FA852308R20003.pdf
PDF 114 KB Posted
- Attached to
- ALQ-172 LRU-7 Power Supply
- Solicitation number
- FA8523-08-R-20003
About this file
Solicitation
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CDRLs.pdf | ||
| DDForm260.pdf | ||
| StatementWork_0820003_00_1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1447-101 STANDARD FORM 1447 (5-88)
Prescribed by GSA FAR (48 CFR 53.215-1(g))
SOLICITATION/CONTRACT
BIDDER/OFFEROR TO COMPLETE BLOCKS 11, 13, 15, 21, 22, & 27.
J
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 350)
RATING
DO: A7
2. CONTRACT NO.
3. AWARD/EFFECTIVE DATE
4. SOLICITATION NUMBER
FA8523-08-R-20003
5. SOLICITATION TYPE
SEALED BIDS NEGOTIATED
(IFB) (RFP)
6.SOLICITATION ISSUE DATE
X
7. ISSUED BY CODE
542 CBSG PKT, CML PHN 478 926 7519
460 Richard Ray Blvd, Suite 200
ROBINS AFB GA 31098-1813
BUYER: Joseph A. Fountain/PKT Joseph.Fountain@robins.af.mil Phone: (478) 926- 2607 Fax: (478) 926-7211 No Collect Calls
FA8523 8. THIS ACQUISITION IS
UNRESTRICTED LABOR SURPLUS AREA CONCERNS
SET ASIDE: % FOR COMBINED SMALL BUSINESS &
LABOR SURPLUS AREA CONCERNS
SMALL BUSINESS Oth Than Full & Open
NAICS CODE: 334511 SIZE STANDARD: 750
9.
Offers will be received at the issuing office until the date and time specified below. All official United States Postal Service mail and classified material will be delivered to the address shown in block 7. Deliver all parcels to: 542 COMBAT SUSTAINMENT GROUP, ATTN: Buyer named above, 265 PERRY ST, BLDG 249, ROBINS AFB GA 31098-1607.
10-MAR-2008 3:30PM
10. ITEMS TO BE PURCHASED (BRIEF DESCRIPTION)
SUPPLIES SERVICES Search, Detection, Nvgtn, Guid, Aeronautical, & Nautical Syst & Instr Mfg X
11. IF OFFER IS ACCEPTED BY THE GOVERNMENT WITHIN * ___ CALENDAR DAYS (60 CALENDAR
DAYS UNLESS OFFEROR INSERTS A DIFFERENT PERIOD) FROM THE DATE SET FORTH IN BLK 9
ABOVE, THE CONTRACTOR AGREES TO HOLD ITS OFFERED PRICES FIRM FOR THE ITEMS
SOLICITED HEREIN AND TO ACCEPT ANY RESULTING CONTRACT SUBJECT TO THE TERMS AND
CONDITIONS STATED HEREIN. *120
12. ADMINISTERED BY CODE
13. CONTRACTOR OFFEROR CODE FACILITY CODE
14. PAYMENT WILL BE MADE BY CODE
(SEE ESP CLAUSE 252.232-7003.)
15. PROMPT PAY DISCOUNT
16. AUTHORITY FOR USING OTHER THAN 10 USC 2304 41 USC 253
FULL AND OPEN COMPETITION (c) (1 ) (c) ( )
17.
ITEM NO. 18.
SCHEDULE OF SUPPLIES/SERVICES 19.
QUANTITY 20.
UNIT 21.
UNIT PRICE 22.
AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
SEE SCHEDULE
24. AWARD AMOUNT (FOR GOVT USE ONLY)
25. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 1 COPIES TO ISSUING OFFICE.
CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SET
FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY CONTINUATION SHEETS SUBJECT
THE TERMS AND CONDITIONS SPECIFIED HEREIN. X
26. AWARD OF CONTRACT: YOUR OFFER ON SOLICITATION NUMBER
SHOWN IN BLOCK 4 INCLUDING ANY ADDITIONS OR CHANGES WHICH
ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
27. SIGNATURE OF OFFEROR/CONTRACTOR
NAME AND TITLE OF SIGNER (TYPE OR PRINT)
28. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
NAME OF CONTRACTING OFFICER
DATE SIGNED DATE SIGNED
ROUTINE
Subject to the terms and conditions stated herein, the Contractor agrees to hold its offered prices firm for 120 days.
SEE LINE ITEM SCHEDULE
SCD:B
EFT:T CHECK IF REMITTANCE IS DIFFERENT
AND PUT SUCH ADDRESS IN OFFER SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK: 14
Total
SF 1447 (5-88) BACK
CANNOT MEET DELIVERY REQUIREMENT
OTHER (Specify)
NO RESPONSE FOR THE REASONS CHECKED
WE DO
WE DO NOT DESIRE TO BE RETAINED ON THE MAILING LIST FOR FUTURE PROCUREMENT OF THE TYPE OF
ITEMS INVOLVED
NAME AND ADDRESS OF FIRM (Include Zip Code) SIGNATURE
TYPE OR PRINT NAME AND TITLE OF SIGNER
FOLD FOLD
FOLD FOLD
SOLICITATION NO. FA852308R20003
DUE: 10 MAR 2008 3:30 PM
FROM: AFFIX
STAMP
HERE
TO:
ATTN: Joseph A Fountain/PKT
542 CBSG PKT, CML PHN 478 926 7519
460 Richard Ray Blvd, Suite 200
ROBINS AFB GA 31098-1813
CANNOT COMPLY WITH SPECIFICATIONS
CANNOT COMPLY WITH SPECIFICATIONS
Request for Proposal FA8523-08-R-20003
PART I - THE SCHEDULE
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
Power Supply
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
EA
NSN: 6130-01-551-5132 EW
Power Supply Dim: 4.25" X 17.5" X 7.75" Form/Function: Multi-output Power Supply Appl: LRU-7 for ALQ-172 Predominant
Material of Manufacture: Aluminum chassis with electrical components inside of the chasis.
Manufacturer Part Number 49956 G635716-1 Purchase Request(s) PR Line Item(s)
FD20600820003 00 0001
Trade Agreement Act
FIRST ARTICLE
Bid A - First Article Required
0001AA
2 EA
CLIN ACRN ACRN Total
0001AA AA
First Article
FIRST ARTICLE
Purchase Request(s) PR Line Item(s)
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2000 2000
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3119 ORIGIN
Class I ODS Substance Application/Use Quantity
NONE
None Type / Ship To PACRN Mark For
A SW3119 PAA FLB RIC
FIRST ARTICLE
Required Delivery
Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri
A SW3119 2 EA
*06 Months
Proposed Delivery
A SW3119 2 EA
First Article Test Procedure
0001AB
1 LO
First Article Test Plan
TEST PLAN IN ACCORDANCE WITH ATTACHED DD FORM 1423
A001 Test Procedure
First Article Test Procedure Purchase Request(s) PR Line Item(s)
FD20600820003 00 0001
Exhibit: A Required Delivery
*090 Calendar Days
First Article Test Report
0001AC
First Article Test Report
TEST REPORT IN ACCORDANCE WITH THE ATTACHED DD FORM 1423
A002 Test/Inspection Report
First Article Test Report Purchase Request(s) PR Line Item(s)
FD20600820003 00 0001
Exhibit: A Required Delivery
*180 Calendar Days
Production Option, Items 0002 - 0003 may be exercised within 12 months following the approval of the First Article.
It is not required that you quote the exact quantity ranges noted below. We encourge the contractor to proposed the quantities between 1-20, utilizing quantity breaks to the maximum extent possible.
Production Option
Alternate
Quantity A
1 EA 4 EA
Quantity B
5 EA 10 EA
Quantity C
11 EA 15 EA
Quantity D
16 EA 20 EA
Power Supply Dim: 4.25" X 17.5" X 7.75" Form/Function: Multi-output Power Supply Appl: LRU-7 for ALQ-172 Predominant
Material of Manufacture: Aluminum chassis with electrical components inside of the chasis.
Manufacturer Part Number 49956 G635716-1 Purchase Request(s) PR Line Item(s)
FD20600820003 00 0001
Trade Agreement Act Required Delivery
Type / Ship To Quantity (U/I) *ARO Each Individual Order
_ Req No / Pri
DATA
LO Not Separately
Priced Not Separately Priced
A003-A006
SDN: F3QCBA7299B001
Inspection/Acceptance Report: Receiving Report Required
Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements
The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
A003 - Test Procedure - Acceptance Test Procedures
0003AA
1 LO Not Separately
A003 - Test Prodedure Purchase Request(s) PR Line Item(s)
FD20600820003 00 0001
Exhibit: A Required Delivery
Type / Ship To Quantity (U/I) *ARO IAW DD1423-
+ IAW1423 1 LO
A004 - Test/Inspection - Acceptance Test Report
0003AB
1 LO Not Separately
A004 - Test/Inspection Report Purchase Request(s) PR Line Item(s)
FD20600820003 00 0001
Exhibit: A Required Delivery
Type / Ship To Quantity (U/I) *ARO IAW DD1423-
A005 - System/Subsystem Specification
0003AC
1 LO Not Separately
A005 - System/Subsystem Specification (SSS) Purchase Request(s) PR Line Item(s)
FD20600820003 00 0001
Exhibit: A Required Delivery
Type / Ship To Quantity (U/I) *ARO IAW DD1423-
A006 - Scientific and Technical Report - Qualification Testing
0003AD
1 LO Not Separately
A006 - Scientific and Technical Reports Purchase Request(s) PR Line Item(s)
FD2060820003 00 0001
Exhibit: A Required Delivery
Type / Ship To Quantity (U/I) *ARO IAW DD 1423-2
Option I, Items 1001 - 1002 may be exercised within 24 months following the approval of the First Article.
It is not required that you quote the exact quantity ranges noted below. We encourge the contractor to proposed the quantities between 1-20, utilizing quantity breaks to the maximum extent possible.
OUT YEAR OPTION
OUT YEAR OPTION
From
Quantity U/I To Quantity Unit Price
Quantity Range A
1 EA 4 EA
Range B
5 EA 10 EA
Range C
11 EA 15 EA
Range D
16 EA 20 EA
Power Supply Dim: 4.25" X 17.5" X 7.75" Form/Function: Multi-output Power Supply Appl: LRU-7 for ALQ-172 Predominant
Material of Manufacture: Aluminum chassis with electrical components inside of the chasis.
Manufacturer Part Number 49956 G635716-1
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Trade Agreement Act Required Delivery
Type / Ship To Quantity (U/I) *ARO Each Individual Order
+ TBD EA
+ TBD EA
LO Not Separately
Exhibit: A
DATA - A003 - Test Procedure - Acceptance Test Procedures
1002AA
1 LO Not Separately
A003 - Test Prodedure Purchase Request(s) PR Line Item(s)
FD20600820003 00 0001
Exhibit: A Required Delivery
Type / Ship To Quantity (U/I) *ARO IAW DD 1423-2
1002AB
1 LO Not Separately
A004 - Test/Inspection Report Purchase Request(s) PR Line Item(s)
FD20600820003 00 0001
Exhibit: A Required Delivery
Type / Ship To Quantity (U/I) *ARO IAW DD 1423-2
1002AC
1 LO Not Separately
A005 - System/Subsystem Specification (SSS) Purchase Request(s) PR Line Item(s)
FD20600820003 00 0001
Exhibit: A Required Delivery
Type / Ship To Quantity (U/I) *ARO IAW DD 1423-2
A006 - Scientific and Technical Report - Qualification Testing
1002AD
1 LO Not Separately
A006 - Scientific and Technical Reports Purchase Request(s) PR Line Item(s)
FD2060820003 00 0001
Exhibit: A Required Delivery
Type / Ship To Quantity (U/I) *ARO IAW DD 1423-2
SHIP TO / PLACE OF PERFORMANCE
TYPE/CODE: + IAW1423
MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
TYPE/CODE: + TBD
MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
TYPE/CODE: A SW3119
DEF DIST DEPOT WARNER ROBINS
455 BYRON STREET BLDG 376
ROBINS AFB GA 31098-1887
MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
SECTION D
PACKAGING AND MARKING
THE CURRENT VERSION OF MIL-STD-130 IS M (DEC 2005)
IAW 252.211-7003, THE CURRENT VERSION OF MIL-STD-130 IS "M".
D-482C
5352.247-9005 SHIPPING CONTAINER MARKING (AFMC) (MAR 2003)
(IAW AFMCFARS 5347.305-10(a)(91), AFMCFARS 5347.305-10(a)(93), AFMCFARS 5347.305-10(a)(94), AFMCFARS 5347.305-10(a)(95))
(a) MIL-STD-129 P
(b) MIL-STD-129 P
(c) Additional marking and/or bar coding requirement exceeding those of Mil-STD-129 P All shipping containers shall be marked using the following criteria:
PACRN(s) Applicable to 5352.247-9005
Additional Bar Coding or Marking Requirements
PAA Not Applicable
D-486C
5352.247-9009 MILITARY PACKAGING AND MARKING (AFMC) (AUG 2002)
(IAW AFMCFARS 5347.305-10(a)(95)) Items shall be packaged in accordance with MIL-STD-2073-1 D , Standard Practice for Military Packaging. Shipping and storage markings shall be in accordance with MIL-STD-129 P , Standard Practice for Military Marking.
The MIL-STD-2073/No Packaging Data Available is as follows:
PACRN PRESERVATION
LVL
PACKING
LVL
QUP
PAA MIL B 001
PACRN SUPPLEMENTAL PACKAGING
PAA
WOODEN LUMBER, WOODEN PALLET AND PACKAGING/CONTAINER STATEMENT (FEB 2007)
(IAW AFMC FORM 158)
All wooden lumber, wooden pallets, and wooden containers produced entirely or in part of solid wood packing material (SWPM) shall be constructed from heat-treated (HT) material (HT 56 degrees centigrade or 133 degrees Fahrenheit for 30 minutes). Certification/marking is required by an accredited agency recognized by the American Lumber Standards Committee (ALSC). For reference documentation, see “International Standards for Phytosanitary Measures (ISPM) No. 15.” This document can be found at www.ippc.int .
SECTION E
INSPECTION AND ACCEPTANCE
E-37
FIRST ARTICLE TEST, CERTIFICATION AND DISPOSITION REQUIREMENTS (FEB 1998)
(IAW FAR 9.308-2)
Test criteria are as follows:
Lot/Item Government Test Criteria/Technical Requirements
Lot/Item Contractor Test Criteria/Technical Requirements (See Below)
Contractor Testing Criteria Performance or other characteristics which the First Articles must mee are contained in Raytheon specifications G635716, all paragraphs.
Disposition of the First Article shall be as follows:
Lot/Item Approved
Lot/Item Disapproved See Block 12
E-1D
52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)
(IAW FAR 46.302)
E-15
52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (FEB 1999)
(IAW FAR 46.311, DFARS 246.202-4(1))
The Contractor shall comply with the higher-level quality standard selected below. [If more than one standard is listed, the offeror shall indicate its selection by checking the appropriate block.]*
*See Individual Line Item Schedule
E-22
52.246-16 RESPONSIBILITY FOR SUPPLIES (APR 1984)
(IAW FAR 46.316)
E-240
252.246-7000 MATERIAL INSPECTION AND RECEIVING REPORT (MAR 2003)
(IAW DFARS 246.370)
E-42
INSPECTION AND ACCEPTANCE (SEP 1999)
(IAW FAR 46.401(b), FAR 46.503) Government Contract Quality Assurance Inspection and Acceptance will be at (Final):
[CONTRACTOR FILL-IN]
Item No(s): See schedule for items with the following code(s) listed below :
Inspection Code and Address:
SECTION F
DELIVERIES OR PERFORMANCE
F-1
52.211-8 TIME OF DELIVERY (JUN 1997)
(IAW FAR 11.404(a)(2)) DELIVERY FOR EACH ITEM IS ANNOTATED IN THE SCHEDULE (PART I SECTION B) UNDER EACH LINE
ITEM.
F-24
52.211-17 DELIVERY OF EXCESS QUANTITIES (SEP 1989)
(IAW FAR 11.703(b)) F-26
52.242-15 STOP-WORK ORDER (AUG 1989)
(IAW FAR 42.1305(b)(1)) F-29
52.242-17 GOVERNMENT DELAY OF WORK (APR 1984)
(IAW FAR 42.1305(c)) F-31
52.247-30 F.O.B. ORIGIN, CONTRACTOR'S FACILITY (FEB 2006)
(IAW FAR 47.303-2(c)) F-78
52.247-65 F.O.B. ORIGIN, PREPAID FREIGHT--SMALL PACKAGE SHIPMENTS (JAN 1991)
(IAW FAR 47.303-17(f))
FC-470C
9952.247-9000 COMMERCIAL BILL OF LADING SHIPMENTS - CARRIER'S RATES (JALC)
(MAR 2003)
(IAW JALC 9947.104-4(90))
F-35
F.O.B. ORIGIN (OCT 1993)
(IAW FAR 47.305(b)) Any supply item applicable to this document shall be delivered F.O.B. at:
F.O.B. Address
[CONTRACTOR FILL-IN]
SECTION G
CONTRACT ADMINISTRATION DATA
G-1
ACCOUNTING AND APPROPRIATION DATA (AUG 1998)
Accounting and Appropriation Chargeable ACRN Funds Citation Amount Chargeable
AA 97 X4930 .FC04 64 8 47 E8 15664P 01N000 00000 000000 503000 HQ0104 $
PSR: J80362 FSR: 013408 DSR: 217887
REFERENCE:
SDN: F3QCBA7299B001
ACRN TOTAL $
GC-51
9952.232-9002 TRANSPORTATION APPROPRIATION CHARGEABLE (JALC) (MAR 2003)
(IAW JALC 9932.705(90))
Insert last digit of current fiscal year in place of any asterisk "*" shown when material is shipped.
TAI ATAC FMS ALLOTMENT /NOTE
TAA FRS6*#0
PART II - CONTRACT CLAUSES
SECTION I
CONTRACT CLAUSES
IB-300
5352.201-9101 OMBUDSMAN (AUG 2005)
(IAW AFFARS 5301.9103)
(c) If resolution cannot be made by the contracting officer, concerned parties may contact the Center/MAJCOM ombudsmen, ALAN MATHIS at 478 926 -4028 , FAX 478 926 -7132 , email ALAN.MATHIS@ROBINS.AF.MIL .
Concerns, issues, disagreements, and recommendations that cannot be resolved at the MAJCOM/DRU level, may be brought by the concerned party for further consideration to the Air Force ombudsman, Associate Deputy Assistant Secretary (ADAS) (Contracting), SAF/AQC, 1060 Air Force Pentagon, Washington DC 20330-1060, phone number
(703) 588-7004, facsimile number (703) 588-1067.
I-11
52.202-1 DEFINITIONS (JUL 2004)
(IAW FAR 2.201)
I-19
52.203-3 GRATUITIES (APR 1984)
(IAW FAR 3.202)
I-20
52.203-5 COVENANT AGAINST CONTINGENT FEES (APR 1984)
(IAW FAR 3.404)
I-21
52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (SEP 2006)
(IAW FAR 3.503-2)
I-22
52.203-7 ANTI-KICKBACK PROCEDURES (JUL 1995)
(IAW FAR 3.502-3)
I-23
52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR
IMPROPER ACTIVITY (JAN 1997)
(IAW FAR 3.104-9(a))
I-25
52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (JAN 1997)
(IAW FAR 3.104-9(b)) I-25C
52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS
(SEP 2007)
(IAW FAR 3.808(b))
IA-22
252.203-7001 PROHIBITION ON PERSONS CONVICTED OF FRAUD OR OTHER DEFENSE-
CONTRACT-RELATED FELONIES (DEC 2004)
(IAW DFARS 203.570-3)
I-39
52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON RECYCLED PAPER (AUG 2000)
(IAW FAR 4.303)
I-41
52.204-7 CENTRAL CONTRACTOR REGISTRATION (JUL 2006)
(IAW FAR 4.1104)
IA-33
252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992)
(IAW DFARS 204.404-70(b))
IA-34C
252.204-7004 ALTERNATE A, CENTRAL CONTRACTOR REGISTRATION (Alternate A to FAR
Clause 52.204-7, Central Contractor Registration) (SEP 2007)
(IAW DFARS 204.1104)
IA-40
252.205-7000 PROVISION OF INFORMATION TO COOPERATIVE AGREEMENT HOLDERS
(DEC 1991)
(IAW DFARS 205.470)
I-72
52.209-3 FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (SEP 1989)
(IAW FAR 9.308-1(a)(1), FAR 9.308-1(b)(1))
(a) The Contractor shall test ** unit(s) of Lot/Item * as specified in this contract. At least *** calendar days before the beginning of first article tests, the Contractor shall notify the Contracting Officer, in writing, of the time and location of the testing so that the Government may witness the tests.
*Lot/Item ***Calendar Days Before Test **Quantity 15 2
(b) The Contractor shall submit the first article test report within ___**___ calendar days from the date of this contract to ___***___ marked "FIRST ARTICLE TEST REPORT: Contract No. Lot/Item No. ___*___” Within ___****___ calendar days after the Government receives the test report, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.
*Lot/Item ****Approval Days ELIN No.
*First Article Item ***Type/Location **Calendar Days
0001AA ASW3119
I-73
52.209-3 FIRST ARTICLE APPROVAL--CONTRACTOR TESTING -- ALTERNATE I (JAN 1997)
(IAW FAR 9.308-1(a)(2), FAR 9.308-1(b)(2)) I-78
52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH
CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT
(SEP 2006)
(IAW FAR 9.409(b))
IA-92
252.209-7004 SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY THE
GOVERNMENT OF A TERRORIST COUNTRY (DEC 2006)
(IAW DFARS 209.409)
I-83
52.211-5 MATERIAL REQUIREMENTS (AUG 2000)
(IAW FAR 11.304)
I-102
52.211-15 DEFENSE PRIORITY AND ALLOCATION REQUIREMENTS (SEP 1990)
(IAW FAR 11.604(b))
This is a rated order certified for national defense use, and the Contractor shall follow all the requirements of the Defense Priorities and Allocations System regulation (15 CFR 700).
IA-103
252.211-7003 ITEM IDENTIFICATION AND VALUATION (JUN 2005)
(IAW DFARS 211.274-5(a), DFARS 212.301(f)(vi))
(a) Definitions. As used in this clause— “DoD recognized unique identification equivalent” means a unique identification method that is in commercial use and has been recognized by DoD. All DoD recognized unique identification equivalents are listed at http://www.acq.osd.mil/dpap/UID/equivalents.html .
“Unique item identifier type” means a designator to indicate which method of uniquely identifying a part has been used. The current list of accepted unique item identifier types is maintained at http://www.acq.osd.mil/dpap/UID/uid_types.html .
(c) DoD unique item identification or DoD recognized unique identification equivalents.
(1) The Contractor shall provide DoD unique item identification, or a DoD recognized unique identification equivalent, for—
(i) All delivered items for which the Government’s unit acquisition cost is $5,000 or more; and
(ii) The following items for which the Government’s unit acquisition cost is less than $5,000:
Contract Line, Subline, or Exhibit Line Item Number
Item Description
*Items less than $5000, which require UID, will be specifically identified in the schedule.
See Schedule as Applicable
(iii) Subassemblies, components, and parts embedded within delivered items as specified in Attachment Number (See Schedule as Applicable).
(3) (i)(C) Text Element Identifiers (TEIs), in accordance with the DoD collaborative solution “DD” format for use until the final solution is approved by ISO/IEC JTC1 SC 31. The “DD” format is described in Appendix D of the DoD Guide to Uniquely Identifying Items, available at http://www.acq.osd.mil/dpap/UID/guides.htm ;
and
(f) The Contractor shall submit the information required by paragraphs (d) and (e) of this clause in accordance with the data submission procedures at http://www.acq.osd.mil/dpap/UID/DataSubmission.htm .
I-128
52.215-2 AUDIT AND RECORDS--NEGOTIATION (JUN 1999)
(IAW FAR 15.209(b)(1)) I-129G
52.215-8 ORDER OF PRECEDENCE--UNIFORM CONTRACT FORMAT (OCT 1997)
(IAW FAR 15.209(h)) I-133C
52.215-10 PRICE REDUCTION FOR DEFECTIVE COST OR PRICING DATA (OCT 1997)
(IAW FAR 15.408(b)) I-135C
52.215-12 SUBCONTRACTOR COST OR PRICING DATA (OCT 1997)
(IAW FAR 15.408(d)) I-137C
52.215-14 INTEGRITY OF UNIT PRICES (OCT 1997)
(IAW FAR 15.408(f)(1)) I-138C
52.215-14 INTEGRITY OF UNIT PRICES -- ALTERNATE I (OCT 1997)
(IAW FAR 15.408(f)(2)) I-139C
52.215-15 PENSION ADJUSTMENTS AND ASSET REVERSIONS (OCT 2004)
(IAW FAR 15.408(g)) I-146C
52.215-18 REVERSION OR ADJUSTMENT OF PLANS FOR POSTRETIREMENT BENEFITS
(PRB) OTHER THAN PENSIONS (JUL 2005)
(IAW FAR 15.408(j))
I-147J
52.215-19 NOTIFICATION OF OWNERSHIP CHANGES (OCT 1997)
(IAW FAR 15.408(k))
IA-152
252.215-7000 PRICING ADJUSTMENTS (DEC 1991)
(IAW DFARS 215.408(1))
IA-157
252.215-7002 COST ESTIMATING SYSTEM REQUIREMENTS (DEC 2006)
(IAW DFARS 215.408(2))
IA-160
252.215-7004 EXCESSIVE PASS-THROUGH CHARGES (APR 2007)
(IAW DFARS 215.408(3))
I-214
52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (MAY 2004)
(IAW FAR 19.708(a)) I-215
52.219-9 SMALL BUSINESS SUBCONTRACTING PLAN (NOV 2007)
(IAW FAR 19.708(b)(1)) I-216C
52.219-9 SMALL BUSINESS SUBCONTRACTING PLAN -- ALTERNATE II (OCT 2001)
(IAW FAR 19.708(b)(1)) I-223
52.219-16 LIQUIDATED DAMAGES--SUBCONTRACTING PLAN (JAN 1999)
(IAW FAR 19.708(b)(2)) I-225N
52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JUN 2007)
(IAW FAR 19.308(d))
(g) If the Contractor does not have representations and certifications in ORCA, or does not have a representation in ORCA for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:
The Contractor represents that it [ ] is, [ ] is not a small business concern under NAICS Code _____________ assigned to contract number ______________________________.
[Contractor to sign and date and insert authorized signer's name and title].
IA-225
252.219-7003 SMALL BUSINESS SUBCONTRACTING PLAN (DoD CONTRACTS) (APR 2007)
(IAW DFARS 219.708(b)(1)(A))
IC-445
9952.219-9000 INCORPORATION OF SUBCONTRACTING PLAN (JALC) (MAR 2003)
(IAW JALC 9919.705-5(a)) In accordance with FAR 52.219-9, Small Business Subcontracting Plan, the subcontracting plan contained in * dated * is incorporated herein by reference.
*Incorporation of Subcontracting Plan Location of Plan Date of Plan
I-245
52.222-1 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES (FEB 1997)
(IAW FAR 22.103-5(a)) I-262L
52.222-19 CHILD LABOR--COOPERATION WITH AUTHORITIES AND REMEDIES (AUG 2007)
(IAW FAR 22.1505(b)) I-263
52.222-20 WALSH-HEALEY PUBLIC CONTRACTS ACT (DEC 1996)
(IAW FAR 22.610)
I-263E
52.222-21 PROHIBITION OF SEGREGATED FACILITIES (FEB 1999)
(IAW FAR 22.810(a)(1)) I-264
52.222-26 EQUAL OPPORTUNITY (MAR 2007)
(IAW FAR 22.810(e)) I-274
52.222-35 EQUAL OPPORTUNITY FOR SPECIAL DISABLED VETERANS, VETERANS OF THE
VIETNAM ERA, AND OTHER ELIGIBLE VETERANS (SEP 2006)
(IAW FAR 22.1310(a)(1), DFARS 222.1310(a)(1))
I-276
52.222-36 AFFIRMATIVE ACTION FOR WORKERS WITH DISABILITIES (JUN 1998)
(IAW FAR 22.1408(a)) I-278
52.222-37 EMPLOYMENT REPORTS ON SPECIAL DISABLED VETERANS, VETERANS OF THE
VIETNAM ERA, AND OTHER ELIGIBLE VETERANS (SEP 2006)
(IAW FAR 22.1310(b))
I-279
52.222-39 NOTIFICATION OF EMPLOYEE RIGHTS CONCERNING PAYMENT OF UNION DUES
OR FEES (DEC 2004)
(IAW FAR 22.1605)
I-289C
52.222-50 COMBATING TRAFFICKING IN PERSONS (AUG 2007)
(IAW FAR 22.1705(a)) I-295
52.223-6 DRUG-FREE WORKPLACE (MAY 2001)
(IAW FAR 23.505)
I-312
52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (FEB 2006)
(IAW FAR 25.1103(a))
IA-288
252.225-7002 QUALIFYING COUNTRY SOURCES AS SUBCONTRACTORS (APR 2003)
(IAW DFARS 225.1101(3))
IA-290C
252.225-7006 QUARTERLY REPORTING OF ACTUAL CONTRACT PERFORMANCE OUTSIDE THE
UNITED STATES (MAY 2007)
(IAW DFARS 225.7204(c))
IA-293
252.225-7012 PREFERENCE FOR CERTAIN DOMESTIC COMMODITIES (JAN 2007)
(IAW DFARS 225.7002-3(a))
IA-294M
252.225-7013 DUTY-FREE ENTRY (OCT 2006)
(IAW DFARS 225.1101(4))
IA-295
252.225-7014 PREFERENCE FOR DOMESTIC SPECIALTY METALS (DEVIATION) (OCT 2007)
(IAW DAR Tracking Number 2007-O0011)
IA-295C
252.225-7014 PREFERENCE FOR DOMESTIC SPECIALTY METALS -- ALTERNATE I (APR 2003)
(IAW DFARS 225.7002-3(b)(2))
IA-308C
252.225-7021 TRADE AGREEMENTS (MAR 2007)
(IAW DFARS 225.1101(6))
IA-314D
252.226-7001 UTILIZATION OF INDIAN ORGANIZATIONS, INDIAN-OWNED ECONOMIC
ENTERPRISES, AND NATIVE HAWAIIAN SMALL BUSINESS CONCERNS (SEP 2004)
(IAW DFARS 226.104)
I-315
52.227-1 AUTHORIZATION AND CONSENT (DEC 2007)
(IAW FAR 27.201-2(a)(1))
I-317
52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT
INFRINGEMENT (DEC 2007)
(IAW FAR 27.201-2(b))
I-353
52.229-4 FEDERAL, STATE, AND LOCAL TAXES (STATE AND LOCAL ADJUSTMENTS)
(APR 2003)
(IAW FAR 29.401-3(b))
I-368
52.230-2 COST ACCOUNTING STANDARDS (APR 1998)
(IAW FAR 30.201-4(a)) I-372
52.230-6 ADMINISTRATION OF COST ACCOUNTING STANDARDS (APR 2005)
(IAW FAR 30.201-4(d)(1))
IA-399
252.231-7000 SUPPLEMENTAL COST PRINCIPLES (DEC 1991)
(IAW DFARS 231.100-70)
I-383
52.232-1 PAYMENTS (APR 1984)
(IAW FAR 32.111(a)(1)) I-391
52.232-8 DISCOUNTS FOR PROMPT PAYMENT (FEB 2002)
(IAW FAR 32.111(b)(1)) I-394
52.232-11 EXTRAS (APR 1984)
(IAW FAR 32.111(c)(2)) I-403
52.232-17 INTEREST (JUN 1996)
(IAW FAR 32.617(a), FAR 32.617(b)) I-409
52.232-23 ASSIGNMENT OF CLAIMS (JAN 1986)
(IAW FAR 32.806(a)(1)) I-412
52.232-25 PROMPT PAYMENT (OCT 2003)
(IAW FAR 32.908(c))
(a) Invoice payments—
(5) Computing penalty amount. The Government will compute the interest penalty in accordance with the Office of Management and Budget prompt payment regulations at 5 CFR part 1315.
(i) For the sole purpose of computing an interest penalty that might be due the Contractor, Government acceptance is deemed to occur constructively on the 7th day (unless otherwise specified in this contract) after the Contractor delivers the supplies or performs the services in accordance with the terms and conditions of the contract, unless there is a disagreement over quantity, quality, or Contractor compliance with a contract provision. If actual acceptance occurs within the constructive acceptance period, the Government will base the determination of an interest penalty on the actual date of acceptance. The constructive acceptance requirement does not, however, compel Government officials to accept supplies or services, perform contract administration functions, or make payment prior to fulfilling their responsibilities.
I-416F
52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER--CENTRAL CONTRACTOR
REGISTRATION (OCT 2003)
(IAW FAR 32.1110(a)(1))
IA-414D
252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (MAR 2007)
(IAW DFARS 232.7004)
(a) Definitions. As used in this clause—
(1) “Contract financing payment” and “invoice payment” have the meanings given in section 32.001 of the Federal Acquisition Regulation.
(2) “Electronic form” means any automated system that transmits information electronically from the initiating system to all affected systems. Facsimile, e-mail, and scanned documents are not acceptable electronic forms for submission of payment requests. However, scanned documents are acceptable when they are part of a submission of a payment request made using one of the electronic forms provided for in paragraph (b) of this clause.
(3) “Payment request” means any request for contract financing payment or invoice payment submitted by the Contractor under this contract.
(b) Except as provided in paragraph (c) of this clause, the Contractor shall submit payment requests using one of the following electronic forms:
(1) Wide Area WorkFlow-Receipt and Acceptance (WAWF-RA). Information regarding WAWF-RA is available on the Internet at https://wawf.eb.mil .
(2) Web Invoicing System (WInS). Information regarding WInS is available on the Internet at https://ecweb.dfas.mil .
(3) American National Standards Institute (ANSI) X.12 electronic data interchange (EDI) formats.
(i) Information regarding EDI formats is available on the Internet at http://www.X12.org .
(ii) EDI implementation guides are available on the Internet at http://www.dod.mil/dfas/contractorpay/electroniccommerce.html .
(4) Another electronic form authorized by the Contracting Officer.
(c) The Contractor may submit a payment request in non-electronic form only when—
(1) DoD is unable to receive a payment request in electronic form; or
(2) The Contracting Officer administering the contract for payment has determined, in writing, that the electronic submission would be unduly burdensome to the Contractor. In such cases, the Contractor shall include a copy of the Contracting Officer’s determination with each request for payment.
(d) The Contractor shall submit any non-electronic payment requests using the method or methods specified in Section G of the contract.
(e) In addition to the requirements of this clause, the Contractor shall meet the requirements of the appropriate payment clauses in this contract when submitting payment requests.
IA-427
252.232-7010 LEVIES ON CONTRACT PAYMENTS (DEC 2006)
(IAW DFARS 232.7102)
I-417
52.233-1 DISPUTES (JUL 2002)
(IAW FAR 33.215)
I-419
52.233-3 PROTEST AFTER AWARD (AUG 1996)
(IAW FAR 33.106(b)) I-421
52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)
(IAW FAR 33.215(b)) I-541
52.242-13 BANKRUPTCY (JUL 1995)
(IAW FAR 42.903)
I-546
52.243-1 CHANGES--FIXED-PRICE (AUG 1987)
(IAW FAR 43.205(a)(1))
IA-648
252.243-7001 PRICING OF CONTRACT MODIFICATIONS (DEC 1991)
(IAW DFARS 243.205-70)
IA-649
252.243-7002 REQUESTS FOR EQUITABLE ADJUSTMENT (MAR 1998)
(IAW DFARS 243.205-71)
I-573
52.244-5 COMPETITION IN SUBCONTRACTING (DEC 1996)
(IAW FAR 44.204(c)) I-574
52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS (MAR 2007)
(IAW FAR 44.403)
IA-655
252.244-7000 SUBCONTRACTS FOR COMMERCIAL ITEMS AND COMMERCIAL COMPONENTS
(DoD CONTRACTS) (JAN 2007)
(IAW DFARS 244.403)
I-627
52.246-23 LIMITATION OF LIABILITY (FEB 1997)
(IAW FAR 46.805(a)(1)) I-636
52.247-1 COMMERCIAL BILL OF LADING NOTATIONS (FEB 2006)
(IAW FAR 47.104-4(a), FAR 47.104-4(b))
IA-745
252.247-7023 TRANSPORTATION OF SUPPLIES BY SEA (MAY 2002)
(IAW DFARS 247.574(b)(1)) I-671
52.248-1 VALUE ENGINEERING (FEB 2000)
(IAW FAR 48.201(b), FAR 48.201(f)) I-684
52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE)
(MAY 2004)
(IAW FAR 49.502(b)(1)(i))
I-699
52.249-8 DEFAULT (FIXED-PRICE SUPPLY AND SERVICE) (APR 1984)
(IAW FAR 49.504(a)(1)) I-731
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
(IAW FAR 52.107(b)) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
Regulations URLs: (Click on the appropriate regulation.)
http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/far1toc.htm http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/dfars/dfar1toc.htm http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/af_afmc/affars/affar1toc.htm http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/af_afmc/afmc/afmc1toc.htm
NOTE: After selecting the appropriate regulation above, at the "Table of Contents" page, conduct a search for the desired regulation reference using your browser's FIND function. When located, click on the regulation reference (hyperlink).
I-733
52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984)
(IAW FAR 52.107(f)) I-750
52.253-1 COMPUTER GENERATED FORMS (JAN 1991)
(IAW FAR 53.111)
PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J
LIST OF ATTACHMENTS
Form Number Description/File Name Date Number of Pages Performance Based Statement of Work
06OCT2007 8
DD FORM 260 First Article Requirements
26JUL2007 3
DD FORM 1423-2 Contract Data Requirements List
10JAN2008 3
PART IV - REPRESENTATIONS AND INSTRUCTIONS
SECTION K
REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS
OF OFFERORS OR RESPONDENTS
K-10E
52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2006)
(IAW FAR 4.1202)
(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is _________________ [insert NAICS code].
(2) The small business size standard is ___________________ [insert size standard].
(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.
(b)(1) If the clause at 52.204-7, Central Contractor Registration, is included in this solicitation, paragraph (c) of this provision applies.
(2) If the clause at 52.204-7 is not included in this solicitation, and the offeror is currently registered in CCR, and has completed the ORCA electronically, the offeror may choose to use paragraph (c) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The offeror shall indicate which option applies by checking one of the following boxes:
[ ] (i) Paragraph (c) applies.
[ ] (ii) Paragraph (c) does not apply and the offeror has completed the individual representations and certifications in the solicitation.
(c) The offeror has completed the annual representations and certifications electronically via the Online Representations and Certifications Application (ORCA) website at http://orca.bpn.gov . After reviewing the ORCA database information, the offeror verifies by submission of the offer that the representations and certifications currently posted electronically have been entered or updated within the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the NAICS code referenced for this solicitation), as of the date of this offer and are incorporated in this offer by reference (see FAR 4.1201); except for the changes identified below [offeror to insert changes, identifying change by clause number, title, date]. These amended representation(s) and/or certification(s) are also incorporated in this offer and are current, accurate, and complete as of the date of this offer.
FAR Clause # Title Date Change
Any changes provided by the offeror are applicable to this solicitation only, and do not result in an update to the representations and certifications posted on ORCA.
K-12C
52.207-4 ECONOMIC PURCHASE QUANTITY--SUPPLIES (AUG 1987)
(IAW FAR 7.203)
(a) Offerors are invited to state an opinion on whether the quantity(ies) of supplies on which bids, proposals or quotes are requested in this solicitation is (are) economically advantageous to the Government.
(b) Each offeror who believes that acquisitions in different quantities would be more advantageous is invited to recommend an economic purchase quantity. If different quantities are recommended, a total and a unit price must be quoted for applicable items. An economic purchase quantity is that quantity at which a significant price break occurs.
If there are significant price breaks at different quantity points, this information is desired as well.
OFFEROR RECOMMENDATIONS
ITEM QUANTITY QUOTATION PRICE TOTAL
K-210
252.209-7001 DISCLOSURE OF OWNERSHIP OR CONTROL BY THE GOVERNMENT OF A
TERRORIST COUNTRY (OCT 2006)
(IAW DFARS 209.104-70(a))
K-105C
52.225-18 PLACE OF MANUFACTURE (SEP 2006)
(IAW FAR 25.1101(f))
(b) For statistical purposes only, the offeror shall indicate whether the place of manufacture of the end products it expects to provide in response to this solicitation is predominantly—
(1) [ ] In the United States (Check this box if the total anticipated price of offered end products manufactured in the United States exceeds the total anticipated price of offered end products manufactured outside the United States); or
(2) [ ] Outside the United States.
K-248D
252.225-7020 TRADE AGREEMENTS CERTIFICATE (JAN 2005)
(IAW DFARS 225.1101(5))
(c) Certification and identification of country of origin.
(2) The following supplies are other nondesignated country end products:
(Line Item Number) (Country of Origin)
K-248DS
252.225-7031 SECONDARY ARAB BOYCOTT OF ISRAEL (JUN 2005)
(IAW DFARS 225.7605)
K-115
52.230-1 COST ACCOUNTING STANDARDS NOTICES AND CERTIFICATION (JUN 2000)
(IAW FAR 30.201-3(a))
I. DISCLOSURE STATEMENT--COST ACCOUNTING PRACTICES AND CERTIFICATION
(c) Check the appropriate box below:
[ ] (1) Certificate of Concurrent Submission of Disclosure Statement.
Date of Disclosure Statement: _______________________________ Name and Address of Cognizant ACO or Federal Official Where Filed:
[ ] (2) Certificate of Previously Submitted Disclosure Statement.
Date of Disclosure Statement: _______________________________ Name and Address of Cognizant ACO or Federal Official Where Filed:
[ ] (3) Certificate of Monetary Exemption.
[ ] (4) Certificate of Interim Exemption.
II. COST ACCOUNTING STANDARDS--ELIGIBILITY FOR MODIFIED CONTRACT COVERAGE
[ ] The offeror hereby claims an exemption from the Cost Accounting Standards
III. ADDITIONAL COST ACCOUNTING STANDARDS APPLICABLE TO EXISTING CONTRACTS
[ ] YES [ ] NO
K-116
52.230-7 PROPOSAL DISCLOSURE -- COST ACCOUNTING PRACTICE CHANGES (APR 2005)
(IAW FAR 30.201-3(c)) The offeror shall check “yes” below if the contract award will result in a required or unilateral change in cost accounting practice, including unilateral changes requested to be desirable changes.
[ ] Yes [ ] No
K-280
252.247-7022 REPRESENTATION OF EXTENT OF TRANSPORTATION BY SEA (AUG 1992)
(IAW DFARS 247.574(a))
(b) Representation.
[ ] Does anticipate that supplies will be transported by sea in the performance of any contract or subcontract resulting from this solicitation.
[ ] Does not anticipate that supplies will be transported by sea in the performance of any contract or subcontract resulting from this solicitation.
SECTION L
INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR RESPONDENTS
L-409
FIRST ARTICLE APPLICABILITY AND/OR CONDITIONS FOR WAIVER (OCT 1988)
(IAW FAR 9.306(c))
(a) First Article Testing is a requirement of this contract. This requirement may be waived by the Contracting Officer, if the bidder/offeror meets any one of the conditions for waiver listed below *** and in the instance of a prior contract, not more than __*__ months have elapsed since the completion of that contract:
*Lot/Item *Months Since Completion of Contract
(b) Bidders who meet the conditions for waiver set forth below shall submit a bid or proposal on Bid/Offer "B" which does not require compliance with the First Article Approval provision set forth herein and furnish the following information in the individual solicitation: Contract No. __________________________, Contract Item No. _________, Date of Contract. __________, Name & Address of Government Agency issuing the Contract.
Failure to include this information will render the IFB(s) non-responsive and may cause rejection of RFP(s).
(c) Bidders/offerors who do not meet the conditions for waiver set forth below shall submit a bid on Bid/Offer, “A” which includes compliance with First Article Approval.
(d) Performance or other characteristics, which the First Article must meet, and detailed technical data requirements for testing of the First Article (including necessary data to be submitted in First Article Test Report, if applicable) are as set forth in this solicitation.
(e) The approved First Article ___**___ serve as a manufacturing standard.
**Lot/Item **Serve as a Manufacturing Standard
WILL NOT
(f) Waivers
***Lot/Item ***Conditions for Waiver First Article Testing Will Not be Waived
L-8
52.211-14 NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE USE (SEP 1990)
(IAW FAR 11.604(a)) Note: DX or DO rating will be completed on cover page.
L-30F
52.214-34 SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE (APR 1991)
(IAW FAR 14.201-6(w)) L-30G
52.214-35 SUBMISSION OF OFFERS IN U.S. CURRENCY (APR 1991)
(IAW FAR 14.201-6(x)) L-58C
52.215-16 FACILITIES CAPITAL COST OF MONEY (JUN 2003)
(IAW FAR 15.408(h)) L-62J
52.215-20 REQUIREMENTS FOR COST OR PRICING DATA OR INFORMATION OTHER THAN
COST OR PRICING DATA (OCT 1997)
(IAW FAR 15.408(l))
L-232
252.215-7003 EXCESSIVE PASS-THROUGH CHARGES--IDENTIFICATION OF SUBCONTRACT
EFFORT (APR 2007)
(IAW DFARS 215.408(3))
L-65C
52.216-1 TYPE OF CONTRACT (APR 1984)
(IAW FAR 16.105)
The Government contemplates award of a (see individual line item) contract resulting from this solicitation.
L-235
252.217-7026 IDENTIFICATION OF SOURCES OF SUPPLY (NOV 1995)
(IAW DFARS 217.7303)
(b) The apparently successful Offeror agrees to complete and submit the following table before award:
TABLE
Source of Supply Line Items National Stock
Number Commercial Item (Y or N)
Company Address Part No Actual Mfg?
(1) (2) (3) (4) (4) (5) (6)
(1) List each deliverable item of supply and item of technical data.
(2) If there is no national stock number, list "none."
(3) Use "Y" if the item is a commercial item; otherwise, use "N". If "Y" is listed, the Offeror need not complete the remaining columns in the table.
(4) For items of supply, list all sources. For technical data, list the source.
(5) For items of supply, list each source's part number for the item.
(6) Use "Y" if the source of supply is the actual manufacturer; "N" if it is not; and "U" if unknown.
L-120
52.233-2 SERVICE OF PROTEST (SEP 2006)
(IAW FAR 33.106(a))
(a) by obtaining written and dated acknowledgment of receipt from (See page 1 Issuing Office).
L-139G
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
(IAW FAR 52.107(a)) This solicitation incorporated one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available.
The full text of a clause may be accessed electronically at this/these address(es): Regulations URLs: (Click on the appropriate regulation.)
http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/far1toc.htm http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/dfars/dfar1toc.htm http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/af_afmc/affars/affar1toc.htm http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/af_afmc/afmc/afmc1toc.htm
NOTE: After selecting the appropriate regulation above, at the "Table of Contents" page conduct a search for the desired regulation reference, using your browser's FIND function. When located, click on the regulation reference (hyperlink).
SECTION M
EVALUATION FACTORS FOR AWARD
MC-400C
9952.207-9000 PRICE DISCOUNTS BASED ON QUANTITY (JALC) (MAR 2003)
(IAW JALC 9907.203(90))
M-1
EVALUATION COST FACTOR FOR FIRST ARTICLE (OCT 1988)
(IAW FAR 9.306(i)) The cost to the Government for first article testing or engineering review and approval of first article test reports (where preliminary Contractor testing is required), as applicable, shall be a factor in the evaluation of this solicitation.
The factor to be used in evaluation shall be
Lot/Item Evaluation cost
File details come from the government source that posted it. Updated .