Contract Data Requirements List, DD Form 1423-1
View the file
Other files
| File | Type | Posted |
|---|---|---|
| redacted_ja_Redacted.pdf | ||
| PWS.docx | DOCX document | |
| GFP_Attachment.pdf | ||
| FA8524-17-R-0023.pdf | ||
| 2198295_PKGRQMT_REPORT.pdf | ||
| dd2875_instructions.doc | DOC document | |
| dd2875.pdf | ||
| SPI.pdf | ||
| CAV_AF_SOW_17April13.pdf | ||
| Wage_determination.pdf | ||
| 2199928_TRNSPDATA_REPORT.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188(1 Data Item)
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188).
Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
60/90 KVA / Voltage Regulator
E. CONTRACT / PR NO.
FD20601800002
F. CONTRACTOR
GE Aviation Systems LLC
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
Commercial Asset Visibility Air Force
3. SUBTITLE
CAV AF
4. AUTHORITY
DI-MGMT-81634C
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS para 4.3
6. REQUIRING OFFICE
FA8524
7. DD 250 REQ
LT
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
A
10. FREQUENCY
See Block 16
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
White, James HNAME: 15 MAR 2017DATE:
1. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF web site or CICA XML IAW the referenced DID IAW and/or CAV AF CFM SOW. This information will be accessed by the program office PMS and by 420 SCMS/GUNAB-Robins in order to ascertain production status.
2. Transactions and data will be submitted by the contractor daily IAW CAV AF User Guide, Version 8.0.1 or higher.
The Contractor shall obtain a valid DOD PKI certificate to log into CAV AF. Each user shall be required to have an Identity Certificate only; an encryption certificate is not required.
3. Training will be provided by 420 SCMS/GUNAB-Robins, (478) 327-6603 or 6602.
4. This DD Form 1423-1 applies to Contractor Furnished Materiel (CFM) type contracts.
Block 7: Enter the applicable code as listed in DOD 5010.12-M, Chapter 3. (Enter LT for Letter of Transmittal if not separately priced or DD if separately priced.)
Block 10:
a. Contractor reporting requirements to CAV AF shall be accomplished daily and/or within 24 hours of a supply or maintenance action occurrence IAW Contractor Users Guide.
b. The method of communication from the contractor to the funding base will be mechanized using the CAV AF Online web site IAW CAV AF Contractor Users Guide.
Block 11: Data shall be current within 24 hours of last End Item maintenance occurrence.
Block 12: Date of first submission shall be within 24 hours following a supply or maintenance transaction after the contract award date and government training as specified in IAW CAV AF Users Guide.
Block 13: Same as remarks regarding Block 10 above.
COORDINATORS:
15. TOTAL
G. PREPARED BY
White, James H
411 SCMS / GULA
478-222-0843
H. DATE
16 MAR 2017
I. APPROVED BY
//DIGITALLY SIGNED//
STEWART.TODD.RICHARD.1071073277
411 SCMS / GULB 478-926-3258 / 468-3258
J. DATE
16 MAR 2017
Page 1 of 6DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 21 Mar 2017
PREVIOUS EDITION MAY BE USED.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
60/90 KVA / Voltage Regulator
E. CONTRACT / PR NO.
FD20601800002
F. CONTRACTOR
GE Aviation Systems LLC
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
AFTO FORM 349, AFTO 95
3. SUBTITLE
Maintenance Data Collection Record
4. AUTHORITY
DI-MISC-81371A/T
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS PARA 4.4 / IAW T.O. 00-20-2
6. REQUIRING OFFICE
411 SCMS/GUEA
7. DD 250 REQ
LT
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
See Block 16
10. FREQUENCY
MTHLY
11. AS OF DATE
SEE BLOCK 16
12. DATE OF FIRST
SUBMISSION
SEE BLOCK 16
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
White, James HNAME: 14 MAR 2017DATE:
Block 4: Tailored to provide for submission of reports electronically, in contractor format, in lieu of AFTO 349.
Block 7: WAWF E-DD Form 250 shall be required for priced data. E-DD Form 250 shall be submitted to FA8524 for accceptance.
Blocks 10 - 13: Reports shall be submitted to arrive NLT 10th calendar day after the end of the month being reported.
Report shall include information for each item being repaired during the month. Negative reports are not required.
Block 14: E-mail all reports accordingly to the ES and the PMS.
COORDINATORS:
(ES) marcus.brady@us.af.mil 0 1 0 411scms.pms@us.af.mil 0 1 0 ATTN: Production Management Specialist 411 SCMS/GULA 235 Byron St Suite 19A Robins AFB GA 31098
PMS:
james.white.21@us.af.mil
0 1 0
0 3 015. TOTAL
G. PREPARED BY
White, James H
411 SCMS / GULA
478-222-0843
H. DATE
16 MAR 2017
I. APPROVED BY
//DIGITALLY SIGNED//
STEWART.TODD.RICHARD.1071073277
411 SCMS / GULB 478-926-3258 / 468-3258
J. DATE
16 MAR 2017
Page 2 of 6DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 21 Mar 2017
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
60/90 KVA / Voltage Regulator
E. CONTRACT / PR NO.
FD20601800002
F. CONTRACTOR
GE Aviation Systems LLC
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM
Contract Depot Maintenance (CDM) Production Report
3. SUBTITLE
Production Report
4. AUTHORITY
DI-PSSS-81995
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS PAR. 4.5
6. REQUIRING OFFICE
411 SCMS/GULAA
7. DD 250 REQ
DD
8. APP CODE
See Block 16
9. DIST STATEMENT
REQUIRED
A
10. FREQUENCY
MTHLY
11. AS OF DATE
SEE BLOCK 16
12. DATE OF FIRST
SUBMISSION
SEE BLOCK 16
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
White, James HNAME: 15 MAR 2017DATE:
BLK 4: The Data Item Description (DID) contains the format, content and preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract. This report shall be provided in the format of Table 1. See DID for Table 1 and content requirement explanations at http://quicksearch.dla.mil/ for content requirements.
BLK 7: WAWF E-DD FORM 250 shall be required for separately priced data. E-DD FORM 250 shall be submitted to Program Manager (PM)/FA8524 designated email address listed in BLK 14.
BLK 8: Approval (written) is not required. However, the data item will be reviewed and accepted/rejected, based on its conforming to the requirements of the DID, and within the review time specified in BLK 16.
BLK 9: "A" Approved for Public Release; distribution is unlimited.
BLK 10-13: Report shall be submitted NLT the 10th calendar day after the end of the month being reported.
BLK 14: EMAIL electronic Contract Depot Maintenance Production Report to the Production Management Specialist(PMS) and Program Manager(PM). Points of contact will be provided to the contractor at contract award.
Submit digital copy in a Microsoft Office compatible format or Adobe PDF for all reports.
COORDINATORS:
411 SCMS/PMS Workflow Email:
411scms.pms@us.af.mil
0 1 0
ATTN: Production Management Specialist 411 SCMS/GULA 235 Byron St Suite 19A Robins AFB GA 31098
PMS:
james.white.21@us.af.mil
0 1 0
0 2 015. TOTAL
G. PREPARED BY
White, James H
411 SCMS / GULA
478-222-0843
H. DATE
16 MAR 2017
I. APPROVED BY
//DIGITALLY SIGNED//
STEWART.TODD.RICHARD.1071073277
411 SCMS / GULB 478-926-3258 / 468-3258
J. DATE
16 MAR 2017
Page 3 of 6DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 21 Mar 2017
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
60/90 KVA / Voltage Regulator
E. CONTRACT / PR NO.
FD20601800002
F. CONTRACTOR
GE Aviation Systems LLC
1. DATA ITEM NO.
A004
2. TITLE OF DATA ITEM
Counterfeit Prevention Plan
3. SUBTITLE
CPP Report
4. AUTHORITY
DI-MISC-81832
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS Paragraph 4.19
6. REQUIRING OFFICE
AFLCMC/WIUEA
7. DD 250 REQ
LT
8. APP CODE
A
9. DIST STATEMENT
REQUIRED
C
10. FREQUENCY
See Block 16
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
White, James HNAME: 15 MAR 2017DATE:
Block 7: The Contractor shall submit the Receiving Report upon final Government acceptance through Wide Area Workflow (WAWF) to collectively account for data previously submitted by Letter of Transmittals. GOVERNMENT
WILL APPROVE/DISAPPROVE WITHIN 15 BUSINESS DAYS OF RECEIPT.
Block 8,10-13: Draft report shall be submitted within 30 workdays after contract award. Contractor shall provide quarterly updates as necessary until final at completion of program. The Government will have 15 workdays to approve, submit comments, or disapprove all submissions. the contractor shall have 15 workdays to resubmit report if changes were deemed necessary by the Government.
Block 9: Distribution authorized to U.S. Government Agencies and their contractors (Administrative or Operational use)(19 July 07). Other requests shall be referred to the contract management team, AFSC/PZAA, 460 Richard ray Blvd, Suite 221, Robins AFB, GA 31098.
Block 14: Submit digital copy in a Microsoft office compatible format or Adobe Portable Format for all reports. Email report to all addressee listed in block 14.
COORDINATORS:
ATTN: Engineering, AFLCMC/WIUEA
235 Byron St. Suite 19A Robins AFB, GA 31098 Engineer:
christopher.traylor.1@us.af.mi
1 1 0
ATTN: Program Manager and
COR
411 SCMS/GULA 460
Richard Ray Blvd Suite 200 Robins AFB GA 31098 Program Manager:
charles.fleming@us.af.mil
1 1 0
2 2 015. TOTAL
G. PREPARED BY
White, James H
411 SCMS / GULA
478-222-0843
H. DATE
16 MAR 2017
I. APPROVED BY
//DIGITALLY SIGNED//
STEWART.TODD.RICHARD.1071073277
411 SCMS / GULB 478-926-3258 / 468-3258
J. DATE
16 MAR 2017
Page 4 of 6DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 21 Mar 2017
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
60/90 KVA / Voltage Regulator
E. CONTRACT / PR NO.
FD20601800002
F. CONTRACTOR
GE Aviation Systems LLC
1. DATA ITEM NO.
A005
2. TITLE OF DATA ITEM
Item Unique Identification (IUID)
3. SUBTITLE
IUID Marking Plan
4. AUTHORITY
DI-MGMT-81803
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS Para 4.20.2
6. REQUIRING OFFICE
AFLCMC/WIUE
7. DD 250 REQ
LT
8. APP CODE
See Block 16
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
See Block 16
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
White, James HNAME: 15 MAR 2017DATE:
Block 7: The Contractor shall submit the Receiving Report upon final Government acceptance through Wide Area Workflow to collectively account for data previously submitted by Letter of Transmittal.
Block 8: Approval (written) is not required. However, the data item will be reviewed and accepted/rejected, based on its conforming to the requirements of the DID, and within the review time specified in Block 16, items 10-12.
Block 9: Distribution authorized to the Department of Defense and U.S. DoD contractors only. Other requests shall be referred to the contract management team, AFSC/PZAAA, 460 Richard Ray Blvd, Suite 221, Robins AFB, GA 31098
Block 10-12: Contractor shall submit an IUID Marking Plan, to the Engineer, AFLCMC/WIUEA, within 10 working days after contract award. Written Government acceptance/comments/rejection will be within 10 working days after receipt of Plan from the Contractor. Contractor final submission shall be submitted within 10 working days of receiving Government comments. Acceptance by the Government is required prior to formal distribution.
Block 13: If, during the performance of this contract, changes to the IUID Marking Plan are required, submit the revised IUID Marking Plan to Engineering Office, AFLCMC/WIUEA, 235 Byron Street, Suite 19A, Robins AFB, GA 31098.
Procedures identified for blocks 8 & 10-12 will apply.
Block 14: EMAIL Report to the Procuring Contract Officer (PCO), DCMA/ACO, Program Manager and Engineer.
CDRL Distribution Points of Contact will be provided to the Contractor at Contract Award.
COORDINATORS:
ATTN: DCMA/ACO 0 1 0
ATTN: Engineering
AFLMC/WIUEA
235 Byron St. Suite 19A Robins AFB,GA 31098 Email:
chris.traylor.1@us.af.mil
1 1 0
ATTN: PCO, AFSC/PZAAA 0 1 0
ATTN: Production Management Specialist 411 SCMS/GULA 235 Byron St Suite 19A Robins AFB GA 31098
PMS:
james.white.21@us.af.mil
1 1 0
ATTN: Program Manager &
COR
411 SCMS/GULAA
235 Byron Street, Suite 19A Robins AFB GA 31098 Email:
charles.fleming@us.af.mil
1 1 0
3 5 015. TOTAL
G. PREPARED BY
White, James H
411 SCMS / GULA
478-222-0843
H. DATE
16 MAR 2017
I. APPROVED BY
//DIGITALLY SIGNED//
STEWART.TODD.RICHARD.1071073277
411 SCMS / GULB 478-926-3258 / 468-3258
J. DATE
16 MAR 2017
Page 5 of 6DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 21 Mar 2017
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
60/90 KVA / Voltage Regulator
E. CONTRACT / PR NO.
FD20601800002
F. CONTRACTOR
GE Aviation Systems LLC
1. DATA ITEM NO.
A006
2. TITLE OF DATA ITEM
IUID MARKING ACTIVITY AND VERIFICATION
REPORT
3. SUBTITLE
IUID MARKING ACTIVITY
4. AUTHORITY
DI-MGMT-81804
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS Para 4.20.3
6. REQUIRING OFFICE
AFLCMC/WIUE
7. DD 250 REQ
LT
8. APP CODE
A
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
QRTLY
11. AS OF DATE
SEE BLK 16
12. DATE OF FIRST
SUBMISSION
SEE BLK 16
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLK 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
White, James HNAME: 15 MAR 2017DATE:
Block 7: The Contractor shall submit a Receiving Report upon final Government acceptance through Wide Area Workflow (WAWF) to collectively account for data previously submitted by Letter of Transmittal.
Block 8, 10-12: Contractor shall submit an IUID Marking Activity and Verification Report, to the Engineer, AFLCMC/WIUEC every three months. Written Government acceptance/comments/rejection will be within 10 working days after receipt of Report from the Contractor. Contractor final submission shall be submitted within 10 working days of receiving Government comments. Acceptance by the Government is required prior to formal distribution.
Block 9: Distribution authorized to the Department of Defense and U.S. DoD contractors only. Other requests shall be referred to the contract management team, AFSC/PZAAA, 460 Richard Ray Blvd, Suite 221, Robins AFB, GA 31098.
Block 13: If, during the performance of this contract, changes to the IUID Marking Plan are required, submit the revised IUID Marking Plan to Engineering Office, AFLCMC/WIUEC, 235 Byron Street, Suite 19A, Robins AFB, GA 31098.
Procedures identified for blocks 8, 10-12 will apply.
Block 14: EMAIL Report to the Procuring Contract Officer, DCMA/ACO, Program Manager and Engineer. CDRL Distribution Points of Contact will be provided to the Contractor at Contract Award
COORDINATORS:
AFLCMC/WIUEA
235 Byron Street, Suite 19A Robins AFB, GA 31098
1 1 0
ATTN: PCO,
AFSC/PZAAA
460 Richard Ray Blvd, Suite Robins AFB, GA. 31098
0 1 0
DCMA/ACO 0 1 0
Program Mgr: Charles Fleming, 411 SCMS/GULA PRIMARY COR: Charles Fleming, 411 SCMS/GULA Email:
charles.fleming@us.af.mil
0 1 0
1 4 015. TOTAL
G. PREPARED BY
White, James H
411 SCMS / GULA
478-222-0843
H. DATE
16 MAR 2017
I. APPROVED BY
//DIGITALLY SIGNED//
STEWART.TODD.RICHARD.1071073277
411 SCMS / GULB 478-926-3258 / 468-3258
J. DATE
16 MAR 2017
Page 6 of 6DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 21 Mar 2017
File details come from the government source that posted it. Updated .