Government Response to Potential Offerors Rev 2 31 May 2013
View the file
Other files
Show 40 more
Latest 50 of 64 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA8232-13-R-3025 F-16 Wiring Harnesses/Kit Assemblies Government Response to Potential Offerors 30 May 2013 Revision 1, 30 May 2013 (8 through 13 added).
Revision 2, 31 May 2013 (14 added).
Response date 21 June 2013, 2:00pm MST remains the same.
1. Provide specification for 16PR106, 16PR145 and 1F-16C-00GV-002.
1 Government Response. Engineering Instructions are marked Distribution D, not for public release and are large pdf files (i.e., 16PR145 is 622 pages). These instructions will not be posted on FBO. Potential offerors can request copy from buyer at dawn.schmidt@hill.af.mil. To determine if release is appropriate to DoD contractor, potential offerors need to provide cage code.
2. What is the ceiling for the basic IDIQ?
2 Government Response. Multiple-award IDIQ is valued at $7.5M. For clarification, RFP includes SOW and requests offerors submit a Firm Fixed Price (not a ceiling price) proposal.
3. How many awards will you make?
3 Government Response. This multiple-award, IDIQ does not have a determined number of awards.
4. Is “teaming” allowed for in response to your solicitation?
4 Government Response. Reference 13 CFR 121.103 – How does SBA Determine Affiliation. Affiliation will be reviewed. If teaming with a large business, unless the small business demonstrates the majority of work is completed by them, the small business will take on the size standard of the large. In the event the small business is not performing the majority of the work, the small business is not qualified to compete in 100% small business set aside.
5. Are there any differences in the Technical Data Packages from Solicitation 1, posted 5-23 and Solicitation 2, posted 5-28?
5 Government Response. No, there are no differences. Uploaded documents refreshed 28 May 2013.
6. There are 3 drawings marked Distribution D and are not for public release. Drawings will not be posted on FBO. Potential offerors can request copy from buyer at dawn.schmidt@hill.af.mil. To determine if release is appropriate to DoD contractor, potential offerors need to provide cage code.
The 3 drawings are 16N3500 CDU Redlines 3 7 2012.pdf; 16N3507 CDU Page 5 Redlines 3 7 2012.pdf; and CB Labels 16N3500 16N3507 3 07 2012.pdf.
7. This solicitation relates to Sources Sought Synopsis FA8232-12-X-0001 F-16 Miscellaneous Wire Harness and Kits, Posted Date: 5 Oct 2011, Response Date: 26 Oct 2011. This solicitation relates to Pre-solicitation (synopsis) FA8232-13-R-3025 F-16 Wiring Harnesses / Kit Assemblies, Posted Date: 25 April 2013.
8. Rev 1 added. Harness Number Matrix posted to use as a reference for drawings.
9. Rev 1 added. There are two versions of LWA06 sheet 2 (08APR13 and 19APR13) GHBPA2012-E-0046. We assume you want us to use the most recent version for quoting purposes, is this correct?
9. Government Response: Yes, use most current.
10. Rev 1 added. Attached drawings are updated from the CDU team. The updates are intended to provide clearer instructions but overall are essentially the same drawings. The following updated drawings are posted.
LWA-06 Pg 1 29 May 13 LWA-06 Pg 2 28 May 13 LWA-06 Pg 3 28 May 13 LWA-06 Pg 4 28 May 13 LWA-08 Pg 1 13 May 13 LWA-16 Pg 2 22 May 13 LWA-017 Pg 2 19 Apr 13
11. Rev 1 added. Can you provide missing drawing GHBPA2012-E-0040 that is referenced in the sample TO?
11 Government Response: Delete reference to -0040 drawing.
12. Rev 1 added. We could not find the following drawings in the solicitation package. Can these be provided?
. GHBPA2012-E--0044
. GHBPA2012-E--0081
. GHBPA2012-E--0084
. GHBPA2012-E--0087
. GHBPA2012-E--0088
. GHBPA2012-E--0137
12 Government Response:
GHBPA2012-E--0044 - this is drawing LWA -05 Pg1 (already provided) see matrix GHBPA2012-E--0081 - CDU DUAL Wiring Diagram Pg 1 GHBPA2012-E--0084 - CDU DUAL Wiring Diagram Pg 2 GHBPA2012-E--0087 - CDU DUAL Wiring Diagram Pg 3 GHBPA2012-E--0088 - CDU DUAL Wiring Diagram Pg 4 GHBPA2012-E--0137 - this is drawing LWA -023 Pg1 (already provided) see matrix
The following CDU dual wiring diagram drawings (page 1 – 4) are posted.
CDU DUAL A Wiring Diagram Pg 1 of 4 08 Apr 13 CDU DUAL A Wiring Diagram Pg 2 of 4 28 May 13 CDU DUAL A Wiring Diagram Pg 3 of 4 08 Apr 13 CDU DUAL A Wiring Diagram Pg 4 of 4 28 May 13
13. Rev 1 added. The following drawing was provided but its parts are not referenced on the master parts list. Was this omission purposeful or should we add the cable's BOM to the kit bid?
. GHBPA2012-E--0049
13 Government Response: Delete reference to -0049 drawing.
14. Rev 2 added. The following items were previously posted as .pdf and are now posted as .xlsx.
SampleTask CDU Kit Contents.xlsx SampleTask CDU AKit Master PL.xlsx
Government POC: AFLCMC/WWMK, Buyer Dawn Schmidt, dawn.schmidt@hill.af.mil