RFI DISTRIBUTED 12 NOV 2026.xlsx
XLSX spreadsheet 15 KB Posted
- Attached to
- Repair of the TH-1H Servo Con Altimeter
- Solicitation number
- FA852427RB001
About this file
This file is a Request for Information (RFI) distributed on November 12, 2026, regarding repair services for the TH-1H Servo Con Altimeter (National Stock Number 6610014597535HL, Part Number 8047/10NVG-5V). The RFI is issued by the Department of the Air Force Materiel Command Air Force Sustainment Center under Solicitation Number FA852427RB001. The Government seeks contractor proposals for initial inspection, testing, bench-checking, and required disassembly to restore the altimeter to serviceable condition in accordance with original equipment manufacturer technical data and specifications. The contractor must not alter the original design or functional capabilities unless authorized in writing by the Procuring Contracting Officer. All repaired assets must be returned in serviceable condition with timely and accurate reporting through Commercial Asset Visibility AF (CAVAF).
The RFI format suggests the Government is gathering market information and contractor capability data prior to formal solicitation. Specific response dates, pricing terms, delivery schedules, award dates, and contract vehicle type are not detailed in this RFI summary. Contractors interested in this repair work should monitor for follow-on formal solicitation documents that will contain specific performance requirements, contract line item numbers (CLINs), delivery timelines, and pricing instructions.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI #1 DISTRIBUTED 12 NOVEMBER
| RFI NUMBER | QUESTION/NEED/ISSUE | REQUEST DATE | USG RESPONSE | CLOSED DATE |
| 1 | 1. Accessible technical documents. The performance work state.pdf and CAVAF Reporting.pdf supplied in | 11-Nov-26 | The Government acknowledges the issue reported with the accessibility of the Performance Work Statement and | 12-Nov-26 |
| the package display protections/access notices,rather than readable contractual requiremements | CAV-AF reporting attachment and will address release of accessible copies through an authorized channel. | |||
| in our copy. Would you provide accessible versions through an authorized channel and any necessary | ||||
| technical-data access procedure? |
| 2 | Repair-source qualification: Must the repair subcontractor be a preapproved source for this NSN/part number? | 11-Nov-26 | The solicitation requires repair of the TH-1H Servo Con Altimeter, NSN 6610-01-459-7535 | 12-Nov-26 |
| What approval, OEM technical-data rights, quality-system documentation, test equipment validation, and | P/N 8047/10NVG-5V, and includes separate CLINs for repair and NFF/BER. The materials provided do not | |||
| qualification evidence must be included with the proposal? | identify a separate preapproved-source requirement for a repair subcontractor in the excerpts available here | |||
| Offerors remain responsible for submitting a proposal conforming to the solicitation and for ensuring any | ||||
| subcontractors are capable of meeting all solicitation requirements |
| 3 | Evaluation: FAR 52.212-2 states “LOWEST PRICE TECHNICALLY ACCEPTABLE” and also “TECHNICAL AND PAST | 11-Nov-26 | Section M incorporates FAR 52.212-2, Evaluation—Commercial Products and Commercial Services, | 12-Nov-26 |
| PERFORMANCE, WHEN COMBINED ARE APPROXIMATELY EQUAL.” Please clarify the controlling evaluation | and the current text reflects both “LOWEST PRICE TECHNICALLY ACCEPTABLE” and | |||
| approach, technical acceptability criteria, past-performance requirements, and prescribed proposal format. | TECHNICAL AND PAST PERFORMANCE, WHEN COMBINED ARE APPROXIMATELY EQUAL. The solicitaition | |||
| will be amended to reflect Lowest Price Technically Acceptable |
| 4 | Delivery clock: Please confirm whether the 90-calendar-day delivery period starts at award, placement of each | 11-Nov-26 | The delivery has been updated to reflect ARO 90 Calendar days; early delivey is acceptable on the solicitation amendment | 12-Nov-26 |
| delivery order, physical receipt of repairable assets, or another defined lead-time event. |
| 5 | IDIQ quantities: Please confirm annual estimates, ordering minimum/maximum, whether unused quantities carry | 11-Nov-26 | The solicitation establishes a five-year ordering period under FAR 52.216-18, with the basic ordering period covering the | 12-Nov-26 |
| forward, and any applicable NFF/BER and repair pricing/authorization procedures | 12 months immediately following contract award. Orders will use the CLIN series in effect at the time of order execution. | |||
| The base estimated quantities reflected in the schedule are 7 each for repair and 1 each for NFF/BER for the basic | ||||
| ordering period, with corresponding CLIN series for subsequent ordering periods. |
| 6 | Government property and reporting: Please clarify the GFE/GFP transfer and shipping process, contractor CAV | 11-Nov-26 | The solicitation includes a Government Furnished Property attachment and incorporates FAR 52.245-1, FAR 52.245-9 | 12-Nov-26 |
| AF/PKI access, reporting obligations, IUID marking, CDRLs A001-A007, and any responsibility differences for prime | DFARS 252.245-7003, and DFARS 252.245-7005. The GFP attachment identifies repairable return property associated | |||
| contractors versus repair subcontractors | with this requirement. |
| 7 | Packaging/FMS: Please identify mandatory repair certification and acceptance records, the required | 11-Nov-26 | Packaging, marking, and transportation requirements are provided in the PKGRQMT_REPORT and TRNSPDATA_REPORT attachments | 12-Nov-26 |
| preservation/packaging marking levels, and any special FMS/export-control restrictions on the repair activity or | ||||
| data release. |
| 8 | Labor/continuity: The solicitation includes DFARS 252.237-7024 with blank references to an essential-services | 11-Nov-26 | These clauses have been removed | 12-Nov-26 |
| attachment. Please clarify whether a continuity plan is required at proposal submission and provide the applicable |
| 9 | Submission: Please confirm the designated proposal submission route/address, any question cutoff, and whether | 11-Nov-26 | The solicitation identifies the POC, There will be a solicitation amendment to include that ALL RFI'S MUST BE SUBMITTED NLT 30 NOV 2026 | 12-Nov-26 |
| any amended solicitation/addendum will be issued to address these points |
| 10 | Payment: Please confirm the WAWF invoice/receiving-report format, inspection/acceptance trigger, and any | 11-Nov-26 | Payment requests and receiving reports shall be submitted electronically through WAWF in accordance with DFARS 252.232-7003 and DFARS 252.232-7006 | 12-Nov-26 |
| available milestone or other contractual payment provisions. | This information is outlined in the solicitation |
File details come from the government source that posted it. Updated .