2293405_CDRL1_REPORT.pdf
PDF 113 KB Posted
- Solicitation number
- FA852218Q0001
About this file
Contract Data Requirements Lists
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1800153_SGFP.pdf | ||
| 2347302_TRNSPDATA_REPORT.pdf | ||
| PWS.docx | DOCX document | |
| FA8522-18-Q-0001.pdf | ||
| WageDetermination.pdf | ||
| 2301110_PKGRQMT_REPORT.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188(1 Data Item)
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188).
Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
AN/ALM-233 & AN/ALM-256 Signal Generator
E. CONTRACT / PR NO.
FD20601800153
F. CONTRACTOR
Anritsu
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
Commercial Asset Visibility Air Force
3. SUBTITLE
CAV-AF
4. AUTHORITY
DI-MGMT-81634C
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS Para 4.2.2, 4.12
6. REQUIRING OFFICE
408 SCMS/GULA
7. DD 250 REQ
LT
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
See Block 16
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Danson, Rebecca LNAME: 04 AUG 2017DATE:
1. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF web site or CICA XML IAW the referenced DID IAW and/or CAV AF CFM SOW. This information will be accessed by the program office PMS and by 420 SCMS/GUNAB-Robins in order to ascertain production status.
2. Transactions and data will be submitted by the contractor daily IAW CAV AF User Guide, Version 8.0.1 or higher.
The Contractor shall obtain a valid DOD PKI certificate to log into CAV AF. Each user shall be required to have an Identity Certificate only; an encryption certificate is not required.
3. Training will be provided by 420 SCMS/GUNAB-Robins, (478) 327-6603 or 6602.
4. This DD Form 1423-1 applies to Contractor Furnished Materiel (CFM) type contracts.
Block 7: Enter the applicable code listed in DOD 5010.12-M, Chapter 3. (Enter LT for Letter of Transmittal if not separately priced or DD if separately priced.)
Block 9: Distribution D. Distribution authorized to Department of Defense and U.S. DoD contractors only due to operational use as of 4 August 2017. Other requests for this document shall be referred to 408 SCMS/GULA or higher DoD authority.
Block 10:
a. Contractor reporting requirements to CAV AF shall be accomplished daily and/or within 24 hours of a supply or maintenance action occurrence IAW Contractor Users Guide.
b. The method of communication from the contractor to the funding base will be mechanized using the CAV AF Online web site IAW CAV AF Contractor Users Guide.
Block 11: Data shall be current within 24 hours of last End Item maintenance occurrence.
Block 12: Date of first submission shall be within 24 hours following a supply or maintenance transaction after contract award date and government training as specified in IAW CAV AF Users Guide.
Block 13: Same as remarks regarding Block 10 above.
COORDINATORS:
15. TOTAL
G. PREPARED BY
Mancilla, Lauren M
408 SCMS / GULA
478-222-6549
H. DATE
07 AUG 2017
I. APPROVED BY
//DIGITALLY SIGNED//
MITCHELL.DOUGLAS.E.1229985813
408 SCMS / GULB 478-926-6558 / 468-6558
J. DATE
04 AUG 2017
Page 1 of 4DD FORM 1423-1, FEB 2001 Version 2Generated by PRPS using Jasper Reports on 25 Oct 2017
PREVIOUS EDITION MAY BE USED.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
AN/ALM-233 & AN/ALM-256 Signal Generator
E. CONTRACT / PR NO.
FD20601800153
F. CONTRACTOR
Anritsu
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
IUID Marking Plan
3. SUBTITLE
Marking Plan
4. AUTHORITY
DI- MGMT- 81803
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS Para 4.2.2, 4.9
6. REQUIRING OFFICE
AFLCMC/WNYEAA
7. DD 250 REQ
DD
8. APP CODE
A
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
See Block 16
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Danson, Rebecca LNAME: 04 AUG 2017DATE:
Block 4: Contractor format is acceptable. IUID Marking Plan shall be type written in Microsoft Word with support files in Microsoft Excel and Microsoft Project. IUID Marking Plan shall be formatted for printing on standard 8.5" x 11" paper.
BLK 7: For invoice submittal in Wide Area Work Flow (WAWF), use ship to DoDAAC FA8522.
BLK 9: Distribution D. Distribution authorized to Department of Defense and U.S. DoD contractors only due to operational use as of 4 August 2017. Other requests for this document shall be referred to the Responsible Engineering Authority for each system or higher DoD authority.
BLKS 8 & 10-13: Submit NLT 30 Days after contract award. Government comments/approval will be provided within 30 days after receipt. The contractor shall resubmit within 15 days after receipt of Government comments.
COORDINATORS:
Ky Pham, 408 SCMS/GUEA ALQ-131 Engineer Ky.pham@us.af.mil
0 1 0
Lauren Mancilla, 408
SCMS/GULA
ALQ-131 Logistics Manager lauren.mancilla@us.af.mil
0 1 0
Lisa Morris, AFLCMC/WNYEAA
ALQ-131 Lead Engineer lisa.morris@us.af.mil
0 1 0
Matt Moorman, 408
SCMS/GUEA
ALQ-131 Engineer matthew.moorman.3@us.af.mi l
0 1 0
0 4 015. TOTAL
G. PREPARED BY
Mancilla, Lauren M
408 SCMS / GULA
478-222-6549
H. DATE
07 AUG 2017
I. APPROVED BY
//DIGITALLY SIGNED//
MITCHELL.DOUGLAS.E.1229985813
408 SCMS / GULB 478-926-6558 / 468-6558
J. DATE
04 AUG 2017
Page 2 of 4DD FORM 1423-1, FEB 2001 Version 2Generated by PRPS using Jasper Reports on 25 Oct 2017
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
AN/ALM-233 & AN/ALM-256 Signal Generator
E. CONTRACT / PR NO.
FD20601800153
F. CONTRACTOR
Anritsu
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM
IUID Marking Activity and Verification Report
3. SUBTITLE
IUID MAVR
4. AUTHORITY
DI- MGMT- 81804A
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS Para 4.2.2, 4.9
6. REQUIRING OFFICE
AFLCMC/WNYEAA
7. DD 250 REQ
DD
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ASREQ
11. AS OF DATE
As Required
12. DATE OF FIRST
SUBMISSION
30 DAC
13. DATE OF SUBSEQUENT
SUBMISSION
As Required
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Danson, Rebecca LNAME: 04 AUG 2017DATE:
Block 4: Contractor format is acceptable. 100% of the units shall be inspected, evaluated and added to the Activity and Verification Report. Initial report during each production cycle shall be delivered electronically via E-mail to the addressees listed in block 14.
All subsequent reports will be stored for 3 years within the contractor's facility or until deemed no longer required by the systems Responsible Engineering Authority.
BLK 7: For invoice submittal in Wide Area Work Flow (WAWF), use ship to DoDAAC FA8522.
BLK 9: Distribution D. Distribution authorized to Department of Defense and U.S. DoD contractors only due to operational use as of 4 August 2017. Other requests for this document shall be referred to the Responsible Engineering Authority for each system or higher DoD authority.
COORDINATORS:
Ky Pham, 408 SCMS/GUEA ALQ-131 Engineer Ky.pham@us.af.mil
0 1 0
Lauren Mancilla, 408
SCMS/GULA
ALQ-131 Logistics Manager lauren.mancilla@us.af.mil
0 1 0
Lisa Morris, AFLCMC/WNYEAA
ALQ-131 Lead Engineer lisa.morris@us.af.mil
0 1 0
Matt Moorman, 408
SCMS/GUEA
ALQ-131 Engineer matthew.moorman.3@us.af.mi l
0 1 0
0 4 015. TOTAL
G. PREPARED BY
Mancilla, Lauren M
408 SCMS / GULA
478-222-6549
H. DATE
07 AUG 2017
I. APPROVED BY
//DIGITALLY SIGNED//
MITCHELL.DOUGLAS.E.1229985813
408 SCMS / GULB 478-926-6558 / 468-6558
J. DATE
04 AUG 2017
Page 3 of 4DD FORM 1423-1, FEB 2001 Version 2Generated by PRPS using Jasper Reports on 25 Oct 2017
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
AN/ALM-233 & AN/ALM-256 Signal Generator
E. CONTRACT / PR NO.
FD20601800153
F. CONTRACTOR
Anritsu
1. DATA ITEM NO.
A004
2. TITLE OF DATA ITEM
Counterfeit Prevention Plan
3. SUBTITLE
CPP
4. AUTHORITY
DI- MISC- 81832
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS Para 4.2.2, 4.8
6. REQUIRING OFFICE
AFLCMC/WNYEAA
7. DD 250 REQ
DD
8. APP CODE
A
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
See Block 16
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Danson, Rebecca LNAME: 04 AUG 2017DATE:
Block 4: Contractor format is acceptable. Counterfeit Prevention Plan (CPP) shall be type written in Microsoft Word with support files in Microsoft Excel and Microsoft Project. CPP shall be formatted for printing on standard 8.5" x 11" paper and delivered electronically to the addressees in block 14.
BLK 7: For invoice submittal in Wide Area Work Flow (WAWF), use ship to DoDAAC FA8522.
BLKS 8 & 10-13: Submit NLT 30 Days after contract award. Government comments/approval will be provided within 30 days after receipt. The contractor shall resubmit within 15 days after receipt of Government comments.
BLK 9: Distribution D. Distribution authorized to Department of Defense and U.S. DoD contractors only due to operational use as of 4 August 2017. Other requests for this document shall be referred to AFLCMC/WNYEAA or higher DoD authority.
COORDINATORS:
Ky Pham, 408 SCMS/GUEA ALQ-131 Engineer Ky.pham@us.af.mil
0 1 0
Lauren Mancilla, 408
SCMS/GULA
ALQ-131 Logistics Manager lauren.mancilla@us.af.mil
0 1 0
Lisa Morris, AFLCMC/WNYEAA
ALQ-131 Lead Engineer lisa.morris@us.af.mil
0 1 0
Matt Moorman, 408
SCMS/GUEA
ALQ-131 Engineer matthew.moorman.3@us.af.mi l
0 1 0
0 4 015. TOTAL
G. PREPARED BY
Mancilla, Lauren M
408 SCMS / GULA
478-222-6549
H. DATE
07 AUG 2017
I. APPROVED BY
//DIGITALLY SIGNED//
MITCHELL.DOUGLAS.E.1229985813
408 SCMS / GULB 478-926-6558 / 468-6558
J. DATE
04 AUG 2017
Page 4 of 4DD FORM 1423-1, FEB 2001 Version 2Generated by PRPS using Jasper Reports on 25 Oct 2017
File details come from the government source that posted it.