This document outlines a federal solicitation for a trailer to facilitate secondary barrier installation and removal on C-17 aircraft. The Air Force Materiel Command seeks a firm-fixed-price contract for two trailers, including a first article, test plan, and test report. The trailer must interface with tow vehicles, tie-down rings, air hoses, support brackets on the cargo bay ceiling, and a hoisting frame to raise a 2,000-pound secondary barrier approximately 15 feet. Additional requirements include braking, lifting and lowering loads, negotiating 11-degree ramps, forkliftability, and tie-down provisions for transport. Responses are due by October 28, 2019 to the contracting specialist and officer listed. This requirement is set aside for 8(a) small business GREEN MACHINE AND MANUFACTURING, INC.
First Article
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CDRL.pdf | ||
| Transportattion.pdf | ||
| Bidset31802.pdf | ||
| Packaging_AFMC158.pdf | ||
| FA852619Q0087.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIRST ARTICLE REQUIREMENTS 1. DATE
21 MAY 2018(AFMCI 64-110, AFMCI 23-102 and FAR Part 9, Sub Part 9.3)(Additional Instructions on Page 3)
2. PR / MIPR NUMBER 3. CAGE / REFERENCE NUMBER
88277 / 17G460213-1
4. NSN
1730014842813BA
5. FIRST ARTICLE QUANTITY
THE FIRST ARTICLE IS 1 UNIT(S) OF LOT / ITEM 1
AND WILL BE: X PART OF PRODUCTION QUANTITY IN ADDITION TO PRODUCTION QUANTITY
6. ARTICLES
WILL X WILL NOT SERVE AS A MANUFACTURING STANDARD
7. LONG LEAD TIME ITEMS
REQUIRED X NOT REQUIRED
(See FAR 52.209-3 OR -4, alternate II)
8. SPECIAL REQUIREMENT/PRODUCTION FACILITIES (See FAR 52.209-3 OR -4 Alternate I)
X REQUIRED NOT REQUIRED
"The First Article offered must be manufactured at the facilities in which that item is to be produced under the contract, or if the First Article is a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must accompany each First Article which is offered."
9. TEST / INSPECTION REQUIREMENTS
A. X CONTRACTOR TESTING
GOVERNMENT TESTING
Performance or other characteristics which the First Articles must meet are
Dimensional Conformance, Material and Process Verification, and Workmanship.
B. The detailed technical requirements for First Article approval tests are contained in
Item TDP especially drawing 17G460213-1 and applicable documents First Article Test Plan (FATP) due 60 DAC First Article Test Report (FATR) due 240 DAC (180 days after approval of FATP) (Cite Spec and Para number)
C. X TEST PLAN REQUIRED
Number of days for government approval / disapproval 60 days.
D. Contractor's notification to ACO and
AFLCMC/WLE C-17 PSE Engineering
(Requesting Activity) of test time and location due 30 days prior to start of testing.
E. X TEST REPORT REQUIRED
(1) Forwarded to
ACO & AFLCMC/WLE C17 PSE Engineer'g
235 Byron St., Suite 19A
Robins AFB, GA 31098
(2) Government written notice of approval / disapproval due 60 days after receipt of contractor's report.
F. FIRST ARTICLE DELIVERY
(1) Due within 330 calendar days from date contract.
(2) Notify 10 calendar days prior to shipment.
(3) Delivered to government at
Ship To: Mark for EB2090
Boeing Distribution Center-Atlanta
5690 Southfield Ct, Ste 200 Door 20
Forest Park, GA 30297-2524
(Set Forth Consignee and Address)
(4) Government written notice of approval / disapproval within 30 days after receipt of first article package.
G. Estimated cost of government testing / inspection evaluation.
¤2,000.0000
Page 1 of 3AFMC IMT 260, 20020830, V-3 Version 4Generated by PRPS using Jasper Reports on 21 May 2018
21 MAY 2018(AFMCI 64-110, AFMCI 23-102 and FAR Part 9, Sub Part 9.3)(Additional Instructions on Page 3)
10. DISPOSITION OF FIRST ARTICLES
X Approved First Articles will be forwarded to
EB2090 AFLCMC/WLE C-17 PSE Engineering
(insert quantity) First Articles will be expended in testing. Residual components of disapproved First Articles will be returned to the contractor will be retained by pending disposition instructions from the contractor.
First Articles will be installed on aircraft/equipment to determine proper fit/function. Approved article will remain on the aircraft/equipment and will not be forwarded to USAF Supply, but will be considered part of the contract quantity.
X Disapproved First Articles
X will be returned to the contractor will be retained by pending disposition instructions from the contractor.
On purchase requests designated as direct shipments the following disposition will apply. (NOTE: Always applicable on Foreign Military Sales (FMS)).
a. Approved First Articles will be returned to the contractor for shipment with production item.
b. Disposition of disapproved First Articles will remain the same as marked above.
Other Disposition:
11. CONDITION(S) FOR WAIVER OF FIRST ARTICLE APPROVAL
a. X Offerors who have previously furnished production quantities of the same or similar article to the prime contractor for delivery to the Government, DoD, X Air Force.
b. Offerors currently in production of the same or similar article for a Government, DoD, Air Force contract and who have received First Article approval under the existing contract.
c. X Offerors who have previously furnished production quantities of the same or similar articles to the Government, DoD, X Air Force, provided articles thus furnished, have exhibited satisfactory performance in service in the opinion of the Air Force.
d. X Provided not more than 48 months have elapsed since completion of the contract.
e. First Article testing will not be waived.
f. X See Remarks in block 12 below.
NOTE TO BUYER: UNDER CONDITIONS A AND C ABOVE, THE COGNIZANT ENGINEERING ACTIVITY WILL DECIDE WHETHER OR NOT THE ITEM HAS EXHIBITED SATISFACTORY PERFORMANCE IN SERVICE AND PREPARE AND RETAIN SUPPORTING DOCUMENTATION TO FULLY JUSTIFY THIS DECISION. THE BUYER MUST SOLICIT DUAL PRICES (That is, both with and without requirement for first article approval) AND MUST FURNISH THE COGNIZANT ENGINEERING ACTIVITY WITH THE FOLLOWING INFORMATION ON THE PREVIOUSLY SUPPLIED ARTICLE:
A. PROCURING OFFICE B. CONTRACT NUMBER C. DATE OF CONTRACT D. SPECIFICATION NUMBER AND REVISION
12. REMARKS
Jones, Anthony LNAME: 21 MAY 2018DATE:
Justification for First Article (FA) Requirement:
1. Critical to Safety/Use (of weapon system).
2. Product described by drawing, OEM and MIL-Specs, End item requires Proof Load testing - testing must be properly performed. The contractor's test plan shall describe the proposed means by which the contractor will accomplish and document conformance to the requirements involved in production (incl. dimensional, material and process conformance) and testing IAW the item TDP. The test plan shall employ text, tables, sketches, drawings and/or photographs as necessary/appropriate to illustrate the contractor plan to satisfy and document conformance to the item TDP and FA CDRL requirements.
3. FAT waived if procured from the OEM or Item Data Manager (IDM), produced directly for and approved by the IDM.
The FATP shall:
1) List/briefly describe the equipment proposed/planned for testing.
2) Describe the means by which calibrations traceable to the NIST will be assured.
3) Describe the means by which the contractor will accomplish/document the dimensional conformance, weighing and proof load tests required IAW the item TDP.
4) Provide sample format(s) proposed for use in FATR documentation of conformance (dimensional, material and process compliance, proof test results) to the TDP.
5) Provide evidence of a plan to photo document compliance to all permanent item marking requirements (stenciling, silk-screening, ID & proof load plates, etc. as applicable).
The Test Report (FATR) shall report the inspection and test results IAW the approved FATP and the FATR CDRL. The contractor shall manufacture the detail parts, acquire the requisite hardware, assemble and test one complete First Article IAW the item TDP. The Government QAR, C-17 COG Engineer, contracting official, program manager and/or Boeing technical representative shall have the opportunity to observe/witness FA testing in the facility used for production article testing
Page 2 of 3AFMC IMT 260, 20020830, V-3 Version 4Generated by PRPS using Jasper Reports on 21 May 2018
21 MAY 2018(AFMCI 64-110, AFMCI 23-102 and FAR Part 9, Sub Part 9.3)(Additional Instructions on Page 3)
13. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR APPROVING TEST
(Name, Organization, Phone)
Jones, Anthony L
AFLCMC / WL E
478-222-1932
472-1932
14. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR CONDUCTING
TEST (Name, Organization, Phone)
Page 3 of 3AFMC IMT 260, 20020830, V-3 Version 4Generated by PRPS using Jasper Reports on 21 May 2018
File details come from the government source that posted it. Updated .