PWS.docx
DOCX document 61 KB Posted
- Solicitation number
- FA8524-17-R-0023
About this file
Performance Work Statement
View the file
Other files
| File | Type | Posted |
|---|---|---|
| redacted_ja_Redacted.pdf | ||
| GFP_Attachment.pdf | ||
| FA8524-17-R-0023.pdf | ||
| 2198295_PKGRQMT_REPORT.pdf | ||
| dd2875_instructions.doc | DOC document | |
| dd2875.pdf | ||
| SPI.pdf | ||
| CAV_AF_SOW_17April13.pdf | ||
| Wage_determination.pdf | ||
| 2199928_TRNSPDATA_REPORT.pdf | ||
| 2193286_CDRL1_REPORT.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance-Based Work Statement (PWS) for
Repair of the Voltage Regulator applicable to the AC-130U Gunship / MC-130H Combat Talon aircraft
Purchase Request Number: FD2060-18-00002
Date: 7 March 2017
DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors (Administrative or Operational Use; 02-24-17). Other requests for this document shall be referred to AFSC/PZAAA, Robins AFB, GA 31098-1670
1.0 Description of Services: This PWS is for depot level repair of the Voltage Regulator applicable to the AC-130U Gunship / MC-130H Combat Talon aircraft Voltage Regulator, National Stock Number (NSN) 6110-01-020-8153LG. Part Number (PN)3S2060DC172C1. The extent of repair work required shall be determined by the initial inspection/bench check and required disassembly to return this item to a serviceable end item that shall efficiently serve its intended purpose. Original design of the end item and parts thereof, or the design functional capabilities of the end item, shall not be changed, modified or altered unless such changes are authorized in writing by the Procuring Contracting Officer (PCO) or specified by publication.
1.1 Objective(s): The Contractor shall delivery schedule shall be met for all requirements. Each asset shall be repaired and returned to the Government in serviceable condition. The Contractor shall provide timely and accurate reporting in CAVAF. Also the Contractor shall establish and maintain Contractor Manpower Reporting.
1.2 Benefit to United States Air Force (USAF): The war fighter will benefit by having more aircraft available with a fully functional Voltage Regulator to perform the Special Operation Forces (SOF) mission.
1.3 Background: The Voltage Regulator provides aircraft power regulation for the 60/90 KVA System. The Voltage Regulator is mission essential equipment for the AC-130U Gunship and MC-130H Combat Talon. This item has been previously repaired by General Electric (GE) -Aviation.
Voltage Regulator (VR) uses a transistor preamplifier and a satiable reactor (magnetic amplifier) to control the generator field winding excitation. By controlling the excitation field current, the output is regulated to 115 VAC per phase. Individual phase sensing is used to control the output voltage of the main generator. The output voltage is regulated to the highest phase voltage. Each VR consists of two basic units: the voltage sensing unit, and the amplifier section. Inputs to the volt- age regulator are 115/208 VAC from the main generator and the 108 VAC from the PMG.
2.0 Services Summary:
| Performance Objective |
| PWS Reference |
| Performance Threshold |
| Delivery schedule shall be met for all requirements. |
| 4.0 |
There shall be no more than one late delivery per quarter. The Contractor shall notify the Government if the delivery of any asset will not meet the scheduled delivery date specified in the contract.
| Each asset shall be repaired and returned to the Government in serviceable condition. |
| 4.17 |
| There shall be no more than two Product Quality deficiency Reporting (PQDR) annually during the period of performance of contract. |
| Provide timely and accurate reporting in CAVAF. |
| 4.3 |
| All CAVAF transactions shall be accomplished daily or as transactions occur basis. The following metrics will be monitored: |
· GFP In- Transit
· Repairable GFP Accountability Assets Not on Contract
Establish and maintain Contractor Manpower Reporting
| 5.8 - 5.8.3 |
| Within 30 calendar days of contract/order award, the Contractor shall establish a record for the contract/order in eCMRA including Order Data, Contact Data and Location Data and submit the annual report no later than October 31 of the following fiscal year. |
3.0 Contractor Responsibility: The Contractor shall be responsible for Government property in their possession in accordance with the Federal Acquisition Regulation (FAR) and applicable supplements. The FAR and applicable supplements can be accessed at http://farsite.hill.af.mil.
3.1 Government Property to be provided: Government property will not be provided, except for the assets to be repaired.
3.2 Government System(s): The Government will provide Contractor personnel access to system(s) necessary to perform tasks under the contract/order. Upon completion/termination of the contract/order or transfer/termination of Contractor personnel, the system account(s) will be closed.
4.0 Technical Requirements: The contractor is required to perform depot level Repair of the NSN. The contractor shall return the end item to a serviceable condition within 90 calendar days of receipt of asset and task order. If the repair action cannot be completed within 90 calendar days, notification to the Government must be made within three calendar days of not meeting the delivery date. Notification shall include the reason for not meeting the delivery schedule, what the contractor will do to preclude the delay from happening again and the date the item will be returned to a serviceable condition. All MICAP and Surge requirements repair actions should be completed within 30 calendar days.
4.1 Period and Place of Performance:
4.1.1 Contract/Order Period of Performance: The period of performance for the contract/order will extend 22 Mar 2013 – 21 Mar 2018.
4.1.2 Place of Performance: The place of performance for this contract will be exclusively not on a U.S. Government installation
4.2 Contract Data Requirements List (CDRL): The Contractor shall deliver all data/reports associated with all CDRLs according to the instructions provided within.
· CDRL A001, DI-MGMT-81634C, Commercial Asset Visibility Air Force (CAVAF) / Government Furnished Material Report
· CDRL A002, DI-MISC-81371A/T, AFTO Form 349/AFTO 95 Maintenance Data Collection Record
· CDRL A003, DI-PSSS-81995, Depot Maintenance Production Report
· CDRL A004, DI-MISC-81832, Counterfeit Prevention Plan (CPP )
· CDRL A005, DI-MGMT-81803, IUID Marking Plan
· CDRL A006, DI-MGMT-81804, UID Marking Activity and Verification Report.
4.3 COMMERCIAL ASSET VISIBILITY AF (CAVAF): The Contractor shall report production using CAV-AF. The Contractor shall provide data on the actions conducted for each unit. The Contractor shall report daily or as actions occur. The following metrics will be monitored: GFM In-Transit, Repairable GFM Accountability and Assets Not on Contract. If CAV-AF training is required, Contractor personnel may send an email to: 406scms.cav.af.ar@us.af.mil. (CDRL A001, DI-MGMT-81634C, Commercial Asset Visibility Air Force (CAVAF) / Government Furnished Material Report)
4.4 Maintenance Records, Forms, and Publications: AFTO Form 349, AFTO 95 Maintenance Data Collection Record is required and shall be IAW T.O. 00-20-2. (CDRL A002, Data, DI-MISC-81371A/T)
4.5 Depot Maintenance Production Report: The contractor shall submit the report on the 10th calendar day after the end of each reporting period IAW the CDRL. (CDRL A003, DI-PSSS-81995)
4.6 Material Inspection and Receiving Report: For all end items repaired and shipped under this contract, copies of DD Form 250 shall be made available via the Wide Area Workflow (WAWF) or copies shall be furnished to 411 SCMS/GULAA.
4.7 Notification shall be provided to the government when long-lead time parts are required. In the event there is a need for long-lead time parts the contractor shall notify the government PCO within (10) calendar days.
4.8 Condemnation and Repair: The contractor shall be required to repair all end items unless written direction is provided by the PCO through the Administrative Contracting Officer (ACO). Requests for condemnation shall be submitted in writing through the ACO to the PCO within ten (10) calendar days following initial inspection/functional testing. Condemnations shall not be requested due to unavailability of replacement parts. Condemnations may only be granted if the item inducted for repair manifests one or more of the following conditions:
a. Physical damage that affects greater than 75 percent of the material within the end item (i.e., crushed).
b. Burn damage that affects greater than 80 percent of the internal electrical components and connections of the end item.
c. Repair cost is greater than 75 percent of the cost for a new end item.
d. Beyond Economical Repair (BERs): Requests for condemnations shall be submitted in writing to the Government Procuring Contracting Officer (PCO) within five calendar days of the intent to condemn. Condemnation authority shall be requested when the cost to repair the asset exceeds 75 percent of the units replacement cost. The contractor shall not charge the full repair cost, but only the firm fixed price associated with negotiated BER actions.
The PCO retains the right to request enlarged color photographs of any proposed condemned end item. These photographs shall clearly portray the extent of damage to the end item and/or effects of overheating. One photograph shall be of the entire end item showing the part number and serial number. The results of any electrical testing performed on the end item shall also be submitted for review. The contractor may be required to submit the proposed condemned end item to Government technical representative for evaluation, confirmation, and/or disposition instructions.
4.9 Teardown, Test, and Evaluation (TT&E): TT&E is performed by the contractor to determine the cause of failure prior to conducting actual repair, of the item. When situations occur where an asset is provided to the contractor for repair, but the contractor cannot duplicate the fault, No Fault Found (NFF), the contractor shall notify the Procuring Contracting Officer (PCO) to report same to the Government. The contractor shall not charge the full repair cost, but only the firm fixed price associated with negotiated NFF or TT&E actions.
4.10 The Government is authorized to replace condemned end items with replacement reparable end items of the same NSN at no additional cost, will bill under firm fixed price associated with negotiated BER actions. The contractor may be authorized reclamation from condemned units. The contractor shall request authorization from the PCO prior to reclaiming any items from the condemned unit. The contractor shall report the use of reclaimed items to the PCO.
4.11 Accessory and Component Reuse, Repair and Replacement: Expense parts of an end item determined unserviceable or missing shall be replaced with equivalent serviceable parts at no additional cost. Items received which are misidentified, misdirected or have Air Force recoverable subassemblies missing shall be reported through the ACO to the PCO, to 411 SCMS/GULAA for disposition instructions. Missing Repairable Expendability, Reparability, Recoverability Code (ERRC) T subassemblies or ERRC Code T subassemblies that are generated as part of the Next Higher Assembly (NHA) and subsequently require condemnation, will be replaced by the government. The replacement item may be repairable or serviceable. The repair (if required) and the installation of the replacement item into the NHA will be accomplished at no additional cost IAW T.O. 00-25-234.
4.12 Upon approval by the Government, the contractor is authorized to cannibalize repair Shop Replaceable Unit (SRU) necessary to accomplish timely repair to meet production schedule and/or accomplish repair of Mission Capable (MICAP) requirements. All cannibalized components will be returned to a pre-cannibalized condition. The contractor shall maintain a record of part numbers cannibalized including the serial number of the units from which the part was removed and installed.
4.13 Facility Requirements: The contractor shall provide a repair facility. The facility shall serve as the depot to carry out the repair and will include contractor owned test equipment, fixtures, adapters and workbenches needed for repair of the assets.
4.14 Repair items shall pass a Government approved acceptance test procedure.
4.15 Packaging and Handling: Equipment shall be handled and stored in such a manner as to prevent damage and theft. Handling of equipment shall be accomplished in accordance with T.O. 00-25-234. (MIL-STD-2073-1d, 10 May 02, Standard Practice for Military Packaging and MIL-STD-129P (4), 19 Sep 07, Military Marking for Shipment and Storage). When shipping containers are received that meet the requirements of the AFMC Form 158, Packaging Requirements, and are suitable for return shipment of serviceable assets, they shall be reclaimed, stored and protected for reuse. Unserviceable containers shall be disposed of and replaced with new containers that meet the requirements of the AFMC Form 158, Packaging Requirements.
4.16 Items received which are misidentified, misdirected, or have AF recoverable modules/subassemblies missing shall be reported to the PCO for disposition instructions.
4.17 Quality: The Contractor’s quality program shall be acceptable to the Government and shall be maintained. The Contractor’s quality program shall meet the requirements of ISO 9001:2008. When requested, the contractor shall assist the cognizant Contract Administration Office in evaluating Product Quality Deficiency Reports (PQDR) and exhibits for defects reported on items Repair under this contract to determine the root cause for deficiencies. These defects may be reported from field or depot organizations. Corrective action to prevent repeat discrepancies shall be an integral part of the contractor’s Quality Program. The contractor shall establish and maintain a program to accomplish the requirements set forth in Air Force T.O. 00-35D-54. There shall be no more than two (PQDR) annually during the performance of this contract Repair effort.
4.18 Over And Above: "Over and above work" means work discovered during the course of performing, maintenance, and repair efforts that is:
a. Within the general scope of the contract.
b. Not covered by the line item(s) for the basic work under the contract.
c. Necessary in order to satisfactorily complete the contract.
4.19 Counterfeit Prevention Plan (CPP): Contractors that supply electronic parts or systems (CDRL A004, DI-MISC-81832) and accomplished for all specified contract items. DI-MISC-81832 is applicable to Parts, Material and Processes Selection (PMPS) associated with delivery of systems and assemblies to the USAF and DoD. The requirements established by DI-MISC-81832 also apply to electronics components procured in sustainment of such systems and assemblies. The requirements of the recently DoD-adopted SAE 5553, Aerospace Standard, Counterfeit Electronics Parts; Avoidance, Detection, Mitigation, and Disposition shall also apply.
4.20 ITEM UNIQUE IDENTIFICATION (IUID)
4.20.1 The IUID Program requires each qualifying AF asset to be uniquely identified with a permanent marking that can sustain its information throughout the life of the asset. The program addresses two categories of assets—those already in the AF inventory and those currently under contract but not currently in the AF inventory. For assets under contract, IUID requirements are specified in DFARs 252-211.7003 and DODD 4100.39-M, Federal Logistics Information System. All assets subject to marking must be recorded in the DoD IUID Registry.
4.20.2 IUID Marking Plan. The Contractor’s IUID Marking Plan shall fully detail and document the strategy and scope to be used to meet MIL-STD-130, DoD Standard Practice Identification Marking of US Military Property. The plan must be approved by the Government Engineering organization, Warner Robins Air Logistics Center, AFMC AFLC/WIUES prior to implementation. (CDRL A005, DI-MGMT-81803)
4.20.3 IUID Marking Activity And Verification Report. The contractor shall provide an IUID Marking Activity and Verification Report. A key attribute for the report is the Verification column which indicates pass/fail for each item’s Data Matrix Symbol Quality. (CDRL A006, DI-MGMT-81804)
4.21 PACKAGING
4.21.1 The Contractor shall package and mark end items and components in accordance with the contract (basic or order, as applicable) Air Force Materiel Command (AFMC) Form 158, Packaging Requirements; MIL-STD-129P, Department of Defense Standard Practice / Military Marking for Shipment and Storage; MIL-STD-130N, Department of Defense Standard Practice / Identification Marking of U.S. Military Property; and MIL-STD-2073-1D, Standard Practice for Military Packaging. The Contractor shall package and mark material in accordance with other applicable Government regulations including, but not limited to, those regarding security, safety and environmental concerns.
4.21.2 The Contractor shall package and mark material for movement, shipment, receipt and storage in a manner that ensures the protection and preservation of the material for shipment to and storage at the destination.
4.21.3 In accordance with MIL-STD-2073-1D, shipping containers received, which meet the requirements of the AFMC Form 158 and are suitable for return shipment of serviceable assets, shall be reclaimed and stored for reutilization. Unsuitable shipping containers shall be disposed of and replaced with new containers that meet the requirements of the AFMC Form 158.
4.22 GOVERNMENT-INDUSTRY DATA EXCHANGE PROGRAM (GIDEP): The Contractor shall participate in GIDEP in accordance with Air Force Joint Instruction (AFJI) 63-108, Government-Industry Data Exchange Program (GIDEP), and GIDEP Operations Manual S0300-BT-PRO-010, Government-Industry Data Exchange Program.
4.23 Reviews: The contractor shall prepare Technical Interchange Meeting (TIM) and Program Management Review (PMR) agendas and briefing materials / slides, present briefings (to include preparation / distribution of minutes), and host TIMs and PMRs semi-annually, as directed by the Program Manager (PM). Dates and locations for TIMs and PMRs, as well as final agenda content, will be decided by the Air Force PM, following coordination with the Air Force PCO, applicable Government sponsors, and the contractor.
5.0 General Information
5.1 Continuation of Mission-Essential Services During a Crisis: The Functional Commander (FC) or civilian equivalent has determined these services are not mission-essential and services will not continue in the event of a crisis.
5.2 Access to Government Systems: The Government will provide Contractor personnel access to systems necessary to perform tasks under the contract/order. The Contractor shall ensure Contractor personnel who require access to any Government Automated Information System (AIS) have the appropriate background check or security investigation. The contractor shall ensure contractor personnel who require access to any classified or unclassified AIS that requires a security clearance have the appropriate security investigation for that system. The Government will provide system access subject to approval of the DD Form 2875, System Authorization Access Request (SAAR). Upon completion/termination of the contract/order or transfer/termination of Contractor personnel, the system account will be closed.
5.3 Affirmative Procurement Programs (APP) (formerly Green Procurement Program (GPP)): GPP is a mandatory federal acquisition program that focuses on the purchase and use of environmentally preferable products and services. GPP requirements apply to all acquisitions using U.S. Government appropriated funds, including services and new requirements. Agency Affirmative Procurement Program, applies and the GPP requires that the products purchased which are included in the Comprehensive Procurement Guidelines (CPG) contain recovered materials, unless the item cannot be acquired: (a) competitively within a reasonable timeframe; (b) meet appropriate performance standards, or (c) at a reasonable price. The prime contractor shall be responsible for ensuring that all subcontractors comply with this requirement.
5.4 Safety Requirements: While performing work under this contract the contractor shall comply with all applicable federal, state and local regulations regarding occupational safety and health. The contractor shall notify the Government Representative (GR), within eight (8) hours of any damage to government property where the dollar value exceeds $500,000.00 and within two calendar days, for any damage to government property less than $500,000.00 during the execution of the contract. Mishap notifications shall contain, as a minimum, the following information:
a. Contract, Contract Number, Name and Title of Person(s) Reporting
b. Date, Time and exact location of accident/incident
c. Brief Narrative of accident/incident (Events leading to accident/incident)
d. Cause of accident/incident, if known
e. Estimated cost of accident/incident (material and labor to repair/replace)
f. Nomenclature of equipment and personnel involved in accident/incident
g. Corrective actions (taken or proposed)
h. Other pertinent information If requested by the designated GR, the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the Procuring Safety Office.
5.5 Inspection of Services: Inspection of Services will be accomplished in accordance with the FAR and applicable supplements and shall be in compliance with all applicable guidance and clauses listed in the contract. The Government reserves the right to inspect Contractor performance.
5.6 Trafficking in Persons: The Contractor shall comply in accordance with the FAR and applicable supplements and shall be in compliance with all applicable guidance and clauses listed in the contract as it relates to Trafficking in Persons. Additional information about Trafficking in Persons is available at the site for the Department of State’s Office to Monitor and Combat Trafficking in Persons. http://www.state.gov/j/tip
5.8 Contractor Manpower Reporting:
5.8.1 In accordance with the Contractor Manpower Reporting / Contractor Quick Reference Guide, the Contractor shall establish a record for the contract/order in the Enterprise-wide Contractor Manpower Reporting Application (eCMRA) no later than 30 calendar days after contract/order award. In accordance with the Contractor Manpower Reporting / Contractor User Guide, the Contractor shall enter Order Data, Contact Data and Location Data.
5.8.2 In accordance with the Secretary of the Air Force for Acquisition (SAF/AQ) Memorandum, Implementation of FY11 National Defense Authorization Act (NDAA) Section 8108 of Public Law 112-10 of the Department of Defense and Full-Year Continuing Appropriations Act, 2011, Contractor Inventory, dated Nov 13 2012, the Contractor shall provide an annual count of Contractor/subcontractor personnel performing work if the DoD is the requiring activity, if the acquisition is using U.S. Government appropriated funds, and if the acquisition is equal to or greater than the Simplified Acquisition Threshold (SAT).
5.8.3 In accordance with the Office of the Secretary of Defense (OSD) Memorandum, Enterprise-wide Contractor Manpower Reporting Application, dated Nov 28, 2012, the Contractor shall report all Contractor labor hours, including subcontractor labor hours, required for performance of the services provided under the contract at the eCMRA site below. Reporting shall be conducted for each fiscal year, which extends October 1 through September 30. While inputs may be made any time during the fiscal year, all data shall be reported no later than October 31 of the following fiscal year. The Contractor may direct questions to the help desk at the eCMRA site. http://www.ecmra.mil
5.9 Invoicing/Payment and Receipt/Acceptance: The Contractor shall submit/process payment requests and receipt/acceptance documents via Wide Area WorkFlow e-Business Suite / Invoicing, Receipt, Acceptance, and Property Transfer (iRAPT) in accordance with all applicable clauses located in the basic contract.
6.0 Appendix: References
| Publication Number |
| Publication Title |
| Publication Date |
| Specific Paragraph Reference |
| ISO 9001:2008 |
| Quality Management Systems Requirements |
| Dec 2008 |
| Entire |
MIL-STD-129P
With Change 4
| Military Marking for Shipment and Storage |
| 19 Sep 07 |
| Entire |
| MIL-STD-130N |
| Department of Defense / Standard Practice / Identification Marking of U.S. Military Property |
17 December 2007 Change 1 – 16 November 2012 http://www.acq.osd.mil/dpap/pdi/uid/docs/MIL-Std130N_Ch1.pdf
Entire
MIL-STD-2073-1d With Change 1 Standard Practice for Military Packaging
10 May 02 Entire
OSHA Public Law 91-596
| Occupational Safety and Health Act (OSHA) of 1970 |
| Jan 2004 |
| Entire |
| 00-20-2 |
| Maintenance Data Documentation |
| Nov 2012 |
| Entire |
00-25-234 With change 38
| General Shop Practice Requirement for the Overhaul Maintenance and Test of Electrical Equipment |
| Aug 1998, Sep 2009 |
| Entire |
| 00-35D-54 |
| USAF Deficiency Reporting, Investigation, and Resolution |
| Nov 2011 |
| Entire |
| (DFARS) clause 252.237-7023 |
| Continuation of Essential Contractor Services and |
| Oct 2010 |
| Entire |
| (DODD 4715.1E) |
| Environmental, Safety, and Occupational Health (ESOH) |
| March 19, 2005 |
http://www.dtic.mil/whs/directives/corres/pub1.html Entire
Draft PWS FD2060-18-000002
PR: FD2060-18-00002 PWS 10