Draft RFP Attachment 6 Excel Cost Model v4_01 Apr 2025.xlsx

XLSX spreadsheet 183 KB Posted

Attached to
Common Armament Tester for Fighter (CAT-F)
Solicitation number
FA8533-25-R-0002
Issued by

About this file

This document is a Draft RFP Attachment 6 Excel Cost Model for the Common Armament Tester - Fighters (CAT-F) program. The cost model details a comprehensive pricing structure across a basic period and four option periods, covering prototype design, digital development, and testing for O-Level and I-Level handheld and fault isolation testers for F-16, F-15, and A-10 aircraft. The contract line item numbers (CLINs) include cost-plus-fixed-fee (CPFF) and firm-fixed-price (FFP) contract types, with line items for prototype design, engineering and manufacturing development (EMD), logistical support, production kits, program management, government testing, technical data, and additional support elements.

The cost model is structured to allow offerors to input pricing details in yellow-highlighted cells, with quantities ranging from 1 to 210 units across different aircraft platforms and testing configurations. The document includes multiple worksheets covering labor, material, and other direct costs for prime and subcontractor rates, with provisions for labor categories, add-on factors like fringe, overhead, G&A, and fee calculations. The solicitation is associated with the Department of the Air Force Materiel Command Lifecycle Management Center at Robins Air Force Base, with a draft RFP review period ending 4 pm EST on Tuesday, 10 December 2024, and feedback to be submitted to specific government points of contact.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cost Format C_CLIN Summary

Common Armament Tester - Fighters (CAT-F) Excel Cost Model (RFP Attachment XX)
"Offeror shall enter data in yellow highlighted fields only"
Solicitation Number:
Enter Offeror's Business Name:
Enter Offeror's CAGE code:
Basic Period (12 months)
CLINContract TypeDescriptionQTYUnitCostCOMFeeUnit PriceExtended Price
0001CPFFF-16 O-Level Handheld/Pre-load Tester Prototype design and digital development1LO$0.00$0.00$0.00$0.00$0.00
0002CPFFF-15 O-Level Handheld/Pre-load Tester Prototype design and digital development1LO$0.00$0.00$0.00$0.00$0.00
0003CPFFA-10 O-Level Handheld/Pre-load Tester Prototype design and digital development1LO$0.00$0.00$0.00$0.00$0.00
0004CPFFF-16 I-Level Fault Isolation Tester design and digital development1LO$0.00$0.00$0.00$0.00$0.00
0005CPFFF-15 I-Level Fault Isolation Tester design and digital development1LO$0.00$0.00$0.00$0.00$0.00
0006CPFFA-10 I-Level Fault Isolation Tester design and digital development1LO$0.00$0.00$0.00$0.00$0.00
0007FFPF-16 O-Level Handheld Tester Prototype4EA$0.00$0.00
0008FFPF-15 O-Level Handheld Tester Prototype4EA$0.00$0.00
0009FFPA-10 O-Level Handheld Tester Prototype4EA$0.00$0.00
0010FFPF-16 I-Level Fault Isolation Tester digital design1LO$0.00$0.00
0011FFPF-15 I-Level Fault Isolation Tester digital design1LO$0.00$0.00
0012FFPA-10 I-Level Fault Isolation Tester digital design1LO$0.00$0.00
0013FFPProgram Management1LO$0.00$0.00
0014CPFFDesign Demonstration (Labor- Not Travel)1LO$0.00$0.00$0.00$0.00$0.00
0015CRNFTravel1LO$0.00$0.00$0.00$0.00
0016FFPSoftware Source Code1LO$0.00$0.00
0017NSPCDRLs (Data)1LONSP
0018FFPPost Award Conference1LO$0.00$0.00
0019NSPCDRLs (Data)1LONSP
Total Extended Price - Basic Period$0.00
Option Period I (12 months)
CLINContract TypeDescriptionQTYUnitCostCOMFeeUnit PriceExtended Price
1001CPFFF-16 O-Level Handheld/Pre-load Tester Engineering and Manufacturing Development (EMD)1LO$0.00$0.00$0.00$0.00$0.00
1002CPFFF-15 O-Level Handheld/Pre-load Tester EMD1LO$0.00$0.00$0.00$0.00$0.00
1003CPFFA-10 O-Level Handheld/Pre-load Tester EMD1LO$0.00$0.00$0.00$0.00$0.00
1004CPFFF-16 I-Level Fault Isolation Tester EMD1LO$0.00$0.00$0.00$0.00$0.00
1005CPFFF-15 I-Level Fault Isolation Tester EMD1LO$0.00$0.00$0.00$0.00$0.00
1006CPFFA-10 I-Level Fault Isolation Tester EMD1LO$0.00$0.00$0.00$0.00$0.00
1007FFPF-16 O-Level Handheld/Pre-load Tester Logistical Support1LO$0.00$0.00
1008FFPF-16 O-Level Handheld Tester LRIP production10EA$0.00$0.00
1009FFPF-16 O-Level Handheld Tester Kits83EA$0.00$0.00
1010FFPProgram Management1LO$0.00$0.00
1011CPFFSupport Government Testing1LO$0.00$0.00$0.00$0.00$0.00
1012CRNFTravel1LO$0.00$0.00$0.00$0.00
1013FFPSoftware Source Code1LO$0.00$0.00
1014NSPCDRLs (Data)1LONSP
1015CPFFTechnical Data1LO$0.00$0.00$0.00$0.00$0.00
1016FFPSurge Option1EA$0.00$0.00
1017NSPCDRLs (Data)1LONSP
Total Extended Price - Option Period I$0.00
Option Period II (12 months)
CLINContract TypeDescriptionQTYUnitCostCOMFeeUnit PriceExtended Price
2001CPFFF-15 O-Level Handheld/Pre-load Tester EMD1LO$0.00$0.00$0.00$0.00$0.00
2002CPFFA-10 O-Level Handheld/Pre-load Tester EMD1LO$0.00$0.00$0.00$0.00$0.00
2003CPFFF-16 I-Level Fault Isolation Tester EMD1LO$0.00$0.00$0.00$0.00$0.00
2004CPFFF-15 I-Level Fault Isolation Tester EMD1LO$0.00$0.00$0.00$0.00$0.00
2005CPFFA-10 I-Level Fault Isolation Tester EMD1LO$0.00$0.00$0.00$0.00$0.00
2006FFPF-15 O-Level Handheld/Pre-load Tester Logistical Support1LO$0.00$0.00
2007FFPA-10 O-Level Handheld/Pre-load Tester Logistical Support1LO$0.00$0.00
2008FFPF-16 O-Level Handheld Tester Kits210EA$0.00$0.00
2009FFPF-15 O-Level Handheld Tester Kits (LRIP)10EA$0.00$0.00
2010FFPF-15 O-Level Handheld Tester Kits162EA$0.00$0.00
2011FFPA-10 O-Level Handheld Tester Kits (LRIP)4EA$0.00$0.00
2012FFPProgram Management1LO$0.00$0.00
2013CPFFSupport Government Testing1LO$0.00$0.00$0.00$0.00$0.00
2014CRNFTravel1LO$0.00$0.00$0.00$0.00
2015FFPSoftware Source Code1LO$0.00$0.00
2016NSPCDRLs (Data)1LONSP
2017CPFFTechnical Data1LO$0.00$0.00$0.00$0.00$0.00
2018FFPSurge Option1EA$0.00$0.00
2019NSPCDRLs (Data)1LONSP
Total Extended Price - Option Period II$0.00
Option Period III (12 months)
CLINContract TypeDescriptionQTYUnitCostCOMFeeUnit PriceExtended Price
3001CPFFA-10 O-Level Handheld/Pre-load Tester EMD1LO$0.00$0.00$0.00$0.00$0.00
3002CPFFF-16 I-Level Fault Isolation Tester EMD1LO$0.00$0.00$0.00$0.00$0.00
3003CPFFF-15 I-Level Fault Isolation Tester EMD1LO$0.00$0.00$0.00$0.00$0.00
3004CPFFA-10 I-Level Fault Isolation Tester EMD1LO$0.00$0.00$0.00$0.00$0.00
3005FFPF-16 I-Level Fault Isolation Tester Logistical Support1LO$0.00$0.00
3006FFPF-15 I-Level Fault Isolation Tester Logistical Support1LO$0.00$0.00
3007FFPA-10 O-Level Handheld Tester Kits64EA$0.00$0.00
3008FFPF-16 I-Level Fault Isolation Tester Kits (LRIP)5EA$0.00$0.00
3009FFPF-15 I-Level Fault Isolation Tester Kits (LRIP)5EA$0.00$0.00
3010FFPF-16 I-Level Fault Isolation Tester Kits138EA$0.00$0.00
3011FFPProgram Management1LO$0.00$0.00
3012CPFFSupport Government Testing1LO$0.00$0.00$0.00$0.00$0.00
3013CRNFTravel1LO$0.00$0.00$0.00$0.00
3014FFPSoftware Source Code1LO$0.00$0.00
3015NSPCDRLs (Data)1LONSP
3016CPFFTechnical Data1LO$0.00$0.00$0.00$0.00$0.00
3017FFPSurge Option1EA$0.00$0.00
3018NSPCDRLs (Data)1LONSP
Total Extended Price - Option Period III$0.00
Option Period IV (12 months)
CLINContract TypeDescriptionQTYUnitCostCOMFeeUnit PriceExtended Price
4001CPFFF-15 I-Level Fault Isolation Tester EMD1LO$0.00$0.00$0.00$0.00$0.00
4002CPFFA-10 I-Level Fault Isolation Tester EMD1LO$0.00$0.00$0.00$0.00$0.00
4003FFPA-10 I-Level Fault Isolation Tester Logistical Support1LO$0.00$0.00
4004FFPF-15 I-Level Fault Isolation Tester Kits75EA$0.00$0.00
4005FFPA-10 I-Level Fault Isolation Tester Kits (LRIP)2EA$0.00$0.00
4006FFPA-10 I-Level Fault Isolation Tester Kits40EA$0.00$0.00
4007FFPProgram Management1LO$0.00$0.00
4008CPFFSupport Government Testing1LO$0.00$0.00$0.00$0.00$0.00
4009CRNFTravel1LO$0.00$0.00$0.00$0.00
4010FFPSoftware Source Code1LO$0.00$0.00
4011NSPCDRLs (Data)1LONSP
4012CPFFTechnical Data1LO$0.00$0.00$0.00$0.00$0.00
4013FFPSurge Option1EA$0.00$0.00
4014NSPCDRLs (Data)1LONSP
Total Extended Price - Option Period IV$0.00

Total Proposed Price $0.00

SOURCE SELECTION INFORMATION--SEE FAR 2.101 and 3.104

FOR OFFICIAL USE ONLY

FFP CLINs

Notes:
1. The prime offeror shall enter a proposed unit price per CLIN in the yellow-highlighted cells below.
2. Each Firm Fixed Price shall be rounded to the nearest whole dollar.
3. The prime offeror shall ensure the cells below are linked correctly to the CLIN cells on worksheet "Cost Format C_CLIN Summary".
Basic Period (12 Months)Option Period I (12 Months)Option Period II (12 Months)Option Period III (12 Months)Option Period IV (12 Months)
CLIN 0007CLIN 1007CLIN 2006CLIN 3005CLIN 4003
QtyUnitProposed Unit PriceQtyUnitProposed Unit PriceQtyUnitProposed Unit PriceQtyUnitProposed Unit PriceQtyUnitProposed Unit Price
4EA1LO1LO1LO1LO
CLIN 0008CLIN 1008CLIN 2007CLIN 3006CLIN 4004
QtyUnitProposed Unit PriceQtyUnitProposed Unit PriceQtyUnitProposed Unit PriceQtyUnitProposed Unit PriceQtyUnitProposed Unit Price
4EA10EA1LO1LO75EA
CLIN 0009CLIN 1009CLIN 2008CLIN 3007CLIN 4005
QtyUnitProposed Unit PriceQtyUnitProposed Unit PriceQtyUnitProposed Unit PriceQtyUnitProposed Unit PriceQtyUnitProposed Unit Price
4EA83EA210EA64EA2EA
CLIN 0010CLIN 1010CLIN 2009CLIN 3008CLIN 4006
QtyUnitProposed Unit PriceQtyUnitProposed Unit PriceQtyUnitProposed Unit PriceQtyUnitProposed Unit PriceQtyUnitProposed Unit Price
1LO1LO10EA5EA40EA
CLIN 0011CLIN 1013CLIN 2010CLIN 3009CLIN 4007
QtyUnitProposed Unit PriceQtyUnitProposed Unit PriceQtyUnitProposed Unit PriceQtyUnitProposed Unit PriceQtyUnitProposed Unit Price
1LO1LO162EA5EA1LO
CLIN 0012CLIN 1016CLIN 2011CLIN 3010CLIN 4010
QtyUnitProposed Unit PriceQtyUnitProposed Unit PriceQtyUnitProposed Unit PriceQtyUnitProposed Unit PriceQtyUnitProposed Unit Price
1LO1EA4EA138EA1LO
CLIN 0013CLIN 2012CLIN 3011CLIN 4013
QtyUnitProposed Unit PriceQtyUnitProposed Unit PriceQtyUnitProposed Unit PriceQtyUnitProposed Unit Price
1LO1LO1LO1EA
CLIN 0016CLIN 2015CLIN 3014
QtyUnitProposed Unit PriceQtyUnitProposed Unit PriceQtyUnitProposed Unit Price
1LO1LO1LO
CLIN 0018CLIN 2018CLIN 3017
QtyUnitProposed Unit PriceQtyUnitProposed Unit PriceQtyUnitProposed Unit Price
1LO1EA1EA

Cost Format A_CLIN X001

Notes:
1. The format of this worksheet may be revised as required to be consistent with the major subcontractor's approved accounting system.
2. The Prime Offeror shall propose labor hours, material costs, and other direct costs in the yellow-highlighted cells below.
3. The Prime Offeror shall ensure the yellow-highlighted rate cells below are linked correctly from the relevant labor rate and add-on factors in the 'Cost Format B_PRIME Rates' worksheet.
4. The proposed factors will be applied to the proposed labor hours, material cost, and other direct costs.
5. Definitions of the labor categories and add-on factors are included in the 'Cost Format B_PRIME Rate Desc' worksheet.
6. Each CPFF Cost, COM and Fee shall be rounded to the nearest whole dollar.
CLINs 0001, 1001, 2001, 3001, and 4001: CPFFProposed Prices (Labor)Proposed Prices (Labor)Proposed Prices (Labor)Proposed Prices (Labor)Proposed Prices (Labor)
0001: F-16 O-Level Handheld/Pre-load Tester Prototype Design and Digital Development - Basic Period1001: F-16 O-Level Handheld/Pre-load Tester EMD - Option Period 12001: F-15 O-Level Handheld/Pre-load Tester EMD - Option Period 23001: A-10 O-Level Handheld/Pre-load Tester EMD - Option Period 34001: F-15 I-Level Fault Isolation Tester EMD - Option Period 4
Labor CategoryHoursRatesCostHoursRatesCostHoursRatesCostHoursRatesCostHoursRatesCost
Labor Category 1: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 2: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 3: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 4: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 5: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 6: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 7: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 8: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 9: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 10: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 11: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 12: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 13: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
TOTAL HOURS/COST0$0.000$0.000$0.000$0.000$0.00
BaseRatesCostBaseRatesCostBaseRatesCostBaseRatesCostBaseRatesCost
Proposed Add-on Factor (Fringe)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (Overhead)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (G&A)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (COM)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (Fee)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Total Proposed Cost$0.00$0.00$0.00$0.00$0.00
Total Proposed COM$0.00$0.00$0.00$0.00$0.00
Total Proposed Fee$0.00$0.00$0.00$0.00$0.00
Total Proposed Price$0.00$0.00$0.00$0.00$0.00
CLINs 0001, 1001, 2001, 3001, and 4001: CPFFProposed Prices (Material)Proposed Prices (Material)Proposed Prices (Material)Proposed Prices (Material)Proposed Prices (Material)
0001: F-16 O-Level Handheld/Pre-load Tester Prototype Design and Digital Development - Basic Period1001: F-16 O-Level Handheld/Pre-load Tester EMD - Option Period 12001: F-15 O-Level Handheld/Pre-load Tester EMD - Option Period 23001: A-10 O-Level Handheld/Pre-load Tester EMD - Option Period 34001: F-15 I-Level Fault Isolation Tester EMD - Option Period 4
BaseRatesCostBaseRatesCostBaseRatesCostBaseRatesCostBaseRatesCost
Total Proposed Material Cost
Proposed Add-on Factor (Overhead)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (G&A)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (COM)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (Fee)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Total Proposed Cost$0.00$0.00$0.00$0.00$0.00
Total Proposed COM$0.00$0.00$0.00$0.00$0.00
Total Proposed Fee$0.00$0.00$0.00$0.00$0.00
Total Proposed Price$0.00$0.00$0.00$0.00$0.00
CLINs 0001, 1001, 2001, 3001, and 4001: CPFFProposed Prices (Other Direct Cost)Proposed Prices (Other Direct Cost)Proposed Prices (Other Direct Cost)Proposed Prices (Other Direct Cost)Proposed Prices (Other Direct Cost)
0001: F-16 O-Level Handheld/Pre-load Tester Prototype Design and Digital Development - Basic Period1001: F-16 O-Level Handheld/Pre-load Tester EMD - Option Period 12001: F-15 O-Level Handheld/Pre-load Tester EMD - Option Period 23001: A-10 O-Level Handheld/Pre-load Tester EMD - Option Period 34001: F-15 I-Level Fault Isolation Tester EMD - Option Period 4
BaseRatesCostBaseRatesCostBaseRatesCostBaseRatesCostBaseRatesCost
Total Proposed Other Direct Cost (ODC)
Proposed Add-on Factor (Overhead)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (G&A)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (COM)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (Fee)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Total Proposed Cost$0.00$0.00$0.00$0.00$0.00
Total Proposed COM$0.00$0.00$0.00$0.00$0.00
Total Proposed Fee$0.00$0.00$0.00$0.00$0.00
Total Proposed Price$0.00$0.00$0.00$0.00$0.00
CLINs 0001, 1001, 2001, 3001, and 4001: CPFFProposed Prices (Labor, Material, and ODC)Proposed Prices (Labor, Material, and ODC)Proposed Prices (Labor, Material, and ODC)Proposed Prices (Labor, Material, and ODC)Proposed Prices (Labor, Material, and ODC)
CLIN 0001: Basic Period (CPFF)CLIN 1001: Option Period 1 (CPFF)CLIN 2001: Option Period 2 (CPFF)CLIN 3001: Option Period 3 (CPFF)CLIN 4001: Option Period 4 (CPFF)
Total Proposed Cost$0.00$0.00$0.00$0.00$0.00
Total Proposed COM$0.00$0.00$0.00$0.00$0.00
Total Proposed Fee$0.00$0.00$0.00$0.00$0.00
Total Proposed Price$0.00$0.00$0.00$0.00$0.00

Cost Format A_CLIN X002

Notes:
1. The format of this worksheet may be revised as required to be consistent with the major subcontractor's approved accounting system.
2. The Prime Offeror shall propose labor hours, material costs, and other direct costs in the yellow-highlighted cells below.
3. The Prime Offeror shall ensure the yellow-highlighted rate cells below are linked correctly from the relevant labor rate and add-on factors in the 'Cost Format B_PRIME Rates' worksheet.
4. The proposed factors will be applied to the proposed labor hours, material cost, and other direct costs.
5. Definitions of the labor categories and add-on factors are included in the 'Cost Format B_PRIME Rate Desc' worksheet.
6. Each CPFF Cost, COM and Fee shall be rounded to the nearest whole dollar.
CLINs 0002, 1002, 2002, 3002, and 4002: CPFFProposed Prices (Labor)Proposed Prices (Labor)Proposed Prices (Labor)Proposed Prices (Labor)Proposed Prices (Labor)
0002: F-15 O-Level Handheld/Pre-load Tester Prototype design and digital development - Basic Period1002: F-15 O-Level Handheld/Pre-load Tester EMD - Option Period 12002: A-10 O-Level Handheld/Pre-load Tester EMD - Option Period 23002: F-16 I-Level Fault Isolation Tester EMD - Option Period 34002: A-10 I-Level Fault Isolation Tester EMD - Option Period 4
Labor CategoryHoursRatesCostHoursRatesCostHoursRatesCostHoursRatesCostHoursRatesCost
Labor Category 1: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 2: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 3: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 4: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 5: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 6: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 7: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 8: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 9: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 10: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 11: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 12: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 13: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
TOTAL HOURS/COST0$0.000$0.000$0.000$0.000$0.00
BaseRatesCostBaseRatesCostBaseRatesCostBaseRatesCostBaseRatesCost
Proposed Add-on Factor (Fringe)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (Overhead)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (G&A)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (COM)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (Fee)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Total Proposed Cost$0.00$0.00$0.00$0.00$0.00
Total Proposed COM$0.00$0.00$0.00$0.00$0.00
Total Proposed Fee$0.00$0.00$0.00$0.00$0.00
Total Proposed Price$0.00$0.00$0.00$0.00$0.00
CLINs 0002, 1002, 2002, 3002, and 4002: CPFFProposed Prices (Material)Proposed Prices (Material)Proposed Prices (Material)Proposed Prices (Material)Proposed Prices (Material)
0002: F-15 O-Level Handheld/Pre-load Tester Prototype design and digital development - Basic Period1002: F-15 O-Level Handheld/Pre-load Tester EMD - Option Period 12002: A-10 O-Level Handheld/Pre-load Tester EMD - Option Period 23002: F-16 I-Level Fault Isolation Tester EMD - Option Period 34002: A-10 I-Level Fault Isolation Tester EMD - Option Period 4
BaseRatesCostBaseRatesCostBaseRatesCostBaseRatesCostBaseRatesCost
Total Proposed Material Cost
Proposed Add-on Factor (Overhead)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (G&A)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (COM)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (Fee)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Total Proposed Cost$0.00$0.00$0.00$0.00$0.00
Total Proposed COM$0.00$0.00$0.00$0.00$0.00
Total Proposed Fee$0.00$0.00$0.00$0.00$0.00
Total Proposed Price$0.00$0.00$0.00$0.00$0.00
CLINs 0002, 1002, 2002, 3002, and 4002: CPFFProposed Prices (Other Direct Cost)Proposed Prices (Other Direct Cost)Proposed Prices (Other Direct Cost)Proposed Prices (Other Direct Cost)Proposed Prices (Other Direct Cost)
0002: F-15 O-Level Handheld/Pre-load Tester Prototype design and digital development - Basic Period1002: F-15 O-Level Handheld/Pre-load Tester EMD - Option Period 12002: A-10 O-Level Handheld/Pre-load Tester EMD - Option Period 23002: F-16 I-Level Fault Isolation Tester EMD - Option Period 34002: A-10 I-Level Fault Isolation Tester EMD - Option Period 4
BaseRatesCostBaseRatesCostBaseRatesCostBaseRatesCostBaseRatesCost
Total Proposed Other Direct Cost (ODC)
Proposed Add-on Factor (Overhead)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (G&A)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (COM)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (Fee)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Total Proposed Cost$0.00$0.00$0.00$0.00$0.00
Total Proposed COM$0.00$0.00$0.00$0.00$0.00
Total Proposed Fee$0.00$0.00$0.00$0.00$0.00
Total Proposed Price$0.00$0.00$0.00$0.00$0.00
CLINs 0002, 1002, 2002, 3002, and 4002: CPFFProposed Prices (Labor, Material, and ODC)Proposed Prices (Labor, Material, and ODC)Proposed Prices (Labor, Material, and ODC)Proposed Prices (Labor, Material, and ODC)Proposed Prices (Labor, Material, and ODC)
CLIN 0002: Basic Period (CPFF)CLIN 1002: Option Period 1 (CPFF)CLIN 2002: Option Period 2 (CPFF)CLIN 3002: Option Period 3 (CPFF)CLIN 4002: Option Period 4 (CPFF)
Total Proposed Cost$0.00$0.00$0.00$0.00$0.00
Total Proposed COM$0.00$0.00$0.00$0.00$0.00
Total Proposed Fee$0.00$0.00$0.00$0.00$0.00
Total Proposed Price$0.00$0.00$0.00$0.00$0.00

Cost Format A_CLIN X003

Notes:
1. The format of this worksheet may be revised as required to be consistent with the major subcontractor's approved accounting system.
2. The Prime Offeror shall propose labor hours, material costs, and other direct costs in the yellow-highlighted cells below.
3. The Prime Offeror shall ensure the yellow-highlighted rate cells below are linked correctly from the relevant labor rate and add-on factors in the 'Cost Format B_PRIME Rates' worksheet.
4. The proposed factors will be applied to the proposed labor hours, material cost, and other direct costs.
5. Definitions of the labor categories and add-on factors are included in the 'Cost Format B_PRIME Rate Desc' worksheet.
6. Each CPFF Cost, COM and Fee shall be rounded to the nearest whole dollar.
CLINs 0003, 1003, 2003, and 3003: CPFFProposed Prices (Labor)Proposed Prices (Labor)Proposed Prices (Labor)Proposed Prices (Labor)
0003: A-10 O-Level Handheld/Pre-load Tester Prototype design and digital development - Basic Period1003: A-10 O-Level Handheld/Pre-load Tester EMD - Option Period 12003: F-16 I-Level Fault Isolation Tester EMD - Option Period 23003: F-15 I-Level Fault Isolation Tester EMD - Option Period 3
Labor CategoryHoursRatesCostHoursRatesCostHoursRatesCostHoursRatesCost
Labor Category 1: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 2: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 3: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 4: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 5: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 6: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 7: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 8: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 9: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 10: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 11: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 12: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 13: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
TOTAL HOURS/COST0$0.000$0.000$0.000$0.00
BaseRatesCostBaseRatesCostBaseRatesCostBaseRatesCost
Proposed Add-on Factor (Fringe)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (Overhead)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (G&A)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (COM)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (Fee)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Total Proposed Cost$0.00$0.00$0.00$0.00
Total Proposed COM$0.00$0.00$0.00$0.00
Total Proposed Fee$0.00$0.00$0.00$0.00
Total Proposed Price$0.00$0.00$0.00$0.00
CLINs 0003, 1003, 2003, and 3003: CPFFProposed Prices (Material)Proposed Prices (Material)Proposed Prices (Material)Proposed Prices (Material)
0003: A-10 O-Level Handheld/Pre-load Tester Prototype design and digital development - Basic Period1003: A-10 O-Level Handheld/Pre-load Tester EMD - Option Period 12003: F-16 I-Level Fault Isolation Tester EMD - Option Period 23003: F-15 I-Level Fault Isolation Tester EMD - Option Period 3
BaseRatesCostBaseRatesCostBaseRatesCostBaseRatesCost
Total Proposed Material Cost
Proposed Add-on Factor (Overhead)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (G&A)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (COM)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (Fee)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Total Proposed Cost$0.00$0.00$0.00$0.00
Total Proposed COM$0.00$0.00$0.00$0.00
Total Proposed Fee$0.00$0.00$0.00$0.00
Total Proposed Price$0.00$0.00$0.00$0.00
CLINs 0003, 1003, 2003, and 3003: CPFFProposed Prices (Other Direct Cost)Proposed Prices (Other Direct Cost)Proposed Prices (Other Direct Cost)Proposed Prices (Other Direct Cost)
0003: A-10 O-Level Handheld/Pre-load Tester Prototype design and digital development - Basic Period1003: A-10 O-Level Handheld/Pre-load Tester EMD - Option Period 12003: F-16 I-Level Fault Isolation Tester EMD - Option Period 23003: F-15 I-Level Fault Isolation Tester EMD - Option Period 3
BaseRatesCostBaseRatesCostBaseRatesCostBaseRatesCost
Total Proposed Other Direct Cost (ODC)
Proposed Add-on Factor (Overhead)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (G&A)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (COM)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (Fee)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Total Proposed Cost$0.00$0.00$0.00$0.00
Total Proposed COM$0.00$0.00$0.00$0.00
Total Proposed Fee$0.00$0.00$0.00$0.00
Total Proposed Price$0.00$0.00$0.00$0.00
CLINs 0003, 1003, 2003, and 3003: CPFFProposed Prices (Labor, Material, and ODC)Proposed Prices (Labor, Material, and ODC)Proposed Prices (Labor, Material, and ODC)Proposed Prices (Labor, Material, and ODC)
CLIN 0003: Basic Period (CPFF)CLIN 1003: Option Period 1 (CPFF)CLIN 2003: Option Period 2 (CPFF)CLIN 3003: Option Period 3 (CPFF)
Total Proposed Cost$0.00$0.00$0.00$0.00
Total Proposed COM$0.00$0.00$0.00$0.00
Total Proposed Fee$0.00$0.00$0.00$0.00
Total Proposed Price$0.00$0.00$0.00$0.00

Cost Format A_CLIN X004

Notes:
1. The format of this worksheet may be revised as required to be consistent with the major subcontractor's approved accounting system.
2. The Prime Offeror shall propose labor hours, material costs, and other direct costs in the yellow-highlighted cells below.
3. The Prime Offeror shall ensure the yellow-highlighted rate cells below are linked correctly from the relevant labor rate and add-on factors in the 'Cost Format B_PRIME Rates' worksheet.
4. The proposed factors will be applied to the proposed labor hours, material cost, and other direct costs.
5. Definitions of the labor categories and add-on factors are included in the 'Cost Format B_PRIME Rate Desc' worksheet.
6. Each CPFF Cost, COM and Fee shall be rounded to the nearest whole dollar.
CLINs 0004, 1004, 2004, and 3004: CPFFProposed Prices (Labor)Proposed Prices (Labor)Proposed Prices (Labor)Proposed Prices (Labor)
0004: F-16 I-Level Fault Isolation Tester design and digital development - Basic Period1004: F-16 I-Level Fault Isolation Tester EMD - Option Period 12004: F-15 I-Level Fault Isolation Tester EMD - Option Period 23004: A-10 I-Level Fault Isolation Tester EMD - Option Period 3
Labor CategoryHoursRatesCostHoursRatesCostHoursRatesCostHoursRatesCost
Labor Category 1: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 2: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 3: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 4: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 5: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 6: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 7: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 8: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 9: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 10: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 11: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 12: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 13: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
TOTAL HOURS/COST0$0.000$0.000$0.000$0.00
BaseRatesCostBaseRatesCostBaseRatesCostBaseRatesCost
Proposed Add-on Factor (Fringe)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (Overhead)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (G&A)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (COM)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (Fee)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Total Proposed Cost$0.00$0.00$0.00$0.00
Total Proposed COM$0.00$0.00$0.00$0.00
Total Proposed Fee$0.00$0.00$0.00$0.00
Total Proposed Price$0.00$0.00$0.00$0.00
CLINs 0004, 1004, 2004, and 3004: CPFFProposed Prices (Material)Proposed Prices (Material)Proposed Prices (Material)Proposed Prices (Material)
0004: F-16 I-Level Fault Isolation Tester design and digital development - Basic Period1004: F-16 I-Level Fault Isolation Tester EMD - Option Period 12004: F-15 I-Level Fault Isolation Tester EMD - Option Period 23004: A-10 I-Level Fault Isolation Tester EMD - Option Period 3
BaseRatesCostBaseRatesCostBaseRatesCostBaseRatesCost
Total Proposed Material Cost
Proposed Add-on Factor (Overhead)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (G&A)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (COM)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (Fee)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Total Proposed Cost$0.00$0.00$0.00$0.00
Total Proposed COM$0.00$0.00$0.00$0.00
Total Proposed Fee$0.00$0.00$0.00$0.00
Total Proposed Price$0.00$0.00$0.00$0.00
CLINs 0004, 1004, 2004, and 3004: CPFFProposed Prices (Other Direct Cost)Proposed Prices (Other Direct Cost)Proposed Prices (Other Direct Cost)Proposed Prices (Other Direct Cost)
0004: F-16 I-Level Fault Isolation Tester design and digital development - Basic Period1004: F-16 I-Level Fault Isolation Tester EMD - Option Period 12004: F-15 I-Level Fault Isolation Tester EMD - Option Period 23004: A-10 I-Level Fault Isolation Tester EMD - Option Period 3
BaseRatesCostBaseRatesCostBaseRatesCostBaseRatesCost
Total Proposed Other Direct Cost (ODC)
Proposed Add-on Factor (Overhead)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (G&A)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (COM)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (Fee)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Total Proposed Cost$0.00$0.00$0.00$0.00
Total Proposed COM$0.00$0.00$0.00$0.00
Total Proposed Fee$0.00$0.00$0.00$0.00
Total Proposed Price$0.00$0.00$0.00$0.00
CLINs 0004, 1004, 2004, and 3004: CPFFProposed Prices (Labor, Material, and ODC)Proposed Prices (Labor, Material, and ODC)Proposed Prices (Labor, Material, and ODC)Proposed Prices (Labor, Material, and ODC)
CLIN 0004: Basic Period (CPFF)CLIN 1004: Option Period 1 (CPFF)CLIN 2004: Option Period 2 (CPFF)CLIN 3004: Option Period 3 (CPFF)
Total Proposed Cost$0.00$0.00$0.00$0.00
Total Proposed COM$0.00$0.00$0.00$0.00
Total Proposed Fee$0.00$0.00$0.00$0.00
Total Proposed Price$0.00$0.00$0.00$0.00

Cost Format A_CLIN X005

Notes:
1. The format of this worksheet may be revised as required to be consistent with the major subcontractor's approved accounting system.
2. The Prime Offeror shall propose labor hours, material costs, and other direct costs in the yellow-highlighted cells below.
3. The Prime Offeror shall ensure the yellow-highlighted rate cells below are linked correctly from the relevant labor rate and add-on factors in the 'Cost Format B_PRIME Rates' worksheet.
4. The proposed factors will be applied to the proposed labor hours, material cost, and other direct costs.
5. Definitions of the labor categories and add-on factors are included in the 'Cost Format B_PRIME Rate Desc' worksheet.
6. Each CPFF Cost, COM and Fee shall be rounded to the nearest whole dollar.
CLINs 0005, 1005, and 2005: CPFFProposed Prices (Labor)Proposed Prices (Labor)Proposed Prices (Labor)
0005: F-15 I-Level Fault Isolation Tester design and digital development - Basic Period1005: F-15 I-Level Fault Isolation Tester EMD - Option Period 12005: A-10 I-Level Fault Isolation Tester EMD - Option Period 2
Labor CategoryHoursRatesCostHoursRatesCostHoursRatesCost
Labor Category 1: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 2: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 3: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 4: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 5: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 6: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 7: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 8: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 9: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 10: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 11: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 12: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00
Labor Category 13: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00$0.00$0.00
TOTAL HOURS/COST0$0.000$0.000$0.00
BaseRatesCostBaseRatesCostBaseRatesCost
Proposed Add-on Factor (Fringe)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (Overhead)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (G&A)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (COM)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (Fee)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Total Proposed Cost$0.00$0.00$0.00
Total Proposed COM$0.00$0.00$0.00
Total Proposed Fee$0.00$0.00$0.00
Total Proposed Price$0.00$0.00$0.00
CLINs 0005, 1005, and 2005: CPFFProposed Prices (Material)Proposed Prices (Material)Proposed Prices (Material)
0005: F-15 I-Level Fault Isolation Tester design and digital development - Basic Period1005: F-15 I-Level Fault Isolation Tester EMD - Option Period 12005: A-10 I-Level Fault Isolation Tester EMD - Option Period 2
BaseRatesCostBaseRatesCostBaseRatesCost
Total Proposed Material Cost
Proposed Add-on Factor (Overhead)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (G&A)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (COM)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (Fee)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Total Proposed Cost$0.00$0.00$0.00
Total Proposed COM$0.00$0.00$0.00
Total Proposed Fee$0.00$0.00$0.00
Total Proposed Price$0.00$0.00$0.00
CLINs 0005, 1005, and 2005: CPFFProposed Prices (Other Direct Cost)Proposed Prices (Other Direct Cost)Proposed Prices (Other Direct Cost)
0005: F-15 I-Level Fault Isolation Tester design and digital development - Basic Period1005: F-15 I-Level Fault Isolation Tester EMD - Option Period 12005: A-10 I-Level Fault Isolation Tester EMD - Option Period 2
BaseRatesCostBaseRatesCostBaseRatesCost
Total Proposed Other Direct Cost (ODC)
Proposed Add-on Factor (Overhead)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (G&A)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (COM)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (Fee)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Total Proposed Cost$0.00$0.00$0.00
Total Proposed COM$0.00$0.00$0.00
Total Proposed Fee$0.00$0.00$0.00
Total Proposed Price$0.00$0.00$0.00
CLINs 0005, 1005, and 2005: CPFFProposed Prices (Labor, Material, and ODC)Proposed Prices (Labor, Material, and ODC)Proposed Prices (Labor, Material, and ODC)
CLIN 0005: Basic Period (CPFF)CLIN 1005: Option Period 1 (CPFF)CLIN 2005: Option Period 2 (CPFF)
Total Proposed Cost$0.00$0.00$0.00
Total Proposed COM$0.00$0.00$0.00
Total Proposed Fee$0.00$0.00$0.00
Total Proposed Price$0.00$0.00$0.00

Cost Format A_CLIN X006

Notes:
1. The format of this worksheet may be revised as required to be consistent with the major subcontractor's approved accounting system.
2. The Prime Offeror shall propose labor hours, material costs, and other direct costs in the yellow-highlighted cells below.
3. The Prime Offeror shall ensure the yellow-highlighted rate cells below are linked correctly from the relevant labor rate and add-on factors in the 'Cost Format B_PRIME Rates' worksheet.
4. The proposed factors will be applied to the proposed labor hours, material cost, and other direct costs.
5. Definitions of the labor categories and add-on factors are included in the 'Cost Format B_PRIME Rate Desc' worksheet.
6. Each CPFF Cost, COM and Fee shall be rounded to the nearest whole dollar.
CLINs 0006 & 1006: CPFFProposed Prices (Labor)Proposed Prices (Labor)
0006: A-10 I-Level Fault Isolation Tester design and digital development - Basic Period1006: A-10 I-Level Fault Isolation Tester EMD - Option Period 1
Labor CategoryHoursRatesCostHoursRatesCost
Labor Category 1: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00
Labor Category 2: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00
Labor Category 3: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00
Labor Category 4: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00
Labor Category 5: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00
Labor Category 6: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00
Labor Category 7: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00
Labor Category 8: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00
Labor Category 9: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00
Labor Category 10: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00
Labor Category 11: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00
Labor Category 12: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00
Labor Category 13: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00$0.00$0.00
TOTAL HOURS/COST0$0.000$0.00
BaseRatesCostBaseRatesCost
Proposed Add-on Factor (Fringe)$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (Overhead)$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (G&A)$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (COM)$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (Fee)$0.00- 0$0.00$0.00- 0$0.00
Total Proposed Cost$0.00$0.00
Total Proposed COM$0.00$0.00
Total Proposed Fee$0.00$0.00
Total Proposed Price$0.00$0.00
CLINs 0006 & 1006: CPFFProposed Prices (Material)Proposed Prices (Material)
0006: A-10 I-Level Fault Isolation Tester design and digital development - Basic Period1006: A-10 I-Level Fault Isolation Tester EMD - Option Period 1
BaseRatesCostBaseRatesCost
Total Proposed Material Cost
Proposed Add-on Factor (Overhead)$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (G&A)$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (COM)$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (Fee)$0.00- 0$0.00$0.00- 0$0.00
Total Proposed Cost$0.00$0.00
Total Proposed COM$0.00$0.00
Total Proposed Fee$0.00$0.00
Total Proposed Price$0.00$0.00
CLINs 0006 & 1006: CPFFProposed Prices (Other Direct Cost)Proposed Prices (Other Direct Cost)
0006: A-10 I-Level Fault Isolation Tester design and digital development - Basic Period1006: A-10 I-Level Fault Isolation Tester EMD - Option Period 1
BaseRatesCostBaseRatesCost
Total Proposed Other Direct Cost (ODC)
Proposed Add-on Factor (Overhead)$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (G&A)$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (COM)$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (Fee)$0.00- 0$0.00$0.00- 0$0.00
Total Proposed Cost$0.00$0.00
Total Proposed COM$0.00$0.00
Total Proposed Fee$0.00$0.00
Total Proposed Price$0.00$0.00
CLINs 0006 & 1006: CPFFProposed Prices (Labor, Material, and ODC)Proposed Prices (Labor, Material, and ODC)
CLIN 0006: Basic Period (CPFF)CLIN 1006: Option Period 1 (CPFF)
Total Proposed Cost$0.00$0.00
Total Proposed COM$0.00$0.00
Total Proposed Fee$0.00$0.00
Total Proposed Price$0.00$0.00

Cost Format A_Travel CLINs

Notes:
1. The format of this worksheet may be revised as required to be consistent with the major subcontractor's approved accounting system.
2. The Prime Offeror shall propose labor hours, material costs, and other direct costs in the yellow-highlighted cells below.
3. The Prime Offeror shall ensure the yellow-highlighted rate cells below are linked correctly from the relevant labor rate and add-on factors in the 'Cost Format B_PRIME Rates' worksheet.
4. The proposed factors will be applied to the proposed labor hours, material cost, and other direct costs.
5. Definitions of the labor categories and add-on factors are included in the 'Cost Format B_PRIME Rate Desc' worksheet.
6. Each CPFF Cost, COM and Fee shall be rounded to the nearest whole dollar.
Proposed Prices (Other Direct Cost)Proposed Prices (Other Direct Cost)Proposed Prices (Other Direct Cost)Proposed Prices (Other Direct Cost)Proposed Prices (Other Direct Cost)
0015: Travel - Basic Period1012: Travel - Option Period 12014: Travel - Option Period 23013: Travel - Option Period 34009: Travel - Option Period 4
BaseRatesCostBaseRatesCostBaseRatesCostBaseRatesCostBaseRatesCost
Total Proposed Other Direct Cost (ODC)
Proposed Add-on Factor (Overhead)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (G&A)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Proposed Add-on Factor (COM)$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00$0.00- 0$0.00
Total Proposed Cost$0.00$0.00$0.00$0.00$0.00
Total Proposed COM$0.00$0.00$0.00$0.00$0.00
Total Proposed Price$0.00$0.00$0.00$0.00$0.00
Proposed Prices (Labor, Material, and ODC)Proposed Prices (Labor, Material, and ODC)Proposed Prices (Labor, Material, and ODC)Proposed Prices (Labor, Material, and ODC)Proposed Prices (Labor, Material, and ODC)
CLIN 0015: Basic PeriodCLIN 1012: Option Period 1CLIN 2014: Option Period 2CLIN 3013: Option Period 3CLIN 4009: Option Period 4
Total Proposed Cost$0.00$0.00$0.00$0.00$0.00
Total Proposed COM$0.00$0.00$0.00$0.00$0.00
Total Proposed Price$0.00$0.00$0.00$0.00$0.00

Cost Format A_CLIN 1014

Notes:
1. The format of this worksheet may be revised as required to be consistent with the major subcontractor's approved accounting system.
2. The Prime Offeror shall propose labor hours, material costs, and other direct costs in the yellow-highlighted cells below.
3. The Prime Offeror shall ensure the yellow-highlighted rate cells below are linked correctly from the relevant labor rate and add-on factors in the 'Cost Format B_PRIME Rates' worksheet.
4. The proposed factors will be applied to the proposed labor hours, material cost, and other direct costs.
5. Definitions of the labor categories and add-on factors are included in the 'Cost Format B_PRIME Rate Desc' worksheet.
6. Each CPFF Cost, COM and Fee shall be rounded to the nearest whole dollar.
CLIN 0014 – CPFFProposed Prices (Labor)
0014: Design Demonstration - Basic Period
Labor CategoryHoursRatesCost
Labor Category 1: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00
Labor Category 2: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00
Labor Category 3: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00
Labor Category 4: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00
Labor Category 5: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00
Labor Category 6: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00
Labor Category 7: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00
Labor Category 8: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00
Labor Category 9: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00
Labor Category 10: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00
Labor Category 11: [INSERT LABOR CATEGORY NAME HERE]$0.00$0.00

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .