2492697_CDRL1_REPORT.pdf

PDF 120 KB Posted

Attached to
Repair of Fire Truck Components
Solicitation number
FA8517-18-Q-0029
Issued by

About this file

Contract Data Requirements List

View the file

Other files

File Type Posted
FA851718Q0029Rev_1.pdf PDF
011631671_SPI.pdf PDF
RFQ_Pricing_Sheet.xlsx XLSX spreadsheet
2560014_TRNSPDATA_REPORT.pdf PDF
Packaging_-_FORM_158_Rev.pdf PDF
011649056_SPI.pdf PDF
FD2060-18-00185_SGFP_rev.pdf PDF
PWS.pdf PDF
FA851718Q0029.pdf PDF
CAVAF_SOW.pdf PDF
012976614_SPI.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188(1 Data Item)

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188).

Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM E. CONTRACT / PR NO.

FD20601800185

F. CONTRACTOR

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

Commercial Asset Visibility Air Force

3. SUBTITLE

CAVAF

4. AUTHORITY

DI-MGMT-81634C

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS para 3.2.1

6. REQUIRING OFFICE

FA8517

7. DD 250 REQ

LT

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

A

10. FREQUENCY

See Block 16

11. AS OF DATE

see block 16

12. DATE OF FIRST

SUBMISSION

see block 16

13. DATE OF SUBSEQUENT

SUBMISSION

see block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Sostarich, Jonn WNAME: 05 APR 2018DATE:

1. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF web site or CICA XML IAW the referenced DID IAW and/or CAV AF CFM SOW. This information will be accessed by the program office PMS and by 420 SCMS/GUNAB-Robins in order to ascertain production status.

2. Transactions and data will be submitted by the contractor daily IAW CAV AF User Guide, Version 8.0.1 or higher.

The Contractor shall obtain a valid DOD PKI certificate to log into CAV AF. Each user shall be required to have an Identity Certificate only; an encryption certificate is not required.

3. Training will be provided by 420 SCMS/GUNAB-Robins, (478) 327-6603 or 6602.

4. This DD Form 1423-1 applies to Contractor Furnished Materiel (CFM) type contracts.

Block 7: Enter the applicable code as listed in DOD 5010.12-M, Chapter 3. (Enter LT for Letter of Transmittal if not separately priced or DD if separately priced.)

Block 10:

a. Contractor reporting requirements to CAV AF shall be accomplished daily and/or within 24 hours of a supply or maintenance action occurrence IAW Contractor Users Guide.

b. The method of communication from the contractor to the funding base will be mechanized using the CAV AF Online web site IAW CAV AF Contractor Users Guide.

Block 11: Data shall be current within 24 hours of last End Item maintenance occurrence.

Block 12: Date of first submission shall be within 24 hours following a supply or maintenance transaction after the contract award date and government training as specified in IAW CAV AF Users Guide.

Block 13: Same as remarks regarding Block 10 above.

COORDINATORS:

15. TOTAL

G. PREPARED BY

Pollard, Dylan T

410 SCMS / GULB

478-327-8741

H. DATE

22 MAY 2018

I. APPROVED BY

//DIGITALLY SIGNED//

VICIOSO.JOHAN.M.1294137579

410 SCMS / GUEA 478-327-2790 / 497-2790

J. DATE

03 MAY 2018

Page 1 of 7DD FORM 1423-1, FEB 2001 Version 3Generated by PRPS using Jasper Reports on 25 Jul 2018

PREVIOUS EDITION MAY BE USED.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM E. CONTRACT / PR NO.

FD20601800185

F. CONTRACTOR

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM

Item Unique Identification (IUID) Marking Plan

3. SUBTITLE

None

4. AUTHORITY

DI-MGMT-81803

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS, Para. 4.12.2

6. REQUIRING OFFICE

410 SCMS/GULB

7. DD 250 REQ

DD

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

See Block 16

11. AS OF DATE

See block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Fazzini, Steven JNAME: 12 APR 2018DATE:

Block 7: The engineer will be responsible for acceptance at the destination.

Block 10-13: The contractor shall submit a complete IUID Marking Plan within 20 business days after contract award.

The Government will review and determine acceptance or rejection and notify contractor within 10 business days of receipt. If rejected the contractor shall have 10 business days to correct any error and return a corrected IUID Marking Plan to the Government for review.

Block 14. Document submission shall be provided electronically via Microsoft Office word format (doc) or Portable Document Format (PDF) to the points of contact (POC)s listed below. Changes to the POC Distribution List shall be made by letter from the Procurement Contracting Officer (PCO) or the Alternate Contracting Officer (ACO) without further revision to this Contract Data Requirements List (CDRL).

CDRL POC Distribution List:

410 SCMS / GULB, Program Manager:

GUS MONOS

Email: gus.monos.1@us.af.mil

410 SCMS / GUEA, Engineer:

STEVEN FAZZINI

Email: steven.fazzini.1@usaf.af.mil

410 SCMS / GULB, Equipment Specialist:

MICHAEL OSBORNE

Email: michael.osborne.2@us.af.mil

COORDINATORS:

410 SCMS / GULB

235 Byron Street, Suite 19A Robins AFB, GA 31098-1813

0 1 0

410 SCMS/GUEA

235 Bryon Street, Suite 19A Robins AFB, GA 31098-1813

0 1 0

0 2 015. TOTAL

G. PREPARED BY

Pollard, Dylan T

410 SCMS / GULB

478-327-8741

H. DATE

22 MAY 2018

I. APPROVED BY

//DIGITALLY SIGNED//

VICIOSO.JOHAN.M.1294137579

410 SCMS / GUEA 478-327-2790 / 497-2790

J. DATE

03 MAY 2018

Page 2 of 7DD FORM 1423-1, FEB 2001 Version 3Generated by PRPS using Jasper Reports on 25 Jul 2018

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM E. CONTRACT / PR NO.

FD20601800185

F. CONTRACTOR

1. DATA ITEM NO.

A003

2. TITLE OF DATA ITEM

Item Unique Identification (IUID) Marking Activity Validation and Verification Report

3. SUBTITLE

NONE

4. AUTHORITY

DI-MGMT-81804A

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS, PARA. 4.12.2

6. REQUIRING OFFICE

410 SCMS/GULB

7. DD 250 REQ

DD

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

See Block 16

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Fazzini, Steven JNAME: 12 APR 2018DATE:

Block 7: The engineer will be responsible for acceptance at the destination.

Block 10-13: The contractor shall submit an IUID Marking Activity, validation and verification Report 65 business days after the first National Stock Number (NSN) has been marked and semi-annually thereafter. The Government will review and determine acceptance or rejection and notify contractor within 10 business days of receipt. If rejected, the contractor shall have 10 business days to correct any errors and return a corrected IUID Marking Activity and Verification Report to the Government for review.

Block 14. Document submission shall be provided electronically via Microsoft Office word format (doc) or Portable Document Format (PDF) to the points of contact (POC)s listed below. Changes to the POC Distribution List shall be made by letter from the Procurement Contracting Officer (PCO) or the Alternate Contracting Officer (ACO) without further revision to this Contract Data Requirements List (CDRL).

CDRL POC Distribution List:

410 SCMS / GULB, Program Manager:

GUS MONOS

Email: gus.monos.1@us.af.mil

410 SCMS / GUEA, Engineer:

STEVEN FAZZINI

Email: steven.fazzini.1@usaf.af.mil

410 SCMS / GULB, Equipment Specialist:

MICHAEL OSBORNE

Email: michael.osborne.2@us.af.mil

COORDINATORS:

410 SCMS/GUEA

235 Bryon Street, Suite 19A Robins AFB, GA 31098-1813

0 1 0

410 SCMS/GULB

235 Bryon Street, Suite 19A Robins AFB, GA 31098-1813

0 1 0

0 2 015. TOTAL

G. PREPARED BY

Pollard, Dylan T

410 SCMS / GULB

478-327-8741

H. DATE

22 MAY 2018

I. APPROVED BY

//DIGITALLY SIGNED//

VICIOSO.JOHAN.M.1294137579

410 SCMS / GUEA 478-327-2790 / 497-2790

J. DATE

03 MAY 2018

Page 3 of 7DD FORM 1423-1, FEB 2001 Version 3Generated by PRPS using Jasper Reports on 25 Jul 2018

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM E. CONTRACT / PR NO.

FD20601800185

F. CONTRACTOR

1. DATA ITEM NO.

A004

2. TITLE OF DATA ITEM

Counterfeit Prevention Plan (CPP)

3. SUBTITLE

None

4. AUTHORITY

DI-MISC-81832

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS, PARA. 4.14

6. REQUIRING OFFICE

410 SCMS/GULB

7. DD 250 REQ

SS

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

See Block 16

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Fazzini, Steven JNAME: 12 APR 2018DATE:

Block 10-12: Contractor shall deliver the CPP within 20 business days after contract award. Government comments will be provided to the contractor within 10 business days after receipt, with contractor re-submittal due 5 business days after receipt of comments. Updates to the CPP shall be provided to the Government within 15 business days after the initial counterfeit part(s) identification/notification.

Block 13: Updates to the CPP shall be provided within 15 business days after each additional counterfeit part(s) identification/notification.

Block 14. Document submission shall be provided electronically via Microsoft Office word format (doc) or Portable Document Format (PDF) to the points of contact (POC)s listed below. Changes to the POC Distribution List shall be made by letter from the Procurement Contracting Officer (PCO) or the Alternate Contracting Officer (ACO) without further revision to this Contract Data Requirements List (CDRL).

CDRL POC Distribution List:

410 SCMS / GULB, Program Manager:

GUS MONOS

Email: gus.monos.1@us.af.mil

410 SCMS / GUEA, Engineer:

STEVEN FAZZINI

Email: steven.fazzini.1@usaf.af.mil

410 SCMS / GULB, Equipment Specialist:

MICHAEL OSBORNE

Email: michael.osborne.2@us.af.mil

COORDINATORS:

410 SCMS/GUEA

235 Bryon Street, Suite 19A Robins AFB, GA 31098-1813

0 1 0

410 SCMS/GULB

235 Bryon Street, Suite 19A Robins AFB, GA 31098-1813

0 1 0

0 2 015. TOTAL

G. PREPARED BY

Pollard, Dylan T

410 SCMS / GULB

478-327-8741

H. DATE

22 MAY 2018

I. APPROVED BY

//DIGITALLY SIGNED//

VICIOSO.JOHAN.M.1294137579

410 SCMS / GUEA 478-327-2790 / 497-2790

J. DATE

03 MAY 2018

Page 4 of 7DD FORM 1423-1, FEB 2001 Version 3Generated by PRPS using Jasper Reports on 25 Jul 2018

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM E. CONTRACT / PR NO.

FD20601800185

F. CONTRACTOR

1. DATA ITEM NO.

A005

2. TITLE OF DATA ITEM

Accident/Incedent Report

3. SUBTITLE

None

4. AUTHORITY

DI-SAFT-81563

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS, Para. 5.5.2

6. REQUIRING OFFICE

410 SCMS/GULB

7. DD 250 REQ

SS

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ASREQ

11. AS OF DATE

As Required

12. DATE OF FIRST

SUBMISSION

As Required

13. DATE OF SUBSEQUENT

SUBMISSION

As Required

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Fazzini, Steven JNAME: 11 APR 2018DATE:

Block 7: DCMA Quality Assurance Representative(QAR) will be responsible for acceptance at source.

Blocks 10-13: The contractor shall prepare an email response to a major accident/incident resulting in any one or more of the following: affecting program planning or production schedules; damaging government property in excess of $10,000; degrading the safety of the equipment under contract, such that personnel injury or property damage may be involved; identifying a potential hazard requiring corrective action. The contractor shall provide the Government with information on the applicability, impact, corrective action, and disposition of any affected items. The contractor shall send email notification to the Logistics Manager.

Block 14: Contract Data Requirements List (CDRL) POC information for Distribution List:

Gus Monos Logistics Manager Phone: DSN 472-3835, Commercial: 478-222-3835 Email: Gus.Monos.1@us.af.mil

COORDINATORS:

410 SCMS/GULB

235 Bryon Street, Suite 19A Robins AFB, GA 31098-1813

0 1 0

0 1 015. TOTAL

G. PREPARED BY

Pollard, Dylan T

410 SCMS / GULB

478-327-8741

H. DATE

22 MAY 2018

I. APPROVED BY

//DIGITALLY SIGNED//

VICIOSO.JOHAN.M.1294137579

410 SCMS / GUEA 478-327-2790 / 497-2790

J. DATE

03 MAY 2018

Page 5 of 7DD FORM 1423-1, FEB 2001 Version 3Generated by PRPS using Jasper Reports on 25 Jul 2018

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM E. CONTRACT / PR NO.

FD20601800185

F. CONTRACTOR

1. DATA ITEM NO.

A006

2. TITLE OF DATA ITEM

Government Industry Data Exchange Program (GIDEP) Alert/Safe-Alert Report

3. SUBTITLE

None

4. AUTHORITY

DI-QCIC-80125B

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS, PARA. 4.15

6. REQUIRING OFFICE

410 SCMS/GULB

7. DD 250 REQ

SS

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ASREQ

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Fazzini, Steven JNAME: 20 APR 2018DATE:

Block 7: DCMA Quality Assurance Representative(QAR) will be responsible for acceptance at source.

Blocks 10-13: The contractor shall prepare a email response to an Alert/Safety Alert to provide the Government with the information of the applicability, impact and corrective action or disposition of the Alerted parts and units containing alerted parts, as required. The contractor shall send email notification to the Logistics Manager, Gus Monos, Email:

Gus.monos@us.af.mil.

Block 14: Contract Data Requirements List (CDRL) POC information for Distribution List:

ATTN:

Gus Monos Logistics Manager

410 SCMS/GULB

235 Byron Street, Suite 19A Robins AFB, GA 31098-1813 Phone: DSN 472-3835, Commercial: 478-222-3835 Email: Gus.Monos@us.af.mil AND

ATTN:

GIDEP OPS Center Code 30G Corona, CA 92878-8000

COORDINATORS:

GIDEP OPS Center Code 30G Corona, CA 92878-8000

0 1 0

Gus Monos Logistics Manager

410 SCMS/GULB

235 Byron Street, Suite 19A Robins AFB, GA 31098-1813

0 1 0

0 2 015. TOTAL

G. PREPARED BY

Pollard, Dylan T

410 SCMS / GULB

478-327-8741

H. DATE

22 MAY 2018

I. APPROVED BY

//DIGITALLY SIGNED//

VICIOSO.JOHAN.M.1294137579

410 SCMS / GUEA 478-327-2790 / 497-2790

J. DATE

03 MAY 2018

Page 6 of 7DD FORM 1423-1, FEB 2001 Version 3Generated by PRPS using Jasper Reports on 25 Jul 2018

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM E. CONTRACT / PR NO.

FD20601800185

F. CONTRACTOR

1. DATA ITEM NO.

A007

2. TITLE OF DATA ITEM

Government Industry Data Exchange Program (GIDEP) Alert/Safe-Alert Response

3. SUBTITLE

None

4. AUTHORITY

DI-QCIC-80126B

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS, PARA 4.15

6. REQUIRING OFFICE

410 SCMS/GULB

7. DD 250 REQ

SS

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ASREQ

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Fazzini, Steven JNAME: 20 APR 2018DATE:

Block 7: DCMA Quality Assurance Representative (QAR) will be responsible for acceptance at source.

Blocks 10-13: The contractor shall prepare a email response to an Alert/Safety Alert to provide the Government with the information of the applicability, impact and corrective action or disposition of the Alerted parts and units containing alerted parts, as required. The contractor shall send email notification to the Logistics Manager, Gus Monos, Email:

Gus.monos@us.af.mil.

Block 14: Contract Data Requirements List (CDRL) POC information for Distribution List:

ATTN:

Gus Monos;

Logistics Manager;

410 SCMS/GULB;

235 Byron Street, Suite 19A;

Robins AFB, GA 31098-1813;

Phone: DSN 472-3835, Commercial: 478-222-3835;

Email: Gus.Monos@us.af.mil AND

ATTN:

GIDEP OPS Center;

Code 30G;

Corona, CA 92878-8000

COORDINATORS:

GIDEP OPS Center Code 30G Corona, CA 92878-8000

0 1 0

Gus Monos Logistics Manager

410 SCMS/GULB

235 Byron Street, Suite 19A Robins AFB, GA 31098-1813

0 1 0

0 2 015. TOTAL

G. PREPARED BY

Pollard, Dylan T

410 SCMS / GULB

478-327-8741

H. DATE

22 MAY 2018

I. APPROVED BY

//DIGITALLY SIGNED//

VICIOSO.JOHAN.M.1294137579

410 SCMS / GUEA 478-327-2790 / 497-2790

J. DATE

03 MAY 2018

Page 7 of 7DD FORM 1423-1, FEB 2001 Version 3Generated by PRPS using Jasper Reports on 25 Jul 2018

File details come from the government source that posted it.