This document is a draft Request for Proposal Vendor Questions and Answers for the C-17 Data Recorder System (DBRS), a Line Replaceable Unit (LRU) procurement to retrofit the United States Air Force C-17 fleet with data bus recording capability. The requirement involves procuring 257 total LRUs: 222 for the USAF C-17 fleet, 12 for Boeing Avionics Integration Support Facility (AISF) and flight testing (7 LRUs plus 5 spares), and 3 kits plus 1 spare for the NATO Airlift Management Program. The DBRS must capture all data present across the C-17's data buses and fuel quantity computers. This is a Small Business Set Aside contract with anticipated RFP release no later than Q2 FY27, with contract award expected approximately 10 months after RFP release. Performance Review Units (PRUs) are anticipated to deliver approximately 6 months after contract award, with production quantities distributed across four lots: Lot 1 (August 2027), Lot 2 (March 2028), Lot 3 (December 2028), and Lot 4 (August 2029).
The Q&A addresses critical technical specifications including data bus protocols (MIL-STD-1553, ARINC 429, Ethernet-based systems), environmental qualification standards (DO-160, MIL-STD-810), cybersecurity requirements (NIST controls, RMF package, secure boot, and trusted computing for Controlled Unclassified Information), and storage requirements without data encryption. The system will use removable SSDs meeting SRD requirements and will only record unclassified data. The Government will provide wiring harness pinouts, interface control documents, and integration engineering drawings to offerors, with Boeing executing ASIS integration supported by the selected vendor. First Article Testing consists of CLINs 0001-0003 (preproduction units) with no additional FAT required beyond production acceptance testing. Contract terms specify FOB Destination with Fixed Firm Pricing for all CLINs, with production CLINs (X004-X006) inspected and accepted by the awardee's DCMA office. Technical proposals must include an Integrated Master Schedule as a key evaluation subfactor, with evaluation criteria weighting described on page 41 of the RFP. The Government will not provide simulation tools, test datasets, or ground data analysis software, but requires vendors to provide Technical Data Packages post-award and develop obsolescence management plans.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SPECIAL NOTICE - 16 Jun 26.pdf | ||
| Draft DBRS RFP Vendor Questions Final V2.docx | DOCX document | |
| Solicitation - FA852626RB007 Draft.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Draft DBRS RFP Vendor Questions
1. Technical Clarifications
1. Please confirm the specific data bus protocols installed across the C-17 fleet (e.g., MIL-STD-1553, ARINC 429, Ethernet-based systems) that the DBRS must capture.
Review attachment 10
1. What are the required data capture rates, storage capacity thresholds, and retention duration requirements?
Review attachment 10
1. Are there defined environmental qualification standards required (e.g., DO-160, MIL-STD-810, EMI/EMC thresholds)?
Review attachment 10
1. Will Government Furnished Information (GFI) include wiring harness design data packages and interface control documents?
Yes, the pinout and interface tray engineering drawings will be provided.
1. Is flight certification required prior to delivery of production LRUs?
Military Flight Release (MFR) should be approved prior to delivery acceptance of production LRUs
1. What are the cybersecurity requirements for the DBRS (e.g., RMF package, NIST SP 800-53 controls, Platform IT vs. PIT determination)?
Review SOW para 2.4.1
1. Will Boeing AISF integration documentation and lab interface specifications be made available to offerors?
Integration engineering drawings (i.e pinout and interface tray) will be provided to offerors. ASIP integration will be executed by Boeing, with support from the selected vendor (SOW para 2.5.1).
2. Contract & Evaluation Questions
1. Please clarify the relative weighting of Technical, Past Performance, and Price factors.
The relative weighted is described on pg 41. See screenshot.
1. Will relevant commercial aerospace data system integration experience be considered acceptable past performance?
No. The somewhat relevant definition in section M will be modified to state, “manufacturing of a databus recorder and/or other commercial solutions into a fleet aircraft as a prime/subcontractor that included direct or indirect support for test.” Since the vendor is not expected to integrate the DBRS, the integration experience will be deemed irrelevant.
1. Is First Article Testing anticipated beyond the preproduction test units identified in CLINs 0001–0003?
There are no initial testing requirements past the acceptance of CLIN 0001-0003. Production acceptance testing is required.
1. Can the Government provide anticipated production ramp timelines across the ordering periods?
Lot 1 (Aug 27), Lot 2 (Mar 28), Lot 3 (Dec 28), Lot 4 (Aug 29) – Quantities are unknown at this time.
3. Industry Feedback Given the complexity of integrating data capture systems into operational aircraft environments, we recommend:
· Clear definition of interface control documentation availability.
· Early cybersecurity integration planning aligned to RMF requirements.
· Consideration of modular, open-architecture design to support long-term sustainment and technology refresh.
· Please provide the legend in the final RFP
Q1 – Aircraft Data Buses
· Which specific data buses must be recorded (MIL-STD-1553, ARINC-429, EIA-422, Ethernet)?
Review attachment 10
· How many bus channels will be recorded at the same time?
Review attachment 10
· Will the Government provide Interface Control Documents (ICDs) for all buses?
Review attachment 10
· Should the recorder capture raw bus traffic or only decoded parameters?
Review attachment 10
· What is the minimum required data rate per bus?
Review attachment 10 Q2 – Storage Requirements
· How many hours of flight data must the recorder store?
Review attachment 10
· Is continuous recording required, or can it be event-based?
Review attachment 10
· What is the total expected data rate across all buses?
Review attachment 10
· Are there encryption requirements for stored data?
SRD (ATTACHMENT 10) will be updated to remove SRD 5-10 requirement. No encryption is required for data.
· Do the removable SSDs need any military qualifications?
The SSD must meet all requirements outlined in the SRD (Attachment 10) Q3 – Installation and Aircraft Interfaces
· Will the Government provide wiring harness pinouts and connector definitions?
Yes. They will shared once they are made available to the USG.
· What are the power input requirements (voltage, transients, MIL-STD-704)?
Review attachment 10
· What is the available mounting space for the LRU?
Review attachment 10
· Are there cooling or temperature limitations for the recorder?
Review attachment 10
· Does the vendor supply mounting hardware and installation kits?
The vendor will have the ability to use the existing mounting tray or provide their own. Reference the SRD.
Q4 – Environmental Qualification
· Which environmental standards must the recorder meet (DO-160, MIL-STD-810)?
Review attachment 10
· What vibration and shock profiles apply?
Review attachment 10
· Are EMI/EMC tests required (MIL-STD-461)?
Review attachment 10
· Are lightning or HIRF requirements applicable?
Review attachment 10 Q5 – Data Retrieval and Ground Systems
· Can data be retrieved via Ethernet/USB, or only via removable SSD?
Review attachment 10
· Is in-flight data access required, or only post-flight?
Review attachment 10
· Will the Government provide ground software for data analysis?
No, however data format must meet SRD requirements
· Should the vendor provide data conversion or visualization tools?
No, however data format must meet SRD requirements Q6 – Cybersecurity
· Are there NIST 800-171, RMF, or other cybersecurity requirements?
Yes, DBRS will be dealing with Controlled Unclassified Information (CUI) data and must be protected appropriately as well as the various DFARS clauses related to protecting CUI information
· Must stored or transferred data be encrypted?
No, not necessary. If we encrypt the data, it will require something to decrypt it.
· Is secure boot or trusted computing required?
Yes, both will be required. DBRS will be dealing with CUI data and must be protected.
Q7 – Test and Integration
· What level of vendor support is expected at Boeing AISF and flight testing?
Reference SOW para. 2.5.1 and 2.5.2
· Will the Government provide bus simulation tools or test datasets?
No, simulation tools or test datasets will not be provided. The AISF will serve as verification testing before flight test.
· What verification testing is required before flight test installation?
The AISF will serve as verification testing before USG flight test. The primary integrator will be tasked with verifying the selected DBRS meets all requirements in SRD.
· Must the vendor provide integration documentation and test procedures?
Vendor must meet integration and testing requirements outlined in SRD (see attachment 10)
Q8 – Production and Logistics
· What is the expected delivery schedule for fleet LRUs?
Vendors will be required to provide an IMS for production. That will be subfactor two of your written technical proposal. The IMS will be primarily considered in the evaluation process.
· What reliability (MTBF) is required?
Review attachment 10
· Must vendors provide technical data packages or source data?
Yes, the USG intent is to have a Technical Data Package delivered after contract award and finalizing system configuration.
SOW will be updated to reflect this intent.
· Are obsolescence management plans required?
Yes. Reference SOW para. 2.3.9 Q9 – Evaluation Criteria
· Will the Government evaluate technical maturity or existing fielded solutions?
Yes. That information should be provided in your written proposal addressing section L&M.
· Are modular or scalable architectures preferred?
USG requires further clarification on intent of question.
· Will COTS recorder architectures be considered acceptable?
Yes, if it meets all SRD requirements.
Q10 – Program Schedule
· When will the final RFP be released?
TBD. New Source selection guidance was implemented AF wide that has caused some potential changes in strategy. NLT Q2 FY27.
· What is the expected award timeline?
~10 months after RFP release
· When will first article testing and flight integration begin?
First article testing will begin once performance review units are received by the USG. Flight integration will begin at the conclusion of the AISF. The USG will accept some risk and initiate production procurement once the selected DBRS is validated via the AISF prior to completing USG flight test.
Q11 – Red/Black Data Separation
· Does the DBRS need to physically or logically separate classified (Red) and unclassified (Black) data?
Only unclassified data will be stored on the DBRS/SSD.
· Are there specific DoD or Air Force information security standards that must be followed (e.g.,DoDI 8500, DoDI 8510, or ICD 705/705A)?
Review attachment 10
· Should separate storage devices or partitions be used for Red vs Black data?
Only unclassified data will be stored on the DBRS/SSD.
· Will the system require cross-domain solutions or encryption mechanisms for Red data handling?
Only unclassified data will be stored on the DBRS/SSD.
· Is data sanitization or controlled media removal required before SSDs are removed or reused?
Review attachment 10 Q12 – C-17 Style Guide
· Should we assume that this data recorder development will adopt an MBSE approach and leverage the existing C-17 style guide?
USG requires further clarification on intent of question.
Q13 – Strict Form-Fit-Function Replacement
· Should we assume a strict form-fit-function replacement? If not, where is there room for deviations from existing mechanical and electrical interfaces?
Review attachment 10 Q14 – Functional and Non-Functional Legacy Units
· Will functional and non-functional legacy units be available for comparative testing and form factor evaluations during the development phase?
As of date, the USG have not procured a databus recorder for their fleet. Therefore, there will be no legacy unit to reference for comparative testing.
Q15 – Preferred Vendors and/or Components
· Are there preferred vendors and/or components that would help reduce risk or impact to certifications?
No preferred vendors and/or components to reduce risk
Q 16 - Can the Government please clarify whether "flight hours" should also include operational hours on ground?
· For this requirement, flight hours includes any period that there is power to the DBRS Q 17 - This implies that the DBRS will stop writing data if storage capacity is reached. Is that the desired behavior?
· Yes, this is the desired behavior.
Q 18 - Does this imply that the DBRS shall have 2 power inputs? Or will the DBRS be installed on a bus with emergency power?
· The DBRS will have only one power input which shall abide by SRD 2-1.
Q 19 - Will alternate 6 pin connectors that appropriately mate with the power connector be satisfactory?
· No.
Q 20 - Does "shut-off" mean power off of the LRU or stopping data recording?
· Power off of the LRU Q 21 - Can the Government clarify the encryption requirements?
· Encryption requirements outlined in Documents, Drawings and Publications, SRD 2.2.2 Q 22 - Can the Government clarify if "volatile memory" should be "non-volatile memory"?
· Volatile memory storage should be sanitized IAW NIST SP 800-53 rev 5 Q 23 - Will alternate 128 pin connectors that appropriately mate with the aircraft harnesses be satisfactory?
· No.
Q 24 - Can the government clarify this requirement and identify where the data will be transferred to?
· Data transfer requirements shall meet SRD requirements (SRD 8-1).
Q 26- Please provide the Government’s anticipated acquisition timeline, including the expected proposal due date, anticipated contract award date, and planned timing of the lead-time event referenced in the delivery schedule.
· The proposal due date is TBD due to changes in source selection guidance AF wide. Key contract dates will be provided once the RFP is officially released. We expect the PRU’s to be delivered ~6 months after contract award based on our market research. Your IMS should highlight the optimal timelines your company can deliver.
Q 27- Can the Government specify inspection and acceptance provisions for production deliveries? CLINs X004-X006 are production CLINs and will be inspected and accepted by awardee's DCMA office. The specific DCMA location will be provided once contract is awarded. The inspection and acceptance are guided by RFO 52.212-4(b).
Q 28- Will the Government consider FOB Origin for all CLINs? FOB Origin is more in line with commercial organization practices and allows for small businesses to more easily recognize revenue. If not, how should potential offerors address the cost of transportation included in the pricing spreadsheets? No, FOB cannot be Origin for all CLINs. There will be no evaluation of transportation costs for FOB Origin. FOB Destination costs shall be included in the FFP.
Q 29- Several of the Special Clauses have “Deviation” listed but no actual deviation number next to them. Can the Government provide the specific deviations to be used? This is due to the Revolutionary FAR Overhaul (RFO) as part of the President’s Executive Order. Currently all RFO clauses are deviations for now. See link for more information: https://www.acquisition.gov/far-overhaul.
Further, will the Government consider tailoring FAR 52.212-4 to be more in line with commercial practices and so they align/do not conflict with the specifications and requirements. Specifically, tailoring should pertain to inspection/acceptance, indemnities, risk of loss, title, and warranty areas. Yes, clauses could be tailored to align commercial practices and specific requirements. The USG would need specific instances as we are unaware of any conflict with specification of requirements. The other areas that are not dealing with requirement or specification are written to be so broad at RFO level as to no conflict with commercial requirements.
Q 30- Will Contractors be required to respond to a USG RFQ or RFP before issuance of delivery or task orders, due to fluctuating quantities? Yes, this process ensures compliance with "fair opportunity" regulations, allowing the government to evaluate the best technical approach and price for specific, fluctuating needs. This draft RFP represents FFP prices for all years which the USG may order from and a single award will be made.
Further, can a Contractor “no-bid” or turn down an order in accordance with 52.216-19 during the period of performance? Yes, a contractor may "no-bid" or decline an order under FAR 52.216-19 if the order exceeds the maximum order limitations specified in the contract. The contractor must return the order within a specified number of days (usually 5–7 days) with written notice stating their intent not to ship the items and the reasons for declination. In most cases, this would allow the Contractor to negotiated additional lead time for quantities in excess of limitations rather than rejection.
Q 31- What will the IDIQ minimum? Will it be the base amounts described in the pricing sheet? The minimum order is defined clause RFO 52.216-19 Q 32- Will PIEE have the ability to accept both a .pdf and a Word copy? Or does the Government expect just a Word copy of the technical proposal to be transmitted? Yes, the Procurement Integrated Enterprise Environment (PIEE) application supports both PDF and Microsoft Word document formats.
In what format does the Government wish to receive the Subfactor Two Integrated Master Schedule - can it be screenshots of MS Project or other graphical views included within the MS Word copy?
· If a specific form of delivery is not highlighted in the RFP, deliver as desired by offeror.
Q 33- Given that subcontractors may perform significant portions of the technical scope, will the Government consider allowing relevant past performance information for key subcontractors to be submitted to demonstrate overall team capability?
· Yes. Past performance information from subcontractors can be submitted to demonstrate team capability.
Q 34- Can the Government provide more information on the reserve pool- specifically: (1) approximately how many backup offerors will be entered into the pool and (2) how the Government will evaluate schedule or cost increases during the Final Proposal Request. We cannot provide information on backup offerors at this time, that information is unknown until after official proposals are received.
Q 35- If an offeror is successful in making the competitive range for discussions, but then excluded due to the KO and SSA limitations, when does the Government expect that the debriefing time limits start? The debriefing time limits typically start within 3 days of receiving the notice of exclusion, if a pre-award debriefing is requested.
Further, do the same debriefing time limits occur to unsuccessful offerors that are placed in the reserve pool? They are entitled to a post-award debriefing within 3 days of receiving notice of the award.
Q 36- Is the award letter a notification letter sent to unsuccessful offerors, in addition to the initially successful offeror, as well? A written notification is sent to unsuccessful offerors, but it is not the same as the award letter that will be sent to the successful offeror.
Will the rest of the Reserve Pool know who else is in the pool with them? No Q 37- If this is a small business set aside, why are there compliance clauses and requirements for identifying as a large business?
· The clause is relevant to a large business that intends on partnering with a small business to bid on this contract.
Q 38- What certification level is being addressed in these general requirements?
· The contractor must meet all requirements and standards outlined in Attachment 10 Q 39- How will limited, restricted, government purpose, or specifically negotiated license rights markings that are authorized by the contract clauses be handled? Solicitation Clause 252.227-7015 has form/fit/function data or operation/maintenance/training data normally given to the public being required; but the CDRLs and other deliverables ask for further technical data beyond these where the Government would normally have unlimited rights.
· The USG will conform to the distribution rights outlined on deliverables.
image1.png