Questions and Answers_FA8525-11-R-31678_6 Apr 11.docx
DOCX document 174 KB Posted
- Attached to
- Solicitation (RFP) for C-17 Actuator Fixture
- Solicitation number
- FA8525-11-R-31678
About this file
Questions/Answers as of 6 Apr 11.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions_and_Answers_FA8525-11-R-31678_12_Apr_11.pdf | ||
| 158.pdf | ||
| Form1423_CDRL.pdf | ||
| FA852511R31678_30 Mar 11.pdf | ||
| EDL.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA8525-11-R-31678
Questions/Answers 6 Apr 11
Question: Do you have any extra detail on item -67 listed as relief valve?
Answer: The following EO should answer the -67 question.
Question: Does item -59 webbing attach to anything?
Answer: The -59 webbing at best answer from Boeing is that it is attached.
Question: Since we are quoting the -501 the identification plates should be the arrow shaped tag and not the rectangular ones. Is that correct? The parts list and the top level drawing say 17G001003-1 and 17G001005-1 which indicates the rectangular.
Answer: Yes, it is the arrow shaped one.
Question: On page 13 of the solicitation in the First Article area I understand the Dimensional portion. What is meant by Continuity, Isolation, and Material Test? If Material Test is referring to material certifications then I understand that but is there some kind of testing that needs to be performed on the raw material?
Answer: Material test is strictly the certification of the metal. Continuity is for any electrical that may be involved, the isolation does not need to be addressed on this.
Question: On drawing 17G450082 the testing for the hydraulic system is described on page 15. I called Tech support at Enerpac and read the testing instructions to him. He said that the equipment is not designed to hold those tolerances. He said that in a controlled laboratory environment that it might could be done but that the ambient air temperature could cause more than 100 psi fluctuation. Maybe the fluctuation is not a big deal as long as there is no leakage. Would we need to contract this testing out to someone?
Answer: As far as the testing goes on the hydraulics, that is your call to sub that out as long as the specs are complied with.
image1.emf
17G450082_88277_NULL_L_2008C000.pdf
April 04, 2011 12:52:16 [17G450082_88277_NULL_L_2008C0001-R_NT_0001_NULL_+_0001_1_U_N_N_N[1]]
File details come from the government source that posted it. Updated .