CAVAF_Reporting_Instructions A-E015_CDRL_Attachment-Monthly_Production_Template
2. All other terms and conditions remain unchanged
SUPPLIES OR SERVICES AND PRICES/COSTS
In accordance with the attached CAV AF Reporting Requirements (see the document listed in Section J), the Contractor shall include a DD1348-1 when assets are shipped. DCMA Quality Assurance Representatives (QARs) will not approve or sign the DD1348-1, but will ensure a DD1348-1 is included with each returned asset. If a DD1348-1 is not included with each returned asset, DCMA will not sign the receiving report
(DD250).
7 Ordering
Requirements
Surge Option
Firm Fixed Price
16,800 EA
1670-00-820-4896 General Inspection Repair Method #1 - IAW PWS and specifications
Other Than High Value Item
Origin 80298
Origin Receiving Report Required
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001-2008 2008
Firm Fixed Price
8,064 EA
1670-00-820-4896 Ring Replacement (Per Ring) Repair Method #2 - IAW PWS and specifications
Other Than High Value Item
Origin Origin
Receiving Report Required Commercial Item Inspection
Firm Fixed Price
394 EA
1670-00-820-4896 Corner Bracket Replacement (Per Bracket) Repair Method #3 - IAW PWS and specifications
Other Than High Value Item
Origin Origin
Receiving Report Required Commercial Item Inspection
Firm Fixed Price
504 EA
1670-00-820-4896 Repair of Rails (Per Rail) Repair Method #4 - IAW PWS and specifications
Other Than High Value Item
Origin Origin
Receiving Report Required Commercial Item Inspection
Firm Fixed Price
16,800 EA
1670-00-820-4896 Apply Coatings (Per Pallet) Repair Method #5 - IAW PWS and specifications
Other Than High Value Item
Origin Origin
Receiving Report Required Commercial Item Inspection
Firm Fixed Price
1,365 EA
1670-00-820-4896 New Top & Bottom Skin and Complete Core Plus One Short Rail Repair Method #6 - IAW PWS and specifications.
Other Than High Value Item
Origin 80298
Origin Receiving Report Required
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001-2008 2008
Firm Fixed Price
2,068 EA
1670-00-820-4896 New Top & Bottom Skin and Complete Core Plus One Long Rail Repair Method #7 - IAW PWS and specifications.
Other Than High Value Item
Origin 80298
Origin Receiving Report Required
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001-2008 2008
Firm Fixed Price
465 EA
1670-00-820-4896 New Top & Bottom Skin and Complete Core Plus Two Short Rails Repair Method #8 - IAW PWS and specifications.
Other Than High Value Item
Origin 80298
Origin Receiving Report Required
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001-2008 2008
Firm Fixed Price
820 EA
1670-00-820-4896 Same as Title Repair Method #9 - IAW PWS and specifications.
Other Than High Value Item
Origin 80298
Origin Receiving Report Required
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001-2008 2008
Firm Fixed Price
1,149 EA
1670-00-820-4896 New Top & Bottom Skin and Complete Core Plus Two Long Rails Repair Method #10 - IAW PWS and specifications.
Other Than High Value Item
Origin 80298
Origin Receiving Report Required
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001-2008 2008
Firm Fixed Price
10,584 EA
1670-00-820-4896 New Top & Bottom Skin and Complete Core Repair Method #11 - IAW PWS and specifications.
Other Than High Value Item
Origin 80298
Origin Receiving Report Required
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001-2008 2008
Not Separately Priced
1 NSP
DATA
IAW Attached DD1423s
Other Than High Value Item
Destination Destination
Receiving Report Required A
Commercial Item Inspection
TYPE / SHIP TO CODE F.O.B.
+ IAW1423 DESTINATION
+ IAW1423 1 *30 Calendar Days
+ IAW1423 1
Firm Fixed Price
16,800 EA
1670-00-820-4896 General Inspection Repair Method #1 - IAW PWS and specifications
Other Than High Value Item
Origin 80298
Origin Receiving Report Required
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Firm Fixed Price
8,064 EA
1670-00-820-4896 Ring Replacement (Per Ring) Repair Method #2 - IAW PWS and specifications
Other Than High Value Item
Origin Origin
Receiving Report Required Commercial Item Inspection
Firm Fixed Price
394 EA
1670-00-820-4896 Corner Bracket Replacement (Per Bracket) Repair Method #3 - IAW PWS and specifications
Other Than High Value Item
Origin Origin
Receiving Report Required Commercial Item Inspection
Firm Fixed Price
504 EA
1670-00-820-4896 Repair of Rails (Per Rail) Repair Method #4 - IAW PWS and specifications
Origin Origin
Receiving Report Required Commercial Item Inspection
Firm Fixed Price
16,800 EA
1670-00-820-4896 Apply Coatings (Per Pallet) Repair Method #5 - IAW PWS and specifications
Other Than High Value Item
Origin Origin
Receiving Report Required Commercial Item Inspection
Firm Fixed Price
1,365 EA
1670-00-820-4896 New Top & Bottom Skin and Complete Core Plus One Short Rail Repair Method #6 - IAW PWS and specifications.
Other Than High Value Item
Origin 80298
Origin Receiving Report Required
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Firm Fixed Price
2,068 EA
1670-00-820-4896 New Top & Bottom Skin and Complete Core Plus One Long Rail Repair Method #7 - IAW PWS and specifications.
Other Than High Value Item
Origin 80298
Origin Receiving Report Required
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001-2008 2008
Firm Fixed Price
465 EA
1670-00-820-4896 New Top & Bottom Skin and Complete Core Plus Two Short Rails Repair Method #8 - IAW PWS and specifications.
Other Than High Value Item
Origin 80298
Origin Receiving Report Required
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001-2008 2008
Firm Fixed Price
820 EA
1670-00-820-4896 Same as Title Repair Method #9 - IAW PWS and specifications.
Other Than High Value Item
Origin 80298
Origin Receiving Report Required
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001-2008 2008
Firm Fixed Price
1,149 EA
1670-00-820-4896 New Top & Bottom Skin and Complete Core Plus Two Long Rails Repair Method #10 - IAW PWS and specifications.
Other Than High Value Item
Origin 80298
Origin Receiving Report Required
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001-2008 2008
10,584 EA
1670-00-820-4896 New Top & Bottom Skin and Complete Core Repair Method #11 - IAW PWS and specifications.
Other Than High Value Item
Origin 80298
Origin Receiving Report Required
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001-2008 2008
Not Separately Priced
NSP
DATA
IAW Attached DD1423s
Other Than High Value Item
Destination Destination
Receiving Report Required B
Commercial Item Inspection
TYPE / SHIP TO CODE F.O.B.
+ IAW1423 DESTINATION
+ IAW1423 1 *30 Calendar Days
+ IAW1423 1
Firm Fixed Price
16,800 EA
1670-00-820-4896 General Inspection Repair Method #1 - IAW PWS and specifications
Other Than High Value Item
Origin 80298
Origin Receiving Report Required
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001-2008 2008
Firm Fixed Price
8,064 EA
1670-00-820-4896 Ring Replacement (Per Ring) Repair Method #2 - IAW PWS and specifications
Other Than High Value Item
Origin Origin
Receiving Report Required Commercial Item Inspection
Firm Fixed Price
394 EA
1670-00-820-4896 Corner Bracket Replacement (Per Bracket)
Repair Method #3 - IAW PWS and specifications
Other Than High Value Item
Origin Origin
Receiving Report Required Commercial Item Inspection
Firm Fixed Price
504 EA
1670-00-820-4896 Repair of Rails (Per Rail) Repair Method #4 - IAW PWS and specifications
Other Than High Value Item
Origin Origin
Receiving Report Required Commercial Item Inspection
Firm Fixed Price
16,800 EA
1670-00-820-4896 Apply Coatings (Per Pallet) Repair Method #5 - IAW PWS and specifications
Other Than High Value Item
Origin Origin
Firm Fixed Price
1,365 EA
1670-00-820-4896 New Top & Bottom Skin and Complete Core Plus One Short Rail Repair Method #6 - IAW PWS and specifications.
Other Than High Value Item
Origin 80298
Origin Receiving Report Required
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001-2008 2008
Firm Fixed Price
2,068 EA
1670-00-820-4896 New Top & Bottom Skin and Complete Core Plus One Long Rail Repair Method #7 - IAW PWS and specifications.
Other Than High Value Item
Origin 80298
Origin Receiving Report Required
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001-2008 2008
465 EA
1670-00-820-4896 New Top & Bottom Skin and Complete Core Plus Two Short Rails Repair Method #8 - IAW PWS and specifications.
Other Than High Value Item
Origin 80298
Origin Receiving Report Required
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001-2008 2008
Firm Fixed Price
820 EA
1670-00-820-4896 Same as Title Repair Method #9 - IAW PWS and specifications.
Other Than High Value Item
Origin 80298
Origin Receiving Report Required
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001-2008 2008
1,149 EA
1670-00-820-4896 New Top & Bottom Skin and Complete Core Plus Two Long Rails Repair Method #10 - IAW PWS and specifications.
Other Than High Value Item
Origin 80298
Origin Receiving Report Required
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001-2008 2008
Firm Fixed Price
10,584 EA
1670-00-820-4896 New Top & Bottom Skin and Complete Core Repair Method #11 - IAW PWS and specifications.
Other Than High Value Item
Origin 80298
Origin Receiving Report Required
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001-2008 2008
Not Separately Priced
DATA
IAW Attached DD1423s
Other Than High Value Item
Destination Destination
Receiving Report Required C
Commercial Item Inspection
+ IAW1423 1 *30 Calendar Days
+ IAW1423 1
Firm Fixed Price
16,800 EA
1670-00-820-4896 General Inspection Repair Method #1 - IAW PWS and specifications
Other Than High Value Item
Origin 80298
Origin Receiving Report Required
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001-2008 2008
8,064 EA
1670-00-820-4896 Ring Replacement (Per Ring) Repair Method #2 - IAW PWS and specifications
Other Than High Value Item
Origin Origin
Receiving Report Required Commercial Item Inspection
Firm Fixed Price
394 EA
1670-00-820-4896 Corner Bracket Replacement (Per Bracket) Repair Method #3 - IAW PWS and specifications
Other Than High Value Item
Origin Origin
Receiving Report Required Commercial Item Inspection
Firm Fixed Price
504 EA
1670-00-820-4896 Repair of Rails (Per Rail) Repair Method #4 - IAW PWS and specifications
Other Than High Value Item
Origin Origin
Commercial Item Inspection
Firm Fixed Price
16,800 EA
1670-00-820-4896 Apply Coatings (Per Pallet) Repair Method #5 - IAW PWS and specifications
Other Than High Value Item
Origin Origin
Receiving Report Required Commercial Item Inspection
Firm Fixed Price
1,365 EA
1670-00-820-4896 New Top & Bottom Skin and Complete Core Plus One Short Rail Repair Method #6 - IAW PWS and specifications.
Other Than High Value Item
Origin 80298
Origin Receiving Report Required
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Firm Fixed Price
2,068 EA
1670-00-820-4896 New Top & Bottom Skin and Complete Core Plus One Long Rail Repair Method #7 - IAW PWS and specifications.
Other Than High Value Item
Origin 80298
Origin Receiving Report Required
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001-2008 2008
Firm Fixed Price
465 EA
1670-00-820-4896 New Top & Bottom Skin and Complete Core Plus Two Short Rails Repair Method #8 - IAW PWS and specifications.
Other Than High Value Item
Origin 80298
Origin Receiving Report Required
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001-2008 2008
820 EA
1670-00-820-4896 Same as Title Repair Method #9 - IAW PWS and specifications.
Other Than High Value Item
Origin 80298
Origin Receiving Report Required
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001-2008 2008
Firm Fixed Price
1,149 EA
1670-00-820-4896 New Top & Bottom Skin and Complete Core Plus Two Long Rails Repair Method #10 - IAW PWS and specifications.
Other Than High Value Item
Origin 80298
Origin Receiving Report Required
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001-2008 2008
Firm Fixed Price
10,584 EA
New Top & Bottom Skin and Complete Core Repair Method #11 - IAW PWS and specifications.
Other Than High Value Item
Origin 80298
Origin Receiving Report Required
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001-2008 2008
Not Separately Priced
DATA
IAW Attached DD1423s
Other Than High Value Item
Destination Destination
Receiving Report Required D
Commercial Item Inspection
TYPE / SHIP TO CODE F.O.B.
+ IAW1423 DESTINATION
+ IAW1423 1 *30 Calendar Days
+ IAW1423 1
Firm Fixed Price
16,800 EA
1670-00-820-4896 General Inspection Repair Method #1 - IAW PWS and specifications
Other Than High Value Item
Origin 80298
Origin Receiving Report Required
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001-2008 2008
Firm Fixed Price
8,064 EA
1670-00-820-4896 Ring Replacement (Per Ring) Repair Method #2 - IAW PWS and specifications
Other Than High Value Item
Origin Origin
Receiving Report Required Commercial Item Inspection
Firm Fixed Price
394 EA
Corner Bracket Replacement (Per Bracket)
Repair Method #3 - IAW PWS and specifications
Other Than High Value Item
Origin Origin
Receiving Report Required Commercial Item Inspection
Firm Fixed Price
504 EA
1670-00-820-4896 Repair of Rails (Per Rail) Repair Method #4 - IAW PWS and specifications
Other Than High Value Item
Origin Origin
Receiving Report Required Commercial Item Inspection
Firm Fixed Price
16,800 EA
1670-00-820-4896 Apply Coatings (Per Pallet) Repair Method #5 - IAW PWS and specifications
Other Than High Value Item
Origin Origin
Firm Fixed Price
1,365 EA
1670-00-820-4896 New Top & Bottom Skin and Complete Core Plus One Short Rail Repair Method #6 - IAW PWS and specifications.
Other Than High Value Item
Origin 80298
Origin Receiving Report Required
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001-2008 2008
Firm Fixed Price
2,068 EA
1670-00-820-4896 New Top & Bottom Skin and Complete Core Plus One Long Rail Repair Method #7 - IAW PWS and specifications.
Other Than High Value Item
Origin 80298
Origin Receiving Report Required
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001-2008 2008
465 EA
1670-00-820-4896 New Top & Bottom Skin and Complete Core Plus Two Short Rails Repair Method #8 - IAW PWS and specifications.
Other Than High Value Item
Origin 80298
Origin Receiving Report Required
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001-2008 2008
Firm Fixed Price
820 EA
1670-00-820-4896 Same as Title Repair Method #9 - IAW PWS and specifications.
Other Than High Value Item
Origin 80298
Origin Receiving Report Required
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001-2008 2008
1,149 EA
1670-00-820-4896 New Top & Bottom Skin and Complete Core Plus Two Long Rails Repair Method #10 - IAW PWS and specifications.
Other Than High Value Item
Origin 80298
Origin Receiving Report Required
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001-2008 2008
Firm Fixed Price
10,584 EA
1670-00-820-4896 New Top & Bottom Skin and Complete Core Repair Method #11 - IAW PWS and specifications.
Other Than High Value Item
Origin 80298
Origin Receiving Report Required
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001-2008 2008
Not Separately Priced
DATA
IAW Attached DD1423s
Other Than High Value Item
Destination Destination
Receiving Report Required E
Commercial Item Inspection
TYPE / SHIP TO CODE F.O.B.
+ IAW1423 DESTINATION
+ IAW1423 1 *30 Calendar Days
+ IAW1423 1
A001 Not Separately Priced
1 LO NSP
DATA
Commercial Asset Visibility Air Force (CAVAF)
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001:2015 31DEC2015
+ IAW1423 1 LO
+ IAW1423 1 LO
A002 Not Separately Priced
1 LO NSP
DATA
Government Property Inventory Report
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001:2015 31DEC2015
+ IAW1423 1 LO
+ IAW1423 1 LO
A003 Not Separately Priced
1 LO NSP
DATA
Request for Variance
Other Than High Value Item
Destination Destination
A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001:2015 31DEC2015
+ IAW1423 1 LO
+ IAW1423 1 LO
A004 Not Separately Priced
1 LO NSP
DATA
Engineering Change Proposal (ECP)
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001:2015 31DEC2015
+ IAW1423 1 LO
+ IAW1423 1 LO
A005 Not Separately Priced
1 LO NSP
DATA
Notice of Revision (NOR)
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001:2015 31DEC2015
+ IAW1423 1 LO
+ IAW1423 1 LO
A006 Not Separately Priced
1 LO NSP
DATA
Repairable Item Inspection Report/Damaged Item Inspection Report
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
+ IAW1423 1 LO
A007 Not Separately Priced
1 LO NSP
DATA
Technical Manual Contract Requirement (TMCR)
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001:2015 31DEC2015
+ IAW1423 1 LO
+ IAW1423 1 LO
A008 Not Separately Priced
1 LO NSP
DATA
Acquisition and Sustainment Data Package (ASDP)Engineering Design Data and Associated Lists (EDDAL)
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001:2015 31DEC2015
+ IAW1423 1 LO
+ IAW1423 1 LO
A009 Not Separately Priced
1 LO NSP
DATA
Test/Inspection Report/Monthly Lot Sample Size Test Report
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001:2015 31DEC2015
A010 Not Separately Priced
1 LO NSP
DATA
Repairable Item Inspection Report/Maintenance and Overhaul Report
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001:2015 31DEC2015
+ IAW1423 1 LO
+ IAW1423 1 LO
A011 Not Separately Priced
1 LO NSP
DATA
Accident/Incident Report
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
+ IAW1423 1 LO
+ IAW1423 1 LO
A012 Not Separately Priced
1 LO NSP
DATA
Alerts/Safe-Alerts GIDEP-Alert Report
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001:2015 31DEC2015
+ IAW1423 1 LO
+ IAW1423 1 LO
A013 Not Separately Priced
1 LO NSP
DATA
Alerts/Safe-Alerts GIDEP-Alert Response
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001:2015 31DEC2015
+ IAW1423 1 LO
+ IAW1423 1 LO
A014 Not Separately Priced
1 LO NSP
DATA
Alerts/Safe-Alerts GIDEP-Annual Progress Report
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001:2015 31DEC2015
A015 Not Separately Priced
1 LO NSP
DATA
Contract Depot Maintenance (CDM) Production Report
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001:2015 31DEC2015
+ IAW1423 1 LO
+ IAW1423 1 LO
B001 Not Separately Priced
1 LO NSP
DATA
Commercial Asset Visibility Air Force (CAVAF)
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
+ IAW1423 1 LO
+ IAW1423 1 LO
B002 Not Separately Priced
1 LO NSP
DATA
Government Property Inventory Report
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001:2015 31DEC2015
+ IAW1423 1 LO
+ IAW1423 1 LO
B003 Not Separately Priced
1 LO NSP
DATA
Request for Variance
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001:2015 31DEC2015
+ IAW1423 1 LO
+ IAW1423 1 LO
B004 Not Separately Priced
1 LO NSP
DATA
Engineering Change Proposal (ECP)
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001:2015 31DEC2015
B005 Not Separately Priced
1 LO NSP
DATA
Notice of Revision (NOR)
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001:2015 31DEC2015
+ IAW1423 1 LO
+ IAW1423 1 LO
B006 Not Separately Priced
1 LO NSP
DATA
Repairable Item Inspection Report/Damaged Item Inspection Report
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
+ IAW1423 1 LO
+ IAW1423 1 LO
B007 Not Separately Priced
1 LO NSP
DATA
Technical Manual Contract Requirement (TMCR)
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001:2015 31DEC2015
+ IAW1423 1 LO
+ IAW1423 1 LO
B008 Not Separately Priced
1 LO NSP
DATA
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001:2015 31DEC2015
+ IAW1423 1 LO
+ IAW1423 1 LO
B009 Not Separately Priced
1 LO NSP
DATA
Test/Inspection Report/Monthly Lot Sample Size Test Report
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001:2015 31DEC2015
B010 Not Separately Priced
1 LO NSP
DATA
Repairable Item Inspection Report/Maintenance and Overhaul Report
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001:2015 31DEC2015
+ IAW1423 1 LO
+ IAW1423 1 LO
B011 Not Separately Priced
1 LO NSP
DATA
Accident/Incident Report
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
+ IAW1423 1 LO
+ IAW1423 1 LO
B012 Not Separately Priced
1 LO NSP
DATA
Alerts/Safe-Alerts GIDEP-Alert Report
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001:2015 31DEC2015
+ IAW1423 1 LO
+ IAW1423 1 LO
B013 Not Separately Priced
1 LO NSP
DATA
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001:2015 31DEC2015
+ IAW1423 1 LO
+ IAW1423 1 LO
B014 Not Separately Priced
1 LO NSP
DATA
Alerts/Safe-Alerts GIDEP-Annual Progress Report
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001:2015 31DEC2015
B015 Not Separately Priced
1 LO NSP
DATA
Contract Depot Maintenance (CDM) Production Report
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001:2015 31DEC2015
+ IAW1423 1 LO
+ IAW1423 1 LO
C001 Not Separately Priced
1 LO NSP
DATA
Commercial Asset Visibility Air Force (CAVAF)
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
+ IAW1423 1 LO
+ IAW1423 1 LO
C002 Not Separately Priced
1 LO NSP
DATA
Government Property Inventory Report
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001:2015 31DEC2015
+ IAW1423 1 LO
+ IAW1423 1 LO
C003 Not Separately Priced
1 LO NSP
DATA
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001:2015 31DEC2015
+ IAW1423 1 LO
+ IAW1423 1 LO
C004 Not Separately Priced
1 LO NSP
DATA
Engineering Change Proposal (ECP)
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001:2015 31DEC2015
C005 Not Separately Priced
1 LO NSP
DATA
Notice of Revision (NOR)
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001:2015 31DEC2015
+ IAW1423 1 LO
+ IAW1423 1 LO
C006 Not Separately Priced
1 LO NSP
DATA
Repairable Item Inspection Report/Damaged Item Inspection Report
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
+ IAW1423 1 LO
+ IAW1423 1 LO
C007 Not Separately Priced
1 LO NSP
DATA
Technical Manual Contract Requirement (TMCR)
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001:2015 31DEC2015
+ IAW1423 1 LO
+ IAW1423 1 LO
C008 Not Separately Priced
1 LO NSP
DATA
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001:2015 31DEC2015
+ IAW1423 1 LO
+ IAW1423 1 LO
C009 Not Separately Priced
1 LO NSP
DATA
Test/Inspection Report/Monthly Lot Sample Size Test Report
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001:2015 31DEC2015
C010 Not Separately Priced
1 LO NSP
DATA
Repairable Item Inspection Report/Maintenance and Overhaul Report
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001:2015 31DEC2015
+ IAW1423 1 LO
+ IAW1423 1 LO
C011 Not Separately Priced
1 LO NSP
DATA
Accident/Incident Report
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
+ IAW1423 1 LO
+ IAW1423 1 LO
C012 Not Separately Priced
1 LO NSP
DATA
Alerts/Safe-Alerts GIDEP-Alert Report
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001:2015 31DEC2015
+ IAW1423 1 LO
+ IAW1423 1 LO
C013 Not Separately Priced
1 LO NSP
DATA
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001:2015 31DEC2015
+ IAW1423 1 LO
+ IAW1423 1 LO
C014 Not Separately Priced
1 LO NSP
DATA
Alerts/Safe-Alerts GIDEP-Annual Progress Report
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001:2015 31DEC2015
C015 Not Separately Priced
1 LO NSP
DATA
Contract Depot Maintenance (CDM) Production Report
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001:2015 31DEC2015
+ IAW1423 1 LO
+ IAW1423 1 LO
D001 Not Separately Priced
1 LO NSP
DATA
Commercial Asset Visibility Air Force (CAVAF)
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
+ IAW1423 1 LO
+ IAW1423 1 LO
D002 Not Separately Priced
1 LO NSP
DATA
Government Property Inventory Report
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001:2015 31DEC2015
+ IAW1423 1 LO
+ IAW1423 1 LO
D003 Not Separately Priced
1 LO NSP
DATA
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001:2015 31DEC2015
+ IAW1423 1 LO
+ IAW1423 1 LO
D004 Not Separately Priced
1 LO NSP
DATA
Engineering Change Proposal (ECP)
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001:2015 31DEC2015
D005 Not Separately Priced
1 LO NSP
DATA
Notice of Revision (NOR)
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001:2015 31DEC2015
+ IAW1423 1 LO
+ IAW1423 1 LO
D006 Not Separately Priced
1 LO NSP
DATA
Repairable Item Inspection Report/Damaged Item Inspection Report
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
+ IAW1423 1 LO
+ IAW1423 1 LO
D007 Not Separately Priced
1 LO NSP
DATA
Technical Manual Contract Requirement (TMCR)
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001:2015 31DEC2015
+ IAW1423 1 LO
+ IAW1423 1 LO
D008 Not Separately Priced
1 LO NSP
DATA
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001:2015 31DEC2015
+ IAW1423 1 LO
+ IAW1423 1 LO
D009 Not Separately Priced
1 LO NSP
DATA
Test/Inspection Report/Monthly Lot Sample Size Test Report
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001:2015 31DEC2015
D010 Not Separately Priced
1 LO NSP
DATA
Repairable Item Inspection Report/Maintenance and Overhaul Report
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001:2015 31DEC2015
+ IAW1423 1 LO
+ IAW1423 1 LO
D011 Not Separately Priced
1 LO NSP
DATA
Accident/Incident Report
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
+ IAW1423 1 LO
+ IAW1423 1 LO
D012 Not Separately Priced
1 LO NSP
DATA
Alerts/Safe-Alerts GIDEP-Alert Report
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001:2015 31DEC2015
+ IAW1423 1 LO
+ IAW1423 1 LO
D013 Not Separately Priced
1 LO NSP
DATA
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001:2015 31DEC2015
+ IAW1423 1 LO
+ IAW1423 1 LO
D014 Not Separately Priced
1 LO NSP
DATA
Alerts/Safe-Alerts GIDEP-Annual Progress Report
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001:2015 31DEC2015
D015 Not Separately Priced
1 LO NSP
DATA
Contract Depot Maintenance (CDM) Production Report
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001:2015 31DEC2015
+ IAW1423 1 LO
+ IAW1423 1 LO
E001 Not Separately Priced
1 LO NSP
DATA
Commercial Asset Visibility Air Force (CAVAF)
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
+ IAW1423 1 LO
+ IAW1423 1 LO
E002 Not Separately Priced
1 LO NSP
DATA
Government Property Inventory Report
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001:2015 31DEC2015
+ IAW1423 1 LO
+ IAW1423 1 LO
E003 Not Separately Priced
1 LO NSP
DATA
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001:2015 31DEC2015
+ IAW1423 1 LO
+ IAW1423 1 LO
E004 Not Separately Priced
1 LO NSP
DATA
Engineering Change Proposal (ECP)
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001:2015 31DEC2015
E005 Not Separately Priced
1 LO NSP
DATA
Notice of Revision (NOR)
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001:2015 31DEC2015
+ IAW1423 1 LO
+ IAW1423 1 LO
E006 Not Separately Priced
1 LO NSP
DATA
Repairable Item Inspection Report/Damaged Item Inspection Report
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
+ IAW1423 1 LO
+ IAW1423 1 LO
E007 Not Separately Priced
1 LO NSP
DATA
Technical Manual Contract Requirement (TMCR)
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001:2015 31DEC2015
+ IAW1423 1 LO
+ IAW1423 1 LO
E008 Not Separately Priced
1 LO NSP
DATA
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001:2015 31DEC2015
+ IAW1423 1 LO
+ IAW1423 1 LO
E009 Not Separately Priced
1 LO NSP
DATA
Test/Inspection Report/Monthly Lot Sample Size Test Report
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001:2015 31DEC2015
E010 Not Separately Priced
1 LO NSP
DATA
Repairable Item Inspection Report/Maintenance and Overhaul Report
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001:2015 31DEC2015
+ IAW1423 1 LO
+ IAW1423 1 LO
E011 Not Separately Priced
1 LO NSP
DATA
Accident/Incident Report
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
+ IAW1423 1 LO
+ IAW1423 1 LO
E012 Not Separately Priced
1 LO NSP
DATA
Alerts/Safe-Alerts GIDEP-Alert Report
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001:2015 31DEC2015
+ IAW1423 1 LO
+ IAW1423 1 LO
E013 Not Separately Priced
1 LO NSP
DATA
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001:2015 31DEC2015
+ IAW1423 1 LO
+ IAW1423 1 LO
E014 Not Separately Priced
1 LO NSP
DATA
Alerts/Safe-Alerts GIDEP-Annual Progress Report
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001:2015 31DEC2015
E015 Not Separately Priced
1 LO NSP
DATA
Contract Depot Maintenance (CDM) Production Report
Other Than High Value Item
Destination Destination
Receiving Report Required A
Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001:2015 31DEC2015
+ IAW1423 1 LO
+ IAW1423 1 LO
+ IAW1423
+ TBD
ADDENDUM TO CLAUSE 52.212-4
(JAN 2023)
(IAW IAW 204.7203)
252.204-7004 BASIC AGREEMENT APPLICABILITY (JAN 2023)
ACCOUNTING AND APPROPRIATION DATA (AUG 1998)
Accounting and Appropriation Chargeable ACRN Funds Citation Amount Chargeable
TO BE CITED ON EACH INDIVIDUAL ORDER $0.00
Form Number Description/File Name Date Number of Pages Atch_1-PWS.pdf 15JAN2025 19
Atch_2-QASP.pdf 29APR2024 13
Atch_3-Legacy_Pallet_Drawing_Package.pdf UNDATED 28
1423 Exhibit_A_CDRLs.pdf UNDATED 48
A-E001_CDRL_Attachment-CAVAF_Reporting_Instr uctions.pdf
01DEC2023 7
A-E015_CDRL_Attachment-Monthly_Production_T emplate
UNDATED
File details come from the government source that posted it. Updated .