First Article Requirements NSN 1420-01-396-0339WR

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AFMC Form 260, 20020830, V3 PageGenerated By PRPS Using Oracle Reports Version of3 1 3

20 July 2016

15090 / G601897 1420013960339WR

2 1

FIRST ARTICLE REQUIREMENTS

(AFMCI 64-110, AFMCI 23-102 and FAR Part 9, Sub Part 9.3) (Additional Instructions on Page 3)

1. DATE

2. PR/MIPR NUMBER 3. CAGE / REFERENCE NUMBER 4. NSN

5. FIRST ARTICLE QUANTITY

THE FIRST ARTICLE IS UNIT(S) OF LOT/ITEM

AND WILL BE: PART OF PRODUCTION QUANTITY IN ADDITION TO PRODUCTION QUANTITY

6. ARTICLES

XWILL WILL NOT SERVE AS A MANUFACTURING

STANDARD

7. LONG LEAD TIME ITEMS

XREQUIRED NOT REQUIRED

(See FAR 52.209-3 OR -4, alternate II)

X

8. SPECIAL REQUIREMENT/PRODUCTION FACILITIES (See FAR 52.209-3 OR -4 Alternate I)

REQUIRED NOT REQUIRED

9. TEST/INSPECTION REQUIREMENTS

A. CONTRACTOR TESTING

GOVERNMENT TESTING

Performance or other characteristics which the First Articles must meet are

Contained in the Tech Data/Drawing and Contract.

B. The detailed technical requirements for First Article approval tests are contained in

IAW Tech Data/Drawing.

C. TEST PLAN REQUIRED

(Cite Spec and Para number)

Number of days for government approval/disapproval 45 days.

D. Contractor's notification to ACO and

782cbsg.afat@robins.af.mil (Requesting Activity) of test time and location due 45 days prior to start of testing.

E. X TEST REPORT REQUIRED

(1) Forwarded to

AFLCMC/EBREM, (DAVID LEWIS)

235 Byron Street Ste 19A

Robins AFB, GA 31098-1813

(2) Government written notice of approval/disapproval due 45 days after receipt of contractor's report.

F. FIRST ARTICLE DELIVERY

(1) Due within calendar days from date contract.

(2) Notify calendar days prior to shipment.

(3) Delivered to government at

(Set Forth Consignee and Address)

(4) Government written notice of approval/disapproval within days after receipt of first article package.

OFFICIAL BUSINESS

"The First Article offered must be manufactured at the facilities in which that item is to be produced under the contract, or if the First Article is a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must accompany each First Article which is offered."

FD2060-16-94913

x x

1062605991C Typewritten Text

1062605991C Typewritten Text

1062605991C Typewritten Text

1062605991C Typewritten Text

1062605991C Typewritten Text x

1062605991C Typewritten Text

1062605991C Typewritten Text

1062605991C Typewritten Text

1062605991C Typewritten Text

1062605991C Typewritten Text

AFLCMC/EBREM, (DAVID LEWIS)

235 Byron Street Ste 19A Robins AFB, GA 31098-1813

OFFICIAL BUSINESS

1062605991C Typewritten Text

1062605991C Typewritten Text

1062605991C Typewritten Text

1062605991C Typewritten Text

1062605991C Typewritten Text

1062605991C Typewritten Text

1062605991C Typewritten Text

1154719004C Typewritten Text x

1154719004C Typewritten Text

AFMC Form 260, 20020830, V3 PageGenerated By PRPS Using Oracle Reports Version of3 2 3

G. Estimated cost of government testing/inspection evaluation.

$1500.00

10. DISPOSITION OF FIRST ARTICLES

Approved First Articles will be forwarded to

(insert quantity) First Articles will be expended in testing. Residual components of dispproved First Articles will be returned to the contractor will be retained by pending disposition instructions from the contractor.

First Articles will be installed on aircraft/equipment to determine proper fit/function. Approved article will remain on the aircraft/equipment and will not be forwarded to USAF Supply, but will be considered part of the contract quantity.

will be retained by pending disposition instructions from the contractor.

On purchase requests designated as direct shipments the following disposition will apply. (NOTE: Always applicable on Foreign Military Sales (FMS)).

a. Approved First Articles will be returned to the contractor for shipment with production item.

b. Disposition of disapproved First Articles will remain the same as marked above.

Other Disposition:

11. CONDITION(S) FOR WAIVER OF FIRST ARTICLE APPROVAL

a. X

X

X

X b.

c.

d.

e.

f.

Offerors who have previously furnished production quantities of the same or similar article to the prime contractor for delivery to the

XGovernment, DoD, Air Force.

Offerors currently in production of the same or similar article for a Government, DoD, Air Force contract and who have received First Article approval under the existing contract. X

Offerors who have previously furnished production quantities of the same or similar articles to the

Government, DoD, X Air Force, provided articles thus furnished, have exhibited satisfactory performance in service in the opinion of the Air Force.

Provided not more than 36 months have elapsed since completion of the contract.

First Article testing will not be waived.

See Remarks in block 12 below. X

A. PROCURING OFFICE B. CONTRACT NUMBER C. DATE OF CONTRACT D. SPECIFICATION NUMBER AND REVISION

Disapproved First Articles

12. REMARKS

For any metal that is not created in the United States, an independent chemical analysis, hardness, and microstructure analysis will be required.

Also, any processing performed outside the United States will require an independent verification that it was performed/applied IAW Tech Data.

Also, the FA will be made available for EBHAEM to perform a Form/Fit/Function

Test.

Oliver, Michael P 20 July 2016NAME DATE

NOTE TO BUYER: UNDER CONDITIONS A AND C ABOVE, THE COGNIZANT ENGINEERING ACTIVITY WILL DECIDE WHETHER OR NOT THE ITEM HAS EXHIBITED SATISFACTORY PERFORMANCE IN SERVICE AND PREPARE AND RETAIN SUPPORTING DOCUMENTATION TO FULLY JUSTIFY THIS DECISION. THE BUYER MUST SOLICIT DUAL PRICES (That is, both with and without requirement for first article approval) AND MUST FURNISH THE COGNIZANT ENGINEERING ACTIVITY WITH THE FOLLOWING INFORMATION ON THE PREVIOUSLY SUPPLIED

ARTICLE:

will be returned to the contractor x x x x The contractor for shipment with production item.

AFMC Form 260, 20020830, V3 Generated By PRPS Using Oracle Reports Version Page of 3 3 3

For any metal that is not created in the United States, an independent chemical analysis, hardness, and microstructure analysis will be required.

Also, any processing performed outside the United States will require an independent verification that it was performed/applied IAW Tech Data.

Also, the FA will be made available for EBHAEM to perform a Form/Fit/Function

Test.

14. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR

CONDUCTING TEST (Name, Organization, Phone)

13. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR

APPROVING TEST (Name, Organization, Phone)

Oliver, Michael P

AFLCMC/EBREM

478-327-4330

497-4330