DRAFT RFP Attachment XX Excel Cost Model.xlsx

XLSX spreadsheet 178 KB Posted

Attached to
Common Armament Tester for Fighter (CAT-F)
Solicitation number
FA8533-25-R-0002
Issued by

About this file

This is a draft RFP Excel cost model template (Attachment XX) for the Common Armament Tester - Fighters (CAT-F) program. The template is structured to capture detailed pricing across multiple Contract Line Item Numbers (CLINs) spanning a base period and four option periods, with different contract types including Cost-Plus-Fixed-Fee (CPFF), Cost-Plus-Incentive-Fee (CPIF), and Firm-Fixed-Price (FFP).

The CLINs cover development and production of O-Level Handheld/Pre-load Testers and I-Level Fault Isolation Testers for F-16, F-15, and A-10 aircraft. Key deliverables include prototype design, digital development, Engineering and Manufacturing Development (EMD), and production units ranging from Low Rate Initial Production (LRIP) to full production quantities. The template includes sections for labor rates, material costs, other direct costs, overhead rates, G&A, COM, and fee structures. Quantities specified include 4 prototype units per aircraft type, production quantities of 83-210 O-Level tester kits, and 2-138 I-Level tester kits across the different aircraft platforms. The template is designed for offerors to input data only in yellow-highlighted fields.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cost Format C_CLIN Summary

Common Armament Tester - Fighters (CAT-F) Excel Cost Model (RFP Attachment XX)
"Offeror shall enter data in yellow highlighted fields only"
Solicitation Number:
Enter Offeror's Business Name:
Enter Offeror's CAGE code:
Basic Period (12 months)
CLINContract TypeDescriptionQTYUnitCostCOMFeeUnit PriceExtended Price
0001CPFFF-16 O-Level Handheld/Pre-load Tester Prototype design and digital development1LO$0.00$0.00$0.00$0.00$0.00
0002CPFFF-15 O-Level Handheld/Pre-load Tester Prototype design and digital development1LO$0.00$0.00$0.00$0.00$0.00
0003CPFFA-10 O-Level Handheld/Pre-load Tester Prototype design and digital development1LO$0.00$0.00$0.00$0.00$0.00
0004CPFFF-16 I-Level Fault Isolation Tester design and digital development1LO$0.00$0.00$0.00$0.00$0.00
0005CPFFF-15 I-Level Fault Isolation Tester design and digital development1LO$0.00$0.00$0.00$0.00$0.00
0006CPFFA-10 I-Level Fault Isolation Tester design and digital development1LO$0.00$0.00$0.00$0.00$0.00
0007FFPDeliver F-16 O-Level Handheld Tester Prototype4EA$0.00$0.00
0008FFPDeliver F-15 O-Level Handheld Tester Prototype4EA$0.00$0.00
0009FFPDeliver A-10 O-Level Handheld Tester Prototype4EA$0.00$0.00
0010FFPDeliver F-16 I-Level Fault Isolation Tester digital design1LO$0.00$0.00
0011FFPDeliver F-15 I-Level Fault Isolation Tester digital design1LO$0.00$0.00
0012FFPDeliver A-10 I-Level Fault Isolation Tester digital design1LO$0.00$0.00
0013FFPProgram Management1LO$0.00$0.00
0014CPFFDesign Demonstration (Labor- Not Travel)1LO$0.00$0.00$0.00$0.00$0.00
0015CRNFTravel1LO$0.00$0.00$0.00$0.00
0016FFPGovernment Data Rights1LO$0.00$0.00
0017NSPCDRLs (Data)1LONSP
Total Extended Price - Basic Period$0.00
Option Period I (12 months)
CLINContract TypeDescriptionQTYUnitCostCOMFeeUnit PriceExtended Price
1001CPFFF-16 O-Level Handheld/Pre-load Tester Engineering and Manufacturing Development (EMD)1LO$0.00$0.00$0.00$0.00$0.00
1002CPFFF-15 O-Level Handheld/Pre-load Tester EMD1LO$0.00$0.00$0.00$0.00$0.00
1003CPFFA-10 O-Level Handheld/Pre-load Tester EMD1LO$0.00$0.00$0.00$0.00$0.00
1004CPFFF-16 I-Level Fault Isolation Tester EMD1LO$0.00$0.00$0.00$0.00$0.00
1005CPFFF-15 I-Level Fault Isolation Tester EMD1LO$0.00$0.00$0.00$0.00$0.00
1006CPFFA-10 I-Level Fault Isolation Tester EMD1LO$0.00$0.00$0.00$0.00$0.00
1007FFPF-16 O-Level Handheld/Pre-load Tester Logistical Support1LO$0.00$0.00
1008FFPF-16 O-Level Handheld Tester LRIP production10EA$0.00$0.00
1009FFPDeliver F-16 O-Level Handheld Tester Kits83EA$0.00$0.00
1010FFPProgram Management1LO$0.00$0.00
1011CPFFSupport Government Testing1LO$0.00$0.00$0.00$0.00$0.00
1012CRNFTravel1LO$0.00$0.00$0.00$0.00
1013FFPGovernment Data Rights1LO$0.00$0.00
1014NSPCDRLs (Data)1LONSP
Total Extended Price - Option Period I$0.00
Option Period II (12 months)
CLINContract TypeDescriptionQTYUnitCostCOMFeeUnit PriceExtended Price
2001CPIFF-15 O-Level Handheld/Pre-load Tester EMD1LO$0.00$0.00$0.00$0.00$0.00
2002CPIFA-10 O-Level Handheld/Pre-load Tester EMD1LO$0.00$0.00$0.00$0.00$0.00
2003CPIFF-16 I-Level Fault Isolation Tester EMD1LO$0.00$0.00$0.00$0.00$0.00
2004CPIFF-15 I-Level Fault Isolation Tester EMD1LO$0.00$0.00$0.00$0.00$0.00
2005CPIFA-10 I-Level Fault Isolation Tester EMD1LO$0.00$0.00$0.00$0.00$0.00
2006FFPF-15 O-Level Handheld/Pre-load Tester Logistical Support1LO$0.00$0.00
2007FFPA-10 O-Level Handheld/Pre-load Tester Logistical Support1LO$0.00$0.00
2008FFPDeliver F-16 O-Level Handheld Tester Kits210EA$0.00$0.00
2009FFPDeliver F-15 O-Level Handheld Tester Kits (LRIP)10EA$0.00$0.00
2010FFPDeliver F-15 O-Level Handheld Tester Kits162EA$0.00$0.00
2011FFPDeliver A-10 O-Level Handheld Tester Kits (LRIP)4EA$0.00$0.00
2012FFPProgram Management1LO$0.00$0.00
2013CPIFSupport Government Testing1LO$0.00$0.00$0.00$0.00$0.00
2014CRNFTravel1LO$0.00$0.00$0.00$0.00
2015FFPGovernment Data Rights1LO$0.00$0.00
2016NSPCDRLs (Data)1LONSP
Total Extended Price - Option Period II$0.00
Option Period III (12 months)
CLINContract TypeDescriptionQTYUnitCostCOMFeeUnit PriceExtended Price
3001CPIFA-10 O-Level Handheld/Pre-load Tester EMD1LO$0.00$0.00$0.00$0.00$0.00
3002CPIFF-16 I-Level Fault Isolation Tester EMD1LO$0.00$0.00$0.00$0.00$0.00
3003CPIFF-15 I-Level Fault Isolation Tester EMD1LO$0.00$0.00$0.00$0.00$0.00
3004CPIFA-10 I-Level Fault Isolation Tester EMD1LO$0.00$0.00$0.00$0.00$0.00
3005FFPF-16 I-Level Fault Isolation Tester Logistical Support1LO$0.00$0.00
3006FFPF-15 I-Level Fault Isolation Tester Logistical Support1LO$0.00$0.00
3007FFPDeliver A-10 O-Level Handheld Tester Kits64EA$0.00$0.00
3008FFPDeliver F-16 I-Level Fault Isolation Tester Kits (LRIP)5EA$0.00$0.00
3009FFPDeliver F-15 I-Level Fault Isolation Tester Kits (LRIP)5EA$0.00$0.00
3010FFPDeliver F-16 I-Level Fault Isolation Tester Kits138EA$0.00$0.00
3011FFPProgram Management1LO$0.00$0.00
3012CPIFSupport Government Testing1LO$0.00$0.00$0.00$0.00$0.00
3013CRNFTravel1LO$0.00$0.00$0.00$0.00
3014FFPGovernment Data Rights1LO$0.00$0.00
3015NSPCDRLs (Data)1LONSP
Total Extended Price - Option Period III$0.00
Option Period IV (12 months)
CLINContract TypeDescriptionQTYUnitCostCOMFeeUnit PriceExtended Price
4001CPIFF-15 I-Level Fault Isolation Tester EMD1LO$0.00$0.00$0.00$0.00$0.00
4002CPIFA-10 I-Level Fault Isolation Tester EMD1LO$0.00$0.00$0.00$0.00$0.00
4003FFPA-10 I-Level Fault Isolation Tester Logistical Support1LO$0.00$0.00
4004FFPDeliver F-15 I-Level Fault Isolation Tester Kits75EA$0.00$0.00
4005FFPDeliver A-10 I-Level Fault Isolation Tester Kits (LRIP)2EA$0.00$0.00
4006FFPDeliver A-10 I-Level Fault Isolation Tester Kits40EA$0.00$0.00
4007FFPProgram Management1LO$0.00$0.00
4008CPIFSupport Government Testing1LO$0.00$0.00$0.00$0.00$0.00
4009CRNFTravel1LO$0.00$0.00$0.00$0.00
4010FFPGovernment Data Rights1LO$0.00$0.00
4011NSPCDRLs (Data)1LONSP
Total Extended Price - Option Period IV$0.00

Total Proposed Price $0.00

SOURCE SELECTION INFORMATION--SEE FAR 2.101 and 3.104

FOR OFFICIAL USE ONLY

FFP CLINs

Notes:
1. The prime offeror shall enter a proposed unit price per CLIN in the yellow-highlighted cells below.
2. Each Firm Fixed Price shall be rounded to the nearest whole dollar.
3. The prime offeror shall ensure the cells below are linked correctly to the CLIN cells on worksheet "Cost Format C_CLIN Summary".
Basic Period (12 Months)Option Period I (12 Months)Option Period II (12 Months)Option Period III (12 Months)Option Period IV (12 Months)
CLIN 0007CLIN 1007CLIN 2006CLIN 3005CLIN 4003
QtyUnitProposed Unit PriceQtyUnitProposed Unit PriceQtyUnitProposed Unit PriceQtyUnitProposed Unit PriceQtyUnitProposed Unit Price
4EA1LO1LO1LO1LO
CLIN 0008CLIN 1008CLIN 2007CLIN 3006CLIN 4004
QtyUnitProposed Unit PriceQtyUnitProposed Unit PriceQtyUnitProposed Unit PriceQtyUnitProposed Unit PriceQtyUnitProposed Unit Price
4EA10EA1LO1LO75EA
CLIN 0009CLIN 1009CLIN 2008CLIN 3007CLIN 4005
QtyUnitProposed Unit PriceQtyUnitProposed Unit PriceQtyUnitProposed Unit PriceQtyUnitProposed Unit PriceQtyUnitProposed Unit Price
4EA83EA210EA64EA2EA
CLIN 0010CLIN 1010CLIN 2009CLIN 3008CLIN 4006
QtyUnitProposed Unit PriceQtyUnitProposed Unit PriceQtyUnitProposed Unit PriceQtyUnitProposed Unit PriceQtyUnitProposed Unit Price
1LO1LO10EA5EA40EA
CLIN 0011CLIN 1013CLIN 2010CLIN 3009CLIN 4007
QtyUnitProposed Unit PriceQtyUnitProposed Unit PriceQtyUnitProposed Unit PriceQtyUnitProposed Unit PriceQtyUnitProposed Unit Price
1LO1LO162EA5EA1LO
CLIN 0012CLIN 2011CLIN 3010CLIN 4010
QtyUnitProposed Unit PriceQtyUnitProposed Unit PriceQtyUnitProposed Unit PriceQtyUnitProposed Unit Price
1LO4EA138EA1LO
CLIN 0013CLIN 2012CLIN 3011
QtyUnitProposed Unit PriceQtyUnitProposed Unit PriceQtyUnitProposed Unit Price
1LO1LO1LO
CLIN 0016CLIN 2015CLIN 3014
QtyUnitProposed Unit PriceQtyUnitProposed Unit PriceQtyUnitProposed Unit Price
1LO1LO1LO

Cost Format A_CLIN X001

Notes:
1. The format of this worksheet may be revised as required to be consistent with the major subcontractor's approved accounting system.
2. The Prime Offeror shall propose labor hours, material costs, and other direct costs in the yellow-highlighted cells below.
3. The Prime Offeror shall ensure the yellow-highlighted rate cells below are linked correctly from the relevant labor rate and add-on factors in the 'Cost Format B_PRIME Rates' worksheet.
4. The proposed factors will be applied to the proposed labor hours, material cost, and other direct costs.
5. Definitions of the labor categories and add-on factors are included in the 'Cost Format B_PRIME Rate Desc' worksheet.
6. Each CPFF/CPIF Cost, COM and Fee shall be rounded to the nearest whole dollar.
CLINs 0001 & 1001: CPFFProposed Prices (Labor)Proposed Prices (Labor)CLINs 2001, 3001, & 4001: CPIFProposed Prices (Labor)Proposed Prices (Labor)Proposed Prices (Labor)
0001: F-16 O-Level Handheld/Pre-load Tester Prototype Design and Digital Development - Basic Period1001: F-16 O-Level Handheld/Pre-load Tester EMD - Option Period 12001: F-15 O-Level Handheld/Pre-load Tester EMD - Option Period 23001: A-10 O-Level Handheld/Pre-load Tester EMD - Option Period 34001: F-15 I-Level Fault Isolation Tester EMD - Option Period 4
Labor CategoryHoursRatesCostHoursRatesCostLabor CategoryHoursRatesCostHoursRatesCostHoursRatesCost
Labor Category 1: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00Labor Category 1: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 2: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00Labor Category 2: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 3: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00Labor Category 3: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 4: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00Labor Category 4: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 5: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00Labor Category 5: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 6: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00Labor Category 6: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 7: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00Labor Category 7: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 8: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00Labor Category 8: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 9: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00Labor Category 9: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 10: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00Labor Category 10: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 11: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00Labor Category 11: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 12: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00Labor Category 12: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 13: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00Labor Category 13: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00
TOTAL HOURS/COST0$0.000$0.00TOTAL HOURS/COST0$0.000$0.000$0.00
BaseRatesCostBaseRatesCostBaseRatesCostBaseRatesCostBaseRatesCost
Proposed Add-on Factor (Fringe)$0.00- 0$0.00$0.00- 0$0.00Proposed Add-on Factor (Fringe)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (Overhead)$0.00- 0$0.00$0.00- 0$0.00Proposed Add-on Factor (Overhead)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (G&A)$0.00- 0$0.00$0.00- 0$0.00Proposed Add-on Factor (G&A)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (COM)$0.00- 0$0.00$0.00- 0$0.00Proposed Add-on Factor (COM)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (Fee)$0.00- 0$0.00$0.00- 0$0.00Proposed Add-on Factor (Fee)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Total Proposed Cost$0.00$0.00Total Proposed Target Cost$0.00$0.00$0.00
Total Proposed COM$0.00$0.00Total Proposed Target COM$0.00$0.00$0.00
Total Proposed Fee$0.00$0.00Total Proposed Target Fee$0.00$0.00$0.00
Total Proposed Price$0.00$0.00Total Proposed Target Price$0.00$0.00$0.00
CLINs 0001 & 1001: CPFFProposed Prices (Material)Proposed Prices (Material)Proposed Prices (Material)Proposed Prices (Material)Proposed Prices (Material)
0001: F-16 O-Level Handheld/Pre-load Tester Prototype Design and Digital Development - Basic Period1001: F-16 O-Level Handheld/Pre-load Tester EMD - Option Period 12001: F-15 O-Level Handheld/Pre-load Tester EMD - Option Period 23001: A-10 O-Level Handheld/Pre-load Tester EMD - Option Period 34001: F-15 I-Level Fault Isolation Tester EMD - Option Period 4
BaseRatesCostBaseRatesCostBaseRatesCostBaseRatesCostBaseRatesCost
Total Proposed Material CostTotal Proposed Material Cost
Proposed Add-on Factor (Overhead)$0.00- 0$0.00$0.00- 0$0.00Proposed Add-on Factor (Overhead)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (G&A)$0.00- 0$0.00$0.00- 0$0.00Proposed Add-on Factor (G&A)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (COM)$0.00- 0$0.00$0.00- 0$0.00Proposed Add-on Factor (COM)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (Fee)$0.00- 0$0.00$0.00- 0$0.00Proposed Add-on Factor (Fee)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Total Proposed Cost$0.00$0.00Total Proposed Target Cost$0.00$0.00$0.00
Total Proposed COM$0.00$0.00Total Proposed Target COM$0.00$0.00$0.00
Total Proposed Fee$0.00$0.00Total Proposed Target Fee$0.00$0.00$0.00
Total Proposed Price$0.00$0.00Total Proposed Target Price$0.00$0.00$0.00
CLINs 0001 & 1001: CPFFProposed Prices (Other Direct Cost)Proposed Prices (Other Direct Cost)Proposed Prices (Other Direct Cost)Proposed Prices (Other Direct Cost)Proposed Prices (Other Direct Cost)
0001: F-16 O-Level Handheld/Pre-load Tester Prototype Design and Digital Development - Basic Period1001: F-16 O-Level Handheld/Pre-load Tester EMD - Option Period 12001: F-15 O-Level Handheld/Pre-load Tester EMD - Option Period 23001: A-10 O-Level Handheld/Pre-load Tester EMD - Option Period 34001: F-15 I-Level Fault Isolation Tester EMD - Option Period 4
BaseRatesCostBaseRatesCostBaseRatesCostBaseRatesCostBaseRatesCost
Total Proposed Other Direct Cost (ODC)Total Proposed Other Direct Cost (ODC)
Proposed Add-on Factor (Overhead)$0.00- 0$0.00$0.00- 0$0.00Proposed Add-on Factor (Overhead)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (G&A)$0.00- 0$0.00$0.00- 0$0.00Proposed Add-on Factor (G&A)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (COM)$0.00- 0$0.00$0.00- 0$0.00Proposed Add-on Factor (COM)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (Fee)$0.00- 0$0.00$0.00- 0$0.00Proposed Add-on Factor (Fee)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Total Proposed Cost$0.00$0.00Total Proposed Target Cost$0.00$0.00$0.00
Total Proposed COM$0.00$0.00Total Proposed Target COM$0.00$0.00$0.00
Total Proposed Fee$0.00$0.00Total Proposed Target Fee$0.00$0.00$0.00
Total Proposed Price$0.00$0.00Total Proposed Target Price$0.00$0.00$0.00
CLINs 0001 & 1001: CPFFProposed Prices (Labor, Material, and ODC)Proposed Prices (Labor, Material, and ODC)Proposed Prices (Labor, Material, and ODC)Proposed Prices (Labor, Material, and ODC)Proposed Prices (Labor, Material, and ODC)
CLIN 0001: Basic Period (CPFF)CLIN 1001: Option Period 1 (CPFF)CLIN 2001: Option Period 2 (CPIF)CLIN 3001: Option Period 3 (CPIF)CLIN 4001: Option Period 4 (CPIF)
Total Proposed Cost$0.00$0.00Total Proposed Target Cost$0.00$0.00$0.00
Total Proposed COM$0.00$0.00Total Proposed Target COM$0.00$0.00$0.00
Total Proposed Fee$0.00$0.00Total Proposed Target Fee$0.00$0.00$0.00
Total Proposed Price$0.00$0.00Total Proposed Target Price$0.00$0.00$0.00

Cost Format A_CLIN X002

Notes:
1. The format of this worksheet may be revised as required to be consistent with the major subcontractor's approved accounting system.
2. The Prime Offeror shall propose labor hours, material costs, and other direct costs in the yellow-highlighted cells below.
3. The Prime Offeror shall ensure the yellow-highlighted rate cells below are linked correctly from the relevant labor rate and add-on factors in the 'Cost Format B_PRIME Rates' worksheet.
4. The proposed factors will be applied to the proposed labor hours, material cost, and other direct costs.
5. Definitions of the labor categories and add-on factors are included in the 'Cost Format B_PRIME Rate Desc' worksheet.
6. Each CPFF/CPIF Cost, COM and Fee shall be rounded to the nearest whole dollar.
CLINs 0002 & 1002: CPFFProposed Prices (Labor)Proposed Prices (Labor)CLINs 2002, 3002, & 4002: CPIFProposed Prices (Labor)Proposed Prices (Labor)Proposed Prices (Labor)
0002: F-15 O-Level Handheld/Pre-load Tester Prototype design and digital development - Basic Period1002: F-15 O-Level Handheld/Pre-load Tester EMD - Option Period 12002: A-10 O-Level Handheld/Pre-load Tester EMD - Option Period 23002: F-16 I-Level Fault Isolation Tester EMD - Option Period 34002: A-10 I-Level Fault Isolation Tester EMD - Option Period 4
Labor CategoryHoursRatesCostHoursRatesCostLabor CategoryHoursRatesCostHoursRatesCostHoursRatesCost
Labor Category 1: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00Labor Category 1: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 2: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00Labor Category 2: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 3: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00Labor Category 3: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 4: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00Labor Category 4: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 5: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00Labor Category 5: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 6: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00Labor Category 6: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 7: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00Labor Category 7: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 8: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00Labor Category 8: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 9: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00Labor Category 9: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 10: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00Labor Category 10: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 11: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00Labor Category 11: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 12: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00Labor Category 12: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 13: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00Labor Category 13: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00
TOTAL HOURS/COST0$0.000$0.00TOTAL HOURS/COST0$0.000$0.000$0.00
BaseRatesCostBaseRatesCostBaseRatesCostBaseRatesCostBaseRatesCost
Proposed Add-on Factor (Fringe)$0.00- 0$0.00$0.00- 0$0.00Proposed Add-on Factor (Fringe)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (Overhead)$0.00- 0$0.00$0.00- 0$0.00Proposed Add-on Factor (Overhead)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (G&A)$0.00- 0$0.00$0.00- 0$0.00Proposed Add-on Factor (G&A)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (COM)$0.00- 0$0.00$0.00- 0$0.00Proposed Add-on Factor (COM)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (Fee)$0.00- 0$0.00$0.00- 0$0.00Proposed Add-on Factor (Fee)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Total Proposed Cost$0.00$0.00Total Proposed Target Cost$0.00$0.00$0.00
Total Proposed COM$0.00$0.00Total Proposed Target COM$0.00$0.00$0.00
Total Proposed Fee$0.00$0.00Total Proposed Target Fee$0.00$0.00$0.00
Total Proposed Price$0.00$0.00Total Proposed Target Price$0.00$0.00$0.00
CLINs 0002 & 1002: CPFFProposed Prices (Material)Proposed Prices (Material)Proposed Prices (Material)Proposed Prices (Material)Proposed Prices (Material)
0002: F-15 O-Level Handheld/Pre-load Tester Prototype design and digital development - Basic Period1002: F-15 O-Level Handheld/Pre-load Tester EMD - Option Period 12002: A-10 O-Level Handheld/Pre-load Tester EMD - Option Period 23002: F-16 I-Level Fault Isolation Tester EMD - Option Period 34002: A-10 I-Level Fault Isolation Tester EMD - Option Period 4
BaseRatesCostBaseRatesCostBaseRatesCostBaseRatesCostBaseRatesCost
Total Proposed Material CostTotal Proposed Material Cost
Proposed Add-on Factor (Overhead)$0.00- 0$0.00$0.00- 0$0.00Proposed Add-on Factor (Overhead)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (G&A)$0.00- 0$0.00$0.00- 0$0.00Proposed Add-on Factor (G&A)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (COM)$0.00- 0$0.00$0.00- 0$0.00Proposed Add-on Factor (COM)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (Fee)$0.00- 0$0.00$0.00- 0$0.00Proposed Add-on Factor (Fee)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Total Proposed Cost$0.00$0.00Total Proposed Target Cost$0.00$0.00$0.00
Total Proposed COM$0.00$0.00Total Proposed Target COM$0.00$0.00$0.00
Total Proposed Fee$0.00$0.00Total Proposed Target Fee$0.00$0.00$0.00
Total Proposed Price$0.00$0.00Total Proposed Target Price$0.00$0.00$0.00
CLINs 0002 & 1002: CPFFProposed Prices (Other Direct Cost)Proposed Prices (Other Direct Cost)Proposed Prices (Other Direct Cost)Proposed Prices (Other Direct Cost)Proposed Prices (Other Direct Cost)
0002: F-15 O-Level Handheld/Pre-load Tester Prototype design and digital development - Basic Period1002: F-15 O-Level Handheld/Pre-load Tester EMD - Option Period 12002: A-10 O-Level Handheld/Pre-load Tester EMD - Option Period 23002: F-16 I-Level Fault Isolation Tester EMD - Option Period 34002: A-10 I-Level Fault Isolation Tester EMD - Option Period 4
BaseRatesCostBaseRatesCostBaseRatesCostBaseRatesCostBaseRatesCost
Total Proposed Other Direct Cost (ODC)Total Proposed Other Direct Cost (ODC)
Proposed Add-on Factor (Overhead)$0.00- 0$0.00$0.00- 0$0.00Proposed Add-on Factor (Overhead)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (G&A)$0.00- 0$0.00$0.00- 0$0.00Proposed Add-on Factor (G&A)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (COM)$0.00- 0$0.00$0.00- 0$0.00Proposed Add-on Factor (COM)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (Fee)$0.00- 0$0.00$0.00- 0$0.00Proposed Add-on Factor (Fee)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Total Proposed Cost$0.00$0.00Total Proposed Target Cost$0.00$0.00$0.00
Total Proposed COM$0.00$0.00Total Proposed Target COM$0.00$0.00$0.00
Total Proposed Fee$0.00$0.00Total Proposed Target Fee$0.00$0.00$0.00
Total Proposed Price$0.00$0.00Total Proposed Target Price$0.00$0.00$0.00
CLINs 0002 & 1002: CPFFProposed Prices (Labor, Material, and ODC)Proposed Prices (Labor, Material, and ODC)Proposed Prices (Labor, Material, and ODC)Proposed Prices (Labor, Material, and ODC)Proposed Prices (Labor, Material, and ODC)
CLIN 0002: Basic Period (CPFF)CLIN 1002: Option Period 1 (CPFF)CLIN 2002: Option Period 2 (CPIF)CLIN 3002: Option Period 3 (CPIF)CLIN 4002: Option Period 4 (CPIF)
Total Proposed Cost$0.00$0.00Total Proposed Target Cost$0.00$0.00$0.00
Total Proposed COM$0.00$0.00Total Proposed Target COM$0.00$0.00$0.00
Total Proposed Fee$0.00$0.00Total Proposed Target Fee$0.00$0.00$0.00
Total Proposed Price$0.00$0.00Total Proposed Target Price$0.00$0.00$0.00

Cost Format A_CLIN X003

Notes:
1. The format of this worksheet may be revised as required to be consistent with the major subcontractor's approved accounting system.
2. The Prime Offeror shall propose labor hours, material costs, and other direct costs in the yellow-highlighted cells below.
3. The Prime Offeror shall ensure the yellow-highlighted rate cells below are linked correctly from the relevant labor rate and add-on factors in the 'Cost Format B_PRIME Rates' worksheet.
4. The proposed factors will be applied to the proposed labor hours, material cost, and other direct costs.
5. Definitions of the labor categories and add-on factors are included in the 'Cost Format B_PRIME Rate Desc' worksheet.
6. Each CPFF/CPIF Cost, COM and Fee shall be rounded to the nearest whole dollar.
CLINs 0003 & 1003: CPFFProposed Prices (Labor)Proposed Prices (Labor)CLINs 2003 & 3003: CPIFProposed Prices (Labor)Proposed Prices (Labor)
0003: A-10 O-Level Handheld/Pre-load Tester Prototype design and digital development - Basic Period1003: A-10 O-Level Handheld/Pre-load Tester EMD - Option Period 12003: F-16 I-Level Fault Isolation Tester EMD - Option Period 23003: F-15 I-Level Fault Isolation Tester EMD - Option Period 3
Labor CategoryHoursRatesCostHoursRatesCostLabor CategoryHoursRatesCostHoursRatesCost
Labor Category 1: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00Labor Category 1: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00
Labor Category 2: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00Labor Category 2: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00
Labor Category 3: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00Labor Category 3: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00
Labor Category 4: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00Labor Category 4: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00
Labor Category 5: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00Labor Category 5: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00
Labor Category 6: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00Labor Category 6: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00
Labor Category 7: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00Labor Category 7: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00
Labor Category 8: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00Labor Category 8: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00
Labor Category 9: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00Labor Category 9: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00
Labor Category 10: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00Labor Category 10: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00
Labor Category 11: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00Labor Category 11: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00
Labor Category 12: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00Labor Category 12: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00
Labor Category 13: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00Labor Category 13: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00
TOTAL HOURS/COST0$0.000$0.00TOTAL HOURS/COST0$0.000$0.00
BaseRatesCostBaseRatesCostBaseRatesCostBaseRatesCost
Proposed Add-on Factor (Fringe)$0.00- 0$0.00$0.00- 0$0.00Proposed Add-on Factor (Fringe)$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (Overhead)$0.00- 0$0.00$0.00- 0$0.00Proposed Add-on Factor (Overhead)$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (G&A)$0.00- 0$0.00$0.00- 0$0.00Proposed Add-on Factor (G&A)$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (COM)$0.00- 0$0.00$0.00- 0$0.00Proposed Add-on Factor (COM)$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (Fee)$0.00- 0$0.00$0.00- 0$0.00Proposed Add-on Factor (Fee)$0.00- 0$0.00$0.00- 0$0.00
Total Proposed Cost$0.00$0.00Total Proposed Target Cost$0.00$0.00
Total Proposed COM$0.00$0.00Total Proposed Target COM$0.00$0.00
Total Proposed Fee$0.00$0.00Total Proposed Target Fee$0.00$0.00
Total Proposed Price$0.00$0.00Total Proposed Target Price$0.00$0.00
CLINs 0003 & 1003: CPFFProposed Prices (Material)Proposed Prices (Material)Proposed Prices (Material)Proposed Prices (Material)
0003: A-10 O-Level Handheld/Pre-load Tester Prototype design and digital development - Basic Period1003: A-10 O-Level Handheld/Pre-load Tester EMD - Option Period 12003: F-16 I-Level Fault Isolation Tester EMD - Option Period 23003: F-15 I-Level Fault Isolation Tester EMD - Option Period 3
BaseRatesCostBaseRatesCostBaseRatesCostBaseRatesCost
Total Proposed Material CostTotal Proposed Material Cost
Proposed Add-on Factor (Overhead)$0.00- 0$0.00$0.00- 0$0.00Proposed Add-on Factor (Overhead)$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (G&A)$0.00- 0$0.00$0.00- 0$0.00Proposed Add-on Factor (G&A)$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (COM)$0.00- 0$0.00$0.00- 0$0.00Proposed Add-on Factor (COM)$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (Fee)$0.00- 0$0.00$0.00- 0$0.00Proposed Add-on Factor (Fee)$0.00- 0$0.00$0.00- 0$0.00
Total Proposed Cost$0.00$0.00Total Proposed Target Cost$0.00$0.00
Total Proposed COM$0.00$0.00Total Proposed Target COM$0.00$0.00
Total Proposed Fee$0.00$0.00Total Proposed Target Fee$0.00$0.00
Total Proposed Price$0.00$0.00Total Proposed Target Price$0.00$0.00
CLINs 0003 & 1003: CPFFProposed Prices (Other Direct Cost)Proposed Prices (Other Direct Cost)Proposed Prices (Other Direct Cost)Proposed Prices (Other Direct Cost)
0003: A-10 O-Level Handheld/Pre-load Tester Prototype design and digital development - Basic Period1003: A-10 O-Level Handheld/Pre-load Tester EMD - Option Period 12003: F-16 I-Level Fault Isolation Tester EMD - Option Period 23003: F-15 I-Level Fault Isolation Tester EMD - Option Period 3
BaseRatesCostBaseRatesCostBaseRatesCostBaseRatesCost
Total Proposed Other Direct Cost (ODC)Total Proposed Other Direct Cost (ODC)
Proposed Add-on Factor (Overhead)$0.00- 0$0.00$0.00- 0$0.00Proposed Add-on Factor (Overhead)$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (G&A)$0.00- 0$0.00$0.00- 0$0.00Proposed Add-on Factor (G&A)$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (COM)$0.00- 0$0.00$0.00- 0$0.00Proposed Add-on Factor (COM)$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (Fee)$0.00- 0$0.00$0.00- 0$0.00Proposed Add-on Factor (Fee)$0.00- 0$0.00$0.00- 0$0.00
Total Proposed Cost$0.00$0.00Total Proposed Target Cost$0.00$0.00
Total Proposed COM$0.00$0.00Total Proposed Target COM$0.00$0.00
Total Proposed Fee$0.00$0.00Total Proposed Target Fee$0.00$0.00
Total Proposed Price$0.00$0.00Total Proposed Target Price$0.00$0.00
CLINs 0003 & 1003: CPFFProposed Prices (Labor, Material, and ODC)Proposed Prices (Labor, Material, and ODC)Proposed Prices (Labor, Material, and ODC)Proposed Prices (Labor, Material, and ODC)
CLIN 0003: Basic Period (CPFF)CLIN 1003: Option Period 1 (CPFF)CLIN 2003: Option Period 2 (CPIF)CLIN 3003: Option Period 3 (CPIF)
Total Proposed Cost$0.00$0.00Total Proposed Target Cost$0.00$0.00
Total Proposed COM$0.00$0.00Total Proposed Target COM$0.00$0.00
Total Proposed Fee$0.00$0.00Total Proposed Target Fee$0.00$0.00
Total Proposed Price$0.00$0.00Total Proposed Target Price$0.00$0.00

Cost Format A_CLIN X004

Notes:
1. The format of this worksheet may be revised as required to be consistent with the major subcontractor's approved accounting system.
2. The Prime Offeror shall propose labor hours, material costs, and other direct costs in the yellow-highlighted cells below.
3. The Prime Offeror shall ensure the yellow-highlighted rate cells below are linked correctly from the relevant labor rate and add-on factors in the 'Cost Format B_PRIME Rates' worksheet.
4. The proposed factors will be applied to the proposed labor hours, material cost, and other direct costs.
5. Definitions of the labor categories and add-on factors are included in the 'Cost Format B_PRIME Rate Desc' worksheet.
6. Each CPFF/CPIF Cost, COM and Fee shall be rounded to the nearest whole dollar.
CLINs 0004 & 1004: CPFFProposed Prices (Labor)Proposed Prices (Labor)CLINs 2004 & 3004: CPIFProposed Prices (Labor)Proposed Prices (Labor)
0004: F-16 I-Level Fault Isolation Tester design and digital development - Basic Period1004: F-16 I-Level Fault Isolation Tester EMD - Option Period 12004: F-15 I-Level Fault Isolation Tester EMD - Option Period 23004: A-10 I-Level Fault Isolation Tester EMD - Option Period 3
Labor CategoryHoursRatesCostHoursRatesCostLabor CategoryHoursRatesCostHoursRatesCost
Labor Category 1: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00Labor Category 1: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00
Labor Category 2: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00Labor Category 2: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00
Labor Category 3: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00Labor Category 3: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00
Labor Category 4: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00Labor Category 4: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00
Labor Category 5: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00Labor Category 5: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00
Labor Category 6: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00Labor Category 6: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00
Labor Category 7: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00Labor Category 7: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00
Labor Category 8: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00Labor Category 8: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00
Labor Category 9: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00Labor Category 9: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00
Labor Category 10: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00Labor Category 10: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00
Labor Category 11: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00Labor Category 11: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00
Labor Category 12: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00Labor Category 12: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00
Labor Category 13: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00Labor Category 13: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00
TOTAL HOURS/COST0$0.000$0.00TOTAL HOURS/COST0$0.000$0.00
BaseRatesCostBaseRatesCostBaseRatesCostBaseRatesCost
Proposed Add-on Factor (Fringe)$0.00- 0$0.00$0.00- 0$0.00Proposed Add-on Factor (Fringe)$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (Overhead)$0.00- 0$0.00$0.00- 0$0.00Proposed Add-on Factor (Overhead)$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (G&A)$0.00- 0$0.00$0.00- 0$0.00Proposed Add-on Factor (G&A)$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (COM)$0.00- 0$0.00$0.00- 0$0.00Proposed Add-on Factor (COM)$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (Fee)$0.00- 0$0.00$0.00- 0$0.00Proposed Add-on Factor (Fee)$0.00- 0$0.00$0.00- 0$0.00
Total Proposed Cost$0.00$0.00Total Proposed Target Cost$0.00$0.00
Total Proposed COM$0.00$0.00Total Proposed Target COM$0.00$0.00
Total Proposed Fee$0.00$0.00Total Proposed Target Fee$0.00$0.00
Total Proposed Price$0.00$0.00Total Proposed Target Price$0.00$0.00
CLINs 0004 & 1004: CPFFProposed Prices (Material)Proposed Prices (Material)Proposed Prices (Material)Proposed Prices (Material)
0004: F-16 I-Level Fault Isolation Tester design and digital development - Basic Period1004: F-16 I-Level Fault Isolation Tester EMD - Option Period 12004: F-15 I-Level Fault Isolation Tester EMD - Option Period 23004: A-10 I-Level Fault Isolation Tester EMD - Option Period 3
BaseRatesCostBaseRatesCostBaseRatesCostBaseRatesCost
Total Proposed Material CostTotal Proposed Material Cost
Proposed Add-on Factor (Overhead)$0.00- 0$0.00$0.00- 0$0.00Proposed Add-on Factor (Overhead)$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (G&A)$0.00- 0$0.00$0.00- 0$0.00Proposed Add-on Factor (G&A)$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (COM)$0.00- 0$0.00$0.00- 0$0.00Proposed Add-on Factor (COM)$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (Fee)$0.00- 0$0.00$0.00- 0$0.00Proposed Add-on Factor (Fee)$0.00- 0$0.00$0.00- 0$0.00
Total Proposed Cost$0.00$0.00Total Proposed Target Cost$0.00$0.00
Total Proposed COM$0.00$0.00Total Proposed Target COM$0.00$0.00
Total Proposed Fee$0.00$0.00Total Proposed Target Fee$0.00$0.00
Total Proposed Price$0.00$0.00Total Proposed Target Price$0.00$0.00
CLINs 0004 & 1004: CPFFProposed Prices (Other Direct Cost)Proposed Prices (Other Direct Cost)Proposed Prices (Other Direct Cost)Proposed Prices (Other Direct Cost)
0004: F-16 I-Level Fault Isolation Tester design and digital development - Basic Period1004: F-16 I-Level Fault Isolation Tester EMD - Option Period 12004: F-15 I-Level Fault Isolation Tester EMD - Option Period 23004: A-10 I-Level Fault Isolation Tester EMD - Option Period 3
BaseRatesCostBaseRatesCostBaseRatesCostBaseRatesCost
Total Proposed Other Direct Cost (ODC)Total Proposed Other Direct Cost (ODC)
Proposed Add-on Factor (Overhead)$0.00- 0$0.00$0.00- 0$0.00Proposed Add-on Factor (Overhead)$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (G&A)$0.00- 0$0.00$0.00- 0$0.00Proposed Add-on Factor (G&A)$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (COM)$0.00- 0$0.00$0.00- 0$0.00Proposed Add-on Factor (COM)$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (Fee)$0.00- 0$0.00$0.00- 0$0.00Proposed Add-on Factor (Fee)$0.00- 0$0.00$0.00- 0$0.00
Total Proposed Cost$0.00$0.00Total Proposed Target Cost$0.00$0.00
Total Proposed COM$0.00$0.00Total Proposed Target COM$0.00$0.00
Total Proposed Fee$0.00$0.00Total Proposed Target Fee$0.00$0.00
Total Proposed Price$0.00$0.00Total Proposed Target Price$0.00$0.00
CLINs 0004 & 1004: CPFFProposed Prices (Labor, Material, and ODC)Proposed Prices (Labor, Material, and ODC)Proposed Prices (Labor, Material, and ODC)Proposed Prices (Labor, Material, and ODC)
CLIN 0004: Basic Period (CPFF)CLIN 1004: Option Period 1 (CPFF)CLIN 2004: Option Period 2 (CPIF)CLIN 3004: Option Period 3 (CPIF)
Total Proposed Cost$0.00$0.00Total Proposed Target Cost$0.00$0.00
Total Proposed COM$0.00$0.00Total Proposed Target COM$0.00$0.00
Total Proposed Fee$0.00$0.00Total Proposed Target Fee$0.00$0.00
Total Proposed Price$0.00$0.00Total Proposed Target Price$0.00$0.00

Cost Format A_CLIN X005

Notes:
1. The format of this worksheet may be revised as required to be consistent with the major subcontractor's approved accounting system.
2. The Prime Offeror shall propose labor hours, material costs, and other direct costs in the yellow-highlighted cells below.
3. The Prime Offeror shall ensure the yellow-highlighted rate cells below are linked correctly from the relevant labor rate and add-on factors in the 'Cost Format B_PRIME Rates' worksheet.
4. The proposed factors will be applied to the proposed labor hours, material cost, and other direct costs.
5. Definitions of the labor categories and add-on factors are included in the 'Cost Format B_PRIME Rate Desc' worksheet.
6. Each CPFF/CPIF Cost, COM and Fee shall be rounded to the nearest whole dollar.
CLINs 0005 & 1005: CPFFProposed Prices (Labor)Proposed Prices (Labor)CLIN 2005: CPIFProposed Prices (Labor)
0005: F-15 I-Level Fault Isolation Tester design and digital development - Basic Period1005: F-15 I-Level Fault Isolation Tester EMD - Option Period 12005: A-10 I-Level Fault Isolation Tester EMD - Option Period 2
Labor CategoryHoursRatesCostHoursRatesCostLabor CategoryHoursRatesCost
Labor Category 1: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00Labor Category 1: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00
Labor Category 2: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00Labor Category 2: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00
Labor Category 3: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00Labor Category 3: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00
Labor Category 4: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00Labor Category 4: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00
Labor Category 5: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00Labor Category 5: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00
Labor Category 6: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00Labor Category 6: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00
Labor Category 7: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00Labor Category 7: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00
Labor Category 8: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00Labor Category 8: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00
Labor Category 9: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00Labor Category 9: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00
Labor Category 10: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00Labor Category 10: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00
Labor Category 11: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00Labor Category 11: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00
Labor Category 12: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00Labor Category 12: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00
Labor Category 13: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00Labor Category 13: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00
TOTAL HOURS/COST0$0.000$0.00TOTAL HOURS/COST0$0.00
BaseRatesCostBaseRatesCostBaseRatesCost
Proposed Add-on Factor (Fringe)$0.00- 0$0.00$0.00- 0$0.00Proposed Add-on Factor (Fringe)$0.00- 0$0.00
Proposed Add-on Factor (Overhead)$0.00- 0$0.00$0.00- 0$0.00Proposed Add-on Factor (Overhead)$0.00- 0$0.00
Proposed Add-on Factor (G&A)$0.00- 0$0.00$0.00- 0$0.00Proposed Add-on Factor (G&A)$0.00- 0$0.00
Proposed Add-on Factor (COM)$0.00- 0$0.00$0.00- 0$0.00Proposed Add-on Factor (COM)$0.00- 0$0.00
Proposed Add-on Factor (Fee)$0.00- 0$0.00$0.00- 0$0.00Proposed Add-on Factor (Fee)$0.00- 0$0.00
Total Proposed Cost$0.00$0.00Total Proposed Target Cost$0.00
Total Proposed COM$0.00$0.00Total Proposed Target COM$0.00
Total Proposed Fee$0.00$0.00Total Proposed Target Fee$0.00
Total Proposed Price$0.00$0.00Total Proposed Target Price$0.00
CLINs 0005 & 1005: CPFFProposed Prices (Material)Proposed Prices (Material)Proposed Prices (Material)
0005: F-15 I-Level Fault Isolation Tester design and digital development - Basic Period1005: F-15 I-Level Fault Isolation Tester EMD - Option Period 12005: A-10 I-Level Fault Isolation Tester EMD - Option Period 2
BaseRatesCostBaseRatesCostBaseRatesCost
Total Proposed Material CostTotal Proposed Material Cost
Proposed Add-on Factor (Overhead)$0.00- 0$0.00$0.00- 0$0.00Proposed Add-on Factor (Overhead)$0.00- 0$0.00
Proposed Add-on Factor (G&A)$0.00- 0$0.00$0.00- 0$0.00Proposed Add-on Factor (G&A)$0.00- 0$0.00
Proposed Add-on Factor (COM)$0.00- 0$0.00$0.00- 0$0.00Proposed Add-on Factor (COM)$0.00- 0$0.00
Proposed Add-on Factor (Fee)$0.00- 0$0.00$0.00- 0$0.00Proposed Add-on Factor (Fee)$0.00- 0$0.00
Total Proposed Cost$0.00$0.00Total Proposed Target Cost$0.00
Total Proposed COM$0.00$0.00Total Proposed Target COM$0.00
Total Proposed Fee$0.00$0.00Total Proposed Target Fee$0.00
Total Proposed Price$0.00$0.00Total Proposed Target Price$0.00
CLINs 0005 & 1005: CPFFProposed Prices (Other Direct Cost)Proposed Prices (Other Direct Cost)Proposed Prices (Other Direct Cost)
0005: F-15 I-Level Fault Isolation Tester design and digital development - Basic Period1005: F-15 I-Level Fault Isolation Tester EMD - Option Period 12005: A-10 I-Level Fault Isolation Tester EMD - Option Period 2
BaseRatesCostBaseRatesCostBaseRatesCost
Total Proposed Other Direct Cost (ODC)Total Proposed Other Direct Cost (ODC)
Proposed Add-on Factor (Overhead)$0.00- 0$0.00$0.00- 0$0.00Proposed Add-on Factor (Overhead)$0.00- 0$0.00
Proposed Add-on Factor (G&A)$0.00- 0$0.00$0.00- 0$0.00Proposed Add-on Factor (G&A)$0.00- 0$0.00
Proposed Add-on Factor (COM)$0.00- 0$0.00$0.00- 0$0.00Proposed Add-on Factor (COM)$0.00- 0$0.00
Proposed Add-on Factor (Fee)$0.00- 0$0.00$0.00- 0$0.00Proposed Add-on Factor (Fee)$0.00- 0$0.00
Total Proposed Cost$0.00$0.00Total Proposed Target Cost$0.00
Total Proposed COM$0.00$0.00Total Proposed Target COM$0.00
Total Proposed Fee$0.00$0.00Total Proposed Target Fee$0.00
Total Proposed Price$0.00$0.00Total Proposed Target Price$0.00
CLINs 0005 & 1005: CPFFProposed Prices (Labor, Material, and ODC)Proposed Prices (Labor, Material, and ODC)Proposed Prices (Labor, Material, and ODC)
CLIN 0005: Basic Period (CPFF)CLIN 1005: Option Period 1 (CPFF)CLIN 2005: Option Period 2 (CPIF)
Total Proposed Cost$0.00$0.00Total Proposed Target Cost$0.00
Total Proposed COM$0.00$0.00Total Proposed Target COM$0.00
Total Proposed Fee$0.00$0.00Total Proposed Target Fee$0.00
Total Proposed Price$0.00$0.00Total Proposed Target Price$0.00

Cost Format A_CLIN X006

Notes:
1. The format of this worksheet may be revised as required to be consistent with the major subcontractor's approved accounting system.
2. The Prime Offeror shall propose labor hours, material costs, and other direct costs in the yellow-highlighted cells below.
3. The Prime Offeror shall ensure the yellow-highlighted rate cells below are linked correctly from the relevant labor rate and add-on factors in the 'Cost Format B_PRIME Rates' worksheet.
4. The proposed factors will be applied to the proposed labor hours, material cost, and other direct costs.
5. Definitions of the labor categories and add-on factors are included in the 'Cost Format B_PRIME Rate Desc' worksheet.
6. Each CPFF/CPIF Cost, COM and Fee shall be rounded to the nearest whole dollar.
CLINs 0006 & 1006: CPFFProposed Prices (Labor)Proposed Prices (Labor)
0006: A-10 I-Level Fault Isolation Tester design and digital development - Basic Period1006: A-10 I-Level Fault Isolation Tester EMD - Option Period 1

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .