This document is a Questions and Answers file for federal contract opportunity FA8533-26-R-0007, the Common Aircraft Portable Reprogrammable Equipment (CAPRE) contract issued by the U.S. Air Force. The solicitation addresses development and production of software and hardware for reprogramming ten Line Replaceable Units (LRUs) used in F-16 aircraft avionics systems, including ALQ-131, Anti-Skid, CPDG/eCPDG, CSFDR, EEFCC, and FCSDR. The contract requires production of 1,800 cable assemblies total: 1 production-ready cable of each type per LRU in the basic year (CLINs 005/006), with 299 additional cables per type in the option year (CLINs 1005/1006) if development cannot be completed within the basic year timeline. Contractors must develop new AAG software from the ground up and produce six hardware articles; historical data from an AAG Developers Kit and organic software from the 516th Software Engineering Squadron will be provided at contract award.
The government clarified that it does not possess proprietary Original Equipment Manufacturer technical data, manufacturing drawings, or intellectual property rights for the LRUs. Contractors are fully responsible for establishing commercial agreements, non-disclosure agreements, and licensing arrangements with respective OEMs to obtain necessary technical data packages, software-loading procedures, interface documentation, and manufacturing rights. All OEM licensing, data acquisition, and intellectual property fees must be proposed under CLIN 0003 (Other Direct Costs). Software Integration Lab access will be provided for testing and interface validation only and does not constitute authorization for hardware production or redesign. Proposals must demonstrate evidence of possession of or authorized access to LRU data through Interface Control Documents, software documentation, or formal agreements with OEMs; letters of commitment are acceptable at proposal submission, and fully executed licensing agreements are not required until after award. Supporting evidence counts toward the 20-page Volume I limit. Funds will be available before award, and all questions must be submitted one week prior to the proposal due date. Proposals shall be submitted via DoD SAFE to designated government representatives.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Number RFP Section TOPR Paragraph Question/Comment Responses 1 Letter FOPR -
FA8533-26-R-0007
Availability of Funds When does the Government anticipate receipt of funds for this task order? Funds will be available before award will be made.
2 FOPR Questions Please confirm there is no cutoff date by which questions must be submitted? To ensure the integrity of the proposal due date, the Government requests that all questions be received one week prior to proposal due date.
3 Attachment A- FOPR Instructions and Evaluation
1.G. Proposal Submittal via DoD
SAFE
Proposals shall be submitted via DoDSAFE to Ben Wilton and Ashley Wynn. Please confirm the DoDSAFE drop-off link requested/provided will specify both Mr. Wilton and Ms.
Wynn as recipients, as drop-off links normally only list the individual who issued the link as the recipient, and does not allow the Contractor to add an additional recipient.
If the Government is not able to configure the drop-off link to specify both Mr. Wilton and Ms. Wynn as recipients please confirm submittal to only the DoDSAFE recipient specified in the drop-off link is acceptable.
An email should be sent to both Ben Wilton and Ashley Wynn requesting the DoDSAFE drop-off link. Ben Wilton or Ashley Wynn will provide the DoDSAFE drop-off link and the offeror will reply to that link.
4 Attachment A- FOPR Instructions and Evaluation
1.H. (2) Volume II:
Factor 2: Past Performance (15-page max) and Factor 2:
Past Performance, Subfactor 2.1
Offerors are required to provide a maximum of three (3) prior efforts within the past five (5) years. Specifically, "detailed narratives and supporting data".
Will the Government please list examples of the type of "supporting data" they require or is this referring to the Subfactor 2.1 requirements only? Also, with a 15-page maximum limit for all past performance, will the Government clarify is they prefer greater focus on the detailed narrative or the supporting data?
Supporting data is outlined in section 2.1.2 Project Specifics and Platform Identification along with section 2.1.3 Complexity and F-16 Comparability. The greater focus should be on supporting data since the evaluation criteria primarily focuses on their historical experience.
However, they should ensure that they fully cover their understanding of the challenges of integrating software and hardware
5 Attachment C - CLIN Structure with Production Ready Cable
Attachment C states cables are "a total production of 300 for the entirety of contract,". However, the CLIN Structure in Attachment F show 300/type in Basic (005 and 006) AND another 300/type in Option I (1005 and 1006). Will the Government please clarify?
A total of 300 ea cables are required for ALQ-131, Anti-Skid, CPDG/eCPDG, CSFDR, EEFCC, and FCSDR. CLIN 005 is referencing one production ready cable each for the above LRUs in which the Government will confirm its design and functionality before CLIN 006, 299 ea cables for the LRUs over the entire contract can be executed. CLIN 1005/1006 will be executed if the development and production cannot be completed during the basic year timeline. A total of 1800 cables is required for the entire contract.
6 Attachment B -
SOW
Table 4.2: F-16 Technical Orders
Will the Government provide, or authorize Offerors to request via ETIMS, the Technical Orders specified in Table 4.2 of the SOW? If the contractor meets the requirements to obtain ETIMS access, we will grant access to the specific TOs listed, once the contract is awarded
7 Attachment B -
SOW
Section 4 - Requirements Page 6
The Government's SOW states: "To complete this effort, the contractor shall obtain LRU data and artifacts from the Original Equipment Manufacturers (OEMs) for successful development of software and hardware. If this data cannot be obtained, the United States Government (USG) will work with the contractor to provide access to LRU and/or aircraft data/artifacts located in various Software Integration Lab (SIL) locations at identified Air Force bases."
Does the Government hold sufficient intellectual property rights, such as Unlimited Rights, Government Purpose Rights (GPR), or at minimum Limited/Restricted Rights in the procedures, protocols, and technical data required to perform Operational Flight Program (OFP) uploads to the LRU, or are those rights retained exclusively by the OEMs?
Those rights are retained exclusively by the OEMs. A list of OEMs has been provided as Attachment J through Amendment 1 of the FOPR.
8 Attachment B - SOW With respect to the 10 LRUs, what data does the Government currently possess? And will you provide that data during the proposal response period as part of a bidders library of GFI?
The Government currently possesses only the Original Equipment Manufacturer (OEM) name and CAGE code for the 10 Line Replaceable Units (LRUs). This information was added as Attachment J in Amendment 1 and posted to sam.gov. The Government does not possess further technical data or GFI for these items, and no additional data exists to provide.
9 Attachment B - SOW Will the Government make available the CPIN and TO for the CAPRE itself? This data is needed to define required interfaces and support software development. The Government will not release the system CPINs or Technical Orders (TOs) during the solicitation phase. This information is not required to formulate a successful proposal response. The Government has provided the necessary, high-level interface definitions within the Statement of Work, section 2, Background, to support proposal development. Full access to the relevant CPINs and TOs will be coordinated and granted to the successful awardee immediately upon contract award, subject to meeting standard security and ETIMS access requirements.
10 Attachment J - OEMs of AAGs
Government's Responses to Questions, 05 OCT
In response to Offeror's request for Technical Orders specified in Table 4.2 of the SOW, the Government provided Attachment J - OEM contact information while denying access to the documents via ETIMs until "once the contract is awarded".
a) To clarify, is the Government directing each Offeror to contact each OEM and obtain required LRU data and artifacts independently, rather than the Government providing such data to all Offerors?
b) If each Offeror is to obtain data from the OEMs independently, please clarify why the Government cannot provide it instead? Respectfully, if the Government provides this data directly to the Offerors it ensures fair and equal dissemination of the information. Relying on each OEM to provide the same data to each Offeror and in the same response time, could potentially result in missing and/or unequal access of data to some Offerors.
a) The Government is not directing or requiring offerors to obtain proprietary OEM Technical Data Packages (TDPs) or Technical Orders (TOs) during the proposal preparation phase. Attachment J (OEM Contact Information) was provided as a courtesy to assist offerors in establishing early industry partnerships if they choose to do so.
b) The Government cannot provide this data because it does not possess it. The Government's information regarding these LRUs is strictly limited to the OEM names and CAGE codes provided in the solicitation. The Government does not own, possess, or control the proprietary Technical Data Packages (TDPs) or engineering baselines for these items.
FA8533-26-R-0007: Common Aircraft Portable Reprogrammable Equipment (CAPRE) FORP# ATSA-0003-FO-1 Questions & Comments
11 Attachment A - FOPR Instructions, Attachment B - SOW and Government Responses to Questions
(05OCT2026)
FOPR Sub-Factor 1.2.1, SOW Section 4 - Requirements and Government's Response to Questions, 05OCT2026
In response to Offeror questions regarding Technical Orders specified in Table 4.2 of the SOW, the Government stated access via ETIMS will only be granted "once the contract is awarded" and if the contractor "meets the requirements to obtain ETIMS access".
However, Sub-Factor 1.2, 1.2.1. Possession and Access to LRU Data: of the CAPRE FOPR instructions states, "This element shall be met when the offeror acceptably demonstrates evidence of current possession of or authorized, unencumbered access to the required LRU TDPs, software baselines, and historical engineering documentation and acceptably demonstrates a data rights posture, to include any licensing agreements necessary, to utilize the data for Government purposes without delay."
a) These two requirements appear to be contradictory. Will the Government please clarify how Offerors shall "demonstrate evidence of current possession" if the Government, or OEMs do not provide during the proposal phase?
b) What other avenues do Offerors have if the information is not provided by an OEM in a timely manner?
a) The government does not own any information on the 10 LRUs. Examples that would serve as evidence are relevant LRU Interface Control Documents, associated software documentation, such as software requirements specifications, design documents, test plans, etc, and can also be demonstrated through formal agreements or letters of commitment with the OEM(s).
b) A technical order is not required to complete the proposal process.
Section 4 in the Statement of Work, Requirements, states "To complete this effort, the contractor shall obtain LRU data and artifacts from the Original Equipment Manufacturers (OEMs) for successful development of software and hardware. If this data cannot be obtained, the United States Government (USG) will work with the contractor to provide access to LRU and/or aircraft data/artifacts located in various Software Integration Lab (SIL) locations at identified Air Force bases." This is after award not during the proposal phase.
Contractors can outline their experience and level of proficiency with software protocol capture, reverse-engineering efforts, or analyzing complex LRU software protocols.
12 Attachment J - OEMs of AAGs
Government's Responses to Questions, 05 OCT
c) If Offerors are required to obtain LRU data and artifacts from each OEM independently, rather than the Government ensuring equal access and providing it to all Offerors, please provide a point of contact name, telephone number and email for each of the OEMs listed in Attachment J - Original Equipment Manufacturer of AAGs.
The Government does not have any contact information for the OEMs listed in Attachment J.
13 Software development:
Can the Government confirm whether the current AAG software development requirement is intended to rehost or adapt existing F-16 software-loading functionality, or whether the contractor is expected to develop new AAG software from the ground up? Is there any existing software that will be a starting point, if so for which AAGs?
Yes new AAG software is expected to develop from the ground up.
Historical data in our AAG Developers Kit is intended to be provided at contract award.
Organic software, which exists at variant levels and stages of development located within the 516th SWES, will be provided at contract award.
14 OEM LRU data rights:
The SOW states that the contractor will be required to conduct investigations and liaise with OEMs to obtain the necessary LRU data.
Our understanding is that the contractor may need to obtain the following information from the respective OEMs:
1. Hardware Technical Data: Engineering drawings, wiring diagrams, connector specifications, bills of materials (BOMs), and other information necessary to manufacture the required AAG hardware and cable assemblies.
2. Software and Interface Documentation: Existing software-loading procedures, communication protocols, interface specifications, and other technical information describing how the applicable LRUs receive and verify Operational Flight Programs (OFPs) and Mission Data Files (MDFs).
3. Intellectual Property and Manufacturing Rights: Any licenses or permissions necessary to use OEM-proprietary technical data, reproduce applicable hardware designs, or incorporate existing software-loading functionality into the newly developed CAPRE AAGs.
Is it expected of the contractor to purchase intellectual property rights or paid licenses from the OEMs to be able to obtain the necessary LRU data to perform the software development and hardware production?
Concerning the hardware, is the contractor expected to pay the OEMs for rights to build the 6 hardware articles required for production? If so, the contractor would need the drawings from the OEMs. Is the government expecting the contractor to purchase the drawings and building rights from the OEMs for the 6 articles to be produced?
The Government does not own, possess, or hold the proprietary data rights, manufacturing drawings, or intellectual property (IP) for the LRUs or the existing AAG designs.
Consequently, the contractor is fully responsible for establishing the necessary commercial agreements, non-disclosure agreements (NDAs), and licensing arrangements with the respective OEMs. This responsibility includes purchasing any required intellectual property rights, manufacturing rights, engineering drawings, and paid licenses from the OEMs necessary to perform the software development and produce the six (6) hardware articles.
Offerors must account for all associated OEM licensing, data acquisition, and IP fees within their cost/price proposal.
15 Software Integration Lab:
The SOW states that the contractor shall obtain the necessary LRU data and artifacts from the OEMs. If this information cannot be obtained, the contractor may utilize LRU and/or aircraft data and artifacts located at various Software Integration Labs (SILs). Our understanding is that certain LRU technical data, software-loading procedures, and hardware designs may be subject to OEM proprietary rights and restrictions. If the contractor is unable to obtain the required technical data or licensing rights directly from an OEM, can the Government clarify how access to the SILs would provide an alternative means of completing the requirement? Specifically, what technical data, software, documentation, and equipment would be made available through the SILs, and would the contractor have sufficient rights and authorization to use that information for AAG software development, hardware redesign, and production?
Additionally, if OEM proprietary rights or licensing restrictions still apply to information or equipment available through the SILs, how does the Government anticipate resolving those restrictions to enable the contractor to successfully perform the requirement?
The Government provides access to Software Integration Labs (SILs) to facilitate testing, interface validation, and software-loading verification on physical or simulated avionics components. SIL access is not an alternative source for obtaining proprietary OEM manufacturing drawings, technical data packages (TDPs), or intellectual property rights required for hardware production or redesign.
1. Data, Software, and Equipment Available in the SIL:
The Government will make available physical test benches, operational aircraft or LRU components, and Government-owned test execution software within the SIL environment for integration testing only. The Government will grant the contractor the authorization and 'Right to Use' this equipment and software solely within the confines of the SIL facility. This access does not include the transfer of proprietary OEM source code, manufacturing drawings, or design documentation.
2. Sufficiency of Rights for Production:
No. The rights and authorization granted for SIL utilization are strictly limited to testing and integration. They are not sufficient to support hardware redesign, parts manufacturing, or production of the hardware articles.
3. Resolution of OEM Proprietary Restrictions:
The responsibility remains entirely with the contractor to establish the necessary commercial agreements, non-disclosure agreements (NDAs), or licensing arrangements with the respective OEMs to obtain the data and rights necessary to fulfill the hardware production requirements of the contract.
16 To develop accurate material and manufacturing cost estimates for our proposal, we would appreciate receiving any available unclassified cable drawings or bills of materials during the proposal phase for the two existing prototype cable types (CPDG/eCPDG and CSFDR), as well as the four additional cable types requiring production (ALQ-131, Anti- Skid, EEFCC, and FCSDR).
These cable assemblies are built using Commercial Off-The-Shelf and industry-compliant components and are required to meet standard commercial and military specifications (such as MIL-DTL-38999 and IPC/WHMA-A-620), no further technical cable documentation will be provided prior to formal contract award.
17 In the case that a contractor holds an active Secret Facility Clearance and employees with secret clearance but does not have approved onsite classified storage capabilities.
please clarify whether cable fabrication could be performed at the contractor's existing facility, with any required classified integration or testing conducted separately at an approved secure location, e.g. Hill Air Force Base.
Cables are not classified. Any classified concerns will be provided in the DD254. Also, none of the development, to include software will require classified locations. Note that testing events or lab access may require classification or SAP access.
18 Will Government confirm if the contractor would be required to handle classified SW and material in their facility or if all classified would only be handled on the Air Force Base? The OFP or MDF could be classified during testing events. Any classified storage or application would have to be coordinated at a secure facility.
19 Attachment A, FOPR Instructions, Sub-Factor 1.2.1 and USG Response to Q11 (02NOV2026, v2)
Sub-Factor 1.2.1 says the element is met when the offeror "acceptably demonstrates evidence of current possession of or authorized, unencumbered access to the required LRU TDPs, software baselines, and historical engineering documentation" and a data rights posture, including any necessary licensing agreements.
The response to Q11 says evidence may include the following:
| • | relevant LRU Interface Control Documents (ICDs) |
| • | associated software documentation (SRS, design documents, test plans), or |
| • | formal agreements or letters of commitment with the OEM(s) |
The Q11 response also says offerors may outline their experience with software protocol capture, reverse-engineering, and analysis of complex LRU software protocols.
To ensure we understand the Government’s response correctly, please confirm/respond to the following:
a) A Sub-Factor 1.2.1 narrative that relies on any one or more of those forms of evidence can be rated at least Acceptable. This holds even if the offeror does not currently hold the OEM TDPs, software baselines, or historical engineering documentation.
b) Letters of commitment, letters of intent, or similar written statements from the OEM(s) are acceptable as "authorized, unencumbered access" at proposal submittal. A fully executed license or data-rights agreement is not required until after award.
c) The "data rights posture" element can be met by describing the offeror's planned licensing and data-rights approach with each OEM. This includes how the offeror will give the Government the data rights needed to use the data "for Government purposes without delay." An executed agreement is not required at submittal.
d) Where an offeror shows access to some LRUs but not all 10, how will the Government evaluate Sub-Factor 1.2.1? Will it assess the LRUs individually or the offeror's overall approach and capability?
e) If a, b, and c are confirmed, will the Government amend Attachment A, Sub-Factor 1.2.1 to match the Q11 response? This would remove any ambiguity about whether "current possession" is required.
A. Yes, any one or more of these forms of evidence can be rated at least acceptable.
B. Yes, fully executed license or data-right agreements are not required until after award.
C. Yes.
D. We will evaluate on the overall approach and capability.
E. Government will be amending Attachment A, Sub-Factor 1.2.1
20 Attachment A, FOPR Instructions, Factor I
Will the Government please confirm the supporting evidence required with the offeror’s proposal does not count against the 20-page limit for Volume I? Supporting evidence will count towards the 20 page limit.
21 Attachment A, FOPR Instructions, Sub-Factor 1.2.1 and USG Response to Q11 (02NOV2026, v2)
What specific documents or evidence are required to satisfy Subfactor 1.2.1 possession and access, and in what format should they be submitted? Examples of possession and access were answered in Q11. These examples are relevant LRU Interface Control Documents, associated software documentation, such as software requirements specifications, design documents, test plans, etc, and can also be demonstrated through formal agreements or letters of commitment with the OEM(s).
Evidence or proof of possession or acces to LRU data listed above must be submitted in PDF format. If the contractor does not own the data, they must provide a mutually signed agreement (i.e letter of commitment or intellectual property rights agreement) identifying their ability to obtain/use the data from the OEM.
22 Attachment A, FOPR Instructions, Sub-Factor 1.2.1 and USG Response to Q11 (02NOV2026, v2)
In drafting the technical narrative for Subfactor 1.2.1, should offerors detail the entire LRU data set or focus only on key gaps that affect performance? The Offeror should provide Comprehensive demonstration to execute all LRU data requirements.
23 Attachment A, FOPR Instructions, Sub-Factor 1.2.1 and USG Response to Q13 (05NOV2026, v3)
a) Does Government-owned AAG source code exist, and can it be released as GFI before proposals are due?
b) Does a Government-developed Software Development Kit (SDK) exist, and can it be released?
c) If neither can be released, will the Government state that no existing code is available as a starting point, so offerors can take this into account when developing pricing?
A. AAG source code will not be released as GFI, but will be released as GFP at time of contract award.
B. AAG Developer's Kit will not be released as GFI, but will be released as GFP at time of contract award.
C. Historical data in our ADK is intended to be provided at contract award.
24 Attachment A, FOPR Instructions, Sub-Factor 1.2.1 and USG Response to Q14 (05NOV2026, v3)
Q14 (05NOV2026, v3) states offerors must account for OEM licensing, data acquisition, and IP fees within the cost/price proposal. Please clarify:
(a) which CLIN(s) these costs should be proposed under: CLIN 0003AA–AK as ODC, CLIN 0008, or the hardware production CLINs 0005/0006 for manufacturing rights; and
(b) the intended scope of CLIN 0008, Intellectual Property Rights License.
A. Costs should be proposed under the 0003 CLINs. SW Development for each cable may come from different OEMs making the cost different for each.
B. CLIN OO8 is from the awardee and will be separate from costs from each OEM. This would be what the awardee proposes to sell their rights to us once complete with contract performance.
25 Attachment A, FOPR Instructions, Sub-Factor 1.2.1 and USG Response to Q11 (02NOV2026, v2)
Evaluation Sub-Factor 1.2.1 states the Possession and Access to LRU Data element is met when the offeror "acceptably demonstrates evidence of current possession of or authorized, unencumbered access to the required LRU TDPs, software baselines, and historical engineering documentation and acceptably demonstrates a data rights posture, to include any licensing agreements necessary, to utilize the data for Government purposes without delay".
Further the Government's response to Q11 states evidence may include the following:
| • | relevant LRU Interface Control Documents (ICDs) |
| • | associated software documentation (SRS, design documents, test plans), or |
| • | formal agreements or letters of commitment with the OEM(s) |
The Q11 response also says offerors may outline their experience with software protocol capture, reverse-engineering, and analysis of complex LRU software protocols.
The Government has clarified that Offerors are not required to possess LRU data or OEM licensing agreements at the time of proposal submittal and provided alternate "evidence" methods via its response to Q11.
Furthermore, the Government's response to Q11 also states, "if this data [LRU data and artifacts from the OEMs] cannot be obtained, the USG will work with the contractor to provide access to LRU and/or aircraft data/artifacts located in various SIL locations at identified Air Forces Bases". This statement appears to contradict with the requirement for Offerors to provide evidence of "possession or access" or "unencumbered access to the required LRU TDPs".
a) Will the Government please clarify?
b) Therefore, will the Government please issue a FOPR amendment revising Sub-Factor 1.2.1 Possession and Access to LRU Data evaluation criteria language and incorporate the alternate evidence specified in its response to Q11?
Specifically, "Sub-Factor 1.2.1 Possession and or Access to LRU Data: "acceptably demonstrates evidence of current possession of or authorized, unencumbered access to the required LRU TDPs, software baselines, and historical engineering documentation and acceptably demonstrates a data rights posture, to include any licensing agreements necessary, to utilize the data for Government purposes without delay. Acceptable examples of such evidence include:
| • | relevant LRU Interface Control Documents (ICDs) |
| • | associated software documentation (SRS, design documents, test plans), or |
| • | formal agreements, or letters, or emails of commitment with the OEM(s) |
A: Per the SOW Section 4 Requirements: To complete this effort, the contractor shall obtain LRU data and artifacts from the Original Equipment Manufacturers (OEMs) for successful development of software and hardware. If this data cannot be obtained, the United States Government (USG) will work with the contractor to provide access to LRU and/or aircraft data/artifacts located in various Software Integration Lab (SIL) locations at identified Air Force bases.
Attachment A, Sub-Factor 1.2.1 states: This element shall be met when the offeror acceptably demonstrates evidence of current possession of or authorized, unencumbered access to the required LRU TDPs, software baselines, and historical engineering documentation and acceptably demonstrates a data rights posture, to include any licensing agreements necessary, to utilize the data for Government purposes without delay.
Unencumbered access means that there are no restrictions from the OEM on your ability to utilize LRU ICDs, Software Documentation, or other agreed upon data. To ensure successful AAG software development, the Contractor will be required to conduct investigations and liaise with OEMs to obtain necessary LRU data. The Government understands that obtaining licensing, agreements, or rights to ALL of the LRU data may be challenging, therefore, the Government will work with the contractor to provide access to LRUs and/or aircraft data/artifacts located in various SIL locations at identified Air Forces Bases to assist with the development.
B: The Government will be amending Attachment A, Sub-Factor 1.2.1 to clarify possession, access/evidence, or experience with software protocol capture, reverse-engineering, and analysis of complex LRU software protocols. Please note: EMAILS ARE NOT ACCEPTABLE.
26 Attachment A, FOPR Instructions, Sub-Factor 1.2.1 and USG Response to Q11 (02NOV2026, v2)
Of the 10 LRUs required, is there a minimum number for which the Offeror must provide evidence of "possession or access" at proposal submittal to be considered acceptable?
The Government has not specified a minimun number. This is a competitive effort so contractor's should do their due diligence to show as many as they can.