FA852813R00104-RFP_A.pdf

PDF 119 KB Posted

Attached to
FA8528-13-R-00104 Predator/Reaper Contractor Logistics Support (CLS) CY14 Solicitation
Solicitation number
FA8528-13-R-00104
Issued by

About this file

FA8528-13-R-00104-RFP A CLS CY14

View the file

Other files

Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STANDARD FORM 1447 (2/2012)

Prescribed by GSA FAR (48 CFR) 53.215-1(d)

4. SOLICITATION NUMBER

FA8528-13-R-00104

6.SOLICITATION ISSUE DATE

8. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR

SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOSB PROGRAM

HUBZONE SMALL

BUSINESS EDWOSB

SERVICE-DISABLED VETERAN-

OWNED SMALL BUSINESS NAICS CODE: 336411

8(A) SIZE STANDARD: 1,500

DATE SIGNED

28. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

26. AWARD OF CONTRACT: YOUR OFFER ON SOLICITATION NUMBER

SHOWN IN BLOCK 4 INCLUDING ANY ADDITIONS OR CHANGES WHICH

ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

ROUTINE

Subject to the terms and conditions stated herein, the Contractor agrees to hold its offered prices firm for 120 days.

When funds expended reach 75% of funding authorized please notify the Government IAW FAR clause 52.232-20

SEE LINE ITEM SCHEDULE

22.

AMOUNT

16. AUTHORITY FOR USING OTHER THAN 10 USC 2304 41 USC 253

FULL AND OPEN COMPETITION (c) (1 ) (c) ( )

DATE SIGNED

27. SIGNATURE OF OFFEROR/CONTRACTOR

20.

UNIT

21.

UNIT PRICE

19.

QUANTITY

13. CONTRACTOR OFFEROR CODE FACILITY CODE

11. IF OFFER IS ACCEPTED BY THE GOVERNMENT WITHIN * ___ CALENDAR DAYS (60 CALENDAR

DAYS UNLESS OFFEROR INSERTS A DIFFERENT PERIOD) FROM THE DATE SET FORTH IN BLK 9

ABOVE, THE CONTRACTOR AGREES TO HOLD ITS OFFERED PRICES FIRM FOR THE ITEMS

SOLICITED HEREIN AND TO ACCEPT ANY RESULTING CONTRACT SUBJECT TO THE TERMS AND

CONDITIONS STATED HEREIN. *120

RATING

DO:A1

3. AWARD/EFFECTIVE DATE

FA8528

2. CONTRACT NO.

X

CHECK IF REMITTANCE IS DIFFERENT

AND PUT SUCH ADDRESS IN OFFER

17.

ITEM NO.

12. ADMINISTERED BY CODE

Total

SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK: 14 EFT:T

SCD:C

NAME AND TITLE OF SIGNER (TYPE OR PRINT) NAME OF CONTRACTING OFFICER

24. AWARD AMOUNT (FOR GOVT USE ONLY)

23. ACCOUNTING AND APPROPRIATION DATA

SEE SCHEDULE

5. SOLICITATION TYPE

SEALED BIDS NEGOTIATED

(IFB) (RFP)

15. PROMPT PAY DISCOUNT

25. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 2

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SETFORTH

OR OTHERWISE IDENTIFIED ABOVE AND ON ANY CONTINUATION SHEETS SUBJECT

THE TERMS AND CONDITIONS SPECIFIED HEREIN.

10. ITEMS TO BE PURCHASED (BRIEF DESCRIPTION)

SUPPLIES SERVICES Aircraft Manufacturing

9.

Offers will be received at the issuing office until the date and time specified below. Late offers are subject to late proposal provisions incorporated herein. All offers are subject to provisions, representations, certifications, and specifications as are attached or incorporated by reference.

30-MAY-2013 4:30PM

X

18.

SCHEDULE OF SUPPLIES/SERVICES

14. PAYMENT WILL BE MADE BY CODE

(SEE ESP CLAUSE 252.232-7003.)

X

7. ISSUED BY CODE

C2ISR - AIR PLATFORMS & SENSORS, AFLCMC/WIKBA

235 BYRON ST STE 19A

BLDG 300 CML PHN 478 926 8374

ROBINS AFB GA 31098-1670

BUYER: Elizabeth F. Kennedy elizabeth.kennedy@robins.af.mil Phone: (478) 926- 8619 No Collect Calls

X

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 350)SOLICITATION/CONTRACT

BIDDER/OFFEROR TO COMPLETE BLOCKS 11, 13, 15, 21, 22, & 27.

JSU

SF 1447 (rev 2/2012) BACK

NO RESPONSE FOR THE REASONS CHECKED

TYPE OR PRINT NAME AND TITLE OF SIGNER

SIGNATURENAME AND ADDRESS OF FIRM (Include Zip Code)

WE DO NOT DESIRE TO BE RETAINED ON THE MAILING LIST FOR FUTURE PROCUREMENT OF THE TYPE OF

ITEMS INVOLVED

WE DO

OTHER (Specify)

CANNOT COMPLY WITH SPECIFICATIONS

CANNOT COMPLY WITH SPECIFICATIONS CANNOT MEET DELIVERY REQUIREMENT

FOLD

FOLD

SOLICITATION NO. FA852813R00104

DUE: 30 MAY 2013 4:30 PM

FROM: AFFIX

STAMP

HERE

TO:

ATTN: Elizabeth F Kennedy

C2ISR - AIR PLATFORMS & SENSORS, AFLCMC/WIKBA

235 BYRON ST STE 19A

BLDG 300 CML PHN 478 926 8374

ROBINS AFB GA 31098-1670

Request for Proposal FA8528-13-R-00104

PART I - THE SCHEDULE

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

CORE MQ-1/MQ-9

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 EA

CORE MQ-1/MQ-9

Services to be provided in accordance with Performance Work Statement dated 25 January 2013.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

A FX2315 1 EA 1 JAN 2014 31 DEC 2014

Proposed Period of Performance

A FX2315 1 EA

SOFTWARE SUSTAINMENT MQ-1

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost COM Fixed Fee Est Total Cost

1 LO

SOFTWARE SUSTAINMENT MQ-1

Services to be provided in accordance with Performance Work Statement dated 25 January 2013 paragraphs 4.1.6, 4.1.8, 4.1.8.1, and 4.1.8.2. NOTIFY PCO IN ACCORDANCE WITH FAR CLAUSE 52.232-22 LIMITATION OF

FUNDS.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

SOFTWARE SUSTAINMENT MQ-1

1 LO 1 JAN 2014 31 DEC 2014

Proposed Period of Performance

1 LO

SOFTWARE SUSTAINMENT MQ-9

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost COM Fixed Fee Est Total Cost

1 LO

SOFTWARE SUSTAINMENT MQ-9

Services to be provided in accordance with Performance Work Statement dated 25 January 2013 paragraphs 4.1.6, 4.1.8, 4.1.8.1, and 4.1.8.2. NOTIFY PCO IN ACCORDANCE WITH FAR CLAUSE 52.232-22 LIMITATION OF

FUNDS.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

1 LO 1 JAN 2014 31 DEC 2014

Proposed Period of Performance

1 LO

URGENT ENGINEERING SUPPORT

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost COM Fixed Fee Est Total Cost

1 LO

URGENT ENGINEERING SUPPORT

Services to be provided in accordance with Performance Work Statement dated 25 January 2013 paragraphs 1.0, 4.1.7, 4.1.9.1, 4.1.9.2, 4.1.9.3, 4.1.9.3.1, 4.1.9.4, 4.1.12, 4.1.13.1.1, 4.1.13.1.2, 4.1.13.1.3, 4.1.13.1.4, 4.1.16, 4.1.16.1, 4.2.7, 4.4.1.3, 4.4.4, and 4.11.3. NOTIFY PCO IN ACCORDANCE WITH FAR CLAUSE 52.232-22 LIMITATION OF

FUNDS.

Limitations of Liability: Other Than High Value Item

URGENT ENGINEERING SUPPORT

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

1 LO 1 JAN 2014 31 DEC 2014

Proposed Period of Performance

1 LO

RELIABILITY & MAINTAINABILITY (R&M)

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost COM Fixed Fee Est Total Cost

1 LO

RELIABILITY & MAINTAINABILITY

Services to be provided in accordance with Performance Work Statement dated 25 January 2013 paragraphs 4.1.15, and 4.1.15.1. See R&M clause (C2ISR-H002) in section H of Part I the schedule for project procedures. NOTIFY

PCO IN ACCORDANCE WITH FAR CLAUSE 52.232-22 LIMITATION OF FUNDS.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

1 LO 1 JAN 2014 31 DEC 2014

Proposed Period of Performance

1 LO

CONTRACTOR INVENTORY CONTROL POINT

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

CONTRACTOR INVENTORY CONTROL POINT (CICP)

CONTRACTOR INVENTORY CONTROL POINT

Services to be provided in accordance with Performance Work Statement dated 25 January 2013 paragraphs 4.2, 4.2.1, 4.2.2, 4.2.3, 4.2.4, 4.2.5, 4.2.6, 4.2.6.1, 4.2.8, 4.2.9, 4.2.10, 4.2.11, 4.2.12, and 4.2.13. NOTIFY PCO IN

ACCORDANCE WITH FAR CLAUSE 52.232-22 LIMITATION OF FUNDS.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

1 LO 1 JAN 2014 31 DEC 2014

Proposed Period of Performance

1 LO

DEPOT REPAIR MQ-1 CONUS (NON SEVERABLE)

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost COM Fixed Fee Est Total Cost

1 LO

DEPOT REPAIR MQ-1 CONUS (NON SEVERABLE)

Services to be provided in accordance with Performance Work Statement dated 25 January 2013 paragraphs 4.1.2.3.1.2, 4.3.3, 4.4.2, 4.4.2.2, 4.4.2.3, 4.4.2.4, 4.4.2.6, 4.4.3, 4.5, and 4.5.1 . This CLIN includes non-severable services for the repair of items identified and inducted for repair during the period of 1 Jan 14-31 Dec 14, completion of which may extend beyond 31 Dec 2014 due to circumstances such as material lead time and repair turnaround time. The Government will only receive benefit when the items inducted for repair during the period of 1 Jan 14 - 31 Dec 14 are completed. NOTIFY PCO IN ACCORDANCE WITH FAR CLAUSE 52.232-22 LIMITATION OF FUNDS.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

A FX2315 1 LO 1 JAN 2014 31 DEC 2014

Proposed Period of

A FX2315 1 LO

DEPOT REPAIR MQ-9 CONUS (NON SEVERABLE)

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost COM Fixed Fee Est Total Cost

1 LO

DEPOT REPAIR MQ-9 CONUS (NON SEVERABLE)

Services to be provided in accordance with Performance Work Statement dated 25 January 2013 paragraphs 4.1.2.3.1.2, 4.3.3, 4.4.2, 4.4.2.2, 4.4.2.3, 4.4.2.4, 4.4.2.6, 4.5, and 4.5.1 This CLIN includes non-severable services for the repair of items identified and inducted for repair during the period of 1 Jan 14-31 Dec 14, completion of which may extend beyond 31 Dec 2014 due to circumstances such as material lead time and repair turnaround time. The Government will only receive benefit when the items inducted for repair during the period of 1 Jan 14 - 31 Dec 14 are completed. NOTIFY PCO IN ACCORDANCE WITH FAR CLAUSE 52.232-22 LIMITATION OF FUNDS.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

A FX2315 1 LO 1 JAN 2014 31 DEC 2014

Proposed Period of Performance

A FX2315 1 LO

DEPOT REPAIR MQ-1 OCONUS (NON SEVERABLE)

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost COM Fixed Fee Est Total Cost

1 LO

DEPOT REPAIR MQ-1 OCONUS (NON SEVERABLE)

Services to be provided in accordance with Performance Work Statement dated 25 January 2013 paragraphs 4.1.2.3.1.2, 4.3.3, 4.4.2, 4.4.2.2, 4.4.2.3, 4.4.2.6, 4.4.3, 4.5, and 4.5.1. This CLIN includes non-severable tasks, completion of which will likely extend beyond 31 December 2014. These non-severable tasks include management, manufacturing and repair of items ordered for replenishment or inducted for repair NLT 31 Dec 14 and may be completed in accordance with normal procedures. NOTIFY PCO IN ACCORDANCE WITH FAR 52.232-22

LIMITATION OF FUNDS.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required

DEPOT REPAIR MQ-1 OCONUS (NON SEVERABLE)

A FX2315 1 LO 1 JAN 2014 31 DEC 2014

Proposed Period of Performance

A FX2315 1 LO

DEPOT REPAIR MQ-9 OCONUS (NON SEVERABLE)

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost COM Fixed Fee Est Total Cost

1 LO

DEPOT REPAIR MQ-9 OCONUS (NON SEVERABLE)

Services to be provided in accordance with Performance Work Statement dated 25 January 2013 paragraphs 4.1.2.3.1.2, 4.3.3, 4.4.2, 4.4.2.2, 4.4.2.3, 4.4.2.4, 4.4.2.6, 4.5, and 4.5.1. This CLIN includes non-severable tasks, completion of which will likely extend beyond 31 December 2014. These non-severable tasks include management, manufacturing and repair of items ordered for replenishment or inducted for repair NLT 31 Dec 14 and may be completed in accordance with normal procedures. NOTIFY PCO IN ACCORDANCE WITH FAR 52.232-22

LIMITATION OF FUNDS.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

A FX2315 1 LO 1 JAN 2014 31 DEC 2014

Proposed Period of Performance

A FX2315 1 LO

FSR MQ-1/MQ-9 CONUS

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

FSR MQ-1/MQ-9 CONUS

Services to be provided in accordance with Performance Work Statement dated 25 January 2013 paragraphs 4.4.1.1, 4.4.1.2, 4.4.2.1, 4.4.2.2, 4.4.1.2.3, 4.4.1.2.4, 4.4.1.3, and 4.4.1.4. NOTIFY PCO IN ACCORDANCE WITH FAR

CLAUSE 52.232-22 LIMITATION OF FUNDS.

FSR MQ-1/MQ-9 CONUS

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Req No / Pri

Required Period of Performance

1 EA 1 JAN 2014 31 DEC 2014

Proposed Period of Performance

1 EA

FSR MQ-1/MQ-9 OCONUS

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

FSR MQ-1/MQ-9 OCONUS

Services to be provided in accordance with Performance Work Statement dated 25 January 2013 paragraphs 4.4.1.1, 4.4.1.2, 4.4.2.1, 4.4.2.2, 4.4.1.2.3, 4.4.1.2.4, 4.4.1.3, and 4.4.1.4. NOTIFY PCO IN ACCORDANCE WITH FAR

CLAUSE 52.232-22 LIMITATION OF FUNDS.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Req No / Pri

Required Period of Performance

1 EA 1 JAN 2014 31 DEC 2014

Proposed Period of Performance

1 EA

SPARES MQ-1

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

NSN: 1550-XX-XXX-XXXX XX

SPARES MQ-1

SPARES MQ-1

Services to be provided in accordance with Performance Work Statement dated 25 January 2013 paragraphs 4.2.6, and 4.2.6.1. NOTIFY PCO IN ACCORDANCE WITH FAR CLAUSE 52.232-22 LIMITATION OF FUNDS.

Replenishment spares are purchased to replace initial spares that are condemned and to meet increases in operational requirements. Condemnations of initial spares during test/evaluation will not be bought with replenishment funds. Purchases shall be limited to the quantity required to support the number of initial spares previously purchased on the Predator/Reaper program. Projections for replenishment spares shall be accomplished taking into account factors such as meantime between failure/demand, flying hours and actual historical data.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Buy American Act/Balance of Payments Program Type / Ship To Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Delivery

A FX2315 1 LO 1 JAN 2014 31 DEC 2014

Proposed Delivery

A FX2315 1 LO

SPARES MQ-9

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

NSN: ####-XX-XXX-XXXX XX

SPARES MQ-9

Services to be provided in accordance with Performance Work Statement dated 25 January 2013 paragraphs 4.2.6, and 4.2.6.1. NOTIFY PCO IN ACCORDANCE WITH FAR CLAUSE 52.232-22 LIMITATION OF FUNDS.

Replenishment spares are purchased to replace initial spares that are condemned and to meet increases in operational requirements. Condemnations of initial spares during test/evaluation will not be bought with replenishment funds. Purchases shall be limited to the quantity required to support the number of initial spares previously purchased on the Predator/Reaper program. Projections for replenishment spares shall be accomplished taking into account factors such as meantime between failure/demand, flying hours and actual historical data.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Buy American Act/Balance of Payments Program Type / Ship To Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Delivery

A FX2315 1 LO 1 JAN 2014 31 DEC 2014

Proposed Delivery

SPARES MQ-9

A FX2315 1 LO

SPARES GCS

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

NSN: 1550-XX-XXX-XXXX XX

SPARES GCS

Services to be provided in accordance with Performance Work Statement dated 25 January 2013 paragraphs 4.2.6, and 4.2.6.1. NOTIFY PCO IN ACCORDANCE WITH FAR CLAUSE 52.232-22 LIMITATION OF FUNDS.

Replenishment spares are purchased to replace initial spares that are condemned and to meet increases in operational requirements. Condemnations of initial spares during test/evaluation will not be bought with replenishment funds. Purchases shall be limited to the quantity required to support the number of initial spares previously purchased on the Predator/Reaper program. Projections for replenishment spares shall be accomplished taking into account factors such as meantime between failure/demand, flying hours and actual historical data.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Buy American Act/Balance of Payments Program Type / Ship To Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Delivery

A FX2315 1 LO 1 JAN 2014 31 DEC 2014

Proposed Delivery

A FX2315 1 LO

BONDED STOCK (NON SEVERABLE)

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

BONDED STOCK (NON SEVERABLE)

Services to be provided in accordance with Performance Work Statement dated 25 January 2013 paragraph 4.2.10.

This CLIN includes non-severable tasks, completion of which will likely extend beyond 31 Dec 14. These non-severable tasks include management, manufacturing and repair of items ordered for replenishment or inducted for repair NLT 31 Dec 14, and may be completed in accordance with normal procedures. NOTIFY PCO IN

ACCORDANCE WITH FAR CLAUSE 52.232-22 LIMITATION OF FUNDS.

BONDED STOCK (NON SEVERABLE)

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

1 LO 1 JAN 2014 31 DEC 2014

Proposed Period of Performance

1 LO

ECP/MODIFICATIONS

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

ECP/MODIFICATIONS

Services to be provided in accordance with Performance Work Statement dated 25 January 2013 paragraphs 4.1.5.3, 4.1.5.3.1, and 4.1.5.3.2. NOTIFY PCO IN ACCORDANCE WITH FAR CLAUSE 52.232-22 LIMITATION OF FUNDS.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date _ Req No / Pri

Required Period of Performance

1 LO 1 JAN 2014 31 DEC 2014

Proposed Period of Performance

1 LO

OVER AND ABOVE

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

OVER AND ABOVE

OVER AND ABOVE

Services to be provided in accordance with Performance Work Statement dated 25 January 2013. NOTIFY PCO IN

ACCORDANCE WITH FAR CLAUSE 52.232-22 LIMITATION OF FUNDS.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date _ Req No / Pri

Required Period of Performance

1 LO 1 JAN 2014 31 DEC 2014

Proposed Period of Performance

1 LO

CONTRACT DATA REQUIREMENTS LIST

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount 1 EA Not Separately Priced Not Separately Priced

CONTRACT DATA REQUIREMENTS LIST

Data requirements are in accordance with Peformance Based Statement of Work dated 25 January 2013, paragraph

2.1 and with Contract Data Requirements List. See Section J, atch 02 for CDRL listing.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

EA 1 JAN 2014 31 DEC 2014

Proposed Period of Performance

EA

(OPTION) BASE RSO MQ-1/MQ-9

Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

(OPTION) BASE RSO MQ-1/MQ-9

1 LO

TRAVEL

Services to be provided in accordance with Performance Work Statement dated 25 January 2013. Travel Reimbursed

IAW FAR 31.2.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date _ Req No / Pri

Required Period of Performance

1 LO 1 JAN 2014 31 DEC 2014

Proposed Period of Performance

1 LO

MAJOR/MINOR MISHAP ASSESSMENT-MQ-1/MQ-9

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

MAJOR/MINOR MISHAP ASSESSMENT-MQ-1/MQ-9

Services to be provided in accordance with Performance Work Statement dated 25 January 2013 paragraph 4.4.2.1.

This CLIN includes non-severable tasks, completion of which will likely extend beyond 31 December 2014. These non-severable tasks include management, manufacturing and repair of items ordered for replenishment or inducted for repair NLT 31 December 2014 and may be completed in accordance with normal procedures. NOTIFY PCO IN

ACCORDANCE WITH FAR 52.232-22 LIMITATION OF FUNDS.

To Be Negotiated Per Occurrence

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date _ Req No / Pri

Required Period of Performance

1 LO 1 JAN 2014 31 DEC 2014

Proposed Period of

MAJOR/MINOR MISHAP REPAIR-MQ-1

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

MAJOR/MINOR MISHAP REPAIRS MQ-1

Services to be provided in accordance with Performance Work Statement dated 25 January 2013 paragraph 4.4.2.1.This CLIN includes non-severable tasks, completion of which will likely extend beyond 31 December 2014.

These non-severable tasks include management, manufacturing and repair of items ordered for replenishment or inducted for repair NLT 31 December 2014 and may be completed in accordance with normal procedures. NOTIFY

PCO IN ACCORDANCE WITH FAR 52.232-22 LIMITATION OF FUNDS.

To Be Negotiated Per Occurrence

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date _ Req No / Pri

Required Period of Performance

1 LO 1 JAN 2014 31 DEC 2014

Proposed Period of Performance

1 LO

MAJOR/MINOR MISHAP REPAIR MQ-9

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

MAJOR/MINOR MISHAP REPAIRS MQ-9

Services to be provided in accordance with Performance Work Statement dated 25 January 2013 paragraph 4.4.2.1.

This CLIN includes non-severable tasks, completion of which will likely extend beyond 31 December 2014. These non-severable tasks include management, manufacturing and repair of items ordered for replenishment or inducted for repair NLT 31 December 2014 and may be completed in accordance with normal procedures. NOTIFY PCO IN

ACCORDANCE WITH FAR 52.232-22 LIMITATION OF FUNDS.

To Be Negotiated Per Occurrence

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date _ Req No / Pri

Required

MAJOR/MINOR MISHAP REPAIR MQ-9

1 LO 1 JAN 2014 31 DEC 2014

Proposed Period of Performance

1 LO

AD HOC FIELD SUPPORT & NEW ANG SITES

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

AD HOC FIELD SUPPORT & NEW ANG SITES

Services to be provided in accordance with Performance Work Statement dated 25 January 2013 paragraphs 4.4.1.1, 4.4.1.2, 4.4.1.2.1, 4.4.1.2.2, 4.4.1.2.3, 4.4.1.2.4, 4.4.1.3, 4.4.1.4, 4.4.1.5, 4.4.2.1 and 4.4.2.2.This CLIN includes non-severable tasks, completion of which will likely extend beyond 31 December 2014. These non-severable tasks include management, manufacturing and repair of items ordered for replenishment or inducted for repair NLT 31 December 2014 and may be completed in accordance with normal procedures. NOTIFY PCO IN ACCORDANCE

WITH FAR 52.232-22 LIMITATION OF FUNDS.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date _ Req No / Pri

Required Period of Performance

1 LO 1 JAN 2014 31 DEC 2014

Proposed Period of Performance

1 LO

DEPOT MAINTENANCE ACTIVATION WORKING GROUP

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

DEPOT MAINTENANCE ACTIVATION WORKING GROUP

Services to be provided in accordance with Performance Work Statement dated 25 January 2013 paragraph 4.4.2.7.This CLIN includes non-severable tasks, completion of which will likely extend beyond 31 December 2014.

These non-severable tasks include management, manufacturing and repair of items ordered for replenishment or inducted for repair NLT 31 December 2014 and may be completed in accordance with normal procedures. NOTIFY

PCO IN ACCORDANCE WITH FAR 52.232-22 LIMITATION OF FUNDS.

DEPOT MAINTENANCE ACTIVATION WORKING GROUP

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date _ Req No / Pri

Required Period of Performance

1 LO 1 JAN 2014 31 DEC 2014

Proposed Period of Performance

1 LO

(OPTION) BASE RSO MQ-1/MQ-9

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

(OPTION) BASE RSO MQ-1/MQ-9

Services to be provided in accordance with Performance Work Statement dated 25 January 2013 paragraphs 4.4.1.1, 4.4.1.2, 4.4.2.1, 4.4.2.2, 4.4.1.2.3, 4.4.1.2.4, 4.4.1.3, and 4.4.1.4.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date _ Req No / Pri

Required Period of Performance

1 LO 1 JAN 2014 31 DEC 2014

Proposed Period of Performance

1 LO

(OPTION) DP-XX MQ-1/MQ-9

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 EA

(OPTION) DP-XX MQ-1/MQ-9

(OPTION) DP-XX MQ-1/MQ-9

Services to be provided in accordance with Peformance Work Statement dated 25 January 2013 paragraphs 4.4.1.1, 4.4.1.2, 4.4.2.1, 4.4.2.2, 4.4.1.2.3, 4.4.1.2.4, 4.4.1.3, and 4.4.1.4.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

EA 1 JAN 2014 31 DEC 2014

Proposed Period of Performance

EA

TEST FLEET SYSTEM MAINTENANCE

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 EA

TEST FLEET SYSTEM MAINTENANCE

Services to be provided in accordance with Performance Work Statement dated 25 January 2013 paragraphs 4.3, 4.3.1, 4.3.2, 4.3.3, and 4.3.4. NOTIFY PCO IN ACCORDANCE WITH FAR 52.232-22 LIMITATION OF FUNDS.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

EA 1 JAN 2014 31 DEC 2014

Proposed Period of Performance

EA

SUPPORT EQUIPMENT

Item No.

Cost Plus Fixed Fee

SUPPORT EQUIPMENT

Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

SUPPORT EQUIPMENT

Services to be provided in accordance with Performance Work Statement dated 25 January 2013 paragraph 4.1.9.

This CLIN includes non-severable tasks, completion of which will likely extend beyond 31 December 2014. These non-severable tasks include management, manufacturing and repair of items ordered for replenishment or inducted for repair NLT 31 Dec 14 and may be completed in accordance with normal procedures. NOTIFY PCO IN

ACCORDANCE WITH FAR 52.232-22 LIMITATION OF FUNDS.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

A FX2315 1 LO 1 JAN 2014 31 DEC 2014

Proposed Period of Performance

A FX2315 1 LO

SHIP TO / PLACE OF PERFORMANCE

TYPE/CODE: A FX2315

FX2315 DET 3

CP 858 312 3646

13550 STOWE DR

POWAY CA 92064-6858

USA

MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)

AWARD NUMBER:

PART I - THE SCHEDULE

SECTION G

CONTRACT ADMINISTRATION DATA

G-900 IMPLEMENTATION OF AVAILABILITY OF FUNDS (APPLICABLE TO FIRM FIXED PRICE

CLINS)

With respect to clause 52.232-18, Availability of Funds, funds are not available for performance under this order/contract after ______________. The Contractor shall not perform after ______________ without prior written notice from the Contracting Officer that funds are available for contractor performance.

G-901 IMPLEMENTATION OF LIMITATION OF COST (APPLICABLE TO COST CLINS)

Funds are not available for performance under this order/contract after ______________. The Contractor shall not perform after ______________ without prior written notice from the Contracting Officer that funds are available for contractor performance.

PART I - THE SCHEDULE

SECTION H

SPECIAL CONTRACT REQUIREMENTS

C2ISR-H001 MQ-1/MQ-9 FLEXIBLE SUSTAINMENT – PROCEDURES FOR ANNUAL FLYING HOUR

ADJUSTMENTS (JANUARY 2013)

a) The basic negotiated cost and fee amounts of this contract are based on flight hour (FH) requirements as levied by the lead command set forth in Attachment 1, Performance Work Statement, 25 January 2013, table 1.1. In the event actual flying hours for a given year differ from these anticipated levels by an amount either greater than 5% or less than 5%, the parties shall negotiate an upward or downward equitable adjustment to the estimated agreed upon cost and fee amounts of this contract. Any upward adjustment must be accompanied by funded modification. Contracted FHs shall not be increased without a funded modification to increase FH. Negotiated COM is __% and FEE is ___% and shall be changed as shown in (e) for any adjustments.

b) The CLINs that will be subject to this flight hour adjustment are as follows:

CLIN 0007 CPFF DEPOT REPAIR MQ-1 CONUS

CLIN 0008 CPFF DEPOT REPAIR MQ-9 CONUS

CLIN 0009 CPFF DEPOT REPAIR MQ-1 OCONUS

CLIN 0010 CPFF DEPOT REPAIR MQ-9 OCONUS

c) The parties will make an assessment to determine if an equitable adjustment is appropriate no later than 31 August 2014. The cost and fee for a given contract year may be assessed and adjusted no more than twice per year, if warranted under the terms of this clause. This assessment will be based on actual flight hours to date and a projection of the fleet performance remaining for the given fiscal year. Any adjustment pursuant to this clause shall be negotiated and made binding via a bi-lateral modification.

d) An example of a proposed FH adjustment mod under this clause is as follows:

In July of the given contract year, FHs for MQ-1CONUS is estimated to change from 15,000 FHs to 14,000 FHs, based on actual hours flown and projected FHs for the rest of the given contract year. Since the resultant change is a 1,000 FH decrease, or a 6.6% decrease, then the FHA clause is applicable.

Therefore the decrease shall be as follows:

FROM:

DEPOT REPAIR CLIN Flight Hours Cost Per Flight Hour CLIN Total

0007 (MQ-1 CONUS) 15,000 $ 1685.64 $25,284,673.31

TO:

DEPOT REPAIR CLIN Flight Hours Cost Per Flight Hour CLIN Total

0007 (MQ-1 CONUS) 14,000 $ 1685.64 $23,598,960.00

A decrease of $1,685,713.31 for CLIN 0007.

e) As a result of the above CLIN 0007 shall be changed in schedule B as follows:

FROM:

CLIN Estimated Cost Fee(8.5%) Total 0007 $ 23,316,997(includes COM) $1,967,676 $25,284,673.31

TO:

CLIN Estimated Cost Fee(8.5%) Total 0007 $21,762,470.62(Includes COM) $1,836,489.38 $23,598,960.00

Estimated Cost above includes Cost Of Money. To compute revised estimated cost and fee, take fee ($1,967,676) and multiply by change in flight hours percentage (in this example 6.6%). Then subtract reduction. In this example fee is reduced from $1,967,676 to $1,836,896.38 a total reduction of $131,186.62 ($1,967,676 multiplied by 6.6%). To get revised estimated cost ($21,762,470.62), subtract revised fee($1,836,489.38) from revised total cost ($23,598,960.00).

C2ISRC2ISR-H002 MQ-1/MQ-9 RELIABILITY AND MAINTAINABILITY (R&M) ENHANCEMENT

PROCEDURES (CLIN 0004) (JANUARY 2013)

1. This clause establishes procedures for defining and authorizing reliability and maintainability (R&M) projects in accordance with PWS paragraph 4.1.15 Reliability and Maintainability (R/M) Enhancements.

These projects shall be accomplished under CLIN 0004 and billed in accordance with actual cost rates.

2. The Contractor and the 703 AESG/Det 3 MQ-1 Lead Engineer will jointly develop a list of potential R&M projects. This working list will include rough order of magnitude (ROM) estimates for each project and a thorough description of the tasks required to complete the project. and the Contractor will coordinate on the project task descriptions and the 703 AESG/Det 3 MQ-1 Lead Engineer will prioritize the projects to determine over the course of the contract period of performance which projects are viable R&M candidates. The Contractor shall then submit a project estimate to include the applicable labor categories and rates for each approved project to the 703 AESG/Det 3 designated Contracting Officer Representative (COR). The COR will obtain and document technical review of the proposed hours, labor category mix and material estimates; and will verify that the cumulative cost sum of the projects are within the available negotiated CLIN 0004 ceiling value.

The project description shall also include a project schedule to completion and anticipated end result.

R&M projects should not include any significant material costs or engineering releases.

3. The final authorized project description shall include the task description, ceiling price to include labor and materials, the projected schedule, the Contractor signature and the COR signature.

4. Upon completion of the project the Contractor shall provide an informal presentation of the findings to the US Government.

C2ISR-H003 RPV SYSTEMS REPAIRS (DECEMBER 2012)

a. Definitions.

"Minor Damage" as used in this contract, means mishap/battle damage repair estimated at or below $350,000 per aircraft.

"Major Damage" as used in this contract, means mishap/battle damage repair estimated above $350,000 per aircraft.

b. Repair estimate. Immediately upon receipt of a Mishap damaged aircraft, the contractor shall develop a repair estimate. The estimate shall include required structural repairs, missing parts and recommended replacement parts with a recommendation regarding classification (i.e. major or minor damage). The estimate shall be submitted to Det 3, 703 AESG product assurance for evaluation and concurrence.

c. Minor Damage. For all aircraft that are categorized as having minor damage, the contractor shall repair pursuant to Paragraph 4.4.2.1 Depot Repair in the Performance Work Statement attached hereto Attachment 1.

d. Major Damage. For all aircraft that are categorized as having major damage and determined not to be beyond economic repair (BER), the contractor is entitled to submit a proposal for equitable adjustment under this contract. The equitable adjustment under this contract for the resulting repair or restoration of the aircraft shall be made in the estimated cost and in the amount of any fee to be paid to the Contractor. The contractor shall not commence work on major mishap/battle damage repair under the subject contract without formal direction from the contracting officer detailing how to proceed.

e. The Contractor agrees to be bound by the operating procedures contained in the combined regulation entitled "Contractors' Flight and Ground Operations" in effect on the date of contract award.

f. The contract is subject to equitable adjustment as defined in paragraph (d) above only when the Contractor is not held liable for the sustained damage under the Government Property clause or "Contractor's Flight and Ground Operations" (DCMA INST 8210.1).

g. In determining the amount of equitable adjustment in the fee, the Contracting Officer will consider any fault of the Contractor, its employees, or any subcontractor that materially contributed to the damage, loss, or destruction.

h. Failure to agree on any adjustment shall be a dispute concerning a question of fact within the meaning of the Disputes clause of this contract.

i. Any modifications to this contract, as a result of this clause, shall be accomplished by Supplemental Agreement. All other terms and conditions of this contract shall remain in full effect.

C2ISR H004- BASE SUPPORT (JUNE 2011)

Base support may be provided by the Government to the Contractor in accordance with this provision.

(a) Base support includes Government-controlled working space, material, equipment, services (including automatic data processing), or other support (excluding use of the Defense Switched Network (DSN)) which the Government determines can be made available at, or through, any Air Force installation where this contract shall be performed. All Government property in the possession of the Contractor, provided through the base support provision, shall be used and managed in accordance with the Government Property clauses.

(b) Unless otherwise stipulated in the contract schedule, support shall be provided on a no-charge-for-use basis and the value shall be a part of the Government's contract consideration.

(c) The Contractor agrees to immediately report (with a copy to the cognizant CAO) inadequacies, defective Government-Furnished Property (GFP), or non-availability of support stipulated by the contract schedule, together with a recommended plan for obtaining the required support. Facilities shall not be purchased under this provision. Additionally, the Contractor (or authorized representative) shall not purchase, or otherwise furnish any base support requirement provided by the provision (or authorize others to do so), without prior written approval of the Contracting Officer regarding the price, terms, and conditions of the proposed purchase, or approval of other arrangements.

(d) Following are installations where base support will be provided:

1. MQ-1: Creech AFB NV; Nellis AFB, NV; Cannon AFB, NM; March ARB, C; California ANG; Davis-Monthan AFB AZ; Ft Huachuca AZ; Hector Field ND ANG; Grand Forks AFB, ND; Ellington ANG TX; Fort Polk LA; Springfield, OH ANG; Holloman AFB NM; Whiteman AFB MO; Grey Butte CA; China Lake NAWS CA,

2. MQ-9: Creech AFB, N; Sheppard AFB, TX; Hancock Field NY Air National Guard; Fort Drum Air National Guard NY; Cannon AFB, NM; Tennessee, ANG; Pennsylvania ANG;

Michigan ANG; Holloman AFB, NM; Grey Butte, CA; China Lake NAWS, CA, Ellsworth AFB, SD, as needed.

(e) The Contractor agrees to request written authorization from the Contracting Officer for support no later than 90 days before the required in-place dates at each Air Force installation, and immediately for any required changes.

C2ISR H005- MQ-1/MQ-9 Contractor Logistics Support (CLS) CY12- Sponsorship at Yuma The Contractor is authorized to obtain test support/services from Major Range and Test Facility Base (MRTFB) installations as government-furnished services at the government established rate.

C2ISR H006- END ITEMS BEYOND ECONOMICAL REPAIR

(a) "Economically Reparable End Items" are defined as end items which can be restored to a serviceable condition in accordance with applicable requirements, when costs of repair will not exceed 75% unless otherwise directed of the Stock List Price specified in the contract. If the Contractor estimates the total cost of the repair and/or overhaul of any end item received will exceed the above percentage of the Stock List Price, the Contractor shall promptly notify the Administrative Contracting Officer in writing and shall not perform further services on any such items except at the direction of the Administrative Contracting Officer. Upon receipt of the written notification that a particular item is not reparable, the Contractor shall dispose of the unit in the manner directed by the Administrative Contracting Officer.

(b) The Procuring Contracting Officer may authorize the Contractor, through the Administrative Contracting Officer, to exceed the percentage of the Stock List Price in subparagraph (a) above when an item is in critical supply status.

C2ISR H007- BASE SUPPORT - ALTERNATE I / ALTERNATE II

Base support shall be provided by the Government to the Contractor in accordance with this clause.

Failure by the Contractor to comply with the requirements of this clause shall release the Government, without prejudice, from its obligation to provide base support by the date(s) required. If warranted, and if the Contractor has complied with the requirements of this clause, an equitable adjustment shall be made if the Government fails to provide base support by the date(s) required.

(a) Base support includes Government-controlled working space, material, equipment, services (including automatic data processing), or other support (excluding use of the Defense Switched Network (DSN)) which the Government determines can be made available at, or through, any Air Force installation where this contract shall be performed. All Government property in the possession of the Contractor, provided through the base support clause, shall be used and managed in accordance with the Government Property clauses.

(b) The Air Force installations providing the support shall be listed in subparagraph (e), and the Government support to be furnished by each installation under this contract shall be listed in subparagraph (f).

(c) Unless otherwise stipulated in the contract schedule, support shall be provided on a nocharge- for-use basis and the value shall be a part of the Government's contract consideration.

(d) The Contractor agrees to immediately report (with a copy to the cognizant CAO) inadequacies, defective Government-Furnished Property (GFP) or non-availability of support stipulated by the contract schedule, together with a recommended plan for obtaining the required support. The Government agrees to determine (within 10 workdays) the validity and extent of the involved requirement and the method by which it shall be fulfilled (e.g., purchase, rental, lease, GFP, etc.). Facilities shall not be purchased under this clause. Additionally, the Contractor (or authorized representative) shall not purchase, or otherwise furnish any base support requirement provided by the clause (or authorize others to do so), without prior written approval of the Contracting Officer regarding the price, terms, and conditions of the proposed purchase, or approval of other arrangements.

(e) Following are installations where base support will be provided as needed:

3. MQ-1: Creech AFB NV; Nellis AFB, NV; Cannon AFB, NM; March ARB, C; California ANG; Davis-Monthan AFB AZ; Ft Huachuca AZ; Hector Field ND ANG; Grand Forks AFB, ND; Ellington ANG TX; Fort Polk LA; Springfield, OH ANG; Holloman AFB NM; Whiteman AFB MO; Grey Butte CA; China Lake NAWS CA,

4. MQ-9: Creech AFB, N; Sheppard AFB, TX; Hancock Field NY Air National Guard; Fort Drum Air National Guard NY; Cannon AFB, NM; Tennessee, ANG; Pennsylvania ANG;

Michigan ANG; Holloman AFB, NM; Grey Butte, CA; China Lake NAWS, CA, Ellsworth AFB, SD, as needed.

(f) The Government support to be furnished under this contract is work space (including utilities, offices and desks for the Site Manager/Team Leader and each FSR, 2 LAN connections for the Site Manager, 6 LAN connections for the FSR team, electrical outlets, Class A and C telephone lines, 3 phone lines for the Site Manager/Team Lead office, 4 phone lines for the general work area, 2 phone lines for general FAX machines); flightline transportation for maintenance support; emergency medical services treatment and emergency patient transportation (reimbursement for such services is due to the USAF within 60 calendar days after receipt of government invoice); Composite Tool Kits for maintenance, special training required on operations, facilities and equipment necessary to support CLS requirements; safety equipment or specialized clothing/equipment required to operate on the Creech AFB flightline and hanger areas during all work-shifts and weather conditions; radios to ensure accessibility to squadron personnel and to monitor ground and inflight activities; access to unit recurring reports/analysis and other key data not directly accessible via CAMS/REMIS (e.g. FOD reports, safety reports, maintenance plans, flying schedules, MAJCOM QPM data, etc); direction for involvement/responsibilities during local exercises;

vehicle passes, decals for privately owned vehicles, and parking passes to ensure unrestricted access to the base and required facilities; USAF Restricted Area Badges if required for unescorted entry to flightline and other restricted areas necessary to accomplish assigned tasks; authorization to take photographs during the performance of their duties (subject to compliance with base security directives); postal services support through the Base Information Transfer System (BITS) for mail that is addressed to or from a government agency and generated as a result of the CLS contract; security forces and fire protection support; temporary storage facilities and disposal for hazardous chemicals and waste generated and accumulated in the course of logistics support activities (the company will comply with applicable regulations on storage and disposal of hazardous waste); authorized use of base Morale, Welfare, and Recreation facilities on an as-available non-interference basis per AFI 34-262, Table A-2.2, priority 19; security passes and identification (line badges) for unrestricted access to the Creech AFB flightline and hangar areas; training or training course material for applicable base directive and procedures while operating on base; access to Top Secret Working Area work areas during normal and other than normal duty hours to support CLS requirements; and keys to gain access to work areas (the contractor shall implement key control procedures to ensure keys issued are properly safeguarded and not used by unauthorized personnel).

Alternate I -- Add the following paragraph (g) to the basic clause:

(g) When this contract is a cost, cost-reimbursement, time-and-materials, or labor hour contract, the Contractor agrees that in the performance of this contract or any major subcontract no direct or indirect costs for property will be incurred if the Government determines that property is available at, or through any Air Force installation where this contract shall be performed. Only the prior written approvalof the Contracting Officer can relieve the Contractor from this restriction.

Alternate II -- Substitute the following paragraph (f) for paragraph (f) of the basic clause:

(f) The Contractor agrees to request written authorization from the Contracting Officer for support not later than 90 days before the required in-place dates at each Air Force installation, and immediately for any required changes. The Contracting Officer shall issue timely written authorization in response to a Contractor's request. Concurrently send support authorization to the Administrative Contracting Officer or to the contract administration office if redelegated to the Air Force installation where the support is provided.

C2ISR H055- INSURANCE CLAUSE IMPLEMENTATION (FEB 2003)

The Contractor shall obtain and maintain the minimum kinds and amounts of insurance during performance of this contract as specified by FAR 28.307-2, Liability, and contemplated by FAR 52.228-5, Insurance--Work on a Government Installation, and/or 52.228-7, Insurance--Liability to Third Persons.

C2ISR H059- APPLICATION FOR EQUIPMENT FREQUENCY AUTHORIZATION (FEB 2003)

The Contractor must ensure that radio frequencies are available to support electromagnetic radiating devices in their intended environment and that adequate protection from interference can be provided to receiving devices. Accordingly, the Contractor shall submit DD Form 1494, Application for Equipment Frequency Allocation, in triplicate to the buyer at the issuing office indicated on the cover of this document within 45 days after contract award. Instructions for preparing the form are contained in AFI 33-118, Radio Frequency Spectrum Management, and on the form itself.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .