C-17_PSE_Solicitation_Template-FA8526-24-Q-0003-RevC.xlsx
XLSX spreadsheet 77 KB Posted
- Solicitation number
- FA852624Q0003
About this file
This document is a spreadsheet template for a firm-fixed price solicitation issued by the Department of the Air Force Materiel Command Lifecycle Management Center at Robins Air Force Base. The solicitation is for the procurement of four (4) test sets for the OBIGGS (Onboard Inert Gas Generating System) heat exchanger on the C-17 aircraft, which includes a first article and associated test plan and report. The government requires the ability to perform leak testing on the OBIGGS heat exchanger at the organizational and depot maintenance levels. The solicitation is set aside for 100% small business participation, and proposals are due by 5:00 PM EST on 22 April 2024. The contract will be awarded on a firm-fixed price basis, with deliveries FOB Destination within the continental United States.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA852624Q0003_______0003.pdf | ||
| FA852624Q0003_0002.pdf | ||
| FA852624Q0003_0001.pdf | ||
| CDRL_A003_IUID_Marking_Plan_EN_17G490139-1.pdf | ||
| MANDATORY_SHIPPING_DOCUMENTS.docx | DOCX document | |
| NDA_RFQ_FA8526-24-Q-0003.pdf | ||
| CDRL_A002_Test_Inspection_17G490139-1.pdf | ||
| Transportation Form_1653.pdf | ||
| CDRL_A001_Test_Inspection_17G490139-1.pdf | ||
| FA852624Q0003.pdf | ||
| EDL_Rev1.pdf | ||
| Packaging Form_158.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACTOR INSTRUCTIONS
| Solicitation #-FA8526-XX-P-XXXX | |
| Title-Peculiar Support Equipment XYZ | |
| INSTRUCTIONAL GUIDANCE | |
| Spreadsheet Worksheet Tab | Instructions for Specific SpreadSheet Worksheet Tab |
| NOTE: "EXAMPLE-REPLACE W/ PROPOSAL DATA" IN RED | |
| Incorporate into Column A, rows 1-4 the information requested as it relates to your solicitation (information will flow into the other tabs) | |
| Incorporate into Columns A & B the correct Contract Line Items (CLINS) and descriptions of each as located in Schedule B of the solicitation | |
| Add in new lines if more CLINS are required than what is presented in this tab (follow the exact layout as provided) | |
| Total Summary Tab by CLIN | Incorporate into Columns C-F Labeled "Proposed Sum of Hours by Labor Category/Material (Contractor Use) the applicable labor categories and rates utilized by CLIN (Replace Task Categories as necessary) |
| Add in additional rows under the related CLIN for additional Task categories needed (ensure formulas are adhered to for calculation purposes) | |
| Incorporate the hours for each labor category identified by CLIN | |
| Incorporate your total dollars for Option CLINs (sample escalation provided) | |
| Ensure your data calculates correctly |
| NOTE: "EXAMPLE-REPLACE W/ PROPOSAL DATA" IN RED | |
| Incorporate into Columns A & B the correct Contract Line Items (CLINS) and descriptions of each as located in Schedule B of the solicitation | |
| Add in new lines if more CLINS are required than what is presented in this tab (follow the exact layout as provided) | |
| Task Summary by CLIN | Incorporate into Columns D-U Labeled "Proposed Sum of Hours by Task (Contractor Use) " the applicable tasks utilized by CLIN (Add To or Replace Labor Catagories as necessary) |
| Add in additional rows under the related CLIN for additional tasks needed in Column C (ensure formulas are adhered to for calculation purposes) | |
| Incorporate the hours for each task identified by CLIN against the labor categories provided (i.e. PM/ENGINEERING/QUALITY) | |
| Ensure your data calculates correctly |
| NOTE: "EXAMPLE-REPLACE W/ PROPOSAL DATA" IN RED | |
| Incorporate into Columns A & B the correct Contract Line Items (CLINS) and descriptions of each as located in Schedule B of the solicitation | |
| Add in new lines if more CLINS are required than what is presented in this tab (follow the exact layout as provided) | |
| Materials Breakout Template | Incorporate into Columns C-H Labeled "Material" the applicable material utilized by CLIN (Replace material as necessary) |
| Add in additional rows under the related CLIN for additional material as needed (ensure formulas are adhered to for calculation purposes) | |
| Incorporate the part number, unit of measure, unit price, and quantity | |
| Add in Shipping Costs as appropriate (Shipping Cost will be respresented as part of the sum of material pulled into the Summary Tab) | |
| Ensure your data calculates appropriately |
Total Summary Tab by CLIN
| Solicitation #-FA8526-XX-Q-XXXX |
| Quote # 1234 (Valid for 30 days) |
| Contractor-ABC Company |
| Date 2 May 2020 |
| PROPOSED-Sum of Hours by Labor Category/Material (CONTRACTOR USE) | Government Technical Review (For Official Use Only) | ||||||
| CLINS | Description | Task | Total Hours | Rates | Total | Total Hours | Rationale |
| BASIC PERIOD | |||||||
| 0001 | First Article/Production-FAT required | ||||||
| 0001AA | First Article | Project Management | $ - 0 | ||||
| Marerials Receiving and Handling | $ - 0 | ||||||
| Work Card / Traveler Development | $ - 0 | ||||||
| Task / Machine Setup | $ - 0 | ||||||
| Machine Operation | $ - 0 | ||||||
| Sheetmetal-Fabrication | $ - 0 | ||||||
| Welding | $ - 0 | ||||||
| Assembley | $ - 0 | ||||||
| In process inspections | $ - 0 | ||||||
| Test | $ - 0 | ||||||
| Paint Unit | $ - 0 | ||||||
| Packaging / Shipping | $ - 0 | ||||||
| $ - 0 | |||||||
| $ - 0 | |||||||
| $ - 0 | |||||||
| Total Hrs/Category: | 0.00 | $ - 0 | 0.00 | ||||
| MATERIAL (SUM FROM MATERIAL TAB) | $ - 0 | ||||||
| CLIN 0001AA TOTAL | $ - 0 | ||||||
| 0001AB | Production Unit | Project Management | $ - 0 | ||||
| Marerials Receiving and Handling | $ - 0 | ||||||
| Work Card / Traveler Development | $ - 0 | ||||||
| Task / Machine Setup | $ - 0 | ||||||
| Machine Operation | $ - 0 | ||||||
| Sheetmetal-Fabrication | $ - 0 | ||||||
| Welding | $ - 0 | ||||||
| Assembley | $ - 0 | ||||||
| In process inspections | $ - 0 | ||||||
| Test | $ - 0 | ||||||
| Paint Unit | $ - 0 | ||||||
| Packaging / Shipping | $ - 0 | ||||||
| $ - 0 | |||||||
| $ - 0 | |||||||
| $ - 0 | |||||||
| Total Hrs/Category: | 0.00 | $ - 0 | 0.00 | ||||
| MATERIAL (SUM FROM MATERIAL TAB) | $ - 0 | ||||||
| CLIN 0001AB TOTAL | $ - 0 | ||||||
| 0002 | DATA/CDRLs | ||||||
| 0002AA | Test Plan | Program Management | $ - 0 | ||||
| Engineering | $ - 0 | ||||||
| Engineering Support | $ - 0 | ||||||
| Total Hrs/Category: | 0.00 | $ - 0 | 0.00 | ||||
| 0002AA | Test Report | Program Management | $ - 0 | ||||
| Engineering | $ - 0 | ||||||
| Engineering Support | $ - 0 | ||||||
| Total Hrs/Category: | 0.00 | $ - 0 | 0.00 | ||||
| BASIC PERIOD TOTAL | |||||||
| Total Proposed Hours | 0.00 | 0.00 | 0.00 | ||||
| Total Proposed Labor Cost | $ - 0 | ||||||
| Total Proposed Material (From Material Tab) | $ - 0 | ||||||
| Total Price Basic Period | $ - 0 | ||||||
| OPTION Years | Production | ||||||
| 1001 | Production | $ - 0 | |||||
| escalation | 1.035 | ||||||
| CLIN 1001 TOTAL | $ - 0 | ||||||
| 2001 | Production | $ - 0 | |||||
| escalation | 1.035 | ||||||
| CLIN 2001 TOTAL | $ - 0 | ||||||
| 3001 | Production | $ - 0 | |||||
| escalation | 1.035 | ||||||
| CLIN 3001 TOTAL | $ - 0 |
EXAMPLE
Replace W/ Proposal Data
Task Summary by CLIN
| Solicitation #-FA8526-XX-Q-XXXX |
| Quote # 1234 (Valid for 30 days) |
| Contractor-ABC Company |
| Date 2 May 2020 |
| PROPOSED-Sum of Hours by Task (Contractor Use) | GOVERNMENT Technical Review (For Official Use Only) | ||
| CLINS | Description | Task |
JACKSON, ROBERT A CIV USAF AFMC AFLCMC/WNKE:
Please modify this section to correspond with the Labor Task that are applicable with the requirement.
| The tasks on the template are only examples and should be modified. | # Hours PM | # Hours Engineering | # Hours Engineering Tech | # Hours Quality Inspector | # Hours Welder-I | # Hours Welder-II | # Hours Welder-III | # Hours Machinist-I | # Hours Machinist-II | # Hours Machinist-III | # Hours Fabricator-I | # Hours Fabricator-II | # Hours Fabricator-III | # Hours Assembler-I | # Hours Assembler-II | # Hours Assembler-III | # Hours Test | # Hours Packaging & Shipping | Total Hours | # Hours PM | # Hours Engineering | # Hours Engineering Tech | # Hours Quality Inspector | # Hours Welder-I | # Hours Welder-II | # Hours Welder-III | # Hours Machinist-I | # Hours Machinist-II | # Hours Machinist-III | # Hours Fabricator-I | # Hours Fabricator-II | # Hours Fabricator-III | # Hours Assembler-I | # Hours Assembler-II | # Hours Assembler-III | # Hours Test | # Hours Packaging & Shipping | Total Hours | Rationale | |||
| BASIC PERIOD | ||||||||||||||||||||||||||||||||||||||||||
| 0001 | First Article/Production-FAT required | |||||||||||||||||||||||||||||||||||||||||
| 0001AA | First Article | Project Management | 0 | 0 | ||||||||||||||||||||||||||||||||||||||
| Marerials Receiving and Handling | 0 | 0 | ||||||||||||||||||||||||||||||||||||||||
| Work Card / Traveler Development | 0 | 0 | ||||||||||||||||||||||||||||||||||||||||
| Task / Machine Setup | 0 | 0 | ||||||||||||||||||||||||||||||||||||||||
| Machine Operation | 0 | 0 | ||||||||||||||||||||||||||||||||||||||||
| Sheetmetal-Fabrication | 0 | 0 | ||||||||||||||||||||||||||||||||||||||||
| Welding | 0 | 0 | ||||||||||||||||||||||||||||||||||||||||
| Assembley | 0 | 0 | ||||||||||||||||||||||||||||||||||||||||
| In process inspections | 0 | 0 | ||||||||||||||||||||||||||||||||||||||||
| Test | 0 | 0 | ||||||||||||||||||||||||||||||||||||||||
| Paint Unit | 0 | 0 | ||||||||||||||||||||||||||||||||||||||||
| Packaging / Shipping | 0 | 0 | ||||||||||||||||||||||||||||||||||||||||
| 0 | 0 | |||||||||||||||||||||||||||||||||||||||||
| 0 | 0 | |||||||||||||||||||||||||||||||||||||||||
| 0 | 0 | |||||||||||||||||||||||||||||||||||||||||
| Total Hrs/Category: | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0001AB | Production Unit | Project Management | 0 | 0 | ||||||||||||||||||||||||||||||||||||
| Marerials Receiving and Handling | 0 | 0 | ||||||||||||||||||||||||||||||||||||||
| Work Card / Traveler Development | 0 | 0 | ||||||||||||||||||||||||||||||||||||||
| Task / Machine Setup | 0 | 0 | ||||||||||||||||||||||||||||||||||||||
| Machine Operation | 0 | 0 | ||||||||||||||||||||||||||||||||||||||
| Sheetmetal-Fabrication | 0 | 0 | ||||||||||||||||||||||||||||||||||||||
| Welding | 0 | 0 | ||||||||||||||||||||||||||||||||||||||
| Assembley | 0 | 0 | ||||||||||||||||||||||||||||||||||||||
| In process inspections | 0 | 0 | ||||||||||||||||||||||||||||||||||||||
| Test | 0 | 0 | ||||||||||||||||||||||||||||||||||||||
| Paint Unit | 0 | 0 | ||||||||||||||||||||||||||||||||||||||
| Packaging / Shipping | 0 | 0 | ||||||||||||||||||||||||||||||||||||||
| 0 | 0 | |||||||||||||||||||||||||||||||||||||||
| 0 | 0 | |||||||||||||||||||||||||||||||||||||||
| 0 | 0 | |||||||||||||||||||||||||||||||||||||||
| Total Hrs/Category: | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0002 | DATA/CDRLs | |||||||||||||||||||||||||||||||||||||||
| 0002AA | Test Plan | Program Management | 0 | 0 | ||||||||||||||||||||||||||||||||||||
| Engineering | 0 | 0 | ||||||||||||||||||||||||||||||||||||||
| Engineering Tech | 0 | 0 | ||||||||||||||||||||||||||||||||||||||
| Total Hrs/Category: | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0002AA | Test Report | Program Management | 0 | 0 | ||||||||||||||||||||||||||||||||||||
| Engineering | 0 | 0 | ||||||||||||||||||||||||||||||||||||||
| Engineering Tech | 0 | 0 | ||||||||||||||||||||||||||||||||||||||
| Total Hrs/Category: | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Total Proposed Hours: 0 Total Objective Hours: 0
| OPTION Years | Production | |||
| 1001 | Production | Learning curve Hr Calculator | ||
| FA Starting Point | Learning Curve | |||
| Prod1 | 95% | |||
| 2001 | Production | Prod2 | 90% | |
| Prod3 | 85% | |||
| Avg Prod | ERROR:#DIV/0! | |||
| 3001 | Production |
EXAMPLE
Replace W/ Proposal Data
Materials Breakout Template
| Solicitation #-FA8526-XX-Q-XXXX |
| Quote # 1234 (Valid for 30 days) |
| Contractor-ABC Company |
| Date 2 May 2020 |
| Materials | Technical Review | ||||||||||||
| Part Number | Description/Type | Unit of Measure | Minimum Order Quantity | ||||||||||
| STEVENSON, JULIAN B NH-03 USAF AFMC AFLCMC/WLE: Only list the MOQ if it is greater that what is required for manufactureing. For Example: If you only need 4 of an item, but the distributer won't sell you less than 10. Then you list 10 as the MOQ. Otherwise, do not list an MOQ. | Unit Cost | FA Quantity (CLIN 0001AA) | Production Quantity (CLIN 0001AB) | Total Quantity | FA Material Cost (CLIN 0001AA) | Production Material Cost (CLIN 0001AB) | Total Extended Price | Comments | Requirement per End Item | Total Required Quantity | Adjusted Total Extended Cost | Rationale |
STEVENSON, JULIAN B NH-03 USAF AFMC AFLCMC/WLE: Only list the MOQ if it is greater that what is required for manufactureing. For Example: If you only need 4 of an item, but the distributer won't sell you less than 10. Then you list 10 as the MOQ. Otherwise, do not list an MOQ.
| STEVENSON, JULIAN B NH-03 USAF AFMC AFLCMC/WLE: Only list the MOQ if it is greater that what is required for manufactureing. For Example: If you only need 4 of an item, but the distributer won't sell you less than 10. Then you list 10 as the MOQ. Otherwise, do not list an MOQ. | 0 | $0.00 | $0.00 | $0.00 | ||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 | |||||
| 0 | $0.00 | $0.00 | $0.00 |
Total Proposed Material Cost : $0.00 $0.00 $0.00 Total Adjusted Material Cost: 0.0
EXAMPLE
Replace W/ Proposal Data
File details come from the government source that posted it. Updated .