CDRLA001.pdf

PDF 585 KB Posted

Attached to
Tool Kit, Main Landing Gear Federal contract opportunity
Solicitation number
FA852619Q0025
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

First Article Test Plan - CDRL A001

View the file

Other files for this federal contract opportunity

Other files attached to Tool Kit, Main Landing Gear, newest first.
File Type Posted
TRANS1423.pdf PDF
EDL.pdf PDF
FA852619Q0025.pdf PDF
CDRLA002.pdf PDF
IUID_CDRL.pdf PDF
FORM_158.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

16. REMARKS

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE Draft

b. COPIES

Final

Reg Repro

15. TOTAL

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages Adobe Professional 8.0

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

Company Logo

Company Name

Address Phone and/or email (all optional)

Cage Code

Item Name (taken from Boeing drawing)

First Article Test Plan

Submitted For

NSN: XXXX-XX-XXX-XXXX

Contract No.: XXXXXX-XX-X-XXXX

Part No.: 17GXXXXXX-XXX, Rev X

Serial No: XXXX-XXXX (supplied by PCO)

CDRL Item No.: A001

Submitted On: MM/DD/YYYY

Test Quantity: XX

Contractor Document #.: XXXXXXXX

Rev.: XXX

Submitted To

AFMC AFLCMC/WLE

Attn: (C-17 ENGR)

235 Byron St, Suite 19A

Robins AFB, GA 31098

Prepared by: Full Name Checked by: Full Name (Contractor QA)

Title: XXXXXXXXX Title: XXXXXXXXX

Signed: __________________ Signed: __________________

Date: MM/DD/YYYY Date: MM/DD/YYYY

1369379700C File Attachment FATP Cover Sheet Format Example.docx

Reset

CONTRACT DATAREQUIREMENTSLIST

(1 Data Item)

A. CONTRACT LINE ITEM NO. B.EXHIBIT C.CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

1 DATA ITEM NO: A001
2 TITLE OF DATA ITEM: First Article Qualification Test Plan and Procedures
3 SUBTITLE: Tool Kit, Main Landing Gear
4 AUTHORITY Data Acquisition Document No: DI-NDTI-81307A/T
5 CONTRACT REFERENCE:
6 REQUIRING OFFICE: AFLCMC/WLE (C-17 Engr)
7 DD 250 REQ: DD
8 APP CODE: A
9 DIST STATEMENT REQUIRED: D
10 FREQUENCY: One/R
12 DATE OF FIRST SUBMISSION: See Blk 16
11 AS OF DATE: See Blk 16
Text7: Blk. 4:

The First Article Test Plan (FATP) shall cover pre-production/First Article (FA) testing and documentation The FATP shall detail the means by which the contractor will satisfy the requirements of the item Technical Data Package (TDP) and any applicable requirements set forth in the related standards, processes and documents referenced therein. The FATP shall describe and/or list: 1) the means by which the contractor shall accomplish the requisite dimensional conformance called for in the TDP; 2) the plan to document the material and process certifications (BOM/TDP compliance) to include a table cross referencing the material and conformance of materials to applicable material standards shown in the Bill of Materials (BOM) and the detail part the material was used to manufacture; 3) the equipment/instruments to be used to perform the required inspections and tests; 4) the means by which the contractor ensures that all test/inspection instruments proposed/employed carry current, valid, traceable calibrations at the time of the test/inspection; 5) plan for photo documentation of all permanent item markings (ID plates, stenciling, branded labeling, etc. (as applicable by detail)). The FATP shall include text, tables, sketches, photos, etc. as applicable or required to address the above enumerated requirements. MIL-HDBK-831 may be used as a guide in preparing the FATP.

NOTE: Any changes to the FATP after approval must be coordinated with the technical authority approving the plan. All coordinating actions shall be processed through the contracting officer in accordance with (IAW) contracting regulations and public law.

NOTE: This item may have subassemblies that are designed to Specification Control Drawings (SCD). Those items shall be procured from the approved sources listed on the drawing when possible. If those items cannot be procured from the pre-approved sources, the contractor may design and build their own item IAW the specific SCD. The Contractor-made item shall be approved by the design control authority, Boeing, in order to maintain the quality and configuration of the part. The contractor must qualify IAW Boeing's procedures in order to be considered a source of supply for the subassembly.

See the attached example for information required to be on the cover page of the FATP.

G PREPARED BY: Julian Stevenson

AFLCMC/WLE; DSN 468-4168

13 DATE OF SUBSEQUENT SUBMISSION: N/A
H DATE: 27-Mar-18
a ADDRESSEE16 REMARKS: AFLCMC/WLE (C17 Eng)
Draft16 REMARKS:
Reg16 REMARKS:
Repro16 REMARKS:
a ADDRESSEE16 REMARKS_2: 235 Byron Street, Suite 19A
Draft16 REMARKS_2:
Reg16 REMARKS_2:
Repro16 REMARKS_2:
a ADDRESSEE16 REMARKS_3: Robins AFB, GA 31098
Draft16 REMARKS_3:
Reg16 REMARKS_3:
Repro16 REMARKS_3:
a ADDRESSEE16 REMARKS_4:
Draft16 REMARKS_4:
Reg16 REMARKS_4:
Repro16 REMARKS_4:
a ADDRESSEE16 REMARKS_5: E-copy
Draft16 REMARKS_5:
Reg16 REMARKS_5:
Repro16 REMARKS_5:
a ADDRESSEE16 REMARKS_6: Searchable Adobe PDF
Draft16 REMARKS_6: 1
Reg16 REMARKS_6: 1
Repro16 REMARKS_6:
a ADDRESSEE16 REMARKS_7: Email to:
Draft16 REMARKS_7:
Reg16 REMARKS_7:
Repro16 REMARKS_7:
a ADDRESSEE16 REMARKS_8: Julian.Stevenson@us.af.mil
Draft16 REMARKS_8:
Reg16 REMARKS_8:
Repro16 REMARKS_8:
a ADDRESSEE16 REMARKS_9: Vandy.Alderman.1@us.af.mil
Draft16 REMARKS_9:
Reg16 REMARKS_9:
Repro16 REMARKS_9:
a ADDRESSEE16 REMARKS_10:
Draft16 REMARKS_10:
Reg16 REMARKS_10:
Repro16 REMARKS_10:
a ADDRESSEE16 REMARKS_11: Digital Data
Draft16 REMARKS_11:
Reg16 REMARKS_11:
Repro16 REMARKS_11: 1
a ADDRESSEE16 REMARKS_12:
Draft16 REMARKS_12:
Reg16 REMARKS_12:
Repro16 REMARKS_12:
a ADDRESSEE16 REMARKS_13:
Draft16 REMARKS_13:
Reg16 REMARKS_13:
Repro16 REMARKS_13:
a ADDRESSEE16 REMARKS_14:
Draft16 REMARKS_14:
Reg16 REMARKS_14:
Repro16 REMARKS_14:
a ADDRESSEE16 REMARKS_15:
Draft16 REMARKS_15:
Reg16 REMARKS_15:
Repro16 REMARKS_15:
a ADDRESSEE16 REMARKS_16:
Draft16 REMARKS_16:
Reg16 REMARKS_16:
Repro16 REMARKS_16:
a ADDRESSEE16 REMARKS_17:
Draft16 REMARKS_17:
Reg16 REMARKS_17:
Repro16 REMARKS_17:
a ADDRESSEE16 REMARKS_18:
Draft16 REMARKS_18:
Reg16 REMARKS_18:
Repro16 REMARKS_18:
a ADDRESSEE16 REMARKS_19:
Draft16 REMARKS_19:
Reg16 REMARKS_19:
Repro16 REMARKS_19:
a ADDRESSEE16 REMARKS_20:
Draft16 REMARKS_20:
Reg16 REMARKS_20:
Repro16 REMARKS_20:
a ADDRESSEE16 REMARKS_21:
Draft16 REMARKS_21:
Reg16 REMARKS_21:
Repro16 REMARKS_21:
a ADDRESSEE16 REMARKS_22:
Draft16 REMARKS_22:
Reg16 REMARKS_22:
Repro16 REMARKS_22:
a ADDRESSEE16 REMARKS_23:
Draft16 REMARKS_23:
Reg16 REMARKS_23:
Repro16 REMARKS_23:
a ADDRESSEE16 REMARKS_24:
Draft16 REMARKS_24:
Reg16 REMARKS_24:
Repro16 REMARKS_24:
a ADDRESSEE16 REMARKS_25:
Draft16 REMARKS_25:
Reg16 REMARKS_25:
Repro16 REMARKS_25:
a ADDRESSEE16 REMARKS_26:
Draft16 REMARKS_26:
Reg16 REMARKS_26:
Repro16 REMARKS_26:
a ADDRESSEE16 REMARKS_27:
Draft16 REMARKS_27:
Reg16 REMARKS_27:
Repro16 REMARKS_27:
a ADDRESSEE16 REMARKS_28:
Draft16 REMARKS_28:
Reg16 REMARKS_28:
Repro16 REMARKS_28:
a ADDRESSEE16 REMARKS_29:
Draft16 REMARKS_29:
Reg16 REMARKS_29:
Repro16 REMARKS_29:
a ADDRESSEE16 REMARKS_30:
Draft16 REMARKS_30:
Reg16 REMARKS_30:
Repro16 REMARKS_30:
a ADDRESSEE16 REMARKS_31:
Draft16 REMARKS_31:
Reg16 REMARKS_31:
Repro16 REMARKS_31:
a ADDRESSEE16 REMARKS_32:
Draft16 REMARKS_32:
Reg16 REMARKS_32:
Repro16 REMARKS_32:
a ADDRESSEE16 REMARKS_33:
Draft16 REMARKS_33:
Reg16 REMARKS_33:
Repro16 REMARKS_33:
a ADDRESSEE16 REMARKS_34:
Draft16 REMARKS_34:
Reg16 REMARKS_34:
Repro16 REMARKS_34:
a ADDRESSEE16 REMARKS_35:
Draft16 REMARKS_35:
Reg16 REMARKS_35:
Repro16 REMARKS_35:
a ADDRESSEE16 REMARKS_36:
Draft16 REMARKS_36:
Reg16 REMARKS_36:
Repro16 REMARKS_36:
a ADDRESSEE16 REMARKS_37:
Draft16 REMARKS_37:
Reg16 REMARKS_37:
Repro16 REMARKS_37:
a ADDRESSEE16 REMARKS_38:
Draft16 REMARKS_38:
Reg16 REMARKS_38:
Repro16 REMARKS_38:
J DATE: 19-May-18
17 PRICE GROUP:
18 ESTIMATED TOTAL PRICE:
Text1: 1
Text2: 1
Text3: 1
Page: 1
of: 2
A CONTRACT LINE ITEM NO:
B EXHIBIT: A
Check Box9: Yes
Check Box10: Off
OTHER:
D SYSTEMITEM: C17/PSE/17G130071-501
E CONTRACTPR NO: FD2060-18-31692
F CONTRACTOR:
16 REMARKS Continued: Blk 7:

The Government will accept the Receiving Report through WAWF upon final delivery.

Blk 11/12:

The contractor shall submit the FATP 60 DAC.

Blk 14;

The FATP shall be submitted in searchable Adobe PDF format and submitted by Email.

Page_2: 2
of_2: 2

File details come from the government source that posted it.