FA852218R0006_______0002.pdf
PDF 150 KB Posted
- Attached to
- Repair of Power Supplies on ALR-56M
- Solicitation number
- FA8522-18-R-0006
About this file
Extension of closing date
View the file
Other files
| File | Type | Posted |
|---|---|---|
| J_&_A_Redacted.pdf | ||
| PWS_18_R_0006.pdf | ||
| FA852218R0006_0001.pdf | ||
| GFP_Form.pdf | ||
| PWS_18_R_0006.pdf | ||
| FA852218R0006.pdf | ||
| Wage_Determination.pdf | ||
| AFMC_158.pdf | ||
| DD_Form_1423.pdf | ||
| DD_Form_1653.pdf | ||
| CAVAF_SOW.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE Page 1
2. AMENDMENT/MODIFICATION NO.
FA8522-18-R-0006-0002
3. EFFECTIVE DATE
4. REQUISITION/PURCHASE REQ. NO.
FD20601600761
5. PROJECT NO (If applicable)
6. ISSUED BY CODE
TARGETING & ELECTRONIC WARFARE, AFSC/PZABB
235 BYRON ST STE 19A
BLDG 300 CML PHN 478 926 7405
ROBINS AFB GA 31098-1670
BUYER: Joseph E. Kiefer/PZABB-R joseph.kiefer.3@us.af.mil Phone: (478) 926- 2329 No Collect Calls
7. ADMINISTERED BY (If other than item 6) CODEFA8522
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE
X
9A. AMENDMENT OF SOLICITATION NO.
FA852218R0006
9B. DATED (SEE ITEM 11)
9-MAR-2018
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods. ( a ) By completing Items 8 and 15, and returning copies of the amendment; ( b ) By acknowledging receipt of this amendment on each copy of the offer submitted; or ( c ) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. 29-JUN-2018 4:00 PM
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
ROUTINE
15A. NAME AND TITLE OF SIGNER (Type or print)
15B. CONTRACTOR/OFFEROR
BY ________________________________________________________
(Signature of person authorized to sign)
15C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16B. UNITED STATES OF AMERICA
BY ____________________________________________________
(Signature of Contracting Officer)
16C. DATE SIGNED
FACILITY CODE
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
30-105 STANDARD FORM 30 (REV. 10-83)
PRESCRIBED BY GSA
FAR (48 CFR) 53.243
X
X X
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
Continuation of block 14. DESCRIPTION OF AMENDMENT/MODIFICATION
The purpose of this amendment is to clarify the "Over and Above" and "Beyond Economic
Repair" statements made in RFP Amendment 0001, and to extend the RFP due date to 29 June
2018.
PART I - THE SCHEDULE
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
SUPPLIES OR SERVICES AND PRICES/COSTS
B. 1 GENERAL: The Contractor (independently, and not as an agent of the Government) shall furnish all necessary personnel, labor, supplies, and material as required to perform the requirements described herein.
B. 2 CONTRACT TYPE: This is a Requirements type contract, as described by FAR 16.503. This contract only authorizes use of the Firm Fixed‐Price (FFP) contract type.
B. 3 ORDERING PERIODS: In accordance with the clause in Section I of this contract, FAR 52.216‐18, orders may be issued hereunder for a period of five (5) years from the effective date of the contract.
Orders issued hereunder shall utilize the Contract Line Item (CLIN) representing the period in effect at the time of order execution for purposes of pricing. The ordering periods are associated with each CLIN series as defined below:
00XX: THE BASIC ORDERING PERIOD - THE 12 MONTH ORDERING PERIOD BEGINNING ON THE DATE OF
CONTRACT AWARD
10XX: ORDERING PERIOD I - THE 12 MONTH ORDERING PERIOD IMMEDIATELY FOLLOWING THE BASIC
ORDERING PERIOD
20XX: ORDERING PERIOD II - THE 12 MONTH ORDERING PERIOD IMMEDIATELY FOLLOWING
ORDERING PERIOD I
30XX: ORDERING PERIOD III - THE 12 MONTH ORDERING PERIOD IMMEDIATELY FOLLOWING
ORDERING PERIOD II
40XX: ORDERING PERIOD IV - THE 12 MONTH ORDERING PERIOD IMMEDIATELY FOLLOWING
ORDERING PERIOD III
B.4 DECENTRALIZED ORDERING: This basic contract allows for decentralized ordering by Procurement Contracting Officers (PCOs) located at Robins Air Force Base. The Primary Procurement Contracting Officer (PPCO) is located within AFSC Robins/PZABB, while the Ordering Procurement Contracting Officers (OPCOs) are located within various Sections, Branches and/or Divisions at Robins AFB. The PPCO is responsible for the overall management of this contract and is the only Contracting Officer who can prepare modifications to the basic contract unless otherwise delegated. OPCOs utilizing the basic contract may issue orders against the basic contract and are authorized to issue modifications against the orders they issue. A copy of their issued order or modification must be sent to the PPCO that administers the basic contract at the time of issuance.
B.5 OVER AND ABOVE (CLIN X006): The contractor shall submit a Firm Fixed Price repair proposal (including delivery information) to the Administrative Contracting Officer (ACO) when Over and Above (O&A) occurs in accordance with the PWS paragraph noted below that is needed to complete the repair of the designated CLINs. After receipt of proposal, the ACO will negotiate a Firm Fixed Price and delivery for the O&A repair. The ACO shall then submit the final negotiated price and delivery to the Ordering Procurement Contracting Officer (OPCO) along with the supporting Price Negotiation Memorandum (PNM). Upon internal receipt and approval of funds to proceed with the repair, the OPCO will issue a contract modification to the applicable order funding the O&A repair accordingly. The contract modification funding the O&A repair issued by the OPCO is the authorization for the contractor to proceed with the O&A repair and continue to repair the item. The contractor is not authorized to proceed with the repair or incur O&A repair costs until a funded contract modification against the applicable order has been received. The Govt is under no obligation to fund the additional O&A repair cost if it so elects and the contractor would not proceed with the repair and would request disposition instructions for the non-repaired item.
B.6 PERFORMANCED-BASED WORK STATEMENT (PWS): The PWS in Section J is herby replaced with PWS dated May 15, 2018.
B.7 TERMS AND CONDITIONS: All terms and conditions of the orignal RFP FA8522-18-R-0006 still apply.
BASIC ORDERING PERIOD
Repair of Power Supply Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
64 EA
CLIN ACRN ACRN Total
0001 AA
NSN: 6130-01-408-3805 EW
POWER SUPPLY
Manufacturer Part Number 08748 4-602-03 81413 330454-106 Priority: R
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
BASIC ORDERING PERIOD
Repair of Power Supply IUID Required: Yes
Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3119 ORIGIN
Type / Ship To PACRN Mark For
A SW3119 PAA
Type / Ship To Quantity (U/I) *ARO 50 days; 3 ea per month Req No / Pri
Required Delivery
A SW3119 64 EA *50 Calendar Days
Proposed Delivery
A SW3119 64 EA
BASIC ORDERING PERIOD
Repair of Power Supply Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
10 EA
CLIN ACRN ACRN Total
0002 AA
NSN: 6130-01-591-9810 EW
POWER SUPPLY
Manufacturer Part Number 19623 4-601-03 81413 330454-107 Priority: R
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
IUID Required: Yes Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3119 ORIGIN
Type / Ship To PACRN Mark For
A SW3119 PAD
BASIC ORDERING PERIOD
Repair of Power Supply Type / Ship To Quantity (U/I) *ARO 50 days; 3 ea per month Req No / Pri
Required Delivery
A SW3119 10 EA *50 Calendar Days
Proposed Delivery
A SW3119 10 EA
BASIC ORDERING PERIOD
Repair of Power Supply Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
8 EA
CLIN ACRN ACRN Total
0003 AA
NSN: 6130-01-362-0928 EW
POWER SUPPLY
Manufacturer Part Number 08748 4-603-01 81413 330454-103 Priority: R
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
IUID Required: Yes Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3119 ORIGIN
Type / Ship To PACRN Mark For
A SW3119 PAB
Type / Ship To Quantity (U/I) *ARO 50 days; 3 ea per month Req No / Pri
Required Delivery
A SW3119 8 EA *50 Calendar Days
Proposed Delivery
BASIC ORDERING PERIOD
Repair of Power Supply
A SW3119 8 EA
No FMS order shall be issued until a valid executed Letter of Offer and Acceptance (LOA) is implemented and received by the USAF Ordering Procurement Contracting Officer (OPCO) that covers the ordering period of the contract that is in effect at the time the order is issued.
BASIC ORDERING PERIOD
FMS Repair of Power Supply Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
5 EA
CLIN ACRN ACRN Total
0004 AB
NSN: 6130-01-591-9810 EW
POWER SUPPLY
Manufacturer Part Number 19623 4-601-03 81413 330454-107 Priority: R
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Foreign Military Sales IUID Required: Yes Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3119 ORIGIN
Type / Ship To PACRN Mark For
A SW3119 PAC
Type / Ship To Quantity (U/I) *ARO 50 days, 3 each per month Req No / Pri
Required Delivery
A SW3119 5 EA *50 Calendar Days
Proposed
A SW3119 5 EA
BASIC ORDERING PERIOD
DATA
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
Data
ELINS: A001-A011
Priority: R
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Standard Inspection
Distribution and delivery of all data items shall be made in accordance with the instructions included under the DD Form 1423-1 attached hereto.
COMMERCIAL ASSET VISIBILITY AF END REPORTING, CAV AF
Item No.
0005AA
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
DATA
ELIN A001, Commercial Asset Visiblity, AF End Reporting DI-MGMT-81634C IAW paragraph 4.9.3 Priority: R ROUTINE Exhibit: A
PARTS APPROVAL REQUEST
Item No.
0005AB
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
DATA
ELIN A002, Parts Approval Request DI-MISC-80071E IAW PWS Para 4.9.4 Priority: R ROUTINE Exhibit: A
CONFERENCE AGENDA
0005AC
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
DATA
ELIN A003, Conference Agenda DI-ADMN-81249B IAW PWS Paragraph 4.9.5 Priority: R ROUTINE Exhibit: A
CONFERENCE MINUTES
0005AD
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
DATA
ELIN A004, Conference Minutes DI-ADMN-81250B IAW PWS Paragraph 4.9.5 Priority: R ROUTINE Exhibit: A
PRESENTATION MATERIAL
0005AE
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
DATA
ELIN A005, Presentation Material DI-ADMN-81373 IAW PWS Paragraph 4.9.5 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Standard Inspection
QUARTERLY PRODUCTION/ASSET POSTURE REPORT
0005AF
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
DATA
ELIN A006, Quarterly Production/Asset Posture Report DI-MGMT-81867/T IAW PWS Paragraph 4.9.6 Priority: R ROUTINE Exhibit: A
IUID MARKING PLAN
0005AG
IUID MARKING PLAN
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
DATA
ELIN A007, Item Unique Identification Marking Plan DI-MGMT-81803 IAW PWS Paragraph 4.9.7.2 Priority: R ROUTINE Exhibit: A
IUID MARKING ACTIVITY, VALIDATION AND VERIFICATION REPORT
0005AH
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
DATA
ELIN A008, IUID Marking Activity, Validation and Verification Report DI-MGMT-81804A IAW PWS Paragraph 4.9.7.3 Priority: R ROUTINE Exhibit: A
DMSMS
0005AJ
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
DATA
ELIN A009, Diminishing Manufacturing Sources and Material Shortages (DMSMS) Implementation Plan DI-MGMT-81949 IAW PWS paragraph 4.9.8 Priority: R ROUTINE Exhibit: A
ENGINEERING CHANGE PROPOSAL
0005AK
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
DATA
ELIN A010, Enginering Change Proposal DI-SESS-80639D IAW PWS paragraph 4.9.9.2 Priority: R ROUTINE Exhibit: A
COUNTERFEIT PREVENTION PLAN
0005AL
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
DATA
ELIN A011, Counterfeit Prevention Plan (CPP) DI-MISC-81832 IAW PWS Paragraph 4.9.10 Priority: R ROUTINE Exhibit: A
Basic Ordering Period
Over and Above Item No.
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO To be Negotiated To be Negotiated
CLIN ACRN ACRN Total
0006 TB
OVER
Over and Above (O&A)
Basic Ordering Period
Over and Above Over and above (O&A) repair in accordance with PWS paragraph 4.15 NOTE: This CLIN is "To Be Negotiated" based on the occurrence as outlined in PWS paragraph 4.15 The contractor must propose the cost to repair and it must be negotiated and funded at the order level prior to the contractor incurring cost. The contractor is not authorized to proceed with the repair until appropriately negotiated and funded.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Type / Ship To Quantity (U/I) To be determined _ Req No / Pri
Required Delivery
I N PLACE 1 LO TBD
Proposed Delivery
I N PLACE 1 LO
Basic Ordering Period
Beyond Economic Repair (BER) Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price
1 EA
CLIN ACRN ACRN Total
0007 TC
NSN: 5955-01-466-2960 EW
Beyond Economic Repair (BER) in accordance with PWS paragraphs 3.2 and 4.8 Manufacturer Part Number 33025 6139-6443-00 Priority: R
Inspection: Origin Acceptance: Origin Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
IUID Required: Yes Physical Item Markings:
Type / Ship To PACRN Mark For
I N PLACE PAT
Type / Ship To Quantity (U/I) *ARO To be determined Req No / Pri
Required
I N PLACE 1 EA *45 Calendar Days
Basic Ordering Period
Beyond Economic Repair (BER) Proposed Delivery
I N PLACE 1 EA
ORDERING PERIOD I: THE 12 MONTH ORDERING PERIOD IMMEDIATELY FOLLOWING THE BASIC
ORDERING PERIOD.
ORDERING PERIOD 1
Repair of Power Supply Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
64 EA
CLIN ACRN ACRN Total
1001 AA
NSN: 6130-01-408-3805 EW
POWER SUPPLY
Manufacturer Part Number 08748 4-602-03 81413 330454-106 Priority: R
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
IUID Required: Yes Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3119 ORIGIN
Type / Ship To PACRN Mark For
A SW3119 PAU
Type / Ship To Quantity (U/I) *ARO 50 days; 3 ea per month Req No / Pri
Required
A SW3119 64 EA *50 Calendar Days
ORDERING PERIOD 1
Repair of Power Supply Proposed Delivery
A SW3119 64 EA
ORDERING PERIOD 1
Repair of Power Supply Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
11 EA
CLIN ACRN ACRN Total
1002 AA
NSN: 6130-01-591-9810 EW
POWER SUPPLY
Manufacturer Part Number 19623 4-601-03 81413 330454-107 Priority: R
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
IUID Required: Yes Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3119 ORIGIN
Type / Ship To PACRN Mark For
A SW3119 PAE
Type / Ship To Quantity (U/I) *ARO 50 days; 3 ea per month Req No / Pri
Required Delivery
A SW3119 11 EA *50 Calendar Days
Proposed
A SW3119 11 EA
ORDERING PERIOD 1
Repair of Power Supply Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
7 EA
CLIN ACRN ACRN Total
1003 AA
NSN: 6130-01-362-0928 EW
POWER SUPPLY
Manufacturer Part Number 08748 4-603-01 81413 330454-103 Priority: R
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
IUID Required: Yes Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3119 ORIGIN
Type / Ship To PACRN Mark For
A SW3119 PAF
Type / Ship To Quantity (U/I) *ARO 50 days; 3 ea per month Req No / Pri
Required Delivery
A SW3119 7 EA *50 Calendar Days
Proposed Delivery
A SW3119 7 EA
No FMS order shall be issued until a valid executed Letter of Offer and Acceptance (LOA) is implemented and received by the USAF Ordering Procurement Contracting Officer (OPCO) that covers the ordering period of the contract that is in effect at the time the order is issued.
ORDERING PERIOD 1
FMS Repair of Power Supply Item No.
Firm Fixed Price
ORDERING PERIOD 1
FMS Repair of Power Supply Best Estimated Qty
U/I Unit Price Amount
5 EA
CLIN ACRN ACRN Total
1004 AB
NSN: 6130-01-591-9810 EW
POWER SUPPLY
Manufacturer Part Number 19623 4-601-03 81413 330454-107 Priority: R
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Foreign Military Sales IUID Required: Yes Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3119 ORIGIN
Type / Ship To PACRN Mark For
A SW3119 PAG
Type / Ship To Quantity (U/I) *ARO 50 days, 3 each per month Req No / Pri
Required Delivery
A SW3119 5 EA *50 Calendar Days
Proposed
ORDERING PERIOD 1
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
Data
ELINS: A001-A011
ORDERING PERIOD 1
DATA
Priority: R
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection
1005AA
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
DATA
ELIN A001, Commercial Asset Visiblity, AF End Reporting DI-MGMT-81634C IAW paragraph 4.9.3 Priority: R ROUTINE Exhibit: A
PARTS APPROVAL REQUEST
1005AB
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
DATA
ELIN A002, Parts Approval Request DI-MISC-80071E IAW PWS Para 4.9.4 Priority: R ROUTINE Exhibit: A
1005AC
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
DATA
ELIN A003, Conference Agenda DI-ADMN-81249B IAW PWS Paragraph 4.9.5 Priority: R ROUTINE Exhibit: A
1005AD
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
DATA
ELIN A004, Conference Minutes DI-ADMN-81250B IAW PWS Paragraph 4.9.5 Priority: R ROUTINE Exhibit: A
1005AE
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
DATA
ELIN A005, Presentation Material DI-ADMN-81373 IAW PWS Paragraph 4.9.5 Priority: R ROUTINE
1005AF
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
DATA
ELIN A006, Quarterly Production/Asset Posture Report DI-MGMT-81867/T IAW PWS Paragraph 4.9.6 Priority: R ROUTINE Exhibit: A
1005AG
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
DATA
ELIN A007, Item Unique Identification Marking Plan DI-MGMT-81803 IAW PWS Paragraph 4.9.7.2 Priority: R ROUTINE Exhibit: A
1005AH
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
ELIN A008, IUID Marking Activity, Validation and Verification Report
IUID MARKING ACTIVITY, VALIDATION AND VERIFICATION REPORT
DI-MGMT-81804A IAW PWS Paragraph 4.9.73 Priority: R ROUTINE Exhibit: A
1005AJ
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
DATA
ELIN A009, Diminishing Manufacturing Sources and Material Shortages (DMSMS) Implementation DI-MGMT-81949 IAW PWS paragraph 4.9.8 Priority: R ROUTINE Exhibit: A
1005AK
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
DATA
ELIN A010, Enginering Change Proposal DI-SESS-80639D IAW PWS paragraph 4.9.9.2 Priority: R ROUTINE Exhibit: A
COUNTERFEIT PREVENTION PLAN
Item No.
1005AL
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
DATA
ELIN A011, Counterfeit Prevention Plan (CPP) DI-MISC-81832 IAW PWS Paragraph 4.9.10 Priority: R ROUTINE Exhibit: A
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO To be Negotiated To be Negotiated
CLIN ACRN ACRN Total
1006 TB
OVER
Over and Above (O&A) Over and above (O&A) repair in accordance with PWS paragraph 4.15 NOTE: This CLIN is "To Be Negotiated" based on the occurrence as outlined in PWS paragraph 4.15 The contractor must propose the cost to repair and it must be negotiated and funded at the order level prior to the contractor incurring cost. The contractor is not authorized to proceed with the repair until appropriately negotiated and funded.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Type / Ship To Quantity (U/I) To be determined _ Req No / Pri
Required Delivery
I N PLACE 1 LO TBD
Proposed
I N PLACE 1 LO
Basic Ordering Period
Beyond Economic Repair (BER) Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price
1 EA
CLIN ACRN ACRN Total
1007 TC
NSN: 5955-01-466-2960 EW
Beyond Economic Repair (BER) in accordance with PWS paragraphs 3.2 and 4.8 Manufacturer Part Number 33025 6139-6443-00 Priority: R
Inspection: Origin Acceptance: Origin Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
IUID Required: Yes Physical Item Markings:
Type / Ship To PACRN Mark For
I N PLACE AA
Type / Ship To Quantity (U/I) *ARO To be determined Req No / Pri
Required Delivery
I N PLACE 1 EA *45 Calendar Days
Proposed Delivery
I N PLACE 1 EA
ORDERING PERIOD II: THE 12 MONTH ORDERING PERIOD IMMEDIATELY FOLLOWING ORDERING
PERIOD I.
ORDERING PERIOD 2
Repair of Power Supply Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
62 EA
CLIN ACRN ACRN Total
2001 AA
NSN: 6130-01-408-3805 EW
POWER SUPPLY
Manufacturer Part Number 08748 4-602-03 81413 330454-106
ORDERING PERIOD 2
Repair of Power Supply Priority: R
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
IUID Required: Yes Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3119 ORIGIN
Type / Ship To PACRN Mark For
A SW3119 PAH
Type / Ship To Quantity (U/I) *ARO 50 days; 3 ea per month Req No / Pri
Required Delivery
A SW3119 62 EA *50 Calendar Days
Proposed Delivery
A SW3119 62 EA
ORDERING PERIOD 2
Repair of Power Supply Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
8 EA
CLIN ACRN ACRN Total
2002 AA
NSN: 6130-01-591-9810 EW
POWER SUPPLY
Manufacturer Part Number 19623 4-601-03 81413 330454-107 Priority: R
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ORDERING PERIOD 2
Repair of Power Supply Title Number Date Tailoring
ISO 9001-2008 2008
IUID Required: Yes Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3119 ORIGIN
Type / Ship To PACRN Mark For
A SW3119 PAI
Type / Ship To Quantity (U/I) *ARO 50 days; 3 ea per month Req No / Pri
Required Delivery
A SW3119 8 EA *50 Calendar Days
Proposed Delivery
A SW3119 8 EA
ORDERING PERIOD 2
Repair of Power Supply Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
7 EA
CLIN ACRN ACRN Total
2003 AA
NSN: 6130-01-362-0928 EW
POWER SUPPLY
Manufacturer Part Number 08748 4-603-01 81413 330454-103 Priority: R
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
IUID Required: Yes Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3119 ORIGIN
ORDERING PERIOD 2
Repair of Power Supply Type / Ship To PACRN Mark For
A SW3119 PAJ
Type / Ship To Quantity (U/I) *ARO 50 days; 3 ea per month Req No / Pri
Required Delivery
A SW3119 7 EA *50 Calendar Days
Proposed Delivery
A SW3119 7 EA
No FMS order shall be issued until a valid executed Letter of Offer and Acceptance (LOA) is implemented and received by the USAF Ordering Procurement Contracting Officer (OPCO) that covers the ordering period of the contract that is in effect at the time the order is issued.
ORDERING PERIOD 2
FMS Repair of Power Supply Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
5 EA
CLIN ACRN ACRN Total
2004 AB
NSN: 6130-01-591-9810 EW
POWER SUPPLY
Manufacturer Part Number 19623 4-601-03 81413 330454-107 Priority: R
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Foreign Military Sales IUID Required: Yes Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3119 ORIGIN
A SW3119 PAK
ORDERING PERIOD 2
FMS Repair of Power Supply Type / Ship To Quantity (U/I) *ARO 50 days, 3 each per month Req No / Pri
Required Delivery
A SW3119 5 EA *50 Calendar Days
Proposed
ORDERING PERIOD 2
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
Data
ELINS: A001-A011
Priority: R
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection
2005AA
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
DATA
ELIN A001, Commercial Asset Visiblity, AF End Reporting DI-MGMT-81634C IAW paragraph 4.9.3
2005AB
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
DATA
ELIN A002, Parts Approval Request DI-MISC-80071E IAW PWS Para 4.9.4 Priority: R ROUTINE Exhibit: A
2005AC
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
DATA
ELIN A003, Conference Agenda DI-ADMN-81249B IAW PWS Paragraph 4.9.5 Priority: R ROUTINE Exhibit: A
2005AD
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
ELIN A004, Conference Minutes
CONFERENCE MINUTES
DI-ADMN-81250B IAW PWS Paragraph 4.9.5 Priority: R ROUTINE Exhibit: A
2005AE
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
DATA
ELIN A005, Presentation Material DI-ADMN-81373 IAW PWS Paragraph 4.9.5 Priority: R ROUTINE Exhibit: A
2005AF
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
DATA
ELIN A006, Quarterly Production/Asset Posture Report DI-MGMT-81867/T IAW PWS Paragraph 4.9.6 Priority: R ROUTINE Exhibit: A
IUID MARKING PLAN
Item No.
2005AG
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
DATA
ELIN A007, Item Unique Identification Marking Plan DI-MGMT-81803 IAW PWS Paragraph 4.9.7.2 Priority: R ROUTINE Exhibit: A
2005AH
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
DATA
ELIN A008, IUID Marking Activity, Validation and Verification Report DI-MGMT-81804A IAW PWS Paragraph 4.9.73 Priority: R ROUTINE Exhibit: A
2005AJ
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
DATA
ELIN A009, Diminishing Manufacturing Sources and Material Shortages (DMSMS) Implementation DI-MGMT-81949 IAW PWS paragraph 4.9.8 Priority: R ROUTINE
2005AK
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
DATA
ELIN A010, Enginering Change Proposal DI-SESS-80639D IAW PWS paragraph 4.9.9.2 Priority: R ROUTINE Exhibit: A
2005AL
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
DATA
ELIN A011, Counterfeit Prevention Plan (CPP) DI-MISC-81832 IAW PWS Paragraph 4.9.10 Priority: R ROUTINE Exhibit: A
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO To be Negotiated To be Negotiated
CLIN ACRN ACRN Total
Basic Ordering Period
Over and Above
2006 TB
OVER
Over and Above (O&A) Over and above (O&A) repair in accordance with PWS paragraph 4.15 NOTE: This CLIN is "To Be Negotiated" based on the occurrence as outlined in PWS paragraph 4.15 The contractor must propose the cost to repair and it must be negotiated and funded at the order level prior to the contractor incurring cost. The contractor is not authorized to proceed with the repair until appropriately negotiated and funded.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Type / Ship To Quantity (U/I) To be determined _ Req No / Pri
Required Delivery
I N PLACE 1 LO TBD
Proposed Delivery
I N PLACE 1 LO
Basic Ordering Period
Beyond Economic Repair (BER) Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price
1 EA
CLIN ACRN ACRN Total
2007 TC
NSN: 5955-01-466-2960 EW
Beyond Economic Repair (BER) in accordance with PWS paragraphs 3.2 and 4.8 Manufacturer Part Number 33025 6139-6443-00 Priority: R
Inspection: Origin Acceptance: Origin Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
IUID Required: Yes Physical Item Markings:
Type / Ship To PACRN Mark For
I N PLACE AA
Type / Ship To Quantity (U/I) *ARO To be determined Req No / Pri
Required
Basic Ordering Period
Beyond Economic Repair (BER) I N PLACE 1 EA *45 Calendar Days
Proposed Delivery
I N PLACE 1 EA
ORDERING PERIOD III: THE 12 MONTH ORDERING PERIOD IMMEDIATELY FOLLOWING ORDERING
PERIOD II.
ORDERING PERIOD 3
Repair of Power Supply Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
63 EA
CLIN ACRN ACRN Total
3001 AA
NSN: 6130-01-408-3805 EW
POWER SUPPLY
Manufacturer Part Number 08748 4-602-03 81413 330454-106 Priority: R
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
IUID Required: Yes Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3119 ORIGIN
Type / Ship To PACRN Mark For
A SW3119 PAL
Type / Ship To Quantity (U/I) *ARO 50 days; 3 ea per month Req No / Pri
Required
A SW3119 63 EA *50 Calendar Days
ORDERING PERIOD 3
Repair of Power Supply Proposed Delivery
A SW3119 63 EA
ORDERING PERIOD 3
Repair of Power Supply Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
9 EA
CLIN ACRN ACRN Total
3002 AA
NSN: 6130-01-591-9810 EW
POWER SUPPLY
Manufacturer Part Number 19623 4-601-03 81413 330454-107 Priority: R
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
IUID Required: Yes Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3119 ORIGIN
Type / Ship To PACRN Mark For
A SW3119 PAM
Type / Ship To Quantity (U/I) *ARO 50 days; 3 ea per month Req No / Pri
Required Delivery
A SW3119 9 EA *50 Calendar Days
Proposed
A SW3119 9 EA
ORDERING PERIOD 3
Repair of Power Supply Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
8 EA
CLIN ACRN ACRN Total
3003 AA
NSN: 6130-01-362-0928 EW
POWER SUPPLY
Manufacturer Part Number 08748 4-603-01 81413 330454-103 Priority: R
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
IUID Required: Yes Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3119 ORIGIN
Type / Ship To PACRN Mark For
A SW3119 PAN
Type / Ship To Quantity (U/I) *ARO 50 days; 3 ea per month Req No / Pri
Required Delivery
A SW3119 8 EA *50 Calendar Days
Proposed Delivery
A SW3119 8 EA
No FMS order shall be issued until a valid executed Letter of Offer and Acceptance (LOA) is implemented and received by the USAF Ordering Procurement Contracting Officer (OPCO) that covers the ordering period of the contract that is in effect at the time the order is issued.
ORDERING PERIOD 3
FMS Repair of Power Supply Item No.
Firm Fixed Price
ORDERING PERIOD 3
FMS Repair of Power Supply Best Estimated Qty
U/I Unit Price Amount
5 EA
CLIN ACRN ACRN Total
3004 AB
NSN: 6130-01-591-9810 EW
POWER SUPPLY
Manufacturer Part Number 19623 4-601-03 81413 330454-107 Priority: R
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Foreign Military Sales IUID Required: Yes Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3119 ORIGIN
Type / Ship To PACRN Mark For
A SW3119 PAO
Type / Ship To Quantity (U/I) *ARO 50 days, 3 each per month Req No / Pri
Required Delivery
A SW3119 5 EA *50 Calendar Days
Proposed
ORDERING PERIOD 3
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
Data
ELINS: A001-A011
ORDERING PERIOD 3
DATA
Priority: R
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection
3005AA
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
DATA
ELIN A001, Commercial Asset Visiblity, AF End Reporting DI-MGMT-81634C IAW paragraph 4.9.3 Priority: R ROUTINE Exhibit: A
3005AB
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
DATA
ELIN A002, Parts Approval Request DI-MISC-80071E IAW PWS Para 4.9.4 Priority: R ROUTINE Exhibit: A
3005AC
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
DATA
ELIN A003, Conference Agenda DI-ADMN-81249B IAW PWS Paragraph 4.9.5 Priority: R ROUTINE Exhibit: A
3005AD
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
DATA
ELIN A004, Conference Minutes DI-ADMN-81250B IAW PWS Paragraph 4.9.5 Priority: R ROUTINE Exhibit: A
3005AE
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
DATA
ELIN A005, Presentation Material DI-ADMN-81373 IAW PWS Paragraph 4.9.5
3005AF
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
DATA
ELIN A006, Quarterly Production/Asset Posture Report DI-MGMT-81867/T IAW PWS Paragraph 4.9.6 Priority: R ROUTINE Exhibit: A
3005AG
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
DATA
ELIN A007, Item Unique Identification Marking Plan DI-MGMT-81803 IAW PWS Paragraph 4.9.7.2 Priority: R ROUTINE Exhibit: A
3005AH
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
ELIN A008, IUID Marking Activity, Validation and Verification Report
IUID MARKING ACTIVITY, VALIDATION AND VERIFICATION REPORT
DI-MGMT-81804A IAW PWS Paragraph 4.9.73 Priority: R ROUTINE Exhibit: A
3005AJ
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
DATA
ELIN A009, Diminishing Manufacturing Sources and Material Shortages (DMSMS) Implementation DI-MGMT-81949 IAW PWS paragraph 4.9.8 Priority: R ROUTINE Exhibit: A
3005AK
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
DATA
ELIN A010, Enginering Change Proposal DI-SESS-80639D IAW PWS paragraph 4.9.9.2 Priority: R ROUTINE Exhibit: A
COUNTERFEIT PREVENTION PLAN
Item No.
3005AL
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
DATA
ELIN A011, Counterfeit Prevention Plan (CPP) DI-MISC-81832 IAW PWS Paragraph 4.9.10 Priority: R ROUTINE Exhibit: A
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO To be Negotiated To be Negotiated
CLIN ACRN ACRN Total
3006 TB
OVER
Over and Above (O&A) Over and above (O&A) repair in accordance with PWS paragraph 4.15 NOTE: This CLIN is "To Be Negotiated" based on the occurrence as outlined in PWS paragraph 4.15 The contractor must propose the cost to repair and it must be negotiated and funded at the order level prior to the contractor incurring cost. The contractor is not authorized to proceed with the repair until appropriately negotiated and funded.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Type / Ship To Quantity (U/I) To be determined _ Req No / Pri
Required Delivery
I N PLACE 1 LO TBD
Proposed
I N PLACE 1 LO
Basic Ordering Period
Beyond Economic Repair (BER) Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price
1 EA
CLIN ACRN ACRN Total
3007 TC
NSN: 5955-01-466-2960 EW
Beyond Economic Repair (BER) in accordance with PWS paragraphs 3.2 and 4.8 Manufacturer Part Number 33025 6139-6443-00 Priority: R
Inspection: Origin Acceptance: Origin Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
IUID Required: Yes Physical Item Markings:
Type / Ship To PACRN Mark For
I N PLACE AA
Type / Ship To Quantity (U/I) *ARO To be determined Req No / Pri
Required Delivery
I N PLACE 1 EA *45 Calendar Days
Proposed Delivery
I N PLACE 1 EA
ORDERING PERIOD IV: THE 12 MONTH ORDERING PERIOD IMMEDIATELY FOLLOWING ORDERING
PERIOD III.
ORDERING PERIOD 4
Repair of Power Supply Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
64 EA
CLIN ACRN ACRN Total
4001 AA
NSN: 6130-01-408-3805 EW
POWER SUPPLY
Manufacturer Part Number 08748 4-602-03 81413 330454-106
ORDERING PERIOD 4
Repair of Power Supply Priority: R
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
IUID Required: Yes Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3119 ORIGIN
Type / Ship To PACRN Mark For
A SW3119 PAP
Type / Ship To Quantity (U/I) *ARO 50 days; 3 ea per month Req No / Pri
Required Delivery
A SW3119 64 EA *50 Calendar Days
Proposed Delivery
A SW3119 64 EA
ORDERING PERIOD 4
Repair of Power Supply Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
8 EA
CLIN ACRN ACRN Total
4002 AA
NSN: 6130-01-591-9810 EW
POWER SUPPLY
Manufacturer Part Number 19623 4-601-03 81413 330454-107 Priority: R
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ORDERING PERIOD 4
Repair of Power Supply Title Number Date Tailoring
ISO 9001-2008 2008
IUID Required: Yes Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3119 ORIGIN
Type / Ship To PACRN Mark For
A SW3119 PAQ
Type / Ship To Quantity (U/I) *ARO 50 days; 3 ea per month Req No / Pri
Required Delivery
A SW3119 8 EA *50 Calendar Days
Proposed Delivery
A SW3119 8 EA
ORDERING PERIOD 4
Repair of Power Supply Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
6 EA
CLIN ACRN ACRN Total
4003 AA
NSN: 6130-01-362-0928 EW
POWER SUPPLY
Manufacturer Part Number 08748 4-603-01 81413 330454-103 Priority: R
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
IUID Required: Yes Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3119 ORIGIN
ORDERING PERIOD 4
Repair of Power Supply Type / Ship To PACRN Mark For
A SW3119 PAR
Type / Ship To Quantity (U/I) *ARO 50 days; 3 ea per month Req No / Pri
Required Delivery
A SW3119 6 EA *50 Calendar Days
Proposed Delivery
A SW3119 6 EA
No FMS order shall be issued until a valid executed Letter of Offer and Acceptance (LOA) is implemented and received by the USAF Ordering Procurement Contracting Officer (OPCO) that covers the ordering period of the contract that is in effect at the time the order is issued.
ORDERING PERIOD 4
FMS Repair of Power Supply Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
5 EA
CLIN ACRN ACRN Total
4004 AB
NSN: 6130-01-591-9810 EW
POWER SUPPLY
Manufacturer Part Number 19623 4-601-03 81413 330454-107 Priority: R
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Foreign Military Sales IUID Required: Yes Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3119 ORIGIN
A SW3119 PAS
ORDERING PERIOD 4
FMS Repair of Power Supply Type / Ship To Quantity (U/I) *ARO 50 days, 3 each per month Req No / Pri
Required Delivery
A SW3119 5 EA *50 Calendar Days
Proposed
ORDERING PERIOD 4
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
Data
ELINS: A001-A011
Priority: R
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection
4005AA
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
DATA
ELIN A001, Commercial Asset Visiblity, AF End Reporting DI-MGMT-81634C IAW paragraph 4.9.3
4005AB
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
DATA
ELIN A002, Parts Approval Request DI-MISC-80071E IAW PWS Para 4.9.4 Priority: R ROUTINE Exhibit: A
4005AC
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
DATA
ELIN A003, Conference Agenda DI-ADMN-81249B IAW PWS Paragraph 4.9.5 Priority: R ROUTINE Exhibit: A
4005AD
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
ELIN A004, Conference Minutes
CONFERENCE MINUTES
DI-ADMN-81250B IAW PWS Paragraph 4.9.5 Priority: R ROUTINE Exhibit: A
4005AE
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
DATA
ELIN A005, Presentation Material DI-ADMN-81373 IAW PWS Paragraph 4.9.5 Priority: R ROUTINE Exhibit: A
4005AF
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
DATA
ELIN A006, Quarterly Production/Asset Posture Report DI-MGMT-81867/T IAW PWS Paragraph 4.9.6 Priority: R ROUTINE Exhibit: A
IUID MARKING PLAN
Item No.
4005AG
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
DATA
ELIN A007, Item Unique Identification Marking Plan DI-MGMT-81803 IAW PWS Paragraph 4.9.7.2 Priority: R ROUTINE Exhibit: A
4005AH
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
DATA
ELIN A008, IUID Marking Activity, Validation and Verification Report DI-MGMT-81804A IAW PWS Paragraph 4.9.73 Priority: R ROUTINE Exhibit: A
4005AJ
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
DATA
ELIN A009, Diminishing Manufacturing Sources and Material Shortages (DMSMS) Implementation DI-MGMT-81949 IAW PWS paragraph 4.9.8 Priority: R ROUTINE
4005AK
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
DATA
ELIN A010, Enginering Change Proposal DI-SESS-80639D IAW PWS paragraph 4.9.9.2 Priority: R ROUTINE Exhibit: A
4005AL
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
DATA
ELIN A011, Counterfeit Prevention Plan (CPP) DI-MISC-81832 IAW PWS Paragraph 4.9.10 Priority: R ROUTINE Exhibit: A
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO To be Negotiated To be Negotiated
CLIN ACRN ACRN Total
Basic Ordering Period
Over and Above
4006 TB
OVER
Over and Above (O&A) Over and above (O&A) repair in accordance with PWS paragraph 4.15 NOTE: This CLIN is "To Be Negotiated" based on the occurrence as outlined in PWS paragraph 4.15 The contractor must propose the cost to repair and it must be negotiated and funded at the order level prior to the contractor incurring cost. The contractor is not authorized to proceed with the repair until appropriately negotiated and funded.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Type / Ship To Quantity (U/I) To be determined _ Req No / Pri
Required Delivery
I N PLACE 1 LO TBD
Proposed Delivery
I N PLACE 1 LO
Basic Ordering Period
Beyond Economic Repair (BER) Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price
1 EA
CLIN ACRN ACRN Total
4007 TC
NSN: 5955-01-466-2960 EW
Beyond Economic Repair (BER) in accordance with PWS paragraphs 3.2 and 4.8 Manufacturer Part Number 33025 6139-6443-00 Priority: R
Inspection: Origin Acceptance: Origin Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
IUID Required: Yes Physical Item Markings:
Type / Ship To PACRN Mark For
I N PLACE AA
Type / Ship To Quantity (U/I) *ARO To be determined Req No / Pri
Required
Basic Ordering Period
Beyond Economic Repair (BER) I N PLACE 1 EA *45 Calendar Days
Proposed Delivery
I N PLACE 1 EA
SHIP TO / PLACE OF PERFORMANCE
TYPE/CODE: A SW3119
DLA DISTRIBUTION WARNER ROBINS
455 BYRON STREET BLDG 376
ROBINS A F B GA 31098-1887 31098-1887
USA
MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
TYPE/CODE: I N PLACE
MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
File details come from the government source that posted it.