FA852615R92138______0002.pdf
PDF 57 KB Posted
- Attached to
- Maintenance and Repair Shop Equipment
- Solicitation number
- FA8526-15-R-92138
About this file
Solicitation Amendment 2
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Response_to_Solicitation_Questions_02.doc | DOC document | |
| Response_to_Solicitation_Questions_02.doc | DOC document | |
| Response_to_Solicitation_Questions_01.doc | DOC document | |
| FA852615R92138______0001.pdf | ||
| FA852615R92138.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
J
2. AMENDMENT/MODIFICATION NO.
FA8526-15-R-92138-0002
3. EFFECTIVE DATE
15 JUN 2015
4. REQUISITION/PURCHASE REQ. NO.
FD2060-15-92138
5. PROJECT NO (If applicable)
6. ISSUED BY CODE
GLOBEMASTER (C-17), AFLCMC/WLMK
235 BYRON ST STE 19A
BLDG 300 CML PHN 478 327 7137
ROBINS AFB GA 31098-1670
BUYER: Abby J. Markert abby.markert.1@us.af.mil Phone: (478) 327- 8373 Fax: (000) 000-0000 No Collect Calls
7. ADMINISTERED BY (If other than item 6) CODEFA8526
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE
X
9A. AMENDMENT OF SOLICITATION NO.
FA852615R92138
9B. DATED (SEE ITEM 11)
21-MAY-2015
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods. ( a ) By completing Items 8 and 15, and returning copies of the amendment; ( b ) By acknowledging receipt of this amendment on each copy of the offer submitted; or ( c ) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
ROUTINE
15A. NAME AND TITLE OF SIGNER (Type or print)
15B. CONTRACTOR/OFFEROR
BY ________________________________________________________
(Signature of person authorized to sign)
15C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16B. UNITED STATES OF AMERICA
BY ____________________________________________________
(Signature of Contracting Officer)
16C. DATE SIGNED
FACILITY CODE
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
30-105 STANDARD FORM 30 (REV. 10-83)
PRESCRIBED BY GSA
FAR (48 CFR) 53.243
X
X X
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
Amendment/Modification FA8526-15-R-92138-0002
Continuation of block 14. DESCRIPTION OF AMENDMENT/MODIFICATION
The purpose of this solicitation amendment is to do the following:
1. In Section D:
a. Local Clause U352.247-U038U “Preservation, Packaging, Packing Requirements” was added
2. In Section E:
a. Under “First Article Test, Certification, & Disposition Requirements,” Lot/Item was corrected:
FROM: 0001
TO: 0001AA
3. In Section I:
a. Under FAR Clause 52.209-3, Lot/Item was corrected:
FROM: 0001
TO: 0001AA
b. DFARS Clause 252.225-7013 was added
4. In Section J:
a. AFMC Form 158 Packaging Requirements was added to List of Attachments
5. In Section L:
a. Under “First Article Applicability and/or Conditions for Waiver,” Lot/Item was corrected:
FROM: 0001
TO: 0001AA
6. In Section M:
a. Added “Evaluation Criteria for Award” to specify that offers will be evaluated based upon the evaluation factor of price only.
b. Added FAR Clause 52.247-50
c. Deleted Local Clause "Evaluation Cost Factor for First Article"
7. All other terms and conditions established within the original solicitation and amendment 01 remain unchanged.
Section B is hereby reprinted below in its entirety for clarity purposes.
No changes were made to Section B.
Amendment/Modification FA8526-15-R-92138-0002
Request for Proposal FA8526-15-R-92138-0002
PART I - THE SCHEDULE
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
First Article Requirements Item No.
NSN: 4920-01-604-3771 BA
Part Number: 17G110676-1 Platform, Maintenance - Wheel Well, Nose Landing Gear Associated Document(s) Line Item(s)
FD20601592138 0002
Buy American Act/Balance of Payments Program Class I ODS Substance Application/Use Quantity None - Not Required
Bid A - First Article Required Item No.
0001AA
Firm Fixed Price Quantity U/I Unit Price Amount
1 EA
CLIN ACRN ACRN Total
0001AA AA
FA
FIRST ARTICLE
Part of Production Associated Document(s) Line Item(s)
FD20601592138 0002
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A EB2090 DESTINATION
Class I ODS Substance Application/Use Quantity
NONE
None Type / Ship To PACRN Mark For A EB2090 AA R. Nation
Bid A - First Article Required Type / Ship To Quantity (U/I) *ARO After
Contract Award _ Req No / Pri
Required Delivery
A EB2090 1 EA *270 Calendar Days
Proposed Delivery
A EB2090 1 EA
Delivery Schedule IAW AFMC Form 260 - First Article Requirements
0001AB
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
CLIN ACRN ACRN Total
0001AB AA
FATP
First Article Test Plan
TEST PLAN IN ACCORDANCE WITH ATTACHED DD FORM 1423
DI-NDTI-81307A/T Data Item Number: A001 Associated Document(s) Line Item(s)
FD20601592138 0003
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
+ IAW1423 DESTINATION
Type / Ship To PACRN Mark For + IAW1423 C-17 Engineering Type / Ship To Quantity (U/I) *ARO After
Contract Award _ Req No / Pri
Required Delivery
+ IAW1423 1 LO *60 Calendar Days
Proposed Delivery
+ IAW1423 1 LO
IAW DD Form 1423:
Submit draft for approval 60 DAC award. Submit final copies 14 days after Government approval of the draft (including equipment substitutions if applicable).
0001AC
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
CLIN ACRN ACRN Total
0001AC AA
FATR
First Article Test Report
TEST REPORT IN ACCORDANCE WITH ATTACHED DD FORM 1423
DI-NDTI-80809B/T Data Item Number: A002 Associated Document(s) Line Item(s)
FD20601592138 0004
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
+ IAW1423 DESTINATION
Type / Ship To PACRN Mark For + IAW1423 C-17 Engineering Type / Ship To Quantity (U/I) *ARO After
Contract Award _ Req No / Pri
Required Delivery
+ IAW1423 1 LO *210 Calendar Days
Proposed Delivery
+ IAW1423 1 LO
Requirement Following First Article Approval Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
15 EA
CLIN ACRN ACRN Total
0002 AA
NSN: 4920-01-604-3771 BA
Platform, Maintenance - Wheel Well NLG Platform for Wheel Well, Nose Landing Gear Maintenance to the C-17 aircraft.
Associated Document(s) Line Item(s)
FD20601592138 0001
Requirement Following First Article Approval
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A EB2090 ORIGIN
Type / Ship To PACRN Mark For A EB2090 AA R. Nation Type / Ship To Quantity (U/I) *ARO Approval of
First Article _ Req No / Pri
Required Delivery
A EB2090 15 EA *120 Calendar Days
Proposed Delivery
A EB2090 15 EA
Option I may be exercised at any time, from time-to-time, within 365 days after approval of First Article.
OPTION I
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
3 EA
CLIN ACRN ACRN Total
1002 NA
NSN: 4920-01-604-3771 BA
Platform, Maintenance - Wheel Well NLG Platform for Wheel Well, Nose Landing Gear Maintenance to the C-17 aircraft.
Associated Document(s) Line Item(s)
FD20601592138 0001
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Buy American Act/Balance of Payments Program Type / Ship To PACRN Mark For + TBD AA R. Nation Type / Ship To Quantity (U/I) *ARO Exercise of
Option I _ Req No / Pri
Required Delivery
OPTION I
+ TBD 3 EA *120 Calendar Days
Proposed Delivery
+ TBD 3 EA
Option II may be exercised at any time, from time-to-time, within 730 days after approval of First Article.
OPTION II
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
3 EA
CLIN ACRN ACRN Total
2002 NA
NSN: 4920-01-604-3771 BA
Platform, Maintenance - Wheel Well NLG Platform for Wheel Well, Nose Landing Gear Maintenance to the C-17 aircraft.
Associated Document(s) Line Item(s)
FD20601592138 0001
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Buy American Act/Balance of Payments Program Type / Ship To PACRN Mark For + TBD AA R. Nation Type / Ship To Quantity (U/I) *ARO Exercise of
Option II _ Req No / Pri
Required Delivery
+ TBD 3 EA *120 Calendar Days
Proposed Delivery
+ TBD 3 EA
Option III may be exercised at any time, from time-to-time, within 1095 days after approval of First Article.
OPTION III
Item No.
Firm Fixed Price
OPTION III
Quantity U/I Unit Price Amount
3 EA
CLIN ACRN ACRN Total
3002 NA
NSN: 4920-01-604-3771 BA
Platform, Maintenance - Wheel Well NLG Platform for Wheel Well, Nose Landing Gear Maintenance to the C-17 aircraft.
Associated Document(s) Line Item(s)
FD20601592138 0001
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Buy American Act/Balance of Payments Program Type / Ship To PACRN Mark For + TBD AA R. Nation Type / Ship To Quantity (U/I) *ARO Exercise of
Option III _ Req No / Pri
Required Delivery
+ TBD 3 EA *120 Calendar Days
Proposed Delivery
+ TBD 3 EA
SHIP TO / PLACE OF PERFORMANCE
TYPE/CODE: + IAW1423
MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
TYPE/CODE: + TBD
MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
TYPE/CODE: A EB2090
BOEING ICP C17 PRGM EB2090
BLDG DR 20 CP 404 363 0257
5690 SOUTHFIELD CT STE 200
FOREST PARK GA 30297-2524
USA
MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
Do not ship prior to FATR approval. Contract may call for direct shipment to final destination in lieu of EB2090.
PART I - THE SCHEDULE
SECTION D
PACKAGING AND MARKING
PRESERVATION, PACKAGING, PACKING REQUIREMENTS (DEC 2003)
When an AFMC Form 158 Packaging Requirements is attached hereto all items shall be preserved, packaged and packed in accordance with this form.
The current version of MIL-STD-129 is R.
Special Packaging Instructions (SPI) shall also apply when attached.
If questions arise concerning these packaging requirements contact Bernie Edwards at (478) 327-3489 .
You will need to provide the purchase request number found directly above block number 1 of the AFMC Form 158.
(The above Clause/Provision has been modified.)
PART I - THE SCHEDULE
SECTION E
INSPECTION AND ACCEPTANCE
FIRST ARTICLE TEST, CERTIFICATION AND DISPOSITION REQUIREMENTS (FEB 1998)
(IAW FAR 9.308-2)
Test criteria are as follows:
Lot/Item Government Test/Inspection Requirements
Lot/Item Contractor Test/Inspection Requirements 0001AA (See Below)
Contractor Testing Requirements Dimensional, material, process, finish, marking and functional requirements IAW the item TDP.
Disposition of the First Article shall be as follows:
Lot/Item Approved 0001AA Forward to: EB 2090 or direct ship, ONLY after FATR approval
Lot/Item Disapproved 0001AA Retained by: CONTRACTOR pending instructions from contractor.
(The above Clause/Provision has been modified.)
PART I - THE SCHEDULE
SECTION G
CONTRACT ADMINISTRATION DATA
ACCOUNTING AND APPROPRIATION DATA (AUG 1998)
Accounting and Appropriation Chargeable ACRN Funds Citation Amount Chargeable
AA 57 33010 . 11 3 47 WT 13C017 4G944B 80401 41130F 503000 F03000 $0.00
CSN: PSEOBM PSR: C80311 FSR: 013489 DSR: 190762
NA ACRN WILL BE ESTABLISHED AT TIME OPTION IS EXERCISED $0.00
REFERENCE:
AA CIN F4FDAM5033B101
ACRN TOTAL $ 0.00
PART II - CONTRACT CLAUSES
SECTION I
CONTRACT CLAUSES
52.209-3 FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (SEP 1989)
(IAW FAR 9.308-1(a)(1), FAR 9.308-1(b)(1))
(a) The Contractor shall test ** unit(s) of Lot/Item * as specified in this contract. At least *** calendar days before the beginning of first article tests, the Contractor shall notify the Contracting Officer, in writing, of the time and location of the testing so that the Government may witness the tests.
*Lot/Item ***Calendar Days Before Test **Quantity
0001AA 35 1
(b) The Contractor shall submit the first article test report within ___**___ calendar days from the date of this contract to ___***___ marked "FIRST ARTICLE TEST REPORT: Contract No. Lot/Item No. ___*___” Within ___****___ calendar days after the Government receives the test report, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.
*Lot/Item ****Approval Days ELIN No.
0001AA 45 A002
FA Test Report Item ***Type/Location **Calendar Days
0001AC +IAW1423 210
(c) If the first article is disapproved, the Contractor, upon Government request, shall repeat any or all first article tests.
After each request for additional tests, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified by the Government. The Government shall take action on this report within the time specified in paragraph (b) above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.
(d) If the Contractor fails to deliver any first article report on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.
(e) Unless otherwise provided in the contract, and if the approved first article is not consumed or destroyed in testing, the Contractor may deliver the approved first article as part of the contract quantity if it meets all contract requirements for acceptance.
(f) If the Government does not act within the time specified in paragraph (b) or (c) above, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.
(g) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for
(1) progress payments, or
(2) termination settlements if the contract is terminated for the convenience of the Government.
(h) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the offeror/contractor and have been accepted by the Government. The offeror/contractor may request a waiver.
(The above Clause/Provision has been modified.)
252.225-7013 DUTY-FREE ENTRY (NOV 2014)
(IAW DFARS 225.1101(4))
PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J
LIST OF ATTACHMENTS
Form Number Description/File Name Date Number of Pages AFMC Form 260 First Article Requirements
DD 1423
CDRLs (Contract Data Requirement List)
AFMC Form 158 Packaging Requirements
PART IV - REPRESENTATIONS AND INSTRUCTIONS
SECTION L
INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR RESPONDENTS
FIRST ARTICLE APPLICABILITY AND/OR CONDITIONS FOR WAIVER (FEB 2013)
(IAW FAR 9.306(c))
(a) First Article Testing is a requirement of this contract. This requirement may be waived by the Contracting Officer, if the bidder/offeror meets any one of the conditions for waiver listed below *** and in the instance of a prior contract, not more than __*__ months have elapsed since the completion of that contract:
Lot/Item *Months Since Completion of Contract
0001AA 60
(b) Bidders who meet the conditions for waiver set forth below shall submit a bid or proposal on Bid/Offer "B" which does not require compliance with the First Article Approval provision set forth herein and furnish the following information in the individual solicitation: Contract No. __________________________, Contract Item No. _________, Date of Contract. __________, Name & Address of Government Agency issuing the Contract. Failure to include this information will render the IFB(s) non-responsive and may cause rejection of RFP(s).
(c) Bidders/offerors who do not meet the conditions for waiver set forth below shall submit a bid on Bid/Offer, “A” which includes compliance with First Article Approval.
(d) Performance or other characteristics, which the First Article must meet, and detailed technical data requirements for testing of the First Article (including necessary data to be submitted in First Article Test Report, if applicable) are as set forth in this solicitation.
(e) The approved First Article ___**___ serve as a manufacturing standard.
Lot/Item **Serve as a Manufacturing Standard
0001AA WILL NOT
(f) Waivers
Lot/Item ***Conditions for Waiver
0001AA Previously furnished to prime contractor for delivery to Air Force
0001AA Currently in production for Air Force
0001AA Previously furnished to Air Force
PART IV - REPRESENTATIONS AND INSTRUCTIONS
SECTION M
EVALUATION FACTORS FOR AWARD
EVALUATION CRITERIA FOR AWARD (OCT 1997)
(IAW FAR 13.106-2(b), FAR 14.201-5(c), FAR 15.204-5(c)) For the purposes of award, offers will be evaluated based on the following factors, listed in descending order of importance:
Evaluation Factors Order of Importance Price or Cost 01
NOTICE FOR OPTIONS: Price will be evaluated by adding the extended prices for basic award and option quantities, if applicable.
(The above Clause/Provision has been modified.)
52.247-50 NO EVALUATION OF TRANSPORTATION COSTS (APR 1984)
(IAW FAR 47.305-5(c)(1))
UNIT PACK WEIGHT UNIT PACK SIZE
Items shall be packaged in accordance with MIL-STD-2073-1 E, Standard Practice for Military Packaging.
Shipping and storage markings shall be in accordance with MIL-STD-129 R, Standard Practice for Military Marking.
3. INSTRUCTIONS TO CONTRACTING OFFICER: Insert appropriate clause(s) into Section D for applicable item(s) as indicated below.
U C L
AFMC FORM 158, 20090727
PACKAGING REQUIREMENTS
PR, MIPR, OR DOCUMENT
AFMC FARS 5352.247-9005, SHIPPING CONTAINER MARKING.
NAME(s) OR NSN/MMAC
FD2060-15-92138
1. PACKAGING REQUIREMENTS: Block 1 shall always be completed and further defined in Blocks 2, 3, or 4. The term "Item ID" refers to line item number, item name, NSN/MMAC, part number, or any other way of identifying a particular item. MIL-STD-2073-1 represents Military Preservation (PRES) and Packing (PACK). Military packing consists of levels A, B, and Minimum (M). ASTM D3951 could be substituted by another document if specified in Block 2. Quantity Per Unit (QUP) and Commercial Best Practice (CBP) are abbreviated. The reverse side of this form has the European Union environmental requirements.
ITEM ID
QUP
PRES
MIL-STD-2073-1
COMMERCIAL
ASTM D3951
PACK PRES PACK
CBP
SPECIAL PACKAGING
INSTRUCTION
NUMBER
(X) (X) (X)(X)(#) (A/B/M)
4920-01-604-3771BA 1
2. ADDITIONAL PACKAGING AND CONTAINER MARKING REQUIREMENTS (Specify all revisions and dates of required specifications)
B
4. CODED DATA: Coded requirements shall be interpreted in accordance with MIL-STD-2073-1
QUANTITY
QUP ICQ
PRES
METH
C D
PRES
MTL
WRAP
MTL
CUSH
DUNN
C T
UNIT
CONT
INT
CONT
SPEC
MKG 10
UNIT PACK CUBE
LENGTH 10 WIDTH 10 DEPTH 10 WHOLE CUBE 1000TH
O P I
AFMCFARS 5352.247-9006, MARKING OF WARRANTED ITEMS.
ITEM NAME(s) OR NSN/MMAC
AFMCFARS 5352.247-9007, SPECIFICATION COMMERCIAL
PACKAGING (ASTM D3951). ITEM NAME(s) OR NSN/MMAC
AFMCFARS 5352.247-9008, CONTRACTOR COMMERCIAL
PACKAGING (Commercial Best Practice). ITEM NAME(s) OR
NSN/MMAC.
AFMCFARS 5352.247-9009, MILITARY PACKAGING AND MARKING.
ITEM NAME(s) OR NSN/MMAC
AFMCFARS 5352.247-9010, ENGINEERED OR SPECIALIZED
CONTAINERS (CDRS). ITEM NAME(s) OR NSN/MMAC
AFMCFARS 5352.247-9013, PACKAGING DATA (Coded and/or/Special Packaging Instructions). ITEM NAME(s) OR NSN/MMAC
AFMCFARS 5352.247-9011, PACKAGING AND MARKING OF
HAZARDOUS MATERIAL. ITEM NAME(s) OR NSN/MMAC
406 SCMS/GULAA
PACKAGING SPECIALIST (Typed Name)
//SIGNED// BERNIE EDWARDS 497-3489
PACKAGING SPECIALIST SIGNATURE
PREVIOUS EDITION IS OBSOLETE
DATE
SEE REVERSE SIDE
20150130
ORGANIZATION
AFMC FORM 158, 20090727
THE FOLLOWING STATEMENT IS IN COMPLIANCE WITH THE UNITED NATIONS – IMPLEMENTED RESTRICTIONS ON WOOD PACKAGING MATERIAL (WPM). THIS REQUIREMENT IS SPECIFICALLY CONCERNED WITH INVASIVE SPECIES, SUCH AS THE PINEWOOD NEMATODE. WPM IS DEFINED AS WOOD PALLETS, SKIDS, LOAD BOARDS, PALLET COLLARS, WOODEN BOXES, REELS, DUNNAGE, CRATES, FRAMES, AND CLEATS. THE STATEMENT BELOW CITES THE REQUIREMENTS IN DETAIL AND COVERS LUMBER FOR BUILDING CONTAINERS AND PALLETS USED FOR DELIVERIES, RESULTING IN SHIPMENTS WORLDWIDE (DIRECT, OR THROUGH AIR LOGISTICS CENTERS (ALC), CONTAINER CONSOLIDATION POINTS (CCP) OR OTHER
BASES).
WOODEN LUMBER, WOODEN PALLET, AND PACKAGING/CONTAINER STATEMENT:
ALL WOODEN LUMBER, WOODEN PALLETS AND WOODEN CONTAINERS PRODUCED ENTIRELY OR IN PART OF WOOD PACKING MATERIAL (WPM) SHALL BE CONSTRUCTED FROM DEBARKED WOOD IN ADDITION TO THE APPLICATION OF HEAT-TREATED (HT) MATERIAL (HT TO 56 DEGREES CENTIGRADE OR 133 DEGREES FAHRENHEIT FOR 30 MINUTES).
CERTIFICATION/MARKING IS REQUIRED BY AN ACCREDITED AGENCY RECOGNIZED BY THE AMERICAN LUMBER STANDARDS COMMITTEE (ALSC). FOR REFERENCE DOCUMENTATION, SEE LATEST REVISION OF “INTERNATIONAL STANDARDS FOR PHYTOSANITARY MEASURES (ISPM NO. 15), “REGULATION OF WOOD PACKAGING MATERIAL IN INTERNATIONAL TRADE.”
INTERNATIONAL STANDARDS FOR PHYTOSANITARY MEASURES
REVISION OF ISPM NO. 15
REVISION OF WOOD PACKING MATERIAL FOR INTERNATIONAL TRADE
REQUIREMENTS, USE THE LATEST REVISION OF (ISPM NO. 15)
File details come from the government source that posted it. Updated .