PWS.pdf

PDF 110 KB Posted

Attached to
Repair of OptoElectro Control Unit for AN/ARS-6(v12)
Solicitation number
FA8524-18-Q-0010
Issued by

About this file

Performance-Based Work Statement

View the file

Other files

File Type Posted
PWS_18-00126_ESCADU_2018_04_04_(002).pdf PDF
DD1653_TRANS.pdf PDF
AFMC_158_PKGRQMT.pdf PDF
SOW_CAVAF_CFM_V18__8Dec2014.pdf PDF
QA807.pdf PDF
ConsolidatedGovernmentFurnishedProperty_18-01496.pdf PDF
FA852418Q0010.pdf PDF
DD_2875_SYSTEM_AUTHORIZATION.pdf PDF
WD_15-5635.pdf PDF
DD1423_CDRLS.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PR: FD2060-18-01496 PWS REVISION: 0 1

Distribution Statement: A

Performance-Based Work Statement for

AN/ARS-6(v12) OptoElectro Control Unit

FD2060-18-01496

Distribution Statement A: Approved for public release. Distribution unlimited.

PR: FD2060-18-01496 PWS REVISION: 0 2

1.0 Description of Services:

1.1 Objective(s): This Performance-based Work Statement describes the services required to furnish the services and material necessary for the essential depot level repair. These services include functional testing, inspection, and packaging of the listed National Stock Numbers (NSN) items in Appendix B of this PWS. The contractor shall fault isolate, repair and test unserviceable assets along with track and resolve items affected by Product Quality Deficiency Reports (PQDR) while performing depot level repair, functional testing, inspection, and packaging. The period of performance shall consist of one year period after contract award.

The contract type is a Firm-Fixed Price Requirements. The Contractor shall perform Test, Teardown and Evaluation (TT&E) on each unit immediately upon induction. The Contractor shall complete the TT&E with in 45 days. The Contractor shall complete all actions to return the asset to serviceable condition within the agreed upon Turn Around Time (TAT) for each repair proposal. The Contractor shall provide immediate response to ensure that time for critical item delivery requests are punctual by responding to the Production Management Specialist (PMS) within one business day of the request with the estimated delivery date of the critical item. The Contractor shall deliver monthly status reports on time. The Contractor shall report production using the Commercial Asset Visibility Air Force (CAVAF) system by maintaining current inputs. The Contractor shall provide data on the actions conducted for each unit. The Contractor shall report daily or as actions occur.

1.2 Benefit to United States Air Force (USAF): This acquisition will benefit the USAF by providing continued support for the AN/ARS-6(v12) Personnel Locator System (PLS).

1.3 Background: The optoelectro control unit (Control Display Unit) was manufactured by Cubic Defense Applications, Inc. The Control Display Unit provides secure, encrypted communications between rescue forces and isolated personnel during civil and combat rescue missions. Operation of the PLS system is controlled from this panel. The Control Display Unit works much like a small laptop computer with a touchscreen.

2.0 Services Summary:

Performance Objective PWS

Reference Performance Threshold

Deliver repaired assets on time. 4.3 Deliveries shall be made in accordance with agreed upon Turn Around Time contained in the repair proposals.

There shall be no more than one late delivery per contract year.

Quality of CDRL deliverable 4.2.1 The Contractor shall deliver all data/reports associated with all CDRLs, with no more than one rejection of each

PR: FD2060-18-01496 PWS REVISION: 0 3

deliverable. There shall be no more than one total rejection(s) of deliverables per contract year. The Government will reject a deliverable if one or more technical errors or two or more minor errors are found within the deliverable.

A technical error is defined as the format not being in accordance with the CDRL or the content not being accurate and complete in accordance with the CDRL, PWS or contract. A minor error is defined as a typographical or grammatical error. The rejected deliverable shall be corrected and resubmitted within three business days of notification of Government rejection.

Receipt of CDRL deliverable 4.2.2 There shall be no more than one late submission(s) of deliverables per contract year. The Contractor shall notify the Government if the delivery of any data/document will not meet the scheduled delivery date and negotiate a revised delivery date. The data/document shall be delivered by the revised delivery date acceptable to the Government.

Provide timely and accurate reporting in CAVAF.

4.16 All CAVAF transactions shall be

accomplished daily or on as transactions occur basis. The following metrics will be monitored:

GFP In-Transit Repairable GFP Accountability Assets Not on Contract

Comply with the quality levels of repair necessary to return assets to serviceable condition.

4.17 There shall be no more than one

(PQDR) per contract year during the performance of this contract repair effort.

Expedite Critical Item Delivery and Respond quickly to a Government request for assistance.

4.3 The Contractor shall respond to the PMS

within one business day of the request with the estimated delivery date of the critical item. Follow-up assistance, if required, shall be provided by a suspense date acceptable to the Government.

PR: FD2060-18-01496 PWS REVISION: 0 4

Induct Funded Assets for Repair within five business days

4.4 The Contractor shall induct funded

assets for repair within five business days after receipt of the unit.

Contractor shall ship fastest, traceable means after DCMA acceptance

4.12 The Contractor shall ship repaired assets

within five business days by fastest, traceable means after DCMA acceptance

3.0 Government Property and Services

3.1 Government Property: The Contractor shall be responsible for Government property in their possession in accordance with the Federal Acquisition Regulation (FAR) and applicable supplements including, but not limited to, FAR Part 45, Government Property; FAR 52.245-1, Government Property; and Defense Federal Acquisition Regulation Supplement (DFARS) Part 245, Government Property. The FAR and applicable supplements can be accessed at the site: http://farsite.hill.af.mil

3.2 Government Property to be Provided: Government property will not be provided.

3.3 Government System(s): Access to Government systems will not be required to peform tasks under the contract/order.

4.0 Technical Requirements

4.1 Period and Place of Performance:

4.1.1 Contract/Order Period of Performance: The period of performance for the contract/order will extend one year beyond the date of the final order or will end on the last day of the contract.

4.1.2 Place of Performance: These services will be performed at San Diego, CA.

4.2 Contract Data Requirements List (CDRL):

• A001, Commercial Asset Visibility Air Force, DI-MGMT-81634C

• A002, Contract Depot Maintenance Production Report, DI-PSSS-81995

• A003, Counterfiet Prevention Plan, DI-MISC-81832

• A004, Item Unique Identification (IUID) Plan, DI-MGMT-81803

• A005, IUID Marking Activity and Verification Report, DI-MGMT-81804

4.2.1 The Contractor shall deliver all data/reports associated with all CDRLs, with no more than one rejection of each deliverable. There shall be no more than one total rejection(s) of deliverables per contract year. The Government will reject a deliverable if one or more technical errors or two or more minor errors are found within the deliverable. A technical error is defined as the format not being in accordance with the CDRL or the content not being accurate and complete in accordance with the CDRL, PWS or contract. A minor error is defined as a typographical or grammatical error. The rejected deliverable shall be corrected and resubmitted http://farsite.hill.af.mil/

PR: FD2060-18-01496 PWS REVISION: 0 5

within three business days of notification of Government rejection. in accordance with the associated DD Form 1423 instructions/requirements.

4.2.2 The Contractor shall deliver all CDRLs with no more than one late submission(s) of deliverables per contract year. The Contractor shall notify the Government if the delivery of any data/document will not meet the scheduled delivery date and negotiate a revised delivery date.

The data/document shall be delivered by the revised delivery date acceptable to the Government.

4.3 Turn Around Time (TAT): TAT is measured from the induction of the funded unit and to the time the asset is shipped back to the Government. TAT for repairs shall be in accordance with the agreed upon proposal for repairing each unit. JCS Surge backorders and MICAP requirements will take precedence over the routine schedule and shall be expedited to the extent possible. The Contractor shall respond to the Production Management Specialist (PMS) within one business day of the request with the estimated delivery date of the critical item. In the event that a repairable item is required by the Government on an emergency basis to fill MICAP/Surge backorders, the Government PMS or Program Manager will notify the Contractor in writing (E-mail preferred) as soon as the need is identified. The Contractor shall initially respond to a Government request for assistance within eight business hours. Follow-up assistance, if required, shall be provided by a suspense date acceptable to the Government.

4.4 Induction: The Contractor shall induct funded units into repair within 3 business days of receipt.

4.5 Obsolete Parts: The Contractor shall notify the Government of evolving obsolete part conditions and make recommendations including last-time buy opportunities and any redesign that may ensue. Requests for funding and all related issues will be directed through the Procurement Contracting Officer (PCO). Replacement parts or redesign will be recommended to minimize impact. Performance of engineering efforts to resolve, redesign, and replace (not due to failure) obsolete parts are not funded under this contract.

4.5.1 Original design of the end item and parts thereof, or the design functional capabilities of the end item, shall not be changed, modified or altered unless such changes are authorized in writing by the Procuring Contracting Officer (PCO).

4.6 Accessory and Component Reuse, Repair and Replacement: Expense parts of an end item determined unserviceable or missing shall be replaced with equivalent serviceable parts at no additional cost. Items received which are misidentified, misdirected or have Air Force recoverable subassemblies missing shall be reported through the ACO to the PCO, to 411 SCMS/GULB for disposition instructions. Missing Repairable Expendability, Reparability, Recoverability Code (ERRC) T subassemblies or ERRC Code T subassemblies that are generated as part of the Next Higher Assembly (NHA) and subsequently require condemnation, will be replaced by the government. The replacement item may be repairable or serviceable.

The Repair (if required) and the installation of the replacement item into the NHA will be accomplished at no additional cost.

PR: FD2060-18-01496 PWS REVISION: 0 6

4.7 Beyond Economical Repair: The Contractor shall be required to repair all end items unless written direction is provided by the PCO through the Administrative Contracting Officer (ACO).

Requests for beyond economical repair (BER) authorization shall be submitted in writing through the ACO to the PCO within 10 calendar days following initial inspection/functional testing. BER authorization shall not be requested due to unavailability of replacement parts or parts missing on induction or cannibalized parts from an inducted unit. BER authorization may only be granted if the asset in repair manifests one or more of the following conditions:

a. Physical damage that affects greater than 75 percent of the material within the end item (i.e., crushed).

b. Burn damage that affects greater than 80 percent of the internal electrical components and connections of the end item.

c. A unit is considered BER if the expected repair cost is greater than 75 percent of the cost for a new end item.

4.7.1 If the Government elects to condemn the BER unit, the Contractor shall not charge the full repair cost, but only the firm fixed price associated with negotiated condemnation actions.

4.7.2 Condemned items shall be disposed of and demilitarized in accordance with DoD Publication 4160.21-M-1 “Defense Demilitarization Manual”. Written authorization from the PCO and system Program Manager authorizing the Contractor to retain a condemned item(s) for cannibalization and reuse.

4.7.3 The Government retains the right to request enlarged color photographs of any proposed condemned end item. These photographs shall clearly portray the extent of damage to the end item and/or effects of overheating. One photograph shall be of the entire end item showing the part number and serial number. The results of any electrical testing performed on the end item shall also be submitted for review. The Contractor may be required to submit the proposed condemned end item to Government technical representative for evaluation, confirmation, and/or disposition instructions.

4.8 Over and Above: The Government may elect to repair a unit previously submitted as BER.

If requested, the Contractor shall submit an over and above repair package quotation within five days of the Government request for the unit previously submitted as BER. The Government will fund over and above repairs on a separate CLIN. Units funded for over and above repair shall be moved from the repair CLIN to the over and above CLIN in CAV-AF.

4.9 Cannibalization: With written authorization from the PCO and Program Manager (PM), the Contractor shall be authorized to retain all condemned items for use in cannibalization down to the Shop Replaceable Unit (SRU) level for use in the repair process. Removing parts, components, or subassemblies to aid in the repair of other units, shall not be reason for condemnation. Parts, components, or subassemblies used to aid in the repair of other units shall be replaced as they become available.

PR: FD2060-18-01496 PWS REVISION: 0 7

4.10 Item Unique Identification (IUID)

4.10.1 Item Identification and Valuation, unique item identification is a method of marking items with unique item identifiers which have machine-readable data elements. Unique item identification is required for all items to be delivered to the DoD that meet the criteria established in accordance with the FAR and applicable supplements and shall be in compliance with all applicable guidance and clauses listed in the contract.

4.10.2 The Contractor shall mark items in accordance contract clauses, and Military Standard (MIL-STD)-130N, Department of Defense Standard Practice / Identification Marking of U.S.

Military Property.

4.10.3 In accordance with the Department of Defense Guide to Uniquely Identifying Items Assuring Valuation, Accountability and Control of Government Property, the Government agent or Contractor representative responsible for causing “life cycle events” (i.e., abandoned, consumed, destroyed by accident, destroyed by combat, donated, exchanged – repair, exchanged

– sold, exchanged – warranty, expended – experimental/target, expended – normal use, leased, loaned, lost, reintroduced, retired, scrapped, sold – foreign government, sold – historic, sold – nongovernment, sold – other federal, sold – state/local, and stolen) will update applicable item record(s) in the IUID Registry.

4.10.4 IUID Marking Plan: The Contractor shall mark items in accordance with DFARS 211.274-2, DFARS 252-211.7003, and Military Standard (MIL-STD)-130N, Department of Defense Standard Practice / Identification Marking of U.S. Military Property. The plan must be approved by the Government Engineering organization, prior to implementation. (CDRL A004, Item Unique Identification Marking Plan, DI-MGMT-81803)

4.10.5 IUID Marking Activity and Verification Report: The Contractor shall provide an IUID Marking Activity and Verification Report. A key attribute for the report is the Verification column which indicates pass/fail for each item’s Data Matrix Symbol Quality. (CDRL A005, Item Unique Identification (IUID) Marking Activity, Validation and Verification Report, DI-

MGMT-81804)

4.11 Packaging: The Contractor shall package and mark material in accordance with the contract (basic and/or order, as applicable) in accordance with the attached Air Force Materiel Command (AFMC) Form 158, Packaging Requirements. The Contractor shall package and mark material in accordance with other applicable Government regulations including, but not limited to, those regarding security, safety and environmental concerns.

The Contractor shall package and mark end items and components in accordance with the contract (basic or order, as applicable) Air Force Materiel Command (AFMC) Form 158, Packaging Requirements; MIL-STD-129R, Department of Defense Standard Practice / Military Marking for Shipment and Storage; MIL-STD-130N, Department of Defense Standard Practice / Identification Marking of U.S. Military Property; and MIL-STD-2073-1E, Standard Practice for Military Packaging. The Contractor shall package and mark material in accordance with other

PR: FD2060-18-01496 PWS REVISION: 0 8

applicable Government regulations including, but not limited to, those regarding security, safety and environmental concerns.

The Contractor shall package and mark material for movement, shipment, receipt and storage in a manner that ensures the protection and preservation of the material for shipment to and storage at the destination. The Contractor shall package electronic parts susceptible to electrostatic discharge damage in accordance with MIL-STD-1686C, Department of Defense Standard Practice / Electrostatic Discharge Control Program for Protection of Electrical and Electronic Parts, Assemblies and Equipment (Excluding Electrically Initiated Explosive Devices), and MIL- HDBK-263B, Military Handbook / Electrostatic Discharge Control Handbook for Protection of Electrical and Electronic Parts, Assemblies and Equipment (Excluding Electrically Initiated Explosive Devices).

In accordance with MIL-STD-2073-1E, Standard Practice for Military Packaging, shipping containers received, which meet the requirements of the AFMC Form 158 and are suitable for return shipment of serviceable assets, shall be reclaimed and stored for reutilization. Unsuitable shipping containers shall be disposed of and replaced with new containers that meet the requirements of the AFMC Form 158.

4.12 Shipping: The Contractor shall ship repaired assets within five business days by fastest, traceable means after DCMA acceptance.

4.13 Counterfeit Electronic Parts: The Contractor shall establish and maintain a counterfeit electronic part detection and avoidance system to mitigate the risk of counterfeit electronics parts being installed in end items or otherwise entering the USAF/DoD inventory.

The system shall incorporate processes/procedures to address the requirements listed in accordance with the FAR and applicable supplements and shall be in compliance with all applicable guidance and clauses listed in the contract. The Government's review of the Contractor’s system will be accomplished as part of the evaluation of the Contractor’s purchasing system in accordance with the FAR and applicable supplements and shall be in compliance with all applicable guidance and clauses listed in the contract.

4.14 Counterfeit Prevention Plan (CPP). Contractors that supply parts or systems that contain electronic parts shall establish policies and procedures to avoid, detect, mitigate and disposition of counterfeit electronic parts to prevent such parts from entering the USAF/DoD supply chain for all specified contract items. Counterfeit Prevention Plan, DI-MISC-81832 is applicable to Parts, Material and Processes Selection (PMPS) associated with delivery of systems and assemblies to the USAF and DoD. The requirements established by DI-MISC-81832 also apply to electronics components procured in sustainment of such systems and assemblies. The requirements of the recently DoD-adopted SAE 5553, Aerospace Standard, Counterfeit Electronics Parts; Avoidance, Detection, Mitigation, and Disposition shall also apply. (CDRL A003, Counterfeit Prevention Plan, DI-MISC-81832)

4.14.1 At a minimum, the CPP shall address:

PR: FD2060-18-01496 PWS REVISION: 0 9

4.14.1.1 Applicability. The Contractor shall identify all Business locations and programs to which the CPP applies. The CPP shall address materials, hardware, electronic parts, and procured assemblies.

4.14.1.2 Definitions. The Contractor shall utilize definitions per AS5553A to ensure consistency. Any Contractor-derived definitions must be included in an appropriate CPP appendix or annex. (Ref. AS5553A)

4.14.1.3 Parts Availability and Use of Parts Brokers. The Contractor shall not procure materials, systems, assemblies, subassemblies or parts from parts Brokers when available from Original Manufacturers (OM) or their Authorized Distributors. In cases where materials, systems, assemblies, subassemblies or parts are no longer available from the OM or their Authorized Distributors, procurement from Brokers may be authorized as defined by the Contractor’s policy and their CPP. (Ref. AS5553A)

4.14.1.4 Procurement Policies. The Contractor shall provide and implement policy directing development and implementation of business practices and procedures, and processes to prevent procurement of Counterfeit materials and parts. The Contractor shall identify the appropriate office(s), business units, functional organizations, and programs, which shall have responsibility for development, maintenance and implementation of the CPP. The CPP shall identify the specific roles and responsibility for each. (Ref. AS5553A)

4.14.1.5 Risk Assessment. The contract shall address the risk of using unknown sources and/or unauthorized suppliers in the CPP. Application or technical risk assessments shall establish the effect that counterfeit parts may have on performance. Vendor or source of supply risk assessments shall establish the potential for obtaining counterfeit parts. Using any risk analysis tool acceptable to the Government, the Contractor shall conduct a risk assessment based upon item characteristics and how likely it is that a counterfeit part will be received. The Contractor shall identify and describe in the CPP how parts are selected for assessment and what risk is acceptable based upon the parts design, construction, material and functional requirements. As a minimum, analysis shall be completed for flagging high risk items, such as items that are obsolete, discontinued, rare, etc. The Contractor shall require completion of a trade study, documented within the CPP that shall facilitate determining whether 100% testing of parts procured from after-market sources is more cost effective than qualification or requalification of a manufacturer. (Ref. AS5553A)

4.14.1.6. Detection and Avoidance Responsibilities. The Contractor shall establish processes for the review and approval of Contractor and applicable subcontractor systems for the detection and avoidance of counterfeit electronic parts and suspect counterfeit electronic parts, which processes shall be comparable to the processes established for Contractor business systems under

PR: FD2060-18-01496 PWS REVISION: 0 10

section 893 of the Ike Skelton National Defense Authorization Act for Fiscal Year 2011 (Public Law 111–383; 124 Stat. 4311; 10 U.S.C. 2302 note). The Contractor shall flow down such requirements and processes to their subcontractors per ODASD Memo titled “Overarching DoD Counterfeit Prevention Guidance”, dated 16 March 2012. (Ref. AS5553A)

4.15 Government-Industry Data Exchange Program (GIDEP): The Contractor shall participate in GIDEP in accordance with GIDEP Operations Manual S0300-BT-PRO-010, Government- Industry Data Exchange Program.

4.16 Commercial Asset Visibility-Air Force (CAV-AF): The Contractor shall report production using CAV-AF. The Contractor shall provide data on the actions conducted for each unit. The Contractor shall report daily or as actions occur. The following metrics will be monitored: GFM In-Transit, Repairable GFM Accountability and Assets Not on Contract. If CAV-AF training is required, Contractor personnel may send an email to: 406scms.cav.af.ar@us.af.mil. [CDRL A001, DI-MGMT-81634C, Commercial Asset Visibility Air Force (CAVAF) / Government Furnished Material Report]

4.17 Workmanship shall be in accordance with the Contractor’s standard repair procedures and acceptance criteria in accordance with best industry practice. The Contractor shall ensure that best commercial practices are implemented to maintain as a minimum, ISO 9001:2008, or equivalent, quality control standards. The Contractor shall maintain a system to ensure each item is inspected, repaired, and tested in accordance with the engineering data currently being used or developed and approved under this contract. There shall be no more than one validated Product Quality Deficeincy Report (PQDR) per contract year. The Contrator shall comply with T.O. 00- 35D-54 USAF Deficiency Reporting, Investigation and Resolution.

4.18 Software Management: The Contractor shall ensure the software version installed upon receipt is the same software version installed upon successfully completing the repair.

4.19 The Contractor shall provide a Contract Depot Maintenance Production Report not later than the tenth working day of the month. [CDRL A002, DI-PSSS-81995, Contract Depot Maintenance Production Report]

5.0 General Information

5.1 Continuation of Mission-Essential Services During a Crisis: The Functional Commander (FC) or civilian equivalent has determined these services are not mission-essential and services will not continue in the event of a crisis.

5.2 Security Requirements

5.2.1 Actual knowledge and/or generation of classified information and/or Controlled Unclassified Information (CUI) are not expected to be necessary for performance of the contract/order. However, Contractor personnel are required to comply with security requirements to preclude potential security incidents or violations.

mailto:406scms.cav.af.ar@us.af.mil

PR: FD2060-18-01496 PWS REVISION: 0 11

5.2.2 Security Clearance: Contractor clearances are not required under this contract. Contractor personnel shall not be authorized access to classified information and/or CUI and classified items or be permitted to work on classified projects and/or programs without a valid security clearance and a need-to-know. If security clearances become necessary after contract/order award, the Contractor shall ensure applicable Contractor personnel obtain valid security clearances appropriate to the access required for proper accomplishment of contract/order requirements.

5.3 Environmental Management System (EMS): Services will be performed at San Diego, California therefore, the EMS requirements do not apply to this effort, but this statement does not exempt the Contractor from any other Federal, State or local statute or requirement.

5.4 Affirmative Procurement Programs (APP): In accordance with FAR 23.404(b)(1), 100% of purchases of Environmental Protection Agency (EPA)-designated products included in the Comprehensive Procurement Guidelines (CPG) list [http://www.epa.gov/cpg/products.htm] and/or United States Department of Agriculture (USDA)-designated products included in the biobased product listings [http://www.biopreferred.gov] shall, at a minimum, meet the EPA or USDA standards for recovered materials or biobased content, respectively, unless an item cannot be acquired competitively within a realistic timeframe, meet appropriate performance standards, and/or be acquired at a reasonable price.

In accordance with FAR 23.404(a)(iii), the Contractor shall provide estimates and verification of recovered material for EPA-designated CPG products and certification for both EPA-designated CPG products and USDA-designated biobased products. In accordance with the Robins Air Force Base, Georgia / Green Procurement Program (GPP) Plan, the Contractor shall provide estimates and certifications to the Government for completion of the applicable attachment(s) to be included in the Purchase Request (PR) package.

5.5 Safety Requirements:

5.5.1 Contractor Compliance: The Contractor shall comply with Government Safety and Health regulations including, but not limited to, Public Law 91-596, Occupational Safety and Health Act (OSHA), and DoDD 4715.1E, Environment, Safety, and Occupational Health (ESOH). OSHA and ESOH requirements shall be incorporated into the Contractor’s safety program.

While performing work under this contract the Contractor shall comply with all applicable federal, state and local regulations regarding occupational safety and health. In accordance with AFI 91-204, Safety Investigations and Reports, the Contractor shall report mishaps involving damage or injury to the USAF. The contractor shall make required notification of all mishaps, and if requested by the Contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the Procuring Safety Office.

5.5.2 Mishap Notification/Investigation: In accordance with AFI 91-204, Safety Investigations and Reports, the Contractor shall report mishaps involving damage or injury to USAF interests.

The Contractor shall ensure the USAF is notified of mishaps. The Contractor shall contact the http://www.epa.gov/cpg/products.htm http://www.biopreferred.gov/

PR: FD2060-18-01496 PWS REVISION: 0 12

Contracting Officer’s Representative (COR), if available, or another MFT member by telephone within 24 business hours and the Contractor shall cooperate with USAF safety investigations.

5.6 Inspection of Services: Inspection of Services will be accomplished in accordance with the FAR and applicable supplements and shall be in compliance with all applicable guidance and clauses listed in the contract. The Government reserves the right to inspect Contractor performance.

5.7 Trafficking in Persons: The Contractor shall comply in accordance with the FAR and applicable supplements and shall be in compliance with all applicable guidance and clauses listed in the contract as it relates to Trafficking in Persons. Additional information about Trafficking in Persons is available at the site for the Department of State’s Office to Monitor and Combat Trafficking in Persons. http://www.state.gov/j/tip

5.9 Invoicing/Payment and Receipt/Acceptance: The Contractor shall submit/process payment requests and receipt/acceptance documents via Wide Area WorkFlow e-Business Suite / Invoicing, Receipt, Acceptance, and Property Transfer (iRAPT) in accordance with all applicable clauses located in the basic contract.

6.0 Appendices

6.1 Appendix A: References

Publication Title of Publication

Date of Publication Section(s) that Apply

AFI 91-204 Safety Investigations and Reports

9 August 2012 reissued 8 April 2013 http://www.e-publishing.af.mil/

Paragraphs 1.3.1.1, 2.4.6.1.1- 2.4.6.1.2

DoD Directive 4715.1E

Environment, Safety and Occupational Health

19 March 2005 Entire

FAR and supplements

Federal Acquisition Regulation http://farsite.hill.af.mil

Sections applicable to contract and

PWS

DFARS Defense Federal Acquisition Regulation http://farsite.hill.af.mil/vfdfara.htm Sections applicable to contract and

PWS

http://www.state.gov/j/tip http://www.e-publishing.af.mil/ http://farsite.hill.af.mil/

PR: FD2060-18-01496 PWS REVISION: 0 13

TO 00-35D-54

USAF

Deficiency Reporting, Investigating and Resolution

15 May 2015 Entire none Department of Defense Guide to Uniquely Identifying Items Assuring Valuation, Accountability and Control of Government Property, Version 2.5

15 September 2012 www.acq.osd.mil/dpap/UID/attachments/ DoDUIDGuideVer2_5.pdf

Entire none Department of Defense Guide to Uniquely Identifying Items Assuring Valuation, Accountability and Control of Government Property, Version 2.5

September 15, 2012 www.acq.osd.mil/dpap/UID/attachments/ DoDUIDGuideVer2_5.pdf

GIDEP

Operations Manual S0300-

BT-PRO-010

Government- Industry Data Exchange Program

September 2009 http://www.gidep.org/

Chapter 2, Participatio n Requiremen ts

MIL-STD-129R Department of Defense / Standard Practice / Military Marking for Shipment and Storage

15 December 2002 Change 1 - 15 January 2004, Change 2 - 10 February 2004, Change 3 - 29 October 2004, Change 4 - 19 September 2007 http://www.acq.osd.mil/log/sci/ait/MIL- STD-129PCH4.pdf

MIL-STD-130N Department of Defense / Standard

17 December 2007 Change 1 – 16 November 2012 http://www.acq.osd.mil/dpap/UID/attachments/DoDUIDGuideVer2_5.pdf http://www.acq.osd.mil/dpap/UID/attachments/DoDUIDGuideVer2_5.pdf http://www.acq.osd.mil/dpap/UID/attachments/DoDUIDGuideVer2_5.pdf http://www.acq.osd.mil/dpap/UID/attachments/DoDUIDGuideVer2_5.pdf http://www.gidep.org/ http://www.acq.osd.mil/log/sci/ait/MIL-STD-129PCH4.pdf http://www.acq.osd.mil/log/sci/ait/MIL-STD-129PCH4.pdf

PR: FD2060-18-01496 PWS REVISION: 0 14

Practice / Identification Marking of U.S.

Military Property http://www.acq.osd.mil/dpap/pdi/uid/docs /MIL-Std130N_Ch1.pdf

MIL-STD-2073-

1E

Department of Defense / Standard Practice for Military Packaging

15 December 1999, Notice 1, 10 May 2002

MIL-HDBK

263-B

Electrostatic Discharge Control Handbook for Protection of Electrical Equipment and Electronic Parts, Assemblies and Equipment

Jan 2007 (July 94) Entire

MIL-STD-

1686C

Department of Defense Standard Practice / Electrostatic Discharge Control Program for Protection of Electrical and Electronic Parts, Assemblies and Equipment (Excluding Electrically Initiated Explosive Devices)

25 Oct 1995

Publication 4160.21-M-1

Department of Defense Demilitarization Manual

18 August 1997 Entire

AS5553 Fraudulent/Coun terfeit

Revision A 2013-01-21

Entire http://www.acq.osd.mil/dpap/pdi/uid/docs/MIL-Std130N_Ch1.pdf http://www.acq.osd.mil/dpap/pdi/uid/docs/MIL-Std130N_Ch1.pdf

PR: FD2060-18-01496 PWS REVISION: 0 15

Appendix B: Repair Candidate

NSN Part Number Noun Quantity 5980-01-590-8181 282765-1 OptoElectro Control

Unit

Electronics Parts;

Avoidance, Detection, Mitigation, and Disposition

Public Law 111– 383; 124 Stat.

4311; 10 U.S.C.

2302 note

Ike Skelton National Defense Authorization Act for Fiscal Year 2011

Section 893

Public Law 91-

Occupational Safety and Health Act

(OSHA)

4.5 Obsolete Parts: The Contractor shall notify the Government of evolving obsolete part conditions and make recommendations including last-time buy opportunities and any redesign that may ensue. Requests for funding and all related issues will be d...
4.7 Beyond Economical Repair: The Contractor shall be required to repair all end items unless written direction is provided by the PCO through the Administrative Contracting Officer (ACO). Requests for beyond economical repair (BER) authorization sh...

File details come from the government source that posted it.