About this file

Attachment 31

View the file

Other files

File Type Posted
Tunner_RFP_Q A_6_-_12-10-12.pdf PDF
Tunner_RFP_Q A_5_-_12-6-12.pdf PDF
FA8519-11-R-0003-0002.pdf PDF
Tunner_RFP_Q A_4 _11-29-12.pdf PDF
Appendix_C_FA8519-11-R-0003_Rev.pdf PDF
FA8519-11-R-0003-0001_-_11-20-12.pdf PDF
TUN_FY13_PBL_OA_PWS_Rev.pdf PDF
Tunner_RFP_Q A_3_-_11-19-12.pdf PDF
Tunner_RFP_Q A_2_-_11-8-12.pdf PDF
Tunner_RFP_Q A_1_-_11-5-12.pdf PDF
QASP_for_FY13_PES_PBL.pdf PDF
TM-86-01N_29aug2012_for_X007.pdf PDF
TUN_FY13_CDRL_X00C_IPMR.pdf PDF
TUN_FY13_PBL_MM_PWS.pdf PDF
Appendix_B.pdf PDF
Atch_25_Cross-Reference_Matrix.xlsx XLSX spreadsheet
TUN_FY13_CDRL_X008_TMCR2.pdf PDF
Atch_29_Data_Library.pdf PDF
TUN_FY13_CDRL_X010_SEP.pdf PDF
TUN_FY13_CDRL_X00E_CONF_MIN.pdf PDF
Proposal_Adequacy_Checklist_July_2008.doc DOC document
Atch_24_PP_Questionnaire.pdf PDF
TUN_FY13_CDRL_X001_TECHBASELINE.pdf PDF
TUN_FY13_CDRL_X005_TEST.pdf PDF
TM-86-01N_31aug2012_for_X008.pdf PDF
FA851911R0003.pdf PDF
TUN_FY13_CDRL_X004_NCIS.pdf PDF
TUN_FY13_CDRL_X006_FEA.pdf PDF
TUN_FY13_CDRL_X002_SAR.pdf PDF
Atch_26_TSSA_Determination_and_Incentive_Fee_Arrangement.pdf PDF
App_C_FA8519-11-R-0003.pdf PDF
TUN_FY13_CDRL_X011_CMP.pdf PDF
TUN_FY13_PBL_OA_PWS.pdf PDF
Atch_32_Facts_Sheet.pdf PDF
TUN_FY13_PBL_OH_PWS.pdf PDF
QASP_for_FY13_OH_PBL.pdf PDF
Atch_27_LaborCate_and_Matl_Add-on_Factor_Table.xlsx XLSX spreadsheet
TUN_FY13_PBL_PES_PWS.pdf PDF
QASP_for_FY13_MM_PBL.pdf PDF
Atch_23_Client_Authorization_Letter.pdf PDF
TUN_FY13_CDRL_X00D_CFSR.pdf PDF
TUN_FY13_CDRL_X007_TMCR1.pdf PDF
TUN_FY13_CDRL_X003_ECP.pdf PDF
TUN_FY13_CDRL_X009_TDP.pdf PDF
TUN_FY13_CDRL_X012_OI_Man.pdf PDF
Atch_22_Partner_consent_form.pdf PDF
TUN_FY13_CDRL_X00B_CWBS.pdf PDF
Atch_28_Government_furnished_property.pdf PDF
FBO_Notice__Tunner_Data_Availability.pdf PDF
DD_2345.pdf PDF
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 31 Dated: 09 AUG 2012

The offeror shall fill out Matrix below by inserting rows and populating with the offeror’s CWBS level 3 elements in column 4. Afterwards, proceed to populate columns 5 thru 7. Do not include prices (costs).

MATRIX OF CWBS ELEMENTS/ CLINs,/ MTL & LABOR

1 2 3 4 5 6 7

CLIN CWBS-

LEVEL 1

CWBS-

LEVEL 2

CWBS-

LEVEL 3

Labor Category

Labor Hours

Narrative Description of How You Determined Material Requirements to Accomplish this WBS Element (additional sheets may be attached for extended explanations)

0001*, 0002, 0003, 0010, 0011, 0017, 0018, 1001, 1002, 2001, 2002, 3001, 3002, 4001, 4002, 5001, 5002, 6001, 6002, 7001, 7002

1. MATERIAL

MANAGEMENT

1.1 Parts (price

per operating hour)

See note 1

1.2 Product

Support (infrastructure)

1.3 Program

Administration

0001*, 0004, 0012, 0019, 1003, 2003, 3003, 4003, 5003, 6003, 7003

2. PROGRAM

ENGINEERING

SUPPORT

2.1 Systems

Engineering

2.2 Change

Activity

2.3 Program

0005*, 0006**, 0013, 0020, 1004, 2004, 3004, 4004, 5004, 6004, 7004

3. OVERHAUL 3.1 Deck See note 2

3.2 Chassis See note 2

3.3 Cab See note 2

3.4 Integration, Assembly, Test and inspection

See note 2

3.5 Program

Offeror completes columns 4-7 for each level 3 CWBS element for PES, MM, and OH segments.

*Applies to unqualified sources only ** Applies to qualified sources only

Note 1: 1.1, the level 3 CWBS shall be segregated into depot level repair parts and expendable parts Note 2: 3.1, 3.2, 3.3 and 3.4, the level 3 CWBS must include total work described in the overhaul manual

File details come from the government source that posted it. Updated .