PWS.pdf.pdf
PDF 68 KB Posted
- Attached to
- Repair Color Weather Radar
- Solicitation number
- FA8524-15-R-01004
About this file
Performance-Based Work Statement - HH-60G Color Weather Radar (CWR) System Repair
View the file
Other files
| File | Type | Posted |
|---|---|---|
| JA__FA8524-16-D-0002_Redacted.pdf | ||
| FA852415R01004_-_amended_9-2-15.pdf | ||
| CDRLS.pdf.pdf | ||
| Packaging.pdf.pdf | ||
| FA852415R01004.pdf | ||
| Transportation.pdf.pdf | ||
| GFP_ATTACHMENT.pdf.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PR: FD2060-14-01004 PWS 1
Performance-based Work Statement (PWS)
Date: 3 Feb 15
For
FD2060-14-01004
Repair of HH-60G Color Weather Radar (CWR) system consisting of:
NSN NOUN
5841-01-363-2767SO Receiver-Transmitter 5841-01-267-5934SO Receiver-Transmitter 5985-01-009-2872SO Antenna Drive Unit 5841-01-267-5932SO Indicator 5841-01-412-7459SO Interface unit
1.0 Description of Services
1.1 Objective(s): This PWS is for depot level repair of the Color Weather Radar (CWR) system installed on the HH-60G helicopter. The CWR system consists of one Receiver-Transmitter, either NSN5841-01-363-2767SO or 5841-01-267-5934SO, which is interchangeable, one Antenna Drive Unit, NSN5985-01-009-2872SO one Interface Unit, NSN5841-01-412-7459SO and one Indicator, NSN5841-01-267-5932SO. These services include inspection, test bench check, and required disassembly, needed for ensuring conformance to the Original Equipment Manufacturer (OEM) data and specifications. The extent of repair work required shall be determined by the initial inspection/ functional checkout and the disassembly/assembly required to return an asset to a serviceable end item that shall efficiently serve its intended purpose. The contractor shall comply with the quality levels of repair necessary to return each Color Weather Radar asset to serviceable condition and on time. Original design of the end item and parts thereof, or the design functional capabilities of the end item, shall not be changed, modified or altered unless such changes are authorized in writing by the Procuring Contracting Officer (PCO). The contractor shall deliver quality data/documents free of technical errors. Timely and accurate reporting in CAV-AF shall be provided by the contractor.
1.0 Benefit to United States Air Force (USAF): The CWR system is Mission Critical for the HH-60G helicopter combat search and rescue mission. Without continued repair coverage of the CWR system, mission capability and effectiveness will be degraded. Crew effectiveness could be hampered without full situational awareness tools provided by the CWR system. The current workload placed on HH-60G aircrew performing combat missions are already at critical levels and could negatively impact mission success if a break in repair coverage occurs. This acquisition will benefit the USAF by ensuring continued repair coverage and result in more aircraft available with a functional CWR system to perform the Special Operation Forces (SOF) mission.
PR: FD2060-14-01004 PWS 2
2.0 Services Summary
Performance Objective
PWS
Reference
Performance Threshold
Comply with the quality levels of repair necessary to return assets to serviceable condition.
4.1 There shall be no more than one Quality Deficiency Report (QDR) per contract year.
Deliver repaired assets on time.
4.2.1
There shall be no more than one late delivery per quarter. The Contractor shall notify the Government if the delivery of any asset will not meet the scheduled delivery date and negotiate a revised delivery date.
The late asset shall be delivered by a revised delivery date acceptable to the Government.
Deliver quality data / documents free of technical errors
4.2.2
There shall be no more than three rejections of each data/document. The Government will reject the submitted data/document if one or more technical errors are found within the data/document. A technical error is defined as the format not being in accordance with the CDRL or the content not being accurate and complete in accordance with the CDRL, PWS or contract. The rejected data/document shall be corrected and resubmitted within 15 business days of notification of Government rejection.
Provide timely and accurate reporting in CAV-AF.
4.7
The Contractor shall report supply and maintenance actions using CAV-AF. The Contractor shall provide data on the actions conducted for each unit. The Contractor shall report daily or as actions occur.
3.0 Government Property and Services
3.1 Contractor Responsibility: The Contractor shall be responsible for Government property in their possession in accordance with the Federal Acquisition Regulation (FAR) and applicable supplements including, but not limited to, FAR Part 45, Government Property; FAR 52.245-1, Government Property; and Defense Federal Acquisition Regulation Supplement (DFARS) Part 245, Government Property. The FAR and applicable supplements can be accessed at http://farsite.hill.af.mil.
3.2 Government Property to be provided: Government property (including material, equipment, etc.) will not be provided.
3.3 Government System(s): The Government will provide Contractor personnel access to system(s) necessary to perform tasks under the contract/order. Upon completion/termination of contract/order or transfer/termination of Contractor personnel, the system account(s) will be closed.
PR: FD2060-14-01004 PWS 3
4.0 Technical Requirements
4.1 Quality. The Contractor’s quality program shall be established and maintained IAW FAR 52.246-11, Higher-Level Contract Quality Requirement, or equivalent. The Contractor’s quality program shall meet the requirements of ISO 9001:2008, Quality Management Systems Requirements. When requested, the contractor shall assist the cognizant Contract Administration Office in evaluating Product Deficiency Reports (PQDRs) and exhibits for defects reported on items repaired under this contract to determine the root cause for deficiencies. These defects may be reported from field or depot organizations. Corrective action to prevent repeat discrepancies shall be an integral part of the contractor’s Quality Program. The contractor shall establish and maintain a program to accomplish the requirements set forth in Air Force T.O. 00- 35D-54, USAF Deficiency Reporting, Investigation, and Resolution. There shall be no more than one Quality Deficiency Report (QDR) per contract year.
4.2 Delivery Schedule.
4.2.1 Assets Repair Turn Around Time: The contractor is required to perform depot level repair of the System assets. The contractor shall return the end items to serviceable condition within 45 workdays of receipt of asset or funded task order, whichever is later. If the repair action cannot be completed within 45 workdays, notification to the Government must be made within three workdays of not meeting the delivery date. Notification shall include the reason for not meeting the delivery schedule, what the contractor will do to preclude the delay from happening again and the date the item will be returned to a serviceable condition. SURGE/MICAP items shall be shipped within 30 workdays TAT from receipt of item or after receipt of order, whichever is later. Only one schedule slippage allowed per quarter. The CWR system is a mission critical item. After receipt of funded order or assets, whichever is later, contractor shall repair and ship assets to the government within 45 work days. Only one schedule slippage allowed per quarter.
The Contractor shall notify the Government if the delivery of any asset will not meet the scheduled delivery date and negotiate a revised delivery date. The late asset shall be delivered by a revised delivery date acceptable to the Government.
4.2.2 Contract Data Requirements List (CDRL): There shall be no more than three rejections of each data/document. The Government will reject the submitted data/document if one or more technical errors are found within the data/document. A technical error is defined as the format not being in accordance with the CDRL or the content not being accurate and complete in accordance with the CDRL, PWS or contract. The rejected data/document shall be corrected and resubmitted within 15 business days of notification of Government rejection. The Government will reject the submitted data/document if one or more technical errors are found within the data/document. A technical error is defined as the format not being in accordance with the CDRL or the content not being accurate and complete in accordance with the CDRL, PWS or contract.
PR: FD2060-14-01004 PWS 4
4.3 Period and Place of Performance
4.3.1 Contract/Order Period of Performance: The period of performance for the contract/order extends five years to include a Basic Year and four Options Years.
4.3.2 Place of Performance: These services shall be performed exclusively not on a U.S.
Government installation. The place of performance is to be at the following address:
To Be Determined (Limited Competition)
4.4 Item Unique Identification (IUID)
4.4.1 In accordance with DFARS 252-211.7003(a), Item Identification and Valuation / Definitions, “ ‘DoD unique item identification’ means a system of marking items delivered to DoD with unique item identifiers that have machine-readable data elements to distinguish an item from all other like and unlike items.” Unique item identification is required for all items that meet the criteria established by DFARS 211.274-2, Policy for unique item identification.
4.4.2 The Contractor shall mark items in accordance with DFARS 211.274-2, DFARS 252- 211.7003, and Military Standard (MIL-STD)-130N, Department of Defense Standard Practice / Identification Marking of U.S. Military Property.
4.4.3 In accordance with the Department of Defense Guide to Uniquely Identifying Items Assuring Valuation, Accountability and Control of Government Property, the Government user will add item(s) to the Department of Defense (DoD) IUID Registry. The Government user or Contractor representative responsible for causing “life cycle events” (i.e., abandoned, consumed, destroyed by accident, destroyed by combat, donated, exchanged – repair, exchanged – sold, exchanged – warranty, expended – experimental/target, expended – normal use, leased, loaned, lost, reintroduced, retired, scrapped, sold – foreign government, sold – historic, sold – nongovernment, sold – other federal, sold – state/local, and stolen) will update the item record(s) in the DoD IUID Registry.
4.4.4 IUID Marking Plan: The Contractor’s IUID Marking Plan shall fully detail and document the strategy and scope to be used to meet MIL-STD-130, DoD Standard Practice Identification Marking of US Military Property. The plan must be approved by AFLCMC/WIEUA prior to implementation. (CDRL A001, DI-MGMT-81803).
4.4.5 IUID Marking Activity and Verification Report: The contractor shall provide an IUID Marking Activity and Verification Report. A key attribute for the report is the Verification column which indicates pass/fail for each item’s Data Matrix Symbol Quality.
(CDRL A002, DI-MGMT-81804)
PR: FD2060-14-01004 PWS 5
4.5 Packaging
4.5.1 The Contractor shall package and mark end items and components in accordance with the contract (basic or order, as applicable) Air Force Materiel Command (AFMC) Form 158, Packaging Requirements; MIL-STD-129P, Department of Defense Standard Practice / Military Marking for Shipment and Storage; MIL-STD-130N, Department of Defense Standard Practice / Identification Marking of U.S. Military Property; and MIL-STD-2073-1D, Standard Practice for Military Packaging. The Contractor shall package and mark material in accordance with other applicable Government regulations including, but not limited to, those regarding security, safety and environmental concerns.
4.5.2 The Contractor shall package and mark material for movement, shipment, receipt and storage in a manner that ensures the protection and preservation of the material for shipment to and storage at the destination. The Contractor shall package electronic parts susceptible to static discharge damage in accordance with MIL-STD-1686C, Military Standard: Electrostatic Discharge Control Program for Protection of Electrical and Electronic Parts, Assemblies and Equipment (Excluding Electrically Initiated Explosive Devices).
4.5.3 In accordance with MIL-STD-2073-1D, shipping containers received, which meet the requirements of the AFMC Form 158 and are suitable for return shipment of serviceable assets, shall be reclaimed and stored for reutilization. Unsuitable shipping containers shall be disposed of and replaced with new containers that meet the requirements of the AFMC Form 158.
4.6. Counterfeit Electronics Parts: The Contractor shall establish policy and procedures to mitigate the risk of counterfeit electronics parts being installed in end items or otherwise entering the USAF/DoD inventory in accordance with Aerospace Standard (AS)5553A, Counterfeit Electronics Parts; Avoidance, Detection, Mitigation, and Disposition.
4.6.1. Counterfeit Prevention Plan (CPP). Contractors that supply electronic parts or systems that contain electronic parts shall establish policies and procedures to avoid, detect, mitigate and disposition counterfeit electronic parts to prevent such parts from entering the USAF/DoD supply chain. These policies and procedures shall be documented in a CPP for submission and approval in accordance with Data Item Description (DID) DI-MISC-81832 and accomplished for all specified contract items. DI-MISC-81832 is applicable to Parts, Material and Processes Selection (PMPS) associated with delivery of systems and assemblies to the USAF and DoD.
The requirements established by DI-MISC-81832 also apply to electronics components procured in sustainment of such systems and assemblies. The requirements of the recently DoD-adopted Aerospace Standard (AS)5553A, Counterfeit Electronics Parts; Avoidance, Detection, Mitigation, and Disposition shall also apply.
4.6.2. At a minimum, the CPP shall address:
4.6.2.1. Applicability. The Contractor shall identify all Business locations and programs to which the CPP applies. The CPP shall address materials, hardware, electronic parts, and procured assemblies.
PR: FD2060-14-01004 PWS 6
4.6.2.2. Definitions. The Contractor shall utilize definitions per AS 5553 to ensure consistency.
Any contractor-derived definitions must be included in an appropriate CPP appendix or annex.
(Ref. AS5553, paragraph 3, 3.1, 3.2, 3.3, appendix H)
4.6.2.3. Parts Availability and Use of Parts Brokers. The Contractor shall not procure materials, systems, assemblies, subassemblies or parts from parts Brokers when available from Original Manufacturers (OM) or their Authorized Distributors. In cases where materials, systems, assemblies, subassemblies or parts are no longer available from the OM or their Authorized Distributors, procurement from Brokers may be authorized as defined by the Contractor’s policy and their CPP. (Ref. AS5553, paragraph 4.1.1, 4.1.2.e., appendix A)
4.6.2.4. Procurement Policies. The Contractor shall provide and implement policy directing development and implementation of business practices and procedures, and processes to prevent procurement of Counterfeit materials and parts. The Contractor shall identify the appropriate office(s), business units, functional organizations, and programs, which shall have responsibility for development, maintenance and implementation of the CPP. The CPP shall identify specific roles and responsibility for each. (Ref. AS5553, paragraph 4.1.2, 4.1.3, appendix B, C, D)
4.6.2.4.1. Risk Assessment. The contract shall address the risk of using unknown sources and or unauthorized suppliers in the CPP. Application or technical risk assessments shall establish the effect that counterfeit parts may have on performance. Vendor or source of supply risk assessments shall establish the potential for obtaining counterfeit parts. Using any risk analysis tool acceptable to the Government, the Contractor shall conduct a risk assessment based upon item characteristics and how likely it is that a counterfeit part will be received. The contractor shall identify and describe in the CPP how parts are selected for assessment and what risk is acceptable based upon the parts design, construction, material and functional requirements. As a minimum, analysis shall be completed for flagging high risk items, such as items that are obsolete, discontinued, rare, etc. The contractor shall require completion of a trade study, documented within the CPP that shall facilitate determining whether 100% testing of parts procured from after-market sources is more cost effective than qualification or requalification of a manufacturer. (Ref. AS5553, paragraph 4.1.2, 4.1.3, appendix B, C, D)
4.6.2.5. Detection and Avoidance Responsibilities. The Contractor shall establish processes for the review and approval of contractor and applicable subcontractor systems for the detection and avoidance of counterfeit electronic parts and suspect counterfeit electronic parts, which processes shall be comparable to the processes established for contractor business systems under section 893 of the Ike Skelton National Defense Authorization Act for Fiscal Year 2011 (Public Law 111–383; 124 Stat. 4311; 10 U.S.C. 2302 note). The Contractor shall flow down such requirements and processes to their subcontractors per ODASD Memo titled “Overarching DoD Counterfeit Prevention Guidance”, dated 16 March 2012. (Ref. AS5553, paragraph 4.1.4, 4.1.5, appendix E)
4.6.2.6. Testing and Verification. The Contractor shall establish and accomplish testing and verification processes for items not received from an original equipment manufacturer, original component manufacturer, or authorized distributor that are identified as having high risk for counterfeit potential. These processes apply to prime contracts, and to subcontracts or suppliers
PR: FD2060-14-01004 PWS 7
below the prime contracts. The Contractor shall provide a list of acceptable test facilities if the subcontractor or supplier does not have the capability to perform required testing. Submittal of Certificates of Compliance indicating the parts are not counterfeit shall be acceptable for verification of testing. (Ref. AS5553, paragraph 4.1.4, appendix E)
4.6.2.7. Configuration Identification and Traceability. The Contractor shall identify and control the configurations of all systems, assemblies, subassemblies and parts, and enable mechanisms to provide traceability of parts. The Contractor shall report to the Government when control of the configurations of all systems, assemblies, subassemblies and parts, and mechanisms to provide traceability of parts are not possible. The Contractor shall identify the specific systems, assemblies, subassemblies and parts beyond the Contractors’ control. The Contractor shall be responsible for detecting and avoiding the use or inclusion of counterfeit materials and parts, to include procured assemblies and subassemblies, in such products and shall be responsible for the rework or corrective action that may be required to resolve the use or inclusion of counterfeit materials and parts. The cost of counterfeit electronic parts and suspect counterfeit electronic parts and the cost of rework or corrective action that may be required to remedy the use or inclusion of such parts are not allowable costs under Department contracts , unless: a) the contractor has established a counterfeit avoidance/detection system approved by the DoD, b) the counterfeit parts were procured from a DoD-accredited trusted supplier or provided as government property, and c) the contractor has provided timely notification to the government.
(Ref. AS5553, paragraph 4.1.6, appendix F)
4.6.2.8. Counterfeit Notification and Reporting. The Contractor shall report in writing to the Procuring Activity within 30 days of determining any end item, component, part, or material contained in supplies purchased by the Department of Defense, or purchased by a contractor or subcontractor for delivery to, or on behalf of, the Department, contains counterfeit electronic parts or suspect counterfeit electronic parts for the purpose of investigation and notification of the Air Force Office of Special Investigations (AFOSI). The Procuring Contracting Officer (PCO) shall coordinate reporting to the appropriate Program Management/Item Management, System Engineering Management, the AFMC Discrepant Materiel Reporting Program (DMRP) Office in 406 SCMS/GULAB, and the AFOSI. Additionally, the Contractor shall within the same 30 day period ensure all suspected or confirmed counterfeit items are entered into the Government-Industry Data Exchange Program (GIDEP) system, which will serve as the DoD central reporting repository. (Ref. AS5553, paragraph 4.1.7, appendix G)
4.6.2.9. Counterfeit Prevention Training. The Contractor shall provide appropriate training and shall require all personnel working procurement within their company, to include at a minimum their supply chain management specialists, receiving inspectors, and engineers, to complete said training. The Contractor shall determine the appropriate training required. Training may be developed in-house or may be other Industry accepted training. The CPP shall describe and list the training provided by the contractor to their personnel.
[CDRL A003, DI-MISC-81832, Counterfeit Prevention Plan (CPP)]
4.7 Commercial Asset Visibility-Air Force (CAV-AF): The Contractor shall report production using CAV-AF. The Contractor shall provide data on the actions conducted for each
PR: FD2060-14-01004 PWS 8
unit. The Contractor shall report daily or as actions occur. If CAV-AF training is required, Contractor personnel may send an email to: 406scms.cav.af.ar@robins.af.mil.
[CDRL A004, DI-MGMT-81634B, Commercial Asset Visibility Air Force (CAVAF)]
4.8 Government-Industry Data Exchange Program (GIDEP)
4.8.1 The Contractor shall participate in GIDEP in accordance with Air Force Joint Instruction (AFJI) 63-108, Government-Industry Data Exchange Program (GIDEP), and GIDEP Operations Manual S0300-BT-PRO-010, Government-Industry Data Exchange Program. The Contractor shall submit all applicable data to GIDEP, as it is generated, in accordance with the CDRLs.
4.8.2 The Contractor shall review each Alert/Safe-Alert report received from GIDEP to determine if the item or process for which the Alert/Safe Alert report is issued is applicable to the contract/order and take appropriate action. Upon the determination that an Alert/Safe-Alert report is applicable, the Contractor shall inform the impacted organizations and subcontractors in accordance with the CDRLs. The Contractor shall maintain a record of the status and disposition of all Alert/Safe-Alert reports in accordance with the CDRLs.
(CDRL A005, DI-QCIC-80125B, Alert/Safe Alert;
CDRL A006, DI-QCIC-80126B, Response to an Alert/Safe Alert)
4.9. Condemnation and Repair, Cannibalization, TT&E
4.9.1 Condemnation and Repair. The contractor shall be required to repair all end items unless written direction is provided by the PCO through the Administrative Contracting Officer (ACO).
Requests for condemnation shall be submitted in writing through the ACO to the PCO within ten
(10) workdays following initial inspection/functional testing. Condemnations may only be granted if the item inducted for repair manifests one or more of the following conditions:
a. Physical damage that affects greater than 75 percent of the material within the end item (i.e., crushed),
b. Burn damage that affects greater than 80 percent of the internal electrical components and connections of the end item,
c. Obsolescence of replacement parts is determined and confirmed by DCMA. In the event Condemnations is granted by the Government, the contractor shall not charge the full repair cost, but only the firm fixed price Beyond Economical Repair (BER) CLIN.
Furthermore, the PCO retains the right to request enlarged color photographs of any proposed condemned end item. These photographs shall clearly portray the extent of damage to the end item and/or effects of overheating. One photograph shall be of the entire end item showing the part number and serial number. The results of any electrical testing performed on the end item shall also be submitted for review. The contractor may be required to submit the proposed condemned end item to Government technical representative for evaluation, confirmation, and/or disposition instructions.
PR: FD2060-14-01004 PWS 9
4.9.2 Cannibalization: Upon approval by the Government, the contractor is authorized to cannibalize repairable Shop Replaceable Unit (SRU) necessary to accomplish timely repair to meet production schedule and/or accomplish repair of Mission Capable (MICAP) requirements.
When an asset is approved for condemnation due to obsolescence it may be cannibalized to repair other assets until no longer usable and prior to disposal. All cannibalized components not approved for condemnation will be returned to a pre-cannibalized condition. The contractor shall maintain a record of part numbers cannibalized including the serial number of the units from which the part was removed and installed.
4.9.3 Teardown, Test, and Evaluation (TT&E). TT&E is performed by the contractor to determine the cause of failure prior to conducting actual repair of the item. When situations occur where an asset is provided to the contractor for repair, but the contractor cannot duplicate the fault, No Fault Found (NFF), the contractor shall notify the Procuring Contracting Officer (PCO) to report same to the Government. The contractor shall not charge the full repair cost, but only the firm fixed price NFF CLIN.
4.9.4 Acceptance Test Procedure (ATP): Repaired items shall pass Government approved ATP
(CDRL A007, DI-NDTI-80603A)
4.9.5 Test/Inspection Report: For the first repaired item, the contractor shall submit a test/inspection report documenting the parameters measured along with their tolerances.
(CDRL A008, DI-NDTI-80809B)
5.0 General Information
5.1 Continuation of Mission-Essential Services During a Crisis: Designation of Services as Mission-Essential: In accordance with DFARS 237.7602(a), The Continuation of Essential Contractor Services / Policy, DFARS 252.237-7023(a)(2), and Air Force Instruction (AFI) 10- 403, Deployment Planning and Execution, paragraph 1.9.1.33.2, the Functional Commander (FC) or civilian equivalent has determined these services are not mission-essential and will not continue in the event of a crisis.
5.2 Security Requirements
5.2.1 Actual knowledge and/or generation of classified information and/or Controlled Unclassified Information (CUI) are not expected to be necessary for performance of the contract/order. Contractor personnel are required to comply with security requirements to preclude potential security incidents or violations. If a change in the security classification of the contract/order becomes necessary after contract/order award, the Contractor shall make a reasonable effort to continue performance of tasks under the contract/order in compliance with the change in security classification in accordance with FAR 52.204-2, Security Requirements.
5.2.2 Government Security Regulations: The Contractor shall ensure personnel, information, system, property, facility and international security requirements are met. The Contractor shall comply with Government security regulations including, but not limited to, Department of Defense (DoD) 5200.2-R, Personnel Security Program; DoD Directive (DoDD) 5205.02E, DoD
PR: FD2060-14-01004 PWS 10
Operations Security (OPSEC) Program; DoD Manual 5205.02-M, DoD OPSEC Program Manual; and Robins Air Force Base Integrated Defense Plan (RAFB IDP) 31-101.
5.2.3 Operations Security (OPSEC): The purpose of OPSEC is to reduce the vulnerability of USAF missions to adversary collection and exploitation of critical information. The Contractor shall ensure compliance with DoDD 5205.02E and DoD Manual 5205.02-M to protect U.S.
Government interests.
5.2.4 Security Clearance: It is not expected Contractor personnel will require security clearances for proper accomplishment of contract/order requirements. Contractor personnel shall not be authorized access to classified information and/or CUI and classified items or be permitted to work on classified projects and/or programs without a valid security clearance and a need-to-know. If security clearances become necessary after contract/order award, the Contractor shall ensure applicable Contractor personnel obtain valid security clearances appropriate to the access required for proper accomplishment of contract/order requirements.
5.2.5 Security Incident or Violation: The Contractor shall immediately notify the Government Security Office of any potential or actual security incident or violation.
5.2.6 Security of Contractor System(s): The Contractor shall ensure the security of Automated Information System(s) (AIS) at the Contractor’s facility to preclude potential security incidents or violations.
5.2.7 Access to Government System(s): The Government will provide Contractor personnel access to system(s) necessary to perform tasks under the contract/order. The Contractor shall ensure Contractor personnel who require access to an unclassified or classified Government AIS have the appropriate background check or security investigation conducted. The Government will provide system access subject to approval of the DD Form 2875, System Authorization Access Request (SAAR). Upon completion/termination of the contract/order or transfer/termination of Contractor personnel, the system account(s) will be closed.
5.3 Environmental Management System (EMS): These services shall be performed only at the Contractor’s facility (Location dependant on contract award as this is competitive contract)
5.4 Green Procurement Program (GPP): Under Secretary of Defense (USD) Memorandum, Establishment of the DoD Green Procurement Program, dated August 27 2004, establishes the requirement for a GPP. The GPP is a mandatory federal acquisition program that focuses on the purchase and use of environmentally-preferable products and services. In accordance with FAR 23.404, Agency Affirmative Procurement Programs, the GPP requires 100% of purchases of Environmental Protection Agency (EPA)-designated products, included in the Comprehensive Procurement Guidelines (CPG) list, contain recovered materials unless the item cannot be acquired competitively within a reasonable timeframe, meet appropriate performance standards, and/or be acquired at a reasonable price. In accordance with FAR 23.101, Sustainable Acquisition Policy / Definition, the GPP requirement applies to all acquisitions, including services, using U.S. Government appropriated funds. The prime Contractor shall ensure subcontractors comply with the GPP requirement.
PR: FD2060-14-01004 PWS 11
5.5 Safety and Health
5.5.1 While performing work under this contract the Contractor shall comply with all applicable federal, state and local regulations regarding occupational safety and health. In accordance with AFI 91-204, Safety Investigations and Reports, paragraph 2.4.6.1.1, the Contractor shall report mishaps involving damage or injury to USAF. The Contractor shall notify the Government Representative (GR), within eight hours of any damage to Government property where the dollar value exceeds $500,000.00 and within two business days, for any damage to Government property less than $500,000.00 during the execution of the contract.
5.5.2 Mishap notifications shall contain, at a minimum, the following information:
a. Contract, Contract Number, Name and Title of Person(s) Reporting
b. Date, time and exact location of accident/incident
c. Brief narrative of accident/incident (Events leading to accident/incident)
d. Cause of accident/incident, if known
e. Estimated cost of accident/incident (material and labor to repair/replace)
f. Nomenclature of equipment and personnel involved in accident/incident
g. Corrective actions (taken or proposed)
h. Other pertinent information
5.5.3 If requested by the designated GR, the Contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the Procuring Safety Office.
5.6 Inspection of Services: In accordance with FAR 52.246-4, Inspection of Services - Fixed- Price, the Government reserves the right to inspect Contractor performance. The Contractor shall maintain an inspection process acceptable to the Government. The Contractor shall maintain records of inspections which shall be made available to the Government as long as the contract requires.
5.7 Trafficking in Persons: The Contractor shall comply with FAR 52.222-50, Combating Trafficking in Persons. Additional information about Trafficking in Persons is available at the site for the Department of State’s Office to Monitor and Combat Trafficking in Persons below.
http://www.state.gov/j/tip. In accordance with the Defense Contingency COR Handbook section on Combating Trafficking in Persons, the COR must inform the PCO if the Contractor fails to comply with the requirements of FAR 52.222.50. The PCO must convey the information to DoD Combat Trafficking in Persons (CTIP) Law Enforcement and Support / Office of Under Secretary of Defense (OUSD) Personnel and Readiness (P&R) Defense Human Resources Activity (DHRA).
5.8 Contract Manpower Reporting
5.8.1 In accordance with the Secretary of the Air Force for Acquisition (SAF/AQ) Memorandum, Implementation of FY11 NDAA [National Defense Authorization Act] Section 8108 [of Public Law 112-10 of the Department of Defense and Full-Year Continuing
PR: FD2060-14-01004 PWS 12
Appropriations Act, 2011], Contractor Inventory, dated Nov 13 2012, the Contractor shall provide an annual count of Contractor personnel performing work if the DoD is the requiring activity, if the acquisition is using U.S. Government appropriated funds, and if the acquisition is equal to or greater than the Simplified Acquisition Threshold (SAT) [currently $150,000.00].
5.8.2 In accordance with the Office of the Secretary of Defense (OSD) Memorandum, Enterprise-wide Contractor Manpower Reporting Application, dated Nov 28 2012, the Contractor shall report all Contractor labor hours, including subcontractor labor hours, required for performance of the services provided under the contract at the Enterprise-wide Contract Manpower Reporting Application (eCMRA) site below. Reporting shall be conducted for each fiscal year (FY), which extends October 1 through September 30. While inputs may be made any time during the FY, all data shall be reported no later than October 31 of the following FY.
The Contractor may direct questions to the help desk at the eCMRA site below.
http://www.ecmra.mil
5.9 Invoicing/Payment and Receipt/Acceptance
5.9.1 In accordance with DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports, the Contractor shall submit/process payment requests (invoices, Receiving Reports or combos) and receipt/acceptance documents via Wide Area Workflow (WAWF). Additional information regarding WAWF is available at the site below.
https://wawf.eb.mil
5.9.2 CDRL deliverables may be submitted using WAWF or be submitted directly to the applicable MFT member in accordance with the CDRL. The CDRL will determine submittal requirements; however, separately priced data must be accepted in WAWF in order for the Contractor to receive payment, and both separately priced and non-separately priced data must be accepted in WAWF in order for the contract line item to be closed out.
5.9.3 Services will be accepted by the DCMA QAR.
PR: FD2060-14-01004 PWS 13
6.0 Appendix: References
Publication Title of Publication
Date of Publication Section(s) that Apply
AFI 10-403 Deployment Planning and Execution
20 September 2012 Change 1 – 29 April 2013 http://www.e-publishing.af.mil/
Paragraph 1.9.1.33
AFI 91-204 Safety Investigations and Reports
9 August 2012 reissued 8 April 2013
Paragraphs 1.3.1.1, 2.4.6.1.1- 2.4.6.1.2
AFMC/CV Policy Letter
Conformance with Air Force Environmental Management System (EMS) Requirements for Contracts Performed on Air Force Installations
1 Aug 07
Entire
Assistant Secretary of the Air Force Policy Letter
Conformance with Air Force Environmental Management System (EMS) Requirements for Contracts Performed on Air Force Installations
11 Dec 06 Entire
None Defense Contingency COR Handbook
Version 2 September 2012 http://www.acq.osd.mil/dpap/ccap/cc/corhb/Fi les/DCCOR_Handbook_2012.pdf
Section on Combating Trafficking in Persons in Chapter 8, Monitoring the Contractor
DoD 5200.2-R Personnel Security Program
1/1/87 Change 1 - 2/12/1990 Change 2 - 7/14/1993
PR: FD2060-14-01004 PWS 14
Change 3 - 2/23/1996 http://www.dtic.mil/whs/directives/corres/pub 1.html
DoDD 5205.02E DoD Operations Security (OPSEC) Program
June 20, 2012
DoD Manual 5205.02-M
DoD Operations Security (OPSEC) Program Manual
November 3, 2008
E.O. 13423 Strengthening Federal Environmental, Energy, and Transportation Management
January 24, 2007 http://www.gpo.gov/fdsys/pkg/FR-2007-01- 26/pdf/07-374.pdf
E.O. 13514 Federal Leadership in Environment, Energy, and Economic Performance
5 October 2009 http://www.whitehouse.gov/assets/documents/ 2009fedleader_eo_rel.pdf
FAR and supplements
Federal Acquisition Regulation http://farsite.hill.af.mil
Sections applicable to contract and
PWS
USD
Memorandum
Establishment of the DoD Green Procurement
August 27 2004 http://www.wbdg.org/pdfs/dod_gpp_082704.pdf
PR: FD2060-14-01004 PWS 15
Publication Title of Publication
Date of Publication Sections that Apply
AFJI 63-108 Government- Industry Data Exchange Program (GIDEP)
15 May 1980
AS5553A
Fraudulent /Counterfeit Electronics Parts;
Avoidance, Detection, Mitigation, and Disposition
Revision A 2013-01-21 none Department of Defense Guide to Uniquely Identifying Items Assuring Valuation, Accountability and Control of Government Property, Version 2.5
September 15, 2012 www.acq.osd.mil/dpap/UID/attachments/DoD UIDGuideVer2_5.pdf
DoD 5220.22-M
National Industrial Security Program Operating Manual
(NISPOM)
February 28, 2006 Change 1 - March 28, 2013
GIDEP
Operations Manual S0300-
BT-PRO-010
Government- Industry Data Exchange
September 2009 http://www.gidep.org/
Chapter 2, Participation Requirements
MIL-STD-129P Department of Defense / Standard Practice / Military Marking for Shipment and Storage
15 December 2002 Change 1 - 15 January 2004, Change 2 - 10 February 2004, Change 3 - 29 October 2004, Change 4 - 19 September 2007 http://www.acq.osd.mil/log/sci/ait/MIL-STD- 129PCH4.pdf
PR: FD2060-14-01004 PWS 16
MIL-STD-130N Department of Defense / Standard Practice / Identification Marking of U.S.
Military Property
17 December 2007 Change 1 – 16 November 2012 http://www.acq.osd.mil/dpap/pdi/uid/docs/MI L-Std130N_Ch1.pdf
MIL-STD-2073-
1D
Department of Defense / Standard Practice for Military Packaging
15 December 1999, Notice 1, 10 May 2002
MIL-STD-1686C Department of Defense Standard Practice / Electrostatic Discharge Control Program for Protection of Electrical and Electronic Parts, Assemblies and Equipment (Excluding Electrically Initiated Explosive Devices)
25 Oct 1995
File details come from the government source that posted it. Updated .