This solicitation requests proposals for a trailer to facilitate the removal and installation of secondary barriers in C-17 aircraft fuel tanks. The Air Force seeks a firm-fixed-price contract for two trailers that can interface with tow vehicles, cargo tie-downs, air hoses, support brackets in the cargo bay ceiling, and a hoisting frame to raise and lower a 2,000-pound load 15 feet. The trailer must navigate 11-degree ramps, allow ground transportation, and include tie-downs for shipping. Responses are due by October 28, 2019. This requirement is set aside for 8(a) small business GREEN MACHINE AND MANUFACTURING, INC. Questions should be directed to the contracting specialist or officer via email.

CDRLs

View the file

Other files

File Type Posted
Transportattion.pdf PDF
Bidset31802.pdf PDF
FirstArticle.pdf PDF
Packaging_AFMC158.pdf PDF
FA852619Q0087.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information, Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information

Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A X TDP TM OTHER

D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR

C17/PSE/ 17G460213-1

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A001 First Article Qualification Test Plan and Procedures

Trailer, Secondary Barrier – Contractor Test Plan

– Contractor FAT Plan 4. AUTHORITY (Data Acquisition Document

No.)

5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-NDTI-81307A/T

AFLCMC/WLME (C-17 Engineering)

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

DD D

One/R See Blk 16

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF

SUBSEQUENT

SUBMISSION

a. ADDRESSEE

FINAL

A See Blk 16

N/A Draft Reg Repro

16. REMARKS AFLCMC/WLME

Blk 4: Test Plan shall cover pre-production/First Article testing and documentation. The test (C-17 Engineering) plan shall detail the means by which the contractor will satisfy the requirements of the E-mail:

item TDP and any applicable requirements set forth in the related standards, processes Hau.Nguyen@us.af.mil and documents referenced therein. The test plan shall describe and/or list: 1) the means by which the contractor shall accomplish the requisite dimensional inspection and proof

Alternate:

load tests, including safety measures related to the load tests per item TDP; 2) plan to Connie.Evans.ctr@robins.af document the material and process certifications (BOM/TDP compliance); 3) the .mil equipment to be used to perform the required inspections and tests; 4) the means by which the contractor ensures that all test/inspection instruments proposed/employed E-copy 1 1 carry current, valid , traceable calibrations at the time of test/inspection 5) plan for (Adobe.pdf format photo documentation of all permanent item markings (ID plates, stenciling, banded or Word.doc) labeling, etc. (as applicable by detail). The plan shall include text, tables, sketches, photos, etc. as applicable or required to address the above enumerated requirements.

Traceability of dimensional and load calibrations must be addressed.

MIL-HDBK-831 may be used as a guide in preparing the Test Plan.

NOTE: Any changes to the Test Plan after approval must be coordinated with the program technical authority approving the plan. All coordinating actions shall be processed through the contracting officer IAW contracting regulations and public law.

Blk 7: The Government will accept the Test Plan through WAWF upon final delivery.

Blk 8/11/12: Contractor shall submit draft for approval 75 DAC award. Contractor shall submit final copies 14 calendar days after Government approval of the draft (including equipment substitutions if applicable). Any subsequent equipment substitutions require separate approval prior to test.

Blk 14: Contractor prepared Test Plan shall be submitted as a searchable Adobe PDF file via E-mail list in 14a.

15. TOTAL 1 1

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Hau Nguyen

AFLCMC/WLME, DSN:497-2741 20130607

DD Form 1423-1, JUN 90 PREVIOUS EDITIONS ARE OBSOLETE. PAGE _1 _ OF __ 2__ PAGES

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information, Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A X TDP TM OTHER NDTI

D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR

C17/PSE/ 17G460213-1

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A002 Test/Inspection Report Trailer, Secondary Barrier – Contractor FAT Report

4. AUTHORITY (Data Acquisition Document No.)

5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-NDTI-80809B/T AFLCMC/WLME (C-17 Engineering)

7. DD 250 REQ 9. DIST

STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

DD D One/R See Blk 16 b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF

SUBSEQUENT

SUBMISSION

a. ADDRESSEE FINAL

A See Blk 16 N/A Draft Reg Repro

16. AFLCMC/WLME

Blk 4: Test Report shall cover pre-production/First Article testing and shall document (C-17 Engineering) conformance to TDP requirements and traceability of test and/or measurement E-mail:

equipment calibrations to accepted standards. The report shall include text, tables, Hau.Nguyen@us.af.mil sketches, etc. as applicable or required. Tabulated data formats the Test Report shall conform to those approved in the Test Plan unless the format changes are Alternate:

coordinated through contracting with the technical authority. Photo documentation Connie.Evans.ctr@robins.af of all exposed permanent markings (ID plates, stenciling, etc.) .mil confirming conformance to item TDP marking requirements is required. All text must and/or numerical designations must be legible in photos (more than one photo E-copy 1 1 may be required in some instances to document adjacent texts). Traceability of (Adobe .pdf, format load, dimensional calibrations is required.

MIL-HDBK-831 may be used as a guide in preparing the Test Report.

or Word .doc)

Test Report shall be certified by Government QAR (Ref MIL-HDBK-831, paragraph 4.1.4.2).

Blk 7: The Government will accept the Report through WAWF upon final delivery.

Blk 8/11/12: Test Report shall be submitted per contract schedule (180 DAC).

Blk 14: Contractor prepared Test Report shall be submitted as a searchable Adobe PDF file via E-mail list in 14a.

15. TOTAL 1 1

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Hau Nguyen

AFLCMC/WLME, DSN: 497-2741 20130607

DD Form 1423-1, JUN 90 PREVIOUS EDITIONS ARE OBSOLETE. PAGE _2 _ OF __ 2__ PAGES