PERFORMANCE WORK STATEMENT PDF.pdf

PDF 319 KB Posted

Attached to
Repair of the TH-1H Servo Con Altimeter
Solicitation number
FA852427RB001
Issued by

About this file

This is a Performance Work Statement (PWS) for the repair of TH-1H Servo Con Altimeter components under Purchase Request FD2060-26-00562, issued September 14, 2026.

The contractor shall perform depot-level repair services on the Servo Con Altimeter (National Stock Number 6610-01-459-7535, Part Number 8047/10NVG-5V) to return units to serviceable condition conforming to original equipment manufacturer specifications. Services include initial inspection, testing, bench-check, and required disassembly. The five-year contract period (Basic with four one-year ordering periods) begins in FY27 and shall be performed at the contractor's facility. The contractor must repair and ship assets within an agreed number of calendar days after receipt, with no more than one schedule slippage per quarter not exceeding fifteen calendar days. Delivery notifications for anticipated delays must be provided ten calendar days in advance. The contractor shall achieve no more than one Product Quality Deficiency Report per 12-month period and maintain prompt Commercial Asset Visibility AF (CAV-AF) reporting with real-time status updates on repair actions for each unit.

Contractor responsibilities include managing government-furnished property in accordance with RFO regulations, performing annual 100% physical inventory of all assets, and reporting via the GFP Module in PIEE. The contractor must maintain Item Unique Identification (IUID) marking per MIL-STD-130N, establish and maintain a counterfeit electronic parts prevention plan per DI-MISC-81832, and comply with CMMC Level 2 (Self) cybersecurity requirements. Required deliverables include Government Property Inventory Reports, IUID Marking Plans and Verification Reports, CAV-AF End Item Reports, Counterfeit Prevention Plans, monthly Contract Depot Maintenance Production Reports, and Accident/Incident Reports. The contractor's quality program must meet ISO 9001:2015 standards and FAR 52.246-11 requirements. The contract includes provisions for over-and-above work requiring prior PCO approval, a surge option for up to 20 percent quantity increase or six additional units, and standard compliance with OSHA, security, safety, and mishap reporting requirements.

View the file

Other files

File Type Posted
WAGE DETERMINATION 2015-4495.pdf PDF
RFI DISTRIBUTED 12 NOV 2026.xlsx XLSX spreadsheet
Solicitation Amendment FA852427RB0010001 SF 30.pdf PDF
RFI DISTRIBUTED 12 NOV 2026.xlsx XLSX spreadsheet
Wage Grade Determination 6610-01-459-7535 Altimeter.pdf PDF
FA8524-24-27-R-B-0001.pdf PDF
CAV AF REPORTING PDF.pdf PDF
PERFORMANCE WORK STATEMENT.pdf PDF
CDRLS.pdf PDF
CAV AF REPORTING.pdf PDF
PERFORMANCE WORK STATEMENT.pdf PDF
PKGRQMT_REPORT.pdf PDF
TRNSPDATA_REPORT.pdf PDF
GFP ATTACHMENT.pdf PDF
OMBUDSMAN.pdf PDF
Solicitation - FA852427RB001.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PR: FD2060-26-00562 PWS REVISION: 0 1

Performance Work Statement for

Repair of the TH-1H Servo Con Altimeter

Purchase Request: FD2060-26-00562

September 14, 2026

PR: FD2060-26-00562 PWS REVISION: 0 2

1.0 Description of Services

1.1 Objective(s): This Performance Work Statement (PWS) describes the services required to repair the Servo Con Altimeter, National Stock Number 6610014597535HL, and Part Number

8047/10NVG-5V. These services include _initial inspection, test, bench-check, and required disassembly to return this item to a serviceable end item that shall efficiently serve its intended purpose; and shall conform to t he original equipment manufacturer’s (OEM’s) technical data and specifications. Original design of the end item and parts thereof, or the design functional capabilities of the end item, shall not be changed, modified or altered unless the Procuring

Contracting Officer (PCO) authorizes such changes in writing or specified by publication or directive listed in this PWS. The contractor shall meet the delivery schedule included per CLIN in the corresponding contract. All assets shall be repaired and returned to the Government in serviceable condition. The contractor shall provide timely and accurate reporting in Commercial

Asset Visibility AF (CAVAF)_.

1.2 Benefit to United States Air Force (USAF): This acquisition will benefit the United States

Air Force (USAF) by ensuring serviceable inventory of these parts, thus enabling the TH-1H helicopter program to continue training pilots and aircrew-members who will be conducting combat search and rescue missions in support of the U.S. warfighter and its allies.

1.3 Background: The TH-1H is a refurbished Bell UH-1H helicopter with an installed Huey II kit, which encompasses a more powerful engine, new dynamic components, a new nose, and tail boom. The cockpit and mission equipment upgrades include a change from analog to digital cockpit, the addition of crashworthy seats, and total re-wiring. The upgraded avionics components are almost exclusively commercial-off-the-shelf (COTS) items. These modifications transformed a legacy helicopter (i.e. UH-1H) into a state-of-the-art training platform (i.e. TH-1H) compatible with future operational aircraft. This undergraduate training helicopter platform develops comprehensive pilot skills and enables a more rapid transition of those skills across multiple aircraft. The TH-1H’s advanced electronics provide expanded training opportunities and improved operational capabilities by upgrading the engine, transmission, and rotor system. It has multi-function displays allowing for future upgrades and provides new aircrews with a seamless transition from the TH-1H to a follow-on rotary wing aircraft such as the CV-22 and the Combat Search and Rescue-X helicopters.

2.0 Services Summary

PR: FD2060-26-00562 PWS REVISION: 0 3

Performance Objective PWS Reference Performance Threshold

Meet delivery schedule for all requirements.

4.0 Contractor shall repair and ship assets

to the Government within the agreed number of days in the contract after receipt of item or receipt of order, whichever is later. If a delivery schedule slippage is anticipated, the

Contractor shall notify the

Contracting Officer and COR in writing no later than ten (10) calendar days prior to the established delivery date. Such notice shall detail the root cause, corrective actions taken, and the revised shipment commitment. Only one schedule slippage allowed per quarter, provided such slippage does not exceed fifteen (15) calendar days from the original requirement.

Repair and return assets to the

Government in serviceable condition.

4.3.10

There shall be no more than one

Product Quality Deficiency Reporting

(PQDR) during each 12-month ordering period of this contract.

Maintain prompt and correct

CAV-AF Reporting.

4.4.4 The Contractor shall report production in

CAV-AF. The Contractor shall provide data on the actions conducted for each unit. The Contractor shall report as actions occur.

Table 1: Services Summary

3.0 Government Property: No Government property such as material, equipment, and information used to perform repairs will be provided IAW this PWS; however, the reparable assets being provided to the Contractor are identified and tracked as Government Furnished

Property (GFP) and will be referenced as such.

3.1 Contractor Responsibility: The contractor shall be responsible for government property in accordance with the Revolutionary FAR Overhaul (RFO) and as specified in the contract/order.

3.2 Government Property to be Provided: Government property to be provided includes the repairable TH-1H Servo Con Altimeter (NSN) 6610-01-459-7535, (PN) 8047/10NVG-5V.

PR: FD2060-26-00562 PWS REVISION: 0 4

3.3 Reporting of Government Property: The contractor shall have a system of internal controls to manage (control, use, preserve, protect, repair, and maintain) government property in its possession in accordance with RFO 52.245-1, and its property management system shall be adequate to satisfy the requirements of this clause. The contractor shall record receipt and return of all Government Furnished Property (GFP), as well as the reporting of shipment, consumption, disposal, or transfer to another contract, in the GFP Module in Procurement Integrated Enterprise

Environment (PIEE), https://piee.eb.mil, as stipulated by R-DFARS 252.245-7005. This reporting requirement does not change any liability provisions or other reporting requirements that may exist under the contract. GFP training and guidance is located at the DoD Procurement

Toolbox at https://dodprocurementtoolbox.com/.

3.4 Loss of Government Property

3.4.1 Definition of Loss of Government Property: “Loss of Government property” means unintended loss of or damage to government property including property that cannot be found after a reasonable search, loss due to inadequate storage, loss due to lack of security, theft, damage requiring repair to restore the item to usable condition, or damage that renders the property useless for its intended purpose or Beyond Economical Repair (BER). Loss of government property does not include manufacturing defects, obsolescence, normal wear and tear, or purposeful destructive testing. Unless otherwise stated in the contract/order, loss of government property does not include normal and reasonable inventory adjustments, i.e., losses of low priority consumable material, such as common hardware, as agreed to by the contractor and the Government Property Administrator.

3.4.2 Reporting Loss of Government Property: The contractor shall report loss of government property in the GFP Module located in PIEE, https://piee.eb.mil/piee-landing/.

3.5 Return or Retention of Government Property: All property provided by the government remains the property of the government and shall be returned to the government as directed, but no later than completion of the contract/order, unless the Contracting Officer (CO) directs the contractor to retain the property for continued use under a successor contract. All government property shall be returned to the government in the condition provided unless approved in advance by the CO. All material generated under the contract/order becomes the property of the government and shall be returned to the government as directed, but no later than completion of the contract/order, unless the CO directs the contractor to retain the material for continued use under a successor contract.

3.6 Government Property Inventory Report: The Contractor shall perform an annual 100% physical inventory during the period of performance of this contract. This shall include any subcontractor inventories where GFP has been provided by the Government for repair and/or overhaul performance. All results, findings, and corrective actions of any physical inventories shall be provided to the Government in accordance with FAR Part 52.245-1(f)(1)(iv), Physical

Inventory. (CDRL A001 Reference in paragraph 4.2, DI-MGMT-80441D, Government

Property (GP), Inventory Report).

https://piee.eb.mil/ https://dodprocurementtoolbox.com/ https://piee.eb.mil/piee-landing/

PR: FD2060-26-00562 PWS REVISION: 0 5

4.0 Technical Requirements: The Contractor is required to perform depot level repair of the part listed in this PWS. There shall be no more than one late delivery per quarter. The Contractor shall notify the Government if the delivery of any asset will not meet the scheduled delivery date specified in the contract. In the event there is a need for long-lead-time parts, the Contractor shall notify the Government PCO within ten calendar days of making this determination. The

Contractor shall repair and ship assets to the Government within the number of agreed-to calendar days after receipt of the item or receipt of the order, whichever is later. This duration of days will be negotiated and specifically stated in the contract. Only one schedule slippage allowed per quarter.

4.1 Period and Place of Performance

4.1.1 Contract/Order Period of Performance: The period of performance for the contract/order will extend five (5) years (Basic with four 1-year ordering periods) beginning in

FY27.

4.1.2 Place of Performance: These services will be performed at the contractor’s facility.

4.2 Contract Data Requirements List(s) (CDRL)

Document

Identifier

Base Year

Option

Year

Option

Year

Option

Year

Option

Year

DID Title PWS

Reference(s)

A001 B001 C001 D001 E001 DI-

MGMT-

80441D

Government

Property Inventory

Report

3.6

A002 B002 C002 D002 E002 DI-

MGMT-

81803A

IUID Marking

Plan

4.4.2.3

A003 B003 C003 D003 E003 DI-

MGMT-

81804A

Item Unique

Identification

(IUID) Marking

Activity, Validation and

Verification

Report

4.4.2.4

A004 B004 C004 D004 E004 DI-

MGMT-

81838

Commercial Asset

Visibility Air

Force (CAV AF)

End Item Report

4.4.4

A005 B005 C005 D005 E005 DI-

MISC-

81832

Counterfeit

Prevention Plan

4.4.6

PR: FD2060-26-00562 PWS REVISION: 0 6

A006 B006 C006 D006 E006 DI-

PSSS-

81995A

Contract Depot

Maintenance

(CDM) Monthly

Production Report

4.8

A007 B007 C007 D007 E007 DI-

SAFT-

81563

Accident Incident

Report

5.5.2

4.2.1 Quality of CDRL Deliverable: There shall be no more than one rejection of any deliverable. There shall be no more than 2 (two) total rejection(s) of deliverables per quarter.

The government will reject a deliverable if 1(one) or more technical errors or 1(one) or more minor errors are found within the deliverable. A technical error is defined as the format not being in accordance with the CDRL or the content not being accurate and complete in accordance with the CDRL, PWS or contract. A minor error is exemplified by a typographical error, a grammatical error, etc. The rejected deliverable shall be corrected and resubmitted within 10 (ten) business days of notification of government rejection.

4.2.2 Receipt of CDRL Deliverable: CDRL deliverables shall be submitted via _Wide Area

Workflow (WAWF) and/or submitted directly to the MFT member identified on the CDRL.

Separately priced data must be submitted and accepted in WAWF in order for the contractor to receive payment. There shall be no more than 1 (one) late submission(s) of deliverables per quarter.The contractor shall notify the government if the delivery of any data/document will not meet the scheduled delivery date and negotiate a revised delivery date. The data/document shall be delivered by the revised delivery date acceptable to the government.

4.3 Timeliness of Responses (Pre-award and Post-award): The contractor is required to provide timely pre-award and post-award responses during the lifecycle of this acquisition. If a tasking and/or request for proposal is received, the contractor shall respond timely to those requests. Management and timely submission of those responses shall be considered under this

Performance Work Statement while the contract’s performance period is active. Delays in response and requests for extended proposal submissions will be considered untimely.

4.4 Item Unique Identification

4.4.1 Marking Requirement: Unique Item Identification is required for all items to be delivered to the Department of Defense (DoD) that meet the criteria established by the RFO.

4.4.2 Reporting in IUID Registry

4.4.2.1 Transmission of government property must be recorded in the IUID Registry: The government is required to record the transfer of GFP to the contractor. The contractor is required to record the receipt of GFP from the government. The contractor is required to record the return of GFP to the Government.

4.4.2.2 The government or contractor/subcontractor personnel responsible for causing a “life cycle event” (i.e., abandoned, consumed, destroyed by accident, destroyed by combat, donated, PR: FD2060-26-00562 PWS REVISION: 0 7 exchanged – repair, exchanged – sold, exchanged – warranty, expended – experimental/target, expended – normal use, leased, loaned, lost, reintroduced, retired, scrapped, sold – foreign government, sold – historic, sold – nongovernment, sold – other federal, sold – state/local, and stolen) will update the item record in the IUID Registry.

4.4.2.3 IUID Marking Plan: The Contractor shall mark items IAW Military Standard (MIL-

STD)-130N, Department of Defense Standard Practice/Identification Marking of U.S. Military

Property. The plan must be approved by the Government Engineering organization prior to implementation. (CDRL A002 Reference in paragraph 4.2, DI-MGMT-81803A, Item

Unique Identification (IUID) Marking Plan)

4.4.2.4 IUID Marking Activity and Verification Report: The Contractor shall provide an

IUID Marking Activity and Verification Report. A key attribute for the report is the Verification column which indicates pass/fail for each item’s Data Matrix Symbol Quality. (CDRL A003

Reference in paragraph 4.2, DI-MGMT-81804A, Item Unique Identification (IUID)

Marking Activity, Validation and Verification Report).

4.4.3 Packaging: The contractor shall package and mark material in accordance with the contract/order Air Force Materiel Command (AFMC) Form 158, Packaging Requirements, and applicable government regulations. The contractor shall ensure that classified material is packaged, marked and delivered in accordance with 32 CFR Part 117, National Industrial

Security Program Operating Manual (NISPOM).

4.4.4 CAVAF CFM End Item Report: The contractor is required to comply with all CAVAF requirements identified in the CDRLs and attachments to the contract and shall report production in CAV-AF. The Commercial Asset Visibility (CAV) application provides a web-based, automated method of tracking Government owned reparable assets as they flow through the repair cycle at the contractor's repair facility. The main purpose of CAV is to provide an inventory management system for reparable assets while they are at commercial repair vendors.

CAV on the World Wide Web allows the contractor to report transactions as they occur. These transactions automatically update the CAV database. An integrated, relational database allows the commercial repair vendors to access their repair data to produce all of the required status and activity reports. (CDRL A004 Reference in paragraph 4.2, DI-MGMT-81838, CAVAF CFM

End Item Report)

4.4.5 Counterfeit Electronic Parts: The contractor shall establish and maintain a counterfeit electronic part detection and avoidance system to mitigate the risk of counterfeit electronic parts being installed in end items or otherwise entering the USAF/DoD inventory.

4.4.6 Counterfeit Prevention Plan (CPP): The Contractor shall establish and maintain a counterfeit electronic part detection and avoidance system to mitigate the risk of counterfeit electronic parts being installed in end-items or otherwise entering the USAF/DoD inventory.

These policies and procedures shall be documented in a CPP for submission and approval in accordance with the Data Item Description (DID) DI-MISC-81832 and accomplished for all

PR: FD2060-26-00562 PWS REVISION: 0 8

specified contract items. DI-MISC-81832 is applicable to Parts, Material and Processes Selection

(PMPS) associated with delivery of systems and assemblies to the USAF and DoD. The requirements established by DI-MISC-81832 also apply to electronic components procured in sustainment of such systems and assemblies. The requirements of the recently DoD-adopted

SAE 5553, Aerospace Standard, Counterfeit Electronic Parts; Avoidance, Detection, Mitigation, and Disposition shall also apply. (CDRL A005, Reference in paragraph 4.2, DI-MISC-81832, Counterfeit Prevention Plan (CPP))

4.5 Surge Option: The government has the option to Increase the quantity of supplies or services called for under this contract by no more than 20 (twenty) percent or 6 (six) each and/or accelerate the rate of delivery called for under this contract, at a price or cost established before contract award or to be established by negotiation

4.6 Holidays and Facility Closings: Contractor/subcontractor personnel shall observe holidays and facility closings as authorized for government personnel. Contractor/subcontractor personnel shall only be permitted access to Government facilities when government personnel are present.

4.7 Travel: Travel requests for contractor/subcontractor personnel shall be submitted for approval to the Contracting Officer prior to costs being incurred and a minimum of 14 business days in advance of departure. Receipts must be presented with the invoice for reimbursement of actual travel costs.

4.8 Maintenance Records, Forms, and Publications: Depot Maintenance Production Reports shall require the Contractor to submit monthly production status reports for the duration of each delivery order. The Contractor shall ensure the delivery schedule is met for all requirements.

After receipt of order and assets, the Contractor shall repair and ship assets to the Government within the duration of TAT in this PWS and on the contract. (CDRL A006, Reference in paragraph 4.2, DI-PSSS-81995A, Contract Depot Maintenance (CDM) Monthly

Production Report).

4.9 Over and Above: Over and above work as defined by this PWS requires prior approval by the PCO. Over and above work is defined as additional work needed to make the item functional, such as: units that are not in a proper configuration, units that are returned due to operation outside designed limits, mishandling, and misuse or battle damage. Over and Above charges may also be approved to cover the cost of disposing of any assets deemed “beyond economical repair.” Over and above charges may also be approved to cover the costs of any updates, repairs, modifications, etc., to existing test equipment/computers required because of the implementation security software patches on the test equipment and computers. Over and above does not cover inflation on Firm Fixed Priced efforts. The contractor will in good faith only request Over and

Above funding when the scope of the effort is significant. The contractor shall submit to the

PCO a detailed quote and tear down report for each unit requiring Over and Above work and shall not proceed with any work until the Over and Above is approved, the basic contract is modified, and the Over and Above is funded on a Task Order.

PR: FD2060-26-00562 PWS REVISION: 0 9

5.0 General Information

5.1 Continuation of Mission-Essential Services During a Crisis: The Functional

Commander/Director has determined these services are not mission-essential and will not continue in the event of a crisis.

5.2 Security Requirements

5.2.1 Security Regulations: The contractor shall ensure personnel, information, system, property, facility and, if applicable, international security requirements are met. The contractor shall ensure contractor/subcontractor personnel who perform work on a government facility comply with the security requirements of the facility.

5.2.2 Cybersecurity Maturity Model Certification (CMMC): The contractor shall achieve and maintain a CMMC Level _2 (Self)_, or higher, and provide the CMMC unique identifier(s)

(CMMC UIDs) issued by Supplier Performance Risk System (SPRS) for each contractor information system that will process, store, or transmit Federal Contract Information (FCI) or

Controlled Unclassified Information (CUI) during performance of the contract.

5.2.3 Operations Security (OPSEC): The purpose of OPSEC is to reduce the vulnerability of

USAF missions to adversary collection and exploitation of critical information. DoDD 5205.02E and DoD Manual 5205.02-M require contractors supporting DoD activities use OPSEC to protect critical information for specified contracts, subcontracts, and information used in the performance of duties in support of Air Force requirements/missions. The contractor shall ensure contractor personnel who perform work on (or in) a government facility comply with the

OPSEC procedures and training requirements of the facility as specified in AFI 10-701.

5.2.4 Security Clearance: It is not expected contractor/subcontractor personnel will require security clearances for proper accomplishment of contract/order requirements. Contractor/Subcontractor personnel shall not be authorized access to classified information and classified items or be permitted to work on classified projects and/or programs without an appropriate security clearance and a need-to-know.

5.2.5 Security Incident or Violation: The contractor shall immediately notify the government

Security Office of any potential or actual security incident or violation.

5.3 Access to Government System(s): The government will provide contractor/subcontractor personnel access to system(s) necessary to perform tasks under the contract/order. The contractor shall ensure contractor/subcontractor personnel who require access to an unclassified or classified government Automated Information System (AIS) have the respective background

PR: FD2060-26-00562 PWS REVISION: 0 10

check or security investigation conducted. At a minimum, the contractor shall ensure contractor/subcontractor personnel who require access to an unclassified AIS have a Tier 1 (T1) background investigation (formerly NACI) conducted. Upon completion/termination of the contract/order or transfer/termination of contractor/subcontractor personnel, the contractor shall ensure the system account(s) are closed.

5.4 Environmental Management System (EMS): These services shall not be performed at a government facility; therefore, the EMS requirement does not apply.

5.5 Safety Requirements

5.5.1 Contractor Environmental, Safety, and Occupational Health Compliance: The

Contractor shall comply with Government Safety and Health regulations including, but not limited to, Public Law 91-596, Occupational Safety and Health Act (OSHA), and DoD Directive

4715.1E, Environmental, Safety, and Occupational Health (ESOH). The Contractor shall require all subContractors to comply with required safety, health and fire standards.

5.5.2 Mishap Notification/Investigation: In accordance with DAFI91-204, Safety

Investigations and Reports, the Contractor shall report mishaps including damage to DoD property; occupational illness to DoD military or civilian personnel; injury to on- or off-duty

DoD military personnel; injury to on-duty DoD civilian personnel; and damage to public or private property or injury or illness to non-DoD personnel caused by Government operations. In the event of a mishap, the Contractor shall ensure the USAF is notified of the mishap. The

Contractor shall contact the organizations listed below within four business hours. The

Contractor shall immediately secure the mishap scene (and damaged property) and impound pertinent maintenance and training records until released by the Government’s Safety Office

(AFLCMC/SE). Such release shall be accomplished through the Contracting Officer. The

Contractor shall cooperate and assist Government personnel in the investigation of the mishap and submit an Accident/Incident Report within 24 hours of the mishap. There shall be no more than one (1) instance of late mishap notification per contract year. (CDRL A007, Reference in paragraph 4.2, DI-SAFT-81563, Accident/Incident Report).

The Contractor shall ensure the following are notified:

a. PCO

b. MFT (COR, if available, or another MFT member),

c. The closest USAF base command post (to relay notification to AFLCMC/SE).

The following information shall be provided in support of the Mishap notification as soon as it becomes available:

a. Contract, contract number, name and title of person(s) reporting

b. Date, time and exact location of accident/incident

c. Brief narrative of accident/incident (events leading to accident/incident)

d. Cause of accident/incident, if known

e. Estimated cost of accident/incident (material and labor to repair/replace)

f. Nomenclature of equipment and personnel involved in accident/incident

g. Corrective actions (taken or proposed)

h. Other pertinent information

PR: FD2060-26-00562 PWS REVISION: 0 11

5.6 Access to Government System(s): The Government will provide contractor/subcontractor personnel access to system(s) necessary to perform tasks under the contract/order. The Contractor shall ensure contractor/subcontractor personnel who require access to an unclassified or classified

Government Automated Information System (AIS) have the respective background check or security investigation conducted. At a minimum, the Contractor shall ensure contractor/subcontractor personnel who require access to an unclassified AIS have a National

Agency Check with Inquiries (NACI) conducted. Upon completion/termination of the contract/order or transfer/termination of contractor/subcontractor personnel, the Contractor shall ensure the system account(s) are closed.

5.6.1 Access to ETAR for AFMC Form 202 submission. Contractor must contact the assigned

Procurement Contracting Officer (PCO) and/or the assigned Contracting Officer Representative

(COR) in order to obtain a Non-classified Internet Protocol Router Network Enterprise Alternate

Token System (NEATS) smart card which will allow them to access the system. Contractor shall contact WR-AFLCMC/WIU Rotary Engineering, to coordinate submission of an automated

System Authorization Access Request (Form 2875) for system access and registration in the

ETAR system and registration within the ETAR application

(https://usaf.dps.mil/sites/AF_PLM_PASS/SitePages/Request-an-AF-PLM-Account.aspx

5.6.2 Inspection of Services: In accordance with the Inspection of Supply/Services clause(s) identified in the contract/order, the government reserves the right to inspect contractor performance.

5.7 Service Contract Reporting (SCR): The contract does not meet the DoD Contract

Reporting criteria or reporting dollar threshold; therefore, SCR does not apply.

5.8 Invoicing/Payment and Receipt/Acceptance: The contractor shall submit/process payment requests and receipt/acceptance documents via Wide Area Workflow (WAWF).

5.9 Contractor’s Quality Program: The contractor’s quality program shall be established and maintained IAW FAR 52.246-11, Higher-Level Contract Quality Requirement. The contractor’s quality program shall meet all requirements of ISO 9001:2015 or equivalent, and is to be approved by the cognizant government representatives. The contractor shall permit the program office or its designated representative to periodically review its quality program.

5.10 Trafficking in Persons: The contractor shall comply in accordance with the RFO and applicable supplements and shall be in compliance with all applicable guidance and clauses listed in the contract as it relates to Trafficking in Persons. Additional information about

Trafficking in Persons is available at the site for the Department of State’s Office to Monitor and

Combat Trafficking in Persons. https://www.state.gov/ https://usaf.dps.mil/sites/AF_PLM_PASS/SitePages/Request-an-AF-PLM-Account.aspx https://www.state.gov/bureaus-offices/under-secretary-for-foreign-assistance-humanitarian-affairs-and-religious-freedom/office-to-monitor-and-combat-trafficking-in-persons/

PR: FD2060-26-00562 PWS REVISION: 0 12

6.0 Appendices

6.1 Appendix A, Reference(s)

Publication Title of Publication Date of

Publication

Sections(s) that Apply

32 CFR

Part 117

National Industrial Security Program Operating

Manual (NISPOM).

July 28 2025 Entire

DoDD

4715.1E

Environment, Safety, and Occupational Health

(ESOH)

March 19, 2005 Entire

DoDD

5205.02E

DoD Operations Security (OPSEC) Program June 20, 2012 Entire

DoD

Manual

5205.02-M

DoD Operations Security (OPSEC) Program

Manual

November 3, Change 2, October 29, 2020

Entire

Public

Law 91-

596 as amended by Public

Law 116-

92-552

Occupational Safety and Health Act of 1970 December 29, as amended through

December 20, Entire

DAFI 91-

Safety Investigations and Reports 10 Mar 21 5.5.2

DoDD

4715.1E

Environmental, Safety, and Occupational Health

(ESOH)

19 Mar 05 Entire