Blank AF 3052.xls
XLS spreadsheet 41 KB Posted
- Attached to
- Dismantling of Modular Facility & Storage Racks
- Solicitation number
- FA850124R0005
About this file
This document appears to be a construction cost estimate breakdown template, which is a standard form used in federal contracting for construction projects. The template includes line items for various construction disciplines, materials, labor, overhead, profit, and other costs. However, this template does not contain any specific information about a federal contract opportunity.
The related federal contract opportunity is for the dismantling of a modular facility and storage racks at Robins Air Force Base. The solicitation number is FA850124R0005, and the work includes the dismantling, clean-up, and disposal of materials and waste. Site visits are offered from March 25-29, and proposals must include a detailed plan and schedule for the work. Funds are not currently available for this effort, and the government reserves the right to cancel the solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 10 - BLANK SAMPLE AF Form 3065.xlsx | XLSX spreadsheet | |
| Attachment 9 - BLANK SAMPLE AF Form 3064.xlsx | XLSX spreadsheet | |
| Statement of Work .docx | DOCX document | |
| Service Contract Act WD 2015-4495.pdf | ||
| Cargo Rollers and Treehouse Picture.docx | DOCX document | |
| Solicitation - FA850124R0005 Final.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Gen Cond 2
| CONSTRUCTION COST ESTIMATE BREAKDOWN | Page 1 | |||||||||
| CONTRACTOR: | GOVERNMENT ESTIMATE | ADDRESS | ||||||||
| CONTRACT FOR: | ||||||||||
| PROJECT NUMBER: | ||||||||||
| Discipline/Item #/Option#: | WORK LOCATION | Robins Air Force Base | ||||||||
| Material Tax: | Labor Burden: | *Overhead: | *Profit: | |||||||
| UNIT | MATERIAL COST | LABOR COST | OTHER | |||||||
| LINE | OF | PER | MAN-HOURS | AVERAGE | DIRECT | LINE | ||||
| NO. | ITEM | MEASURE | QUANTITY | UNIT | TOTAL | MAN-DAYS | RATE | TOTAL | COSTS | TOTAL |
| GENERAL CONDITIONS (PRIME CONTRACTOR)* | ||||||||||
| 1.0 | ||||||||||
| 2.0 | ||||||||||
| 3.0 | ||||||||||
| 4.0 | ||||||||||
| 5.0 | ||||||||||
| 6.0 | ||||||||||
| 7.0 | ||||||||||
| 8.0 | ||||||||||
| 9.0 | ||||||||||
| 10.0 | ||||||||||
| 11.0 | ||||||||||
| 12.0 | ||||||||||
| 13.0 | ||||||||||
| 14.0 | ||||||||||
| 15.0 | ||||||||||
| 16.0 | ||||||||||
| 17.0 | ||||||||||
| 18.0 | ||||||||||
| 19.0 | ||||||||||
| 20.0 | ||||||||||
| 21.0 | ||||||||||
| 22.0 | ||||||||||
| 23.0 | ||||||||||
| 24.0 | ||||||||||
| 25.0 | ||||||||||
| *NOTE: ITEMS ABOVE DO NOT SHOW LATEST MARKET PRICES, BUT THEY ARE GIVEN TO ENSURE THE DESIGNERS CONSIDER THEM ON EACH PROJECT. Edit/Delete for your Project. | $0 | $0 | $0 | $0 | ||||||
| Sales Tax | $0 | Labor Burden | $0 | |||||||
| Subtotal | $0 | Subtotal | $0 | $0.00 | $0 | |||||
| OverHead | $0 | |||||||||
| SubTotal | $0 | |||||||||
| Profit | $0 | |||||||||
| P&P Bonds | ||||||||||
| Grand Total | $0 | |||||||||
| AF Form 3052 Gen Conditions Page 1 |
&L&D &T&C&F
File details come from the government source that posted it. Updated .