PWS_IBDSS_30Sept2026.pdf
PDF 628 KB Posted
- Attached to
- Delivery and Installation of Integrated Base Defense Security Systems (IBDSS) for buildings on Robins AFB
- Solicitation number
- FA850127R0003
About this file
This is a Performance Work Statement (PWS) for an Indefinite Delivery, Indefinite Quantity (IDIQ) contract to install Integrated Base Defense Security Systems (IBDSS) at Robins Air Force Base in Warner Robins, Georgia, for the 78 Security Forces Squadron. The contract period runs from October 1, 2026, through September 30, 2027, with four one-year option years and a potential six-month extension. The contractor must provide complete installation, programming, testing, training, and one-year warranty coverage for Honeywell Vindicator-based intrusion detection systems (IDS), access control systems (ACS), closed-circuit television (CCTV), and duress systems across approximately 120+ Air Force facilities. All installations must comply with Air Force Authority to Operate (ATO) requirements, the Non-Nuclear Configuration Management Database (CMD), and Defense Facility requirements including DAFI 31-101, ESE-TP-0023, and ICD 705.
Key technical requirements include installation of NEMA 1-rated Interior Distribution Boxes (IDBs) manufactured in the United States, balanced magnetic switches, 360-degree motion sensors, tamper switches, Honeywell graphical keypads, and backup power systems with eight-hour minimum battery life. All systems must annunciate to Building 988 Base Defense Operations Center (BDOC) through Cisco network switches connected to the base datacenter. The contractor must employ Honeywell Vindicator-certified technicians with minimum two years' direct experience and successful completion of three Vindicator system projects annually for three years. Personnel requiring facility access must maintain active Department of Defense Secret security clearances. Performance standards require 99.1% of installed assets to pass government acceptance testing with no more than one failure per fiscal year. Testing occurs in three phases: Phase I contractor verification testing, Phase II 72-hour continuous testing, and Phase III 30-day operational testing to establish false alarm and nuisance alarm baselines. Response times for maintenance range from one hour for catastrophic failures at PL1-PL2 levels to 24 hours for partial failures at higher protection levels. The contractor must submit seven Contract Data Requirements List (CDRL) deliverables including training documentation, testing reports, drawings, warranty information, AFTO Form 747, and accident/incident reports. All work must comply with AS9100 quality management standards, OSHA safety requirements, and environmental health protocols, with a mandatory pre-bid site survey required prior to proposal submission.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Example Project.pdf | ||
| Alarm Building List.pdf | ||
| Solicitation - FA850127R0003.pdf | ||
| CDRLs Combined.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PWS REVISION: 1 1
(CUI)CONTROLLED UNCLASSIFIED INFORMATION (CUI)
Performance Work Statement (PWS) for
Integrated Base Defense Security Systems (IBDSS) - IDIQ
Installation for
Robins Air Force Base Warner Robins, GA
78 Security Forces Squadron (SFS)
Version: 02
30 September 2026
Q A P C
PWS REVISION: 1 2
1.0 Description of Services. The contractor shall provide all necessary labor, personnel, documentation, drawings, supervision, management, tools, equipment, transportation, programming, materials, and any other items necessary for the installation of a Vindicator Intrusion Detection System (IDS), Access Control System (ACS), Closed-Circuit Television (CCTV), and duress systems for approximately 120+ facilities, as requested, on Robins AFB, Warner Robins, GA.
The contractor shall install the Vindicator platform to meet Air Force Authority to Operate (ATO) requirements. The contractor shall install the IDS using the current Air Force Non-Nuclear IDS Equipment.
The system will include balanced magnetic switches, 360-degree motion sensors, tamper switches, Vindicator-compatible keypads, a Honeywell graphical keypad, and all hardware, fittings, wire, backup power supplies, and firmware required to complete the requirement.
Upon completion of work, the system must provide the capability to detect alarms and initiate responses in a manner that aids in preventing damage, destruction, or unauthorized access to resources.
In addition to this statement of work, any attached appendices, manufacturer's standards, applicable US laws, commercial standards, and business practices, a mandatory pre-bid site survey will be required for all companies prior to bidding.
1.1 Objective(s): This Performance Work Statement (PWS) describes the services required for Integrated Base Defense Security System (IBDSS) installation. These services include the general requirements for the installation of IDS, ACS, CCTV, and duress for any facilities requesting installation of Vindicator equipment on ROBINS AFB, GA.
All Vindicator alarms will annunciate back to Bldg. 988, Base Defense Operation Center (BDOC) 78 SFS. This will require the installation and programing for installing all Vindicator and associated equipment.
All parts and installation work performed must meet applicable security regulatory guidance that includes the most current versions of the Non-Nuclear Configuration Management Database
(CMD).
This scope of work requires activities to include but are not limited to pre-quote/proposal site survey, logistics, parts purchasing, programming, installation and testing. This project requires the installation of software and hardware for multiple components and peripherals to ensure the entire Electronic Security Systems meet minimum standards.
Contractor will ensure equipment and installation are covered on a per task order basis for 1-years’ time after Phase II is complete.
Honeywell Vindicator certified installer must be present during installation, programming, and testing prior to government acceptance.
PWS REVISION: 1 3
1.2 Benefit to United States Air Force (USAF): This acquisition will benefit the United States Air Force (USAF) by streamlining the process for tenant units to upgrade and/or install an IDS to an Air Force approved system. This will fulfill all regulatory requirements and supports the ability to provide worldwide sustainment management support and adequate security for various aircraft, weapon systems, missiles, remotely piloted vehicles, support equipment, electronic warfare and avionics systems, and all Air Force helicopters in support of HQ AFMC.
1.3 Background: The majority of Robins AFB is currently using an unapproved and outdated system (Microkey) for IDS/ACS. This acquisition will allow tenant units the ability to upgrade to an Air Force compliant system which also provides the support of 78 SFS technicians the ability to troubleshoot/repair any issues that arise. Units who are unable to upgrade to this system are at a much higher risk for their protection level assets to be on an alarm system that is deemed unreliable, possibly jeopardizing millions of dollars of infrastructure or personnel.
2.0 Services Summary
Performance Objective PWS Reference
Performance Threshold
Quality of Installation 6.1 Assets shall be installed in accordance with DAFI
31-101 AFA4S GENADMIN.
Installed assets shall pass inspection with no more than one failure per fiscal year.
At a minimum, 99.1% of installed assets shall pass government acceptance testing.
Quality of CDRL(s) Deliverable
4.2 There shall be no more than one rejection of any
deliverable.
There shall be no more than 3 total rejections of deliverables per contract year.
The Government will reject deliverable if 1 or more technical errors or 2 or more minor errors are found within the deliverable.
The rejected deliverable shall be corrected and resubmitted within 5 business days of notification of Government rejection.
Receipt of CDRL(s) Deliverable
4.2 There shall be no more than 1 late submission of
deliverables per month.
The Contractor shall notify the Government if the delivery of any data/document will not meet the scheduled delivery date and negotiate a revised delivery date. The data/document shall be delivered by the revised delivery date acceptable to the Government.
PWS REVISION: 1 4
Services Calls (Warranty) 4.8 The Contractor shall initially respond in accordance with response table listed in 4.8.
Contractor Personnel Qualifications
4.1 Contractor/subcontractor personnel shall provide
verification of technician qualifications within 30 Calendar Days of Task order award.
Adherence to Contractor Quality Management System (QMS)
5.9 100% compliance with the QMS is required.
3.0 Government Property: Government property will not be provided.
4.0 Technical Requirements:
4.1 Phase I: Installation
- Install Interior Distribution Boxes (IDBs) Rated at NEMA 1. IDBs must be manufactured in the Unites States. The appropriate size and standard for the indicated Priority Level resource and/or facilities are required. The IDBs must account for limited space within the rooms involved and should not be overly obstructive. The IDBs will house Vindicator equipment, network switch, Unified Power Source (UPS) devices and all other associated equipment. All IDBs will be tampered. Utilized equipment WILL NOT be made in CHINA.
- All Intrusion Detection Equipment (IDE) components such as sensors, junction boxes, communication wiring, battery power, and line supervision shall be individually identifiable to include separate alarm points. No alarm points shall be grouped to show one name and one main area without the ability to identify which individual sensor is activated.
- All alarm points shall be wired to the alarm panel clockwise (left) when entering the room from the main door and shall be connected into the alarm panel in this order from left to right in the panel.
- The IDE shall have a backup power source, such as a battery, that will provide an uninterrupted amount of eight (8) hours at a minimum. It can be more dependent on the classification of the facility. This back up power source must be connected to provide a 30-minute battery failure notification prior to battery failing. This notification must be incorporated into the panel to provide Security Forces with this information.
- Installation of a dedicated power circuit to serve the IDB. Contractors will work closely with the base Civil Engineering Squadron on locations and available circuits (if needed). Power MUST come in protected inside of the equipment rack.
- ACS cabling will be concealed above a drop ceiling in existing cable trays, wire straps or on J hooks. Any cable unable to be concealed above a drop ceiling will be installed in conduit unless otherwise specified.
PWS REVISION: 1 5
- Installing a fiber optic patch cable to link the IT equipment cabinet with the existing fiber optic network patch panel. Contractor will work closely with the 78th ABW Communications Squadron on locating and identifying the available fiber pair and location. Two strands of single mode fiber are required (if needed). We require that Cisco switches are utilized for all installations and NO media converters.
- The contractor will program the Cisco network switches to communicate from facilities to Bldg. 228 (Datacenter) 78 ABW. From Bldg. 228 the Communication must connect to Bldg.
988 Comm Closet 78 SFS.
- All key personnel that are proposed to the United States Governments within the proposal will be incorporated into the contract and will be binding. If any key personnel need to be changed the contractor is required to submit the replacement along with all required certification and resume for approval by the contracting officer prior to making any adjustments.
- The contractor must provide a statement that all the proposed deliverables for the seed project are compliant with the most current Non-Nuclear Configuration Management Database (CMD). The instructions that MUST be adhered to are referenced in: This includes conduit, wiring, and tampering work.
- Contractor/Technician Requirements:
o Honeywell Vindicator certified technician is required for all new installations, modernizations, support, and service calls.
o Honeywell Vindicator certified technicians performing device installation activities possess a minimum of two (2) years of direct, hands-on experience installing field devices for Honeywell Vindicator systems.
o Honeywell Vindicator certified technicians shall possess a minimum of two (2) years’ experience installing devices included on the Air Force Non-Nuclear Configuration Management Database (CMD).
o Honeywell Vindicator certified technicians shall have successfully completed a minimum of three (3) Honeywell Vindicator system projects per year for each of the past three (3) years.
o Honeywell Vindicator certified technicians must also be certified to work on Cisco Network Switches. (as applicable) o Contractor shall provide valid and current certifications and resumes for key personnel.
This includes certifications in: Hirsch Velocity, PSG VICADs, Vindicator and/or CISCO Switch Technician, as applicable. Tenant unit will determine what is applicable and required on a case-by-case basis.
o Contractor shall provide required certifications during quote proposal period.
PWS REVISION: 1 6
o All designated Key Personnel requiring physical or logical access to Robins Air Force Base (RAFB) under this contract shall possess and maintain an active Department of Defense (DoD) Secret security clearance prior to being granted facility access.
4.2 Phase II: Training & Maintenance
- Training: Provide end user training to personnel who will operate the All-Air Force Approved System not limited to Vindicator Site Commander, Intrusion Detection Equipment (IDE), Access Control System (ACS), Closed-Circuit Television (CCTV) and associated equipment, pertaining to the personnel within that facility that need access to the system. Each training session, if multiple sessions (no more than two) are required, should not exceed over eight hours. Contractors will coordinate closely with the Government on scheduling for various shifts, etc. The total number of personnel to be trained will be case by case basis per the end user.
- Maintenance: Maintenance of the system will fall on the contractor’s 1-year commercial warranty that must be disclosed at the time of bid.
4.3 Phase III: Testing
- Contractor Verification Test (CVT) shall be performed after the completion of installation and/or modification. When completed the Contractor shall notify the ESS NCOIC upon the system is read for Phase testing.
- This test and certification process shall be accomplished before the IDS is deemed operational. The testing and certification shall occur in three (3) phases.
- Perform phase 1, 2, and 3 testing as prescribed in DAFI 31-101 AFA4S GENADMIN, and ESE-TP-0023. The contractor shall perform a Contractor Verification Test (CVT) upon the IDE Installation. The contractor, and 78 SFS/S5S shall witness test Phase I. The test shall be performed in accordance with the written testing procedures provided in the Installation Design Package (IDP). Any component found to be inoperative during the test or at any time during the installation period shall be brought to the attention of the Security Forces POC. Acceptance testing shall consist of the following: intrusion tests, tamper tests, annunciation test, assessment test, AC power loss test, line supervision test, sensor system self-tests, and access control.
- The contractor will coordinate closely with the Government on scheduling and testing.
Contractor will obtain project completion signoff from the Government at the end of the successful test. Phase II testing is a 72-hour continuous test that ensures all equipment is installed properly and works according to specifications. Phase II establishes initial expectations regarding nuisance and false alarms. Phase III testing is a 30-day continuous operational test to assess how well the system performs in its normal operating mode on a permanent basis. This test is to detect any premature or latent defects in the equipment or components and to allow the operators and maintainers an opportunity to assess the adequacy of logistics support and assess the nuisance and false alarm rates of the system.
This is a requirement for the system to be accepted by the government via AFTO Form 747.
- Individual Resource IDS: IDS configured to protect an individually exposed resource, such as an aircraft, must not have more than three false alarms or three nuisance alarms per individual sensor point within the previous 24-hour period.
- Exterior IDS: No more than one false alarm per individual sensor point within the previous 24-hour period is acceptable. No more than three nuisance alarms per individual sensor point within the previous 24-hour period is acceptable.
- Interior IDS: Interior false and nuisance alarms should be extremely limited. No more than one false alarm per individual sensor point within the previous 30 days is acceptable. No more than three nuisance alarms per individual sensor point within the previous 30 days is acceptable.
4.4 AFTO Form 747: This form is used to signify the completion of the project and acceptance of the installed system by the user. The completion of this form means the system has been tested and accepted as installed, and all noted exceptions corrected by the party responsible for the satisfaction of the signee. The decision to accept the successful completion of the test phase is a commander-level decision and should be completed by the appropriate commander at a given location.
4.5 Period and Place of Performance
4.5.1 Period of Performance: The period of performance for the IDIQ contract will be base year with (4) option years:
• Base Year: 1 October 2026 – 30 September 2027
• OY1: 1 October 2027 – 30 September 2028
• OY2: 1 October 2028 – 30 September 2029
• OY3: 1 October 2029 – 30 September 2030
• OY4: 1 October 2030 – 30 September 2031
• 6-month Ext: 1 October 2031 – 1 April 2032 (-8 optional)
4.5.2 Place of Performance: All services will be conducted on Robins Air Force Base (AFB), Warner Robins, GA 31098.
4.6 Warranty: Contractor will ensure parts and installation are covered on a per task order basis for 1-year after Phase II is complete.
4.7 Contract Data Requirements List(s) (CDRL):
PWS REVISION: 1
PWS REVISION: 1 8
Document Identifier Base Year
Option Year
Option Year
Option Year
Option Year
DID Title PWS Reference(s)
A001 B001 C001 D001 E001 DI-MGMT-81862 Training Documentation
4.2
A002 B002 C002 D002 E002 DI-QCIC-80553 Testing Report 4.1
A003 B003 C003 D003 E003 MIL-HDBK-
863A Drawings and
Schematics 1.0
A004 B004 C004 D004 E004 DI-SESS-81639 Warranty 4.2
A005 B005 C005 D005 E005 MIL-STD-471 AFTO 747 4.4
A006 B006 C006 D006 E006 DI-SAFT-81563 Accident Incident
Report 5.5
A007 B007 C007 D007 E007 DI-SAFT-82313 Environmental, Safety, and
Occupational Health (ESOH) Plan
5.5
4.7.1 Quality of CDRL Deliverable: There shall be no more than one rejection of any deliverable.
There shall be no more than 1 total rejection(s) of deliverables per month. The Government will reject a deliverable if 1 or more technical errors or 3 or more minor errors are found within the deliverable. A technical error is defined as the format not being in accordance with the CDRL or the content not being accurate and complete in accordance with the CDRL, PWS or contract. A minor error is exemplified by a typographical error, a grammatical error, etc. The rejected deliverable shall be corrected and resubmitted within 5 business days of notification of Government rejection.
4.7.2 Receipt of CDRL Deliverable: CDRL deliverables shall be submitted via Wide Area Workflow (WAWF) and submitted directly to the MFT member identified on the CDRL. There shall be no more than 1 late submission(s) of deliverables per month. The Contractor shall notify the Government if the delivery of any data/document will not meet the scheduled delivery date and negotiate a revised delivery date. The data/document shall be delivered by the revised delivery date acceptable to the Government.
4.8 Response Time: The contractor shall initially answer the work order request within one (1) hour of the telephone call or email. When the contractor is unable to resolve work order issues telephonically or when directed by ESS NCO, the contract or personnel shall meet the response time thresholds listed below by having service personnel arrive on-site to begin trouble shooting/repair. Response time metric shall begin at the time a technician is dispatched to respond to a work order that cannot be rectified telephonically by base SF personnel. For the table below, TABLE 4-1. Response Time Thresholds (Maintenance), Duty Day is 0700-1600 local time.
TABLE 4-1. Response Time Thresholds (Maintenance)
Performance Metric PL Levels
PL1 PL2 PL3 PL4
Catastrophic Failure (CF) 1 Hour 1 Hour 12 Hours 12 Hours
Major Malfunction (MF) 1 Hour 1 Hour Mon-Fri: 12 Hours
Weekend/Federal Holidays:
Next Duty Day
Mon-Fri: 24 Hours
Weekend/Federal Holidays:
Next Duty Day
Partial Failure (PF) Mon-Fri: 24 Hours
Weekend/Federal Holidays: Next Duty Day
4.9 Holidays and Facility Closings: Contractor/subcontractor personnel shall observe holidays and facility closings as authorized for government personnel. Contractor/subcontractor personnel shall only be permitted access to Government facilities when Government personnel are present. holidays falling on a Saturday will be observed on the preceding Friday, and holidays falling on a Sunday will be observed on the following Monday.
• 1 January New Year’s Days
• 3rd Monday in January Martin Luther King Jr.’s Birthday
• 3rd Monday in February President’s Day
• Last Monday in May Memorial Day
• 19 June* Juneteenth National Independence Day
• 4th of July* Independence Day
• 1st Monday in September Labor Day
• 2nd Monday in October Columbus Day
• 11 November* Veterans Day
• 4th Thursday in November Thanksgiving Day
• December* Christmas Day
5.0 General Information
5.1 Continuation of Mission-Essential Services During a Crisis: The Functional Commander/Director has determined these services are not mission-essential and will not continue in the event of a crisis.
PWS REVISION: 1
PWS REVISION: 1 10
5.2 Security Requirements
5.2.1 Security Regulations: The Contractor shall ensure personnel, information, system, property, facility and, if applicable, international security requirements are met. The Contractor shall ensure contractor/subcontractor personnel who perform work on a Government facility comply with the security requirements of the facility. The Contractor shall install up to UL2050 standards.
5.2.2 Operations Security (OPSEC): The purpose of OPSEC is to reduce the vulnerability of USAF missions to adversary collection and exploitation of critical information. DoDD 5205.02E and DoD Manual 5205.02-M require contractors supporting DoD activities to use OPSEC to protect critical information for specified contracts, subcontracts, and information used in the performance of duties in support of Air Force requirements/missions. The Contractor shall ensure Contractor personnel who perform work on (or in) a Government facility comply with the OPSEC procedures and training requirements of the facility as specified in AFI 10-701.
5.2.3 Security Clearance: The Contractor shall ensure applicable contractor/subcontractor personnel have security clearance(s) at the secret level for proper accomplishment of contract/order requirements. The security clearance(s) shall be obtained in accordance with the Department of Defense (DD) Form 254, Department of Defense Contract Security Classification Specification.
5.2.4 Security Incident or Violation: The Contractor shall immediately notify the Government Security Office of any potential or actual security incident or violation.
5.2.5 Access to Government System(s): The Government will provide contractor/subcontractor personnel access to system(s) necessary to perform tasks under the contract/order. The Contractor shall ensure contractor/subcontractor personnel who require access to an unclassified or classified Government Automated Information System (AIS) have the respective background check or security investigation conducted. At a minimum, the Contractor shall ensure contractor/subcontractor personnel who require access to an unclassified AIS have a National Agency Check with Inquiries (NACI) conducted. Upon completion/termination of the contract/order or transfer/termination of contractor/subcontractor personnel, the Contractor shall ensure the system account(s) are closed.
5.2.6 Access to Robins Air Force Base (AFB): The Contractor shall ensure contractor/subcontractor personnel who require access to Robins AFB comply with the security requirements of the installation. The Contractor shall provide the government POC a list of all contractor/subcontractor personnel requiring access to Robins AFB, the contract/order number and the period of performance. The Contractor shall also provide, if possible, the location of the work site and the days/hours during which the contractor/subcontractor personnel will require access to Robins AFB.
5.2.7 Identification (ID) Card/Badge:
PWS REVISION: 1 11
5.2.7.1 The Contractor shall ensure an ID card is obtained by all contractor/subcontractor personnel who require recurring access to a Government facility, but not local area network (LAN) access. The Contractor shall submit a letter to the government POC listing all contractor/subcontractor personnel requiring access to the facility. The POC will approve the request and forward it to the issuing/registration office for processing. Contractor/subcontractor personnel shall report to the issuing/registration office to obtain the ID card(s).
5.2.7.2 The Contractor shall submit a letter to the POC immediately if contractor/subcontractor personnel no longer require access, upon transfer/termination of contractor/subcontractor personnel or upon completion/termination of the contract/order. The letter shall identify the name(s) and social security number(s) of the contractor/subcontractor personnel. The Contractor shall return the ID card(s) to the issuing/registration office upon expiration, upon transfer/termination of contractor/subcontractor personnel, or once contractor/subcontractor personnel no longer require access to the facility. The Contractor shall return all ID cards to the issuing/registration office upon completion/termination of the contract.
5.3 Environmental Management System (EMS): Contractor/subcontractor personnel who perform work on any Government facility shall comply with the EMS requirements established by the facility. Contractor/subcontractor personnel may be required to complete EMS training prior to beginning work.
5.4 Agency Affirmative Procurement Programs: This acquisition does not require the purchase of Environmental Protection Agency (EPA)-designated products or United States Department of Agriculture (USDA)-designated products; therefore, the requirement does not apply.
5.5 Safety Requirements
5.5.1. Contractor Environmental, Safety, and Occupational Health Compliance: The Contractor shall comply with Government Safety and Health regulations including, but not limited to, Public Law 91-596, Occupational Safety and Health Act (OSHA), and DoD Directive 4715.01E, Environmental, Safety, and Occupational Health (ESOH). The Contractor shall establish and maintain a site-specific safety and health program detailed in a written Contractor’s Safety and Health Plan (SHP). The Contractor shall send a copy of the plan to the 78 ABW Safety Office at: (78abw.se.frontoffice@us.af.mil). The Contractor shall require all subcontractors to comply with the required safety, health, and fire standards.
5.5.2. Contractor Safety & Health Program/Plan: The Contractor shall establish and maintain a safety and health program detailed in a written Contractor’s Safety and Health Plan (SHP) in accordance with OSHA and ESOH and tailored to the contract. The SHP shall address the requirements established in the Safety Appendix (Environmental, Safety and Occupational Health Requirements) to the contract. The Contractor shall submit the SHP to the MFT member identified on the CDRL [DI-SAFT-82313, Environmental, Safety, and Occupational Health (ESOH) Plan]. The cognizant Government safety office will review the SHP to determine if safety mailto:78abw.se.frontoffice@us.af.mil
PWS REVISION: 1 12
requirements are correctly addressed. The Contractor shall notify the cognizant Government safety office of any revisions made to its SHP after contract award. All changes to the SHP must also be submitted in writing and approved by the cognizant Government safety office.
5.5.3 Mishap Notification/Investigation
5.5.3.1 In accordance with DAFI 91-204, paragraph 2.14, Safety Investigations and Reports, the Contractor shall promptly report pertinent facts regarding mishaps involving reportable damage or injury to the DAF and cooperate in accordance with this instruction, in any DAF investigation. In accordance with DoDI 6055.07, Mishap Notification, Investigation, Reporting, and Record Keeping, DoD mishaps are an unplanned event or series of events that results in damage to DoD property; occupational illness to DoD personnel; injury to on- or off-duty DoD military personnel;
injury to on-duty DoD civilian personnel; or damage to public or private property, or injury or illness to non-DoD personnel, caused by DoD activities. The Contractor shall ensure the USAF is notified of mishaps occurring on Robins AFB. The Contractor shall contact the Contracting Officer (CO) or the Contracting Officer’s Representative (COR), if available, or another MFT member, and the 78 ABW Safety Office (78abw.se.frontoffice@us.af.mil; 478-926 6271) by email/telephone within eight (8) hours of any damage to government property where the dollar value exceeds $600,000.00, and within two workdays for any damage to government property less than $600,000.00 during the execution of the contract. There shall be no more than one (1) instance of late mishap notification per contract year [Referenced in paragraph 4.2, DI-SAFT-81563, Accident/Incident Report]. The Contractor shall ensure the following are notified:
a. PCO
b. MFT (COR, if available, or another MFT member),
c. Robins Air Force base command post (478-327-2612).
Mishap notifications shall contain, as a minimum, the following information:
a. Contract, contract number, name, and title of person(s) reporting
b. Date, time, and exact location of accident/incident
c. Brief narrative of accident/incident (events leading to accident/incident)
d. Cause of accident/incident, if known
e. Estimated cost of accident/incident (material and labor to repair/replace)
f. Nomenclature of equipment and personnel involved in accident/incident
g. Corrective actions (taken or proposed)
h. Other pertinent information
5.5.3.2 The Contractor shall immediately secure the mishap scene (and damaged property) and impound pertinent maintenance and training records until released by the Government’s safety office. Such a release shall be accomplished through the Contracting Officer. The Contractor shall cooperate and assist Government personnel in the investigation of the mishap and submit an Accident/Incident Report within 48 hours of the mishap [CDRL A/B/C/D007, Reference in paragraph 4.2, Accident/Incident Report, DI- SAFT-81563].
mailto:78abw.se.frontoffice@us.af.mil
PWS REVISION: 1 13
5.5.3.3 In accordance with DAFI 91-204, paragraph 3.3.3, Under the contractor’s day-to-day supervision, the contractor, not the DAF, will be responsible for reporting contractor injuries and illnesses to OSHA, even if the contractor’s employees are co-located with a DAF organization.
5.5.3.4 In accordance with DAFI 91-204, paragraph 2.44, the Contractor shall cooperate with DAF safety investigations.
5.5.4 Department of Labor (DoL) Inspection of Contractor Operations: The Contractor is subject to DoL inspections and enforcement by OSHA health and safety officials while performing work on government installations. OSHA health and safety officials may access workplaces on Government installations at any time, scheduled or unscheduled, during regular work hours. OSHA health and safety officials must meet security requirements to enter restricted or classified areas. The Contractor shall immediately notify the COR and the contracting unit’s Safety Office upon notification of a visit.
5.6 Inspection of Services: In accordance with the Inspection of Supply/Services clause(s) identified in the contract/order, the Government reserves the right to inspect Contractor performance.
5.7 Service Contract Reporting: In accordance with R-DFARS 252.204-7023, Reporting Requirements for Contracted Services, the Contractor shall provide a Service Contract Report for each contract/order that meets the DoD Contract Reporting criteria and has obligations in excess of $3,000,000. The Contractor shall report the total amount invoiced and contractor labor hours expended on the services performed during the previous fiscal year. Prime contractor labor hours, including any required Tier 1 subcontractor information, shall be reported in the System for Award Management (SAM). The Contractor shall report annually, by October 31, on the services performed during the preceding government fiscal year. SAM will only enable reporting for entities with contracts that meet the SCR criteria and thresholds. Additional information and user manuals for government personnel and Contractors is available at https://www.sam.gov. SCR eligibility, reporting rules and criteria is located on the DoD Procurement Toolbox at https://dodprocurementtoolbox.com/site-pages/service-contract-reporting-scr.
5.8 Invoicing/Payment and Receipt/Acceptance: The Contractor shall submit/process payment requests and receipt/acceptance documents via Wide Area Workflow (WAWF).
5.9 Contractor’s Quality Program: The Contractor's Quality Management System (QMS) shall meet the requirements of AS9100, Quality Management Systems Requirements for Aviation, Space, and Defense Organizations, which is based on the standards of ISO 9001. The contractor must establish an AS9100 compliant quality management system, ensure its functionality and compliance through internal auditing, and undergo a certification audit conducted by an external registrar. The Contractor shall allow the Government access to the records and data collected to demonstrate the suitability and effectiveness of the quality management system. The Government reserves the right to request corrective action if the quality system fails to meet objectives. The Contractor shall permit the program office or its designated representative to periodically review its quality program.
https://www.sam.gov/ https://dodprocurementtoolbox.com/site-pages/service-contract-reporting-scr
PWS REVISION: 1 14
5.10 Trafficking in Persons: The Contractor shall comply in accordance with the FAR and applicable supplements and shall be compliant with all applicable guidance and clauses listed in the contract as it relates to Trafficking in Persons. Additional information about Trafficking in Persons is available at the site for the Department of State’s Office to Monitor and Combat Trafficking in Persons. http://www.state.gov/j/tip
6.0 Appendices
6.1 Appendix A, Reference(s)
Publication Title of Publication Date of Publication Sections(s) that Apply
DAFI 31-101 Base Defense Operations September 10, 2024 1.1, 4.7, 5.2
DAFI 31-101 AFA4S
GENADMIN
Security Forces Guidance for Integrated Base Defense Security Systems (IBDSS)
September 23, 2024 4.1, 4.2, 4.3, 4.4, 4.7, 4.8
ESE-TP-0023 Electronic Security Equipment Master Installation Acceptance Test and Turnover Plan
January 6, 2025 4.1, 4.2, 4.3, 4.4
ICD 705 Technical Specifications for Construction and Management of SCIFs
July 26, 2021 4.1, 4.2, 4.3, 4.4, 4.7, 4.8, 5.2
CMD Air Force Non-Nuclear Configuration Management Database
March 23, 2026 1.1, 4.1
DAFI 91-204 Safety Investigations and Reports March 10, 2021 5.5
END OF PERFORMANCE WORK STATEMENT (PWS)