Amendment - FA8534-24-R-0001-0001.pdf

PDF 10 MB Posted

Attached to
463L Legacy Cargo Pallets Federal contract opportunity
Solicitation number
FA8534-24-R-0001
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

This is Amendment 0001 to solicitation FA8534-24-R-0001 issued by the Air Force Materiel Command for 463L Legacy Cargo Pallet repair services. The amendment adds two new attachments to the solicitation: A-E001_CDRL_Attachment-CAVAF_Reporting_Instructions and A-E015_CDRL_Attachment-Monthly_Production_Template.

The underlying solicitation is for a 5-year Firm Fixed Price Requirements contract (1 base year plus four 1-year options) for repair services of 463L Cargo Pallets. The Best Estimated Quantity (BEQ) is 16,800 pallets per year, with a total BEQ of 84,000 pallets across all periods. The contract requires delivery to begin 30 days after receipt of funded orders with a minimum monthly output of 750 pallets. The solicitation will be issued sole source to AAR Mobility Systems (CAGE: 80298) on January 29, 2025, with responses due February 28, 2025. The contractor must include DD1348-1 documentation with shipped assets for DCMA quality assurance purposes.

View the file

Other files for this federal contract opportunity

Other files attached to 463L Legacy Cargo Pallets, newest first.
File Type Posted
A-E015 CDRL Attachment - Monthly Production Template.xlsx XLSX spreadsheet
A-E001 CDRL Attachment - CAVAF Reporting Instructions.pdf PDF
Exhibit_A_CDRLs.pdf PDF
FA8534-24-R-0001.pdf PDF
QASP_Signed - FD2060-24-30585.pdf PDF
Atch_1-PWS_Legacy_Pallet_Repair_2024.pdf PDF
463L_Cargo_Pallet_Drawing_Package.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

J

2. AMENDMENT/MODIFICATION NO.

FA8534-24-R-0001-0001

3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO (If applicable)

6. ISSUED BY CODE

AGILE AIRBASE, AFLCMC/ROKC

235 BYRON ST BLDG 300 STE 19A

ROBINS AFB GA 31098-1670

BUYER: Wesley C. Hardy/ROKC wesley.hardy@us.af.mil

7. ADMINISTERED BY (If other than item 6) CODEFA8534

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE

X

9A. AMENDMENT OF SOLICITATION NO.

FA853424R0001

9B. DATED (SEE ITEM 11)

29-JAN-2025

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods. ( a ) By completing Items 8 and 15, and returning copies of the amendment; ( b ) By acknowledging receipt of this amendment on each copy of the offer submitted; or ( c ) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

15A. NAME AND TITLE OF SIGNER (Type or print)

15B. CONTRACTOR/OFFEROR

BY ________________________________________________________

(Signature of person authorized to sign)

15C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16B. UNITED STATES OF AMERICA

BY ____________________________________________________

(Signature of Contracting Officer)

16C. DATE SIGNED

FACILITY CODE

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

30-105 STANDARD FORM 30 (REV. 10-83)

PRESCRIBED BY GSA

FAR (48 CFR) 53.243

X

X X

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

FA8534-24-R-0001-0001

Continuation of block 14. DESCRIPTION OF AMENDMENT/MODIFICATION

The purpose of this amendment is to:

1. Add the following attachments to the solicitation:

A-E001_CDRL_Attachment-CAVAF_Reporting_Instructions A-E015_CDRL_Attachment-Monthly_Production_Template

2. All other terms and conditions remain unchanged

SUPPLIES OR SERVICES AND PRICES/COSTS

In accordance with the attached CAV AF Reporting Requirements (see the document listed in Section J), the Contractor shall include a DD1348-1 when assets are shipped. DCMA Quality Assurance Representatives (QARs) will not approve or sign the DD1348-1, but will ensure a DD1348-1 is included with each returned asset. If a DD1348-1 is not included with each returned asset, DCMA will not sign the receiving report

(DD250).

7 Ordering

Requirements

Surge Option

Firm Fixed Price

16,800 EA

1670-00-820-4896 General Inspection Repair Method #1 - IAW PWS and specifications

Other Than High Value Item

Origin 80298

Origin Receiving Report Required

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001-2008 2008

Firm Fixed Price

8,064 EA

1670-00-820-4896 Ring Replacement (Per Ring) Repair Method #2 - IAW PWS and specifications

Other Than High Value Item

Origin Origin

Receiving Report Required Commercial Item Inspection

Firm Fixed Price

394 EA

1670-00-820-4896 Corner Bracket Replacement (Per Bracket) Repair Method #3 - IAW PWS and specifications

Other Than High Value Item

Origin Origin

Receiving Report Required Commercial Item Inspection

Firm Fixed Price

504 EA

1670-00-820-4896 Repair of Rails (Per Rail) Repair Method #4 - IAW PWS and specifications

Other Than High Value Item

Origin Origin

Receiving Report Required Commercial Item Inspection

Firm Fixed Price

16,800 EA

1670-00-820-4896 Apply Coatings (Per Pallet) Repair Method #5 - IAW PWS and specifications

Other Than High Value Item

Origin Origin

Receiving Report Required Commercial Item Inspection

Firm Fixed Price

1,365 EA

1670-00-820-4896 New Top & Bottom Skin and Complete Core Plus One Short Rail Repair Method #6 - IAW PWS and specifications.

Other Than High Value Item

Origin 80298

Origin Receiving Report Required

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001-2008 2008

Firm Fixed Price

2,068 EA

1670-00-820-4896 New Top & Bottom Skin and Complete Core Plus One Long Rail Repair Method #7 - IAW PWS and specifications.

Other Than High Value Item

Origin 80298

Origin Receiving Report Required

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001-2008 2008

Firm Fixed Price

465 EA

1670-00-820-4896 New Top & Bottom Skin and Complete Core Plus Two Short Rails Repair Method #8 - IAW PWS and specifications.

Other Than High Value Item

Origin 80298

Origin Receiving Report Required

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001-2008 2008

Firm Fixed Price

820 EA

1670-00-820-4896 Same as Title Repair Method #9 - IAW PWS and specifications.

Other Than High Value Item

Origin 80298

Origin Receiving Report Required

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001-2008 2008

Firm Fixed Price

1,149 EA

1670-00-820-4896 New Top & Bottom Skin and Complete Core Plus Two Long Rails Repair Method #10 - IAW PWS and specifications.

Other Than High Value Item

Origin 80298

Origin Receiving Report Required

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001-2008 2008

Firm Fixed Price

10,584 EA

1670-00-820-4896 New Top & Bottom Skin and Complete Core Repair Method #11 - IAW PWS and specifications.

Other Than High Value Item

Origin 80298

Origin Receiving Report Required

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001-2008 2008

Not Separately Priced

1 NSP

DATA

IAW Attached DD1423s

Other Than High Value Item

Destination Destination

Receiving Report Required A

Commercial Item Inspection

TYPE / SHIP TO CODE F.O.B.

+ IAW1423 DESTINATION

+ IAW1423 1 *30 Calendar Days

+ IAW1423 1

Firm Fixed Price

16,800 EA

1670-00-820-4896 General Inspection Repair Method #1 - IAW PWS and specifications

Other Than High Value Item

Origin 80298

Origin Receiving Report Required

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Firm Fixed Price

8,064 EA

1670-00-820-4896 Ring Replacement (Per Ring) Repair Method #2 - IAW PWS and specifications

Other Than High Value Item

Origin Origin

Receiving Report Required Commercial Item Inspection

Firm Fixed Price

394 EA

1670-00-820-4896 Corner Bracket Replacement (Per Bracket) Repair Method #3 - IAW PWS and specifications

Other Than High Value Item

Origin Origin

Receiving Report Required Commercial Item Inspection

Firm Fixed Price

504 EA

1670-00-820-4896 Repair of Rails (Per Rail) Repair Method #4 - IAW PWS and specifications

Origin Origin

Receiving Report Required Commercial Item Inspection

Firm Fixed Price

16,800 EA

1670-00-820-4896 Apply Coatings (Per Pallet) Repair Method #5 - IAW PWS and specifications

Other Than High Value Item

Origin Origin

Receiving Report Required Commercial Item Inspection

Firm Fixed Price

1,365 EA

1670-00-820-4896 New Top & Bottom Skin and Complete Core Plus One Short Rail Repair Method #6 - IAW PWS and specifications.

Other Than High Value Item

Origin 80298

Origin Receiving Report Required

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Firm Fixed Price

2,068 EA

1670-00-820-4896 New Top & Bottom Skin and Complete Core Plus One Long Rail Repair Method #7 - IAW PWS and specifications.

Other Than High Value Item

Origin 80298

Origin Receiving Report Required

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001-2008 2008

Firm Fixed Price

465 EA

1670-00-820-4896 New Top & Bottom Skin and Complete Core Plus Two Short Rails Repair Method #8 - IAW PWS and specifications.

Other Than High Value Item

Origin 80298

Origin Receiving Report Required

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001-2008 2008

Firm Fixed Price

820 EA

1670-00-820-4896 Same as Title Repair Method #9 - IAW PWS and specifications.

Other Than High Value Item

Origin 80298

Origin Receiving Report Required

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001-2008 2008

Firm Fixed Price

1,149 EA

1670-00-820-4896 New Top & Bottom Skin and Complete Core Plus Two Long Rails Repair Method #10 - IAW PWS and specifications.

Other Than High Value Item

Origin 80298

Origin Receiving Report Required

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001-2008 2008

10,584 EA

1670-00-820-4896 New Top & Bottom Skin and Complete Core Repair Method #11 - IAW PWS and specifications.

Other Than High Value Item

Origin 80298

Origin Receiving Report Required

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001-2008 2008

Not Separately Priced

NSP

DATA

IAW Attached DD1423s

Other Than High Value Item

Destination Destination

Receiving Report Required B

Commercial Item Inspection

TYPE / SHIP TO CODE F.O.B.

+ IAW1423 DESTINATION

+ IAW1423 1 *30 Calendar Days

+ IAW1423 1

Firm Fixed Price

16,800 EA

1670-00-820-4896 General Inspection Repair Method #1 - IAW PWS and specifications

Other Than High Value Item

Origin 80298

Origin Receiving Report Required

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001-2008 2008

Firm Fixed Price

8,064 EA

1670-00-820-4896 Ring Replacement (Per Ring) Repair Method #2 - IAW PWS and specifications

Other Than High Value Item

Origin Origin

Receiving Report Required Commercial Item Inspection

Firm Fixed Price

394 EA

1670-00-820-4896 Corner Bracket Replacement (Per Bracket)

Repair Method #3 - IAW PWS and specifications

Other Than High Value Item

Origin Origin

Receiving Report Required Commercial Item Inspection

Firm Fixed Price

504 EA

1670-00-820-4896 Repair of Rails (Per Rail) Repair Method #4 - IAW PWS and specifications

Other Than High Value Item

Origin Origin

Receiving Report Required Commercial Item Inspection

Firm Fixed Price

16,800 EA

1670-00-820-4896 Apply Coatings (Per Pallet) Repair Method #5 - IAW PWS and specifications

Other Than High Value Item

Origin Origin

Firm Fixed Price

1,365 EA

1670-00-820-4896 New Top & Bottom Skin and Complete Core Plus One Short Rail Repair Method #6 - IAW PWS and specifications.

Other Than High Value Item

Origin 80298

Origin Receiving Report Required

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001-2008 2008

Firm Fixed Price

2,068 EA

1670-00-820-4896 New Top & Bottom Skin and Complete Core Plus One Long Rail Repair Method #7 - IAW PWS and specifications.

Other Than High Value Item

Origin 80298

Origin Receiving Report Required

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001-2008 2008

465 EA

1670-00-820-4896 New Top & Bottom Skin and Complete Core Plus Two Short Rails Repair Method #8 - IAW PWS and specifications.

Other Than High Value Item

Origin 80298

Origin Receiving Report Required

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001-2008 2008

Firm Fixed Price

820 EA

1670-00-820-4896 Same as Title Repair Method #9 - IAW PWS and specifications.

Other Than High Value Item

Origin 80298

Origin Receiving Report Required

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001-2008 2008

1,149 EA

1670-00-820-4896 New Top & Bottom Skin and Complete Core Plus Two Long Rails Repair Method #10 - IAW PWS and specifications.

Other Than High Value Item

Origin 80298

Origin Receiving Report Required

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001-2008 2008

Firm Fixed Price

10,584 EA

1670-00-820-4896 New Top & Bottom Skin and Complete Core Repair Method #11 - IAW PWS and specifications.

Other Than High Value Item

Origin 80298

Origin Receiving Report Required

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001-2008 2008

Not Separately Priced

DATA

IAW Attached DD1423s

Other Than High Value Item

Destination Destination

Receiving Report Required C

Commercial Item Inspection

+ IAW1423 1 *30 Calendar Days

+ IAW1423 1

Firm Fixed Price

16,800 EA

1670-00-820-4896 General Inspection Repair Method #1 - IAW PWS and specifications

Other Than High Value Item

Origin 80298

Origin Receiving Report Required

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001-2008 2008

8,064 EA

1670-00-820-4896 Ring Replacement (Per Ring) Repair Method #2 - IAW PWS and specifications

Other Than High Value Item

Origin Origin

Receiving Report Required Commercial Item Inspection

Firm Fixed Price

394 EA

1670-00-820-4896 Corner Bracket Replacement (Per Bracket) Repair Method #3 - IAW PWS and specifications

Other Than High Value Item

Origin Origin

Receiving Report Required Commercial Item Inspection

Firm Fixed Price

504 EA

1670-00-820-4896 Repair of Rails (Per Rail) Repair Method #4 - IAW PWS and specifications

Other Than High Value Item

Origin Origin

Commercial Item Inspection

Firm Fixed Price

16,800 EA

1670-00-820-4896 Apply Coatings (Per Pallet) Repair Method #5 - IAW PWS and specifications

Other Than High Value Item

Origin Origin

Receiving Report Required Commercial Item Inspection

Firm Fixed Price

1,365 EA

1670-00-820-4896 New Top & Bottom Skin and Complete Core Plus One Short Rail Repair Method #6 - IAW PWS and specifications.

Other Than High Value Item

Origin 80298

Origin Receiving Report Required

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Firm Fixed Price

2,068 EA

1670-00-820-4896 New Top & Bottom Skin and Complete Core Plus One Long Rail Repair Method #7 - IAW PWS and specifications.

Other Than High Value Item

Origin 80298

Origin Receiving Report Required

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001-2008 2008

Firm Fixed Price

465 EA

1670-00-820-4896 New Top & Bottom Skin and Complete Core Plus Two Short Rails Repair Method #8 - IAW PWS and specifications.

Other Than High Value Item

Origin 80298

Origin Receiving Report Required

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001-2008 2008

820 EA

1670-00-820-4896 Same as Title Repair Method #9 - IAW PWS and specifications.

Other Than High Value Item

Origin 80298

Origin Receiving Report Required

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001-2008 2008

Firm Fixed Price

1,149 EA

1670-00-820-4896 New Top & Bottom Skin and Complete Core Plus Two Long Rails Repair Method #10 - IAW PWS and specifications.

Other Than High Value Item

Origin 80298

Origin Receiving Report Required

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001-2008 2008

Firm Fixed Price

10,584 EA

New Top & Bottom Skin and Complete Core Repair Method #11 - IAW PWS and specifications.

Other Than High Value Item

Origin 80298

Origin Receiving Report Required

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001-2008 2008

Not Separately Priced

DATA

IAW Attached DD1423s

Other Than High Value Item

Destination Destination

Receiving Report Required D

Commercial Item Inspection

TYPE / SHIP TO CODE F.O.B.

+ IAW1423 DESTINATION

+ IAW1423 1 *30 Calendar Days

+ IAW1423 1

Firm Fixed Price

16,800 EA

1670-00-820-4896 General Inspection Repair Method #1 - IAW PWS and specifications

Other Than High Value Item

Origin 80298

Origin Receiving Report Required

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001-2008 2008

Firm Fixed Price

8,064 EA

1670-00-820-4896 Ring Replacement (Per Ring) Repair Method #2 - IAW PWS and specifications

Other Than High Value Item

Origin Origin

Receiving Report Required Commercial Item Inspection

Firm Fixed Price

394 EA

Corner Bracket Replacement (Per Bracket)

Repair Method #3 - IAW PWS and specifications

Other Than High Value Item

Origin Origin

Receiving Report Required Commercial Item Inspection

Firm Fixed Price

504 EA

1670-00-820-4896 Repair of Rails (Per Rail) Repair Method #4 - IAW PWS and specifications

Other Than High Value Item

Origin Origin

Receiving Report Required Commercial Item Inspection

Firm Fixed Price

16,800 EA

1670-00-820-4896 Apply Coatings (Per Pallet) Repair Method #5 - IAW PWS and specifications

Other Than High Value Item

Origin Origin

Firm Fixed Price

1,365 EA

1670-00-820-4896 New Top & Bottom Skin and Complete Core Plus One Short Rail Repair Method #6 - IAW PWS and specifications.

Other Than High Value Item

Origin 80298

Origin Receiving Report Required

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001-2008 2008

Firm Fixed Price

2,068 EA

1670-00-820-4896 New Top & Bottom Skin and Complete Core Plus One Long Rail Repair Method #7 - IAW PWS and specifications.

Other Than High Value Item

Origin 80298

Origin Receiving Report Required

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001-2008 2008

465 EA

1670-00-820-4896 New Top & Bottom Skin and Complete Core Plus Two Short Rails Repair Method #8 - IAW PWS and specifications.

Other Than High Value Item

Origin 80298

Origin Receiving Report Required

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001-2008 2008

Firm Fixed Price

820 EA

1670-00-820-4896 Same as Title Repair Method #9 - IAW PWS and specifications.

Other Than High Value Item

Origin 80298

Origin Receiving Report Required

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001-2008 2008

1,149 EA

1670-00-820-4896 New Top & Bottom Skin and Complete Core Plus Two Long Rails Repair Method #10 - IAW PWS and specifications.

Other Than High Value Item

Origin 80298

Origin Receiving Report Required

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001-2008 2008

Firm Fixed Price

10,584 EA

1670-00-820-4896 New Top & Bottom Skin and Complete Core Repair Method #11 - IAW PWS and specifications.

Other Than High Value Item

Origin 80298

Origin Receiving Report Required

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001-2008 2008

Not Separately Priced

DATA

IAW Attached DD1423s

Other Than High Value Item

Destination Destination

Receiving Report Required E

Commercial Item Inspection

TYPE / SHIP TO CODE F.O.B.

+ IAW1423 DESTINATION

+ IAW1423 1 *30 Calendar Days

+ IAW1423 1

A001 Not Separately Priced

1 LO NSP

DATA

Commercial Asset Visibility Air Force (CAVAF)

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001:2015 31DEC2015

+ IAW1423 1 LO

+ IAW1423 1 LO

A002 Not Separately Priced

1 LO NSP

DATA

Government Property Inventory Report

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001:2015 31DEC2015

+ IAW1423 1 LO

+ IAW1423 1 LO

A003 Not Separately Priced

1 LO NSP

DATA

Request for Variance

Other Than High Value Item

Destination Destination

A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001:2015 31DEC2015

+ IAW1423 1 LO

+ IAW1423 1 LO

A004 Not Separately Priced

1 LO NSP

DATA

Engineering Change Proposal (ECP)

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001:2015 31DEC2015

+ IAW1423 1 LO

+ IAW1423 1 LO

A005 Not Separately Priced

1 LO NSP

DATA

Notice of Revision (NOR)

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001:2015 31DEC2015

+ IAW1423 1 LO

+ IAW1423 1 LO

A006 Not Separately Priced

1 LO NSP

DATA

Repairable Item Inspection Report/Damaged Item Inspection Report

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

+ IAW1423 1 LO

A007 Not Separately Priced

1 LO NSP

DATA

Technical Manual Contract Requirement (TMCR)

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001:2015 31DEC2015

+ IAW1423 1 LO

+ IAW1423 1 LO

A008 Not Separately Priced

1 LO NSP

DATA

Acquisition and Sustainment Data Package (ASDP)Engineering Design Data and Associated Lists (EDDAL)

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001:2015 31DEC2015

+ IAW1423 1 LO

+ IAW1423 1 LO

A009 Not Separately Priced

1 LO NSP

DATA

Test/Inspection Report/Monthly Lot Sample Size Test Report

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001:2015 31DEC2015

A010 Not Separately Priced

1 LO NSP

DATA

Repairable Item Inspection Report/Maintenance and Overhaul Report

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001:2015 31DEC2015

+ IAW1423 1 LO

+ IAW1423 1 LO

A011 Not Separately Priced

1 LO NSP

DATA

Accident/Incident Report

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

+ IAW1423 1 LO

+ IAW1423 1 LO

A012 Not Separately Priced

1 LO NSP

DATA

Alerts/Safe-Alerts GIDEP-Alert Report

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001:2015 31DEC2015

+ IAW1423 1 LO

+ IAW1423 1 LO

A013 Not Separately Priced

1 LO NSP

DATA

Alerts/Safe-Alerts GIDEP-Alert Response

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001:2015 31DEC2015

+ IAW1423 1 LO

+ IAW1423 1 LO

A014 Not Separately Priced

1 LO NSP

DATA

Alerts/Safe-Alerts GIDEP-Annual Progress Report

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001:2015 31DEC2015

A015 Not Separately Priced

1 LO NSP

DATA

Contract Depot Maintenance (CDM) Production Report

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001:2015 31DEC2015

+ IAW1423 1 LO

+ IAW1423 1 LO

B001 Not Separately Priced

1 LO NSP

DATA

Commercial Asset Visibility Air Force (CAVAF)

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

+ IAW1423 1 LO

+ IAW1423 1 LO

B002 Not Separately Priced

1 LO NSP

DATA

Government Property Inventory Report

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001:2015 31DEC2015

+ IAW1423 1 LO

+ IAW1423 1 LO

B003 Not Separately Priced

1 LO NSP

DATA

Request for Variance

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001:2015 31DEC2015

+ IAW1423 1 LO

+ IAW1423 1 LO

B004 Not Separately Priced

1 LO NSP

DATA

Engineering Change Proposal (ECP)

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001:2015 31DEC2015

B005 Not Separately Priced

1 LO NSP

DATA

Notice of Revision (NOR)

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001:2015 31DEC2015

+ IAW1423 1 LO

+ IAW1423 1 LO

B006 Not Separately Priced

1 LO NSP

DATA

Repairable Item Inspection Report/Damaged Item Inspection Report

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

+ IAW1423 1 LO

+ IAW1423 1 LO

B007 Not Separately Priced

1 LO NSP

DATA

Technical Manual Contract Requirement (TMCR)

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001:2015 31DEC2015

+ IAW1423 1 LO

+ IAW1423 1 LO

B008 Not Separately Priced

1 LO NSP

DATA

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001:2015 31DEC2015

+ IAW1423 1 LO

+ IAW1423 1 LO

B009 Not Separately Priced

1 LO NSP

DATA

Test/Inspection Report/Monthly Lot Sample Size Test Report

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001:2015 31DEC2015

B010 Not Separately Priced

1 LO NSP

DATA

Repairable Item Inspection Report/Maintenance and Overhaul Report

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001:2015 31DEC2015

+ IAW1423 1 LO

+ IAW1423 1 LO

B011 Not Separately Priced

1 LO NSP

DATA

Accident/Incident Report

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

+ IAW1423 1 LO

+ IAW1423 1 LO

B012 Not Separately Priced

1 LO NSP

DATA

Alerts/Safe-Alerts GIDEP-Alert Report

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001:2015 31DEC2015

+ IAW1423 1 LO

+ IAW1423 1 LO

B013 Not Separately Priced

1 LO NSP

DATA

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001:2015 31DEC2015

+ IAW1423 1 LO

+ IAW1423 1 LO

B014 Not Separately Priced

1 LO NSP

DATA

Alerts/Safe-Alerts GIDEP-Annual Progress Report

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001:2015 31DEC2015

B015 Not Separately Priced

1 LO NSP

DATA

Contract Depot Maintenance (CDM) Production Report

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001:2015 31DEC2015

+ IAW1423 1 LO

+ IAW1423 1 LO

C001 Not Separately Priced

1 LO NSP

DATA

Commercial Asset Visibility Air Force (CAVAF)

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

+ IAW1423 1 LO

+ IAW1423 1 LO

C002 Not Separately Priced

1 LO NSP

DATA

Government Property Inventory Report

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001:2015 31DEC2015

+ IAW1423 1 LO

+ IAW1423 1 LO

C003 Not Separately Priced

1 LO NSP

DATA

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001:2015 31DEC2015

+ IAW1423 1 LO

+ IAW1423 1 LO

C004 Not Separately Priced

1 LO NSP

DATA

Engineering Change Proposal (ECP)

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001:2015 31DEC2015

C005 Not Separately Priced

1 LO NSP

DATA

Notice of Revision (NOR)

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001:2015 31DEC2015

+ IAW1423 1 LO

+ IAW1423 1 LO

C006 Not Separately Priced

1 LO NSP

DATA

Repairable Item Inspection Report/Damaged Item Inspection Report

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

+ IAW1423 1 LO

+ IAW1423 1 LO

C007 Not Separately Priced

1 LO NSP

DATA

Technical Manual Contract Requirement (TMCR)

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001:2015 31DEC2015

+ IAW1423 1 LO

+ IAW1423 1 LO

C008 Not Separately Priced

1 LO NSP

DATA

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001:2015 31DEC2015

+ IAW1423 1 LO

+ IAW1423 1 LO

C009 Not Separately Priced

1 LO NSP

DATA

Test/Inspection Report/Monthly Lot Sample Size Test Report

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001:2015 31DEC2015

C010 Not Separately Priced

1 LO NSP

DATA

Repairable Item Inspection Report/Maintenance and Overhaul Report

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001:2015 31DEC2015

+ IAW1423 1 LO

+ IAW1423 1 LO

C011 Not Separately Priced

1 LO NSP

DATA

Accident/Incident Report

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

+ IAW1423 1 LO

+ IAW1423 1 LO

C012 Not Separately Priced

1 LO NSP

DATA

Alerts/Safe-Alerts GIDEP-Alert Report

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001:2015 31DEC2015

+ IAW1423 1 LO

+ IAW1423 1 LO

C013 Not Separately Priced

1 LO NSP

DATA

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001:2015 31DEC2015

+ IAW1423 1 LO

+ IAW1423 1 LO

C014 Not Separately Priced

1 LO NSP

DATA

Alerts/Safe-Alerts GIDEP-Annual Progress Report

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001:2015 31DEC2015

C015 Not Separately Priced

1 LO NSP

DATA

Contract Depot Maintenance (CDM) Production Report

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001:2015 31DEC2015

+ IAW1423 1 LO

+ IAW1423 1 LO

D001 Not Separately Priced

1 LO NSP

DATA

Commercial Asset Visibility Air Force (CAVAF)

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

+ IAW1423 1 LO

+ IAW1423 1 LO

D002 Not Separately Priced

1 LO NSP

DATA

Government Property Inventory Report

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001:2015 31DEC2015

+ IAW1423 1 LO

+ IAW1423 1 LO

D003 Not Separately Priced

1 LO NSP

DATA

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001:2015 31DEC2015

+ IAW1423 1 LO

+ IAW1423 1 LO

D004 Not Separately Priced

1 LO NSP

DATA

Engineering Change Proposal (ECP)

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001:2015 31DEC2015

D005 Not Separately Priced

1 LO NSP

DATA

Notice of Revision (NOR)

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001:2015 31DEC2015

+ IAW1423 1 LO

+ IAW1423 1 LO

D006 Not Separately Priced

1 LO NSP

DATA

Repairable Item Inspection Report/Damaged Item Inspection Report

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

+ IAW1423 1 LO

+ IAW1423 1 LO

D007 Not Separately Priced

1 LO NSP

DATA

Technical Manual Contract Requirement (TMCR)

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001:2015 31DEC2015

+ IAW1423 1 LO

+ IAW1423 1 LO

D008 Not Separately Priced

1 LO NSP

DATA

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001:2015 31DEC2015

+ IAW1423 1 LO

+ IAW1423 1 LO

D009 Not Separately Priced

1 LO NSP

DATA

Test/Inspection Report/Monthly Lot Sample Size Test Report

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001:2015 31DEC2015

D010 Not Separately Priced

1 LO NSP

DATA

Repairable Item Inspection Report/Maintenance and Overhaul Report

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001:2015 31DEC2015

+ IAW1423 1 LO

+ IAW1423 1 LO

D011 Not Separately Priced

1 LO NSP

DATA

Accident/Incident Report

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

+ IAW1423 1 LO

+ IAW1423 1 LO

D012 Not Separately Priced

1 LO NSP

DATA

Alerts/Safe-Alerts GIDEP-Alert Report

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001:2015 31DEC2015

+ IAW1423 1 LO

+ IAW1423 1 LO

D013 Not Separately Priced

1 LO NSP

DATA

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001:2015 31DEC2015

+ IAW1423 1 LO

+ IAW1423 1 LO

D014 Not Separately Priced

1 LO NSP

DATA

Alerts/Safe-Alerts GIDEP-Annual Progress Report

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001:2015 31DEC2015

D015 Not Separately Priced

1 LO NSP

DATA

Contract Depot Maintenance (CDM) Production Report

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001:2015 31DEC2015

+ IAW1423 1 LO

+ IAW1423 1 LO

E001 Not Separately Priced

1 LO NSP

DATA

Commercial Asset Visibility Air Force (CAVAF)

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

+ IAW1423 1 LO

+ IAW1423 1 LO

E002 Not Separately Priced

1 LO NSP

DATA

Government Property Inventory Report

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001:2015 31DEC2015

+ IAW1423 1 LO

+ IAW1423 1 LO

E003 Not Separately Priced

1 LO NSP

DATA

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001:2015 31DEC2015

+ IAW1423 1 LO

+ IAW1423 1 LO

E004 Not Separately Priced

1 LO NSP

DATA

Engineering Change Proposal (ECP)

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001:2015 31DEC2015

E005 Not Separately Priced

1 LO NSP

DATA

Notice of Revision (NOR)

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001:2015 31DEC2015

+ IAW1423 1 LO

+ IAW1423 1 LO

E006 Not Separately Priced

1 LO NSP

DATA

Repairable Item Inspection Report/Damaged Item Inspection Report

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

+ IAW1423 1 LO

+ IAW1423 1 LO

E007 Not Separately Priced

1 LO NSP

DATA

Technical Manual Contract Requirement (TMCR)

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001:2015 31DEC2015

+ IAW1423 1 LO

+ IAW1423 1 LO

E008 Not Separately Priced

1 LO NSP

DATA

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001:2015 31DEC2015

+ IAW1423 1 LO

+ IAW1423 1 LO

E009 Not Separately Priced

1 LO NSP

DATA

Test/Inspection Report/Monthly Lot Sample Size Test Report

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001:2015 31DEC2015

E010 Not Separately Priced

1 LO NSP

DATA

Repairable Item Inspection Report/Maintenance and Overhaul Report

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001:2015 31DEC2015

+ IAW1423 1 LO

+ IAW1423 1 LO

E011 Not Separately Priced

1 LO NSP

DATA

Accident/Incident Report

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

+ IAW1423 1 LO

+ IAW1423 1 LO

E012 Not Separately Priced

1 LO NSP

DATA

Alerts/Safe-Alerts GIDEP-Alert Report

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001:2015 31DEC2015

+ IAW1423 1 LO

+ IAW1423 1 LO

E013 Not Separately Priced

1 LO NSP

DATA

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001:2015 31DEC2015

+ IAW1423 1 LO

+ IAW1423 1 LO

E014 Not Separately Priced

1 LO NSP

DATA

Alerts/Safe-Alerts GIDEP-Annual Progress Report

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001:2015 31DEC2015

E015 Not Separately Priced

1 LO NSP

DATA

Contract Depot Maintenance (CDM) Production Report

Other Than High Value Item

Destination Destination

Receiving Report Required A

Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001:2015 31DEC2015

+ IAW1423 1 LO

+ IAW1423 1 LO

+ IAW1423

+ TBD

ADDENDUM TO CLAUSE 52.212-4

(JAN 2023)

(IAW IAW 204.7203)

252.204-7004 BASIC AGREEMENT APPLICABILITY (JAN 2023)

ACCOUNTING AND APPROPRIATION DATA (AUG 1998)

Accounting and Appropriation Chargeable ACRN Funds Citation Amount Chargeable

TO BE CITED ON EACH INDIVIDUAL ORDER $0.00

Form Number Description/File Name Date Number of Pages Atch_1-PWS.pdf 15JAN2025 19

Atch_2-QASP.pdf 29APR2024 13

Atch_3-Legacy_Pallet_Drawing_Package.pdf UNDATED 28

1423 Exhibit_A_CDRLs.pdf UNDATED 48

A-E001_CDRL_Attachment-CAVAF_Reporting_Instr uctions.pdf

01DEC2023 7

A-E015_CDRL_Attachment-Monthly_Production_T emplate

UNDATED

File details come from the government source that posted it. Updated .