Quality Assurance Surveillance Plan for Contractor Logistics Support (CY14) MQ-1 (Predator)/MQ-9 (Reaper) Contract:
Purchase Request: FX2399-14-00104
I. Performance Management:
A. Objective: This Performance Plan has been developed to aid Government personnel in providing effective and systematic surveillance of contractor’s performance. This plan provides for monitoring the services specified in the Performance Work Specification for total logistic support/sustainment of the MQ-1 (Predator) and MQ-9 (Reaper) Remote Piloted Aircraft (RPAs). This effort benefits the Government because it provides end-to-end system sustainment, increased system availability, enhanced Engineering/Field level support, and improved Predator/Reaper Operational/Mission rates.
B. Results: The goal of the Multi-Functional Team (MFT) is to make certain the logistic support/sustainment required for Predators/Reapers efficiently and effectively meets all operational/mission requirements. The results are: decreased turn-around-times; enhanced quality of products and services; reduced MICAPs; provide optimum response for Emergency/Urgent Tech Order requirements; and improved overall customer support. Achievement of the aforementioned goals constitutes program success.
C. General United States (U.S.) Government Multi-Functional Team (MFT) Responsibilities:
| 1. | Fostering partnerships with industry to ensure cooperation and exchange of |
| Information occurs. |
2. Conducting market research to identify commercial products and services which Already exist, product developments, technological advancements, suppliers’ capabilities, new vendors, and commercial best practices. Providing findings to the person responsible for preparing the market research report.
3. Identifying U.S. Government requirements.
4. Ensuring the acquisition is linked to the USAF mission.
5. Ensuring the acquisition utilizes Performance-Based Service(s) Acquisition (PBSA) Methods. Developing, implementing and executing an acquisition strategy including metrics to evaluate Contractor performance and incentives to encourage the highest level of Contractor performance.
6. Planning, programming, and budgeting adequate funds to ensure the acquisition is within approved funding.
7. Developing, implementing and executing a source selection that provides a thorough assessment of the proposal(s) of the offeror(s) and the best value for U.S. Government.
8. Ensuring an Initial Contract Performance Review (30-Day Review) is conducted in accordance with Air Force Instruction (AFI) 63-101, Acquisition and Sustainment Life Cycle Management, paragraph 4.9. Proactively reporting significant variances in quality of services, cost and/or schedule to U.S. Government management throughout the contract/order Period of Performance (PoP).
| 9. | Developing, implementing, and executing Contractor performance measurement and |
| management in accordance with the Quality Assurance Surveillance Plan (QASP). |
| 10. Developing, implementing and managing milestones to ensure the Contractor is on |
| schedule for meeting U.S. Government requirements within the contract/order PoP. |
11. Conducting surveillance of Contractor performance to ensure U.S. Government requirements including quality of services, cost and/or schedule are met. Providing results of surveillance to the Contracting Officer’s Representative(s) [COR(s)] for input into the Performance Assessment Report (PAR) and the person updating the Contractor Performance Assessment Reporting System (CPARS).
| 12. | Identifying opportunities to improve Contractor performance throughout the life of |
| the contract/order including benchmarking against industry. Promoting initiatives to | |
| improve Contractor performance, assessing the risks associated with initiatives, using the QASP to implement initiatives, and monitoring the success of implementation. |
13. Ensuring customer needs are met.
D. Specific U.S. Government Multi-Functional Team (MFT) Members Roles and Responsibilities:
| 1. | Program Manager (PM): | ||
| a. | Responsible for overall program. | ||
| b. | Serves as MFT lead. | ||
| c. | Works with the MFT to identify U.S. Government requirements and prepare | ||
| Purchase Request (PR) package. | |||
| d. Prepares market research report. | |||
| e. | Prepares and submits Contractor Performance Assessment Reports (CPARs). | ||
| f. | Approves travel requests for Contractor personnel. |
| 2. Engineer: | |||
| a. | Works with MFT in conducting market research. | ||
| b. | Prepares Air Force Materiel Command (AFMC) Form 807, Recommended | ||
| Quality Assurance Provisions and Special Inspection Requirements | |||
| d. | Works with MFT in developing other technical documents for PR package. |
| 3. | Contracting Officer’s Representative (COR): | |
| a. | Works with MFT in conducting surveillance on Contractor performance. | |
| b. | Evaluates and documents Contractor performance as defined in the QASP in accordance with Air Force Federal Acquisition Regulation Supplement (AFFARS) Mandatory Procedure (MP) 5346.103, Contracting Office Responsibilities / The Quality Assurance Program, paragraph 1.c.(4)(a). | |
| c. | Notifies the Procuring Contracting Officer (PCO) of significant Contractor performance deficiencies in accordance with AFFARS MP5346.103, paragraph 1.c. (4) (b). | |
| d. | Makes recommendations to improve the QASP and/or PWS in accordance with | |
| AFFARS MP5346.103, paragraph 1.c. (4) (b). | ||
| e. | Maintains surveillance documentation in accordance with AFFARS MP5346.103, | |
| paragraph 1.c. (4) (c). | ||
| f. | Issues PARs, at a minimum, quarterly, and negative PARs or Corrective Action | |
| Reports (CARs) as required. |
| 4. | Quality Assurance Program Coordinator (QAPC): | |
| a. | Supports the MFT in the development of the contract/order specifically ensuring |
requirements are clearly stated and enforceable in accordance with AFFARS MP 5346.103, paragraph 1.c. (1).
b. Provides training to COR management and CORs.
| 5. | Procuring Contracting Officer (PCO): | |
| a. | Only individual authorized to enter into contracts for supplies and services by | |
| obligating the U.S. Government. | ||
| b. | Advises the MFT on PWS and QASP development including incentives and | |
| remedies tied to performance objectives and performance thresholds. | ||
| c. | Develops and awards a contract/order based on MFT requirements and acquisition | |
| strategy. | ||
| d. | Determines if MFT surveillance of Contractor performance is required. Submits |
request for Contracting Officer’s Representative Support to requiring activity. Upon receipt of the Nomination of Contracting Officer’s Representative from the COR Supervisor, submits Designation of Contracting Officer’s Representative to the COR(s) and Contractor for signature thereby ensuring contractor is notified of the COR(s) assigned to the contract/order and their areas of responsibility and limitation of authority. Upon transfer/termination of the COR(s), issues a Revocation of Designation of Contracting Officer’s Representative.
| e. | Responsible for administration of the contract/order except as delegated to the | |
| Administrative Contracting Officer (ACO). | ||
| f. | Monitors Contractor performance to ensure compliance with contractual | |
| requirements. | ||
| g. | Takes action, if necessary, to enforce contractual requirements. |
| 6. | Contractor: |
| a. | Participates as a member of the MFT upon approval of Justification & Approval |
| (J&A) if sole source and upon contract/order award if competitive acquisition. | |
| b. | Responsible for ensuring personnel, information, system, facility, and |
international security requirements are met in accordance with DoD 5200.2-R, DoD 5200.22-M, National Industrial Security Program Operating Manual (NISPOM), AFI 31-101.
| c. | Complies with contractual requirements including the PWS and CDRLs. | |
| d. | Performs services required by the contract/order including the PWS and CDRLs. | |
| e. | Provides the U.S. Government with contractual deliverables and other requested data by which metrics will be developed and Contractor performance will be evaluated. | |
| h. | Signs and returns a PAR within five business days. | |
| i. | Signs and returns a negative PAR with corrective action identified within 10 | |
| business days. | ||
| j. | Signs and returns a CAR with corrective action plan by the suspense date. |
| 7. | Defense Contract Management Agency (DCMA): Administers contract/order in |
| accordance with FAR Part 42, Contract Administration and Audit Services. |
8 Contracting Officer’s Representative (COR) Supervisor:
a. Upon receipt of Request for Contracting Officer’s Representative Support from the PCO, submits Nomination of Contracting Officer’s Representative to the PCO.
b. Reviews Contractor performance documentation prepared by the COR(s) on a regular basis.
c. Considers COR duties in appraisal in accordance with Deputy Secretary of Defense memorandum, Monitoring Contract Performance in Contracts for Services, dated 22 Aug 08, and Under Secretary of Defense memorandum, Designation of Contracting Officer’s Representatives on Contracts for Services in Support of Department of Defense Requirements, dated 6 Dec 06.
E. Management Strategy: The POC/SME for each performance objective will collect and record performance data for the Services Summary Performance Objectives and report it to the QAP and alternate QAP on a Quarterly basis. Copies will be maintained in the Surveillance Folder. Meeting Minutes shall address all discussions applicable to the performance objectives and will be filed in the Surveillance Folder. ROBINS AFMC AFLCMC/WIID will chair periodic program review at an agreed location with the MFT to review cost, schedule and performance threshold and implement corrective action as required. Incentives will be in response to contract performance and cost management, and include positive and negative incentives. Positive incentives include: monetary performance incentive, share of cost under runs, a letter of appreciation, decreased surveillance, reduced meeting frequency, exercising of options, positive Contractor Performance Assessment Report System (CPARS) and recognition. Negative incentives include: reduction in target fee, share of cost over-runs, increased surveillance, invoking inspection of Services Clause FAR 52.246-5, and increased meeting frequency. Remedies for negative performance include: increased surveillance, a negative CPARS, invoking terms of the Inspection of Services Clause, and invoking terms of Termination of Default Clause. Repeated poor performance shall be unacceptable resulting in issuance of a Corrective Action Report (CAR), negative CPARS, and may include invoking the Inspection of Services – Cost Reimbursement clause, Cost Reimbursement clause, and FAR 52.246-5. Unacceptable performance shall result in a negative PAR. After two (2) negative evaluations, the QAP will prepare a Corrective Action Report (CAR).
Remedies for non-compliance are the Inspection of Services Clause FAR 52-246-4 of the contract.
Possible remedies may include:
(1) Re-performance at no additional cost to the Government
(2) Reduce the amount of the invoice relative to degree of service not rendered
(3) Charge the cost the Government incurred because of non-performance
(4) Terminate the contract for default
F. Metrics:
Objective #1: The WR-ALC Engineers and Equipment Specialist (ES) along with Det 3 designated personnel will monitor/track all 107 submittals from the time the 107 is received by the contractor to the time of completed actions to ensure contractor has met required timelines. The results for each 107 submitted during that quarter will be provided to the PM/QAP/MFT for assessment of contractors overall performance.
Objective #2: A CDRL spread sheet will be developed by the Program Management Team to monitor/track sequence of events for each CDRL identified on the contract. The tracking/monitoring will start at the time of contract award, will identify dates when CDRL is to be provided/actual date submitted/delivered by contractor, Government SME/POC/Customer for the CDRL, date for completion of review/approval by Government SME/POC/Customer, dates for return to contractor for updates/changes/ corrections, date resubmitted to Government with updates, and final approval by Government SME/POC. Results will be provided to the PM/QAP/MFT quarterly for assessment of contractors overall performance.
Objective #3: Tech Order updates/changes will be monitored/tracked by the WR-ALC Equipment Specialist along with Det 3 designated personnel to ensure contractor is meeting the required times per the TMCR. Results will be provided to the PM/QAP/MFT quarterly for assessment of contractors overall performance.
Objectives #4/5/6: These objectives deal specifically with Supply Chain Management (SCM) support for Depot/Field level activities of Predator/Reaper systems. The WR-ALC Item Manager and Det 3 designated personnel will review all supply chain transactions to ensure contractor is meeting required response times. Also customer (Depot/Field level personnel) responses/inputs will be reviewed and considered for this performance action. Results will be provided to the PM/QAP/MFT quarterly for assessment of contractors overall performance.
By meeting the Performance Objectives identified above, Predator/Reaper, GCS systems, and other equipment involved with this contract will be able to meet mission requirements throughout the program.
G. Initial Contract Performance Review: In accordance with AFI 63-101, paragraphs
4.4.2.1 and 4.9, the SDO is responsible for managing and overseeing acquisition of services and the MFT is responsible for conducting an Initial Contract Performance Review. In accordance with AFI 63-101, paragraph 4.9, the review is a determination by the MFT that the Contractor has successfully started performance, has completed transition, is fully operational, and is within the estimated cost, schedule, and performance parameters of the contract. In accordance with AFI 63-101, paragraph 4.9.1, the review will take place within 30 [calendar] days after the Contractor assumes full performance responsibilities.
H. COR Supervisor Review: The COR Supervisor will review Contractor performance documentation prepared by the COR(s) on a regular basis for the purposes of monitoring Contractor performance and considering COR duties in appraisal(s) in accordance with Deputy Secretary of Defense memorandum, Monitoring Contract Performance in Contracts for Services, dated 22 Aug 08, and Under Secretary of Defense memorandum, Designation of Contracting Officer’s Representatives on Contracts for Services in Support of Department of Defense Requirements, dated 6 Dec 06.
I. Annual Execution Review: The SDO is responsible for ensuring an Annual Execution Review is conducted in accordance with AFI 63-101, paragraph 4.10.
J. U.S. Government Contractor Performance Assessment Reporting System (CPARS)
1. The total estimated value of the contract equals or exceeds one million dollars ($1,000,000.00); therefore, CPARS reporting is required.
2. In accordance with FAR Part 42, Contract Administration and Audit Services, the MFT will evaluate Contractor performance. The Program Manager will, at a minimum, review the PARs and other information contained in the COR surveillance folder to prepare and substantiate the CPAR. CPARS will be updated, at a minimum annually, documenting Contractor performance for the contract/order in accordance with the current Department of Defense Contractor Performance Assessment Reporting System (CPARS) Policy Guide. More frequent updates may be made, as required, to document a significant improvement or decline in the level of Contractor performance.
3. The Contractor shall have input into the CPAR prior to it being finalized. For each reporting period, the Program Manager will provide the Contractor a draft CPAR with no ratings, only justifications, to review for seven calendar days.
4. After seven calendar days, unless additional time is needed to address the Contractor’s response, the CPAR process will continue. The CPAR will be coordinated through management up to the Division level. Once approved, the CPAR will be sent to the Contractor via CPARS for the official 30 calendar day review. The Contractor shall have the option to concur or non-concur, with comments, via CPARS.
5. The following areas will be rated on the CPAR as applicable: quality of product/service, schedule, and management of key personnel, business relations, and cost control.
K. Place of Performance: These services shall be performed at Contractor’s facility and USAF installations.
L. U.S. Government Environmental Management System (EMS)
1. Executive Order (E.O.) 13423, Strengthening Federal Environmental, Energy, and Transportation Management, and E.O. 13514, Federal Leadership in Environment, Energy, and Economic Performance, establish the requirement for an EMS and obligate federal (U.S. Government) agencies to implement sustainable practices.
2. In accordance with the Secretary of the Air Force (SAF) Policy Letter, Conformance with Air Force Environmental Management System (EMS) Requirements for Contracts Performed on Air Force Installations, dated 11 Dec 06, and the Air Force Materiel Command/Vice Commander (AFMC/CV) Policy Letter, Conformance with Air Force Environmental Management System (EMS) Requirements for Contracts Performed on Air Force Installations, dated 1 Aug 07, Contractor personnel who perform work on any USAF installation shall comply with the EMS requirements established by the installation.
3. The prime Contractor shall ensure subcontractors comply with the EMS requirement.
M. U.S. Government Green Procurement Program (GPP)
1. Under Secretary of Defense Memorandum, Establishment of the DoD Green Procurement Program, dated August 27, 2004, establishes the requirement for a GPP. The GPP requirement applies to all acquisitions, including services, using U.S. Government funds. The GPP is a mandatory federal (U.S. Government) acquisition program that focuses on the purchase and use of environmentally-preferable products and services. In accordance with FAR 23.404, Agency affirmative procurement programs, the GPP requires 100% of purchases of Environmental Protection Agency (EPA)-designated products, included in the Comprehensive Procurement Guidelines (CPG) list, contain recovered materials unless the item cannot be acquired competitively within a reasonable timeframe, meet appropriate performance standards, or be acquired at a reasonable price.
2. The prime Contractor shall ensure subcontractors comply with the GPP requirement.
N. Safety and Health
1. Mishap Notification/Investigation: In accordance with AFI 91-204, Safety Investigations and Reports, paragraph 2.12, the Contractor shall promptly report mishaps involving damage or injury to the USAF and cooperate with USAF safety investigations.
2. MFT Surveillance: The MFT will monitor Contractor compliance with the Safety and Health Plan/Program. The COR(s) will review applicable Contractor reports (e.g., monthly status reports, etc.) and any mishap notifications. The COR(s) will address safety and health issues in the quarterly PAR.
O. Trafficking in Persons
1. The Contractor shall comply with FAR 52.222-50, Combating Trafficking in Persons. Additional information about Trafficking in Persons can be found at the website for the Department of State’s Office to Monitor and Combat Trafficking in Persons at:
http://www.state.gov/g/tip .
2. In accordance with the Department of Defense COR Handbook, the COR(s) must inform the PCO if the Contractor/subcontractor and/or Contractor/subcontractor personnel fail to comply with the requirements of FAR 52.222.50. The PCO must convey the information to DoD Combat Trafficking in Persons (CTIP) Law Enforcement and Support / Office of Under Secretary of Defense (OUSD) Personnel and Readiness (P&R) Defense Human Resources Activity (DHRA).
II. Assessment Management:
A. Services Summary chart with method of surveillance:
| Performance Objectives |
| SOW Para. |
| Performance Threshold |
| Surveillance Method |
| 1. Provide timely responses to TO 00-25-107 depot assistance requests. |
| Para 4.1.9.2 |
| Request for TO 00-25-107 depot assistance: Provide intended course of action response within four (4) hours for emergency requests and within 72 hours for routine. |
100% Quarterly inspection by gov’t MFT SME (System Engineers/ES/Det 3) of TO 00-25-107
2. Accurate and Timely delivery of CDRLs
| This applies to CDRL Table of Contents, pg. 31-32 of the PWS. |
| On timely delivery per CDRL and quality of the delivered item as identified by the DID. |
98% - 100% Exceptional 95% - 97% Good 90% - 94% Satisfactory 85% - 89% Marginal Below 85% Unsatisfactory 100 % Quarterly inspection by gov’t MFT SME (PM and/or Log Mgr.)
| 3. Resolve AFTO Form 22, AFMC 252 and AF Form 847s within established timelines as stated in the TMCR |
| Para 4.1.7 |
| Emergency change request recommendations shall be provided within 24 hours of receipt. Closure for emergency requests, consisting of a Rapid Action Changes or Safety/Operational Supplement, as directed by ROBINS AFLCMC/WIID and AFLCMC/WII-Det 3, shall be provided within 48 hours of initial receipt. Urgent change request recommendations shall be provided within 15 days of receipt. Closure for Urgent requests, consisting of a Rapid Action Change or Safety/Operational Supplement, as directed by ROBINS AFLCMC/WIID and, AFLCMC/WII-Det 3 shall be provided within 40 days of initial receipt. Routine changes approved by ROBINS AFLCMC/WIID and AFLCMC/WII-Det 3 shall be incorporated into the next scheduled change or revision cycle. 100% on-time for urgent/emergency updates and 90% on-time for routine updates. |
| 100% Quarterly inspection by gov’t MFT SME (ES/Det 3) of submissions. |
| 4. Repair Turnaround Time (TAT) requirements |
| Para 4.4.2.2 |
| 95% TAT on aggregate time rate: The average Depot repair TAT shall be 45 calendar days for in-house repairs and 60 calendar days for those items returned to vendor or subcontractors for repair. |
| 100% Quarterly inspection by gov’t MFT SME (IM/Det 3) of submissions. |
5. MICAP Services
| Para 4.2.3 |
| Contractor shall ensure available assets to support MICAP requests are promptly processed for the carriers’ next scheduled pickup to requiring activity 95% of the time. |
| 100% Quarterly inspection by gov’t MFT SME (IM/Det 3) of submissions. |
| 6. Material Management |
| Para 4.2, 4.2.1, 4.2.2 |
| The contractor shall provide support actions for CONUS and OCONUS requisitions within 8 hours (normal business hours) from receipt of requisitions until assets provided to premium carrier for transport to requiring activity 95% of the time. |
100% Quarterly inspection by MFT SME (IM/Det 3) of data as reported in SBSS and GCSS-AF.
B. COR Surveillance Folder Contents:
Tab 1: Contractual Documents contract/order, applicable contract/order modifications PWS, PWS revisions QASP, QASP revisions applicable CDRLs
Tab 2: Appointment and Training Contract-Specific COR Training Checklist(s) COR(s) Appointment Termination of Designation of Contracting Officer’s Representative Designation of Contracting Officer’s Representative Nomination of Contracting Officer’s Representative Request for Contracting Officer’s Representative Support COR Level C Training Certificate(s)
| Contracting Officer’s Representative (COR) Leader Training for SDOs, FC/FDs | |
| and COR Supervisors Certificates |
Tab 3: Contractor Performance Documentation (Metrics) monthly status reports other Contractor reports DCMA reports Commercial Asset Visibility-Air Force (CAV-AF) Repair Item Actions Reports Wide Area Workflow (WAWF) Receiving Reports
Tab 4: Surveillance and Inspection PARs CARs Initial Contract Performance Review (30-Day Review) COR Supervisor Surveillance Review Checklists
Tab 5: meeting minutes correspondence
Tab 6: Contract Plans (basic or order, as applicable) contract/order Appendix B (Government-Furnished Property) contract/order Appendix C (Industrial Safety Requirements) Contractor Safety and Health Plan
C. Plan for Corrective Action:
1. Unsatisfactory Contractor performance will result in the COR(s) issuing a negative PAR. The COR(s) will prepare and forward the negative PAR to the PCO for submission to the Contractor. The PCO will submit the negative PAR to the Contractor for corrective action. In Section II of the negative PAR, the Contractor shall explain the discrepancy and identify the corrective action they shall take to resolve the discrepancy. The Contractor shall sign and return the negative PAR to PCO within 10 business days.
2. If repetitive negative PARs or a single negative PAR identifying critical Contractor non-compliance are issued without satisfactory resolution, the COR(s) will initiate the CAR process. However, the MFT reserves the right to issue a CAR at any time based on the severity of the Contractor non-compliance. The COR(s) will prepare a CAR and forward it to the PCO for submission to the Contractor. The PCO will submit the CAR to the Contractor for corrective action. The Contractor shall sign and return the CAR, with corrective action plan, to the PCO for acceptance by the MFT by the suspense date. The corrective action will be tracked and documented until the discrepancy is resolved. The CAR will become part of the PCO contract file. If the CAR process fails to resolve the discrepancy, the PCO has the right to invoke FAR 52.246-4.
As a result of non-compliance with contractual requirements in accordance with FAR 52.246-4, the U.S. Government may:
| a. | require the Contractor to perform the services again at no increase in contract amount; | |
| b. | require the Contractor to take action necessary to ensure future performance conforms to contractual requirements; | |
| c. | reduce the contract price to reflect the reduced value of the services performed; | |
| d. | perform the services, by contract or otherwise, and charge to the Contractor any | |
| cost incurred by the U.S. Government that is directly related to the performance | ||
| of such services; and/or | ||
| e. | terminate the contract for default. |
D. Acceptance of Services: In accordance with DFARS 252.232-7003, Electronic Submission of Payment Requests, the Contractor shall submit/process payment requests (invoices, Receiving Reports or combos), Receipt/Acceptance documents, and CDRL deliverables via WAWF. Services will be accepted by Program Manager.
III. Signature Page: By signing below, you are appointed to the MFT for this acquisition and accept the above responsibilities.