This Statement of Work (SOW) details cadmium plating services for Minuteman III Launch Facility (LF) and Launch Control Center (LCC) Motor Generator (MG) components for the 309th Electronics Maintenance Group at Hill Air Force Base. The five-year Blanket Purchase Agreement requires the contractor to perform Brush Cadmium Plating using the Rapid Electroplating Process (REP) on specific motor generator components, including bed plates, motor frames, alternator frames, and control cabinet enclosures and panels.
Key technical requirements include surface preparation using isopropyl alcohol and #150 grit abrasive material, applying Rapid Activator No. 3, and plating with a thickness of 0.0003-0.0005 inches for bare steel and 0.0003-0.001 inches for repair areas. The contractor must conduct visual and dimensional inspections, provide process completion certification, and ensure all personnel are annually certified. Work will be performed at the contractor's facility, with government quality inspections, and completed within 21 days of each order receipt. The government will provide technical drawings, component parts, and inspection criteria.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Motor Generator Cad Plating Statement of Work 28 May 2025
DELIVERY ORDER (DO)
STATEMENT OF WORK (SOW)
FOR
CADMIUM PLATING SERVICES
LAUNCH FACILITY (LF) \
LAUNCH CONTROL CENTER (LCC)
MOTOR GENERATORS
309th Electronics Maintenance Group (309 EMXG) Hill AFB, UT
28 May 2025
DISTRIBUTION STATEMENT A
Approved for public release; distribution is unlimited.
1.0 Scope
This Statement of Work (SOW) outlines the requirements for Brush Cadmium Plating on Minuteman III Launch Facility (LF) and Launch Control Center (LCC) Motor Generator (MG) components in accordance with AP/TS 5.8 Sections 1 and 3 and SAE AMS-QQ-P-416 Type I, Class 2. The objective is to restore corrosion protection and minimum bonding resistance on exposed steel surfaces of MG components.
The work shall be performed using the Rapid Electroplating Process (REP) as specified in Section 1 of AP/TS 5.8. Section 2 will not be used since Dalistick equipment is not available. Operator certification and quality compliance per Section 3 shall be required.
2.0 Applicable Documents
The contractor shall comply with the latest versions of the following industry standards. In the event of conflicting information, AP/TS 5.8 shall take precedence over other listed standards.
• AP/TS 5.8, Sections 1 & 3 – Brush Cadmium Plating Requirements
• AMS-QQ-P-416 Type I, Class 2 – Cadmium Plating Specification
• ASTM B-571 – Standard Practice for Qualitative Testing of Metallic Coatings
3.0 Requirements
3.1 Surface Preparation
The contractor shall:
• Degrease all surfaces using Isopropyl Alcohol as specified in AP/TS 5.8, Section 1, 3.1.1.
• Remove existing coatings, rust, or corrosion using abrasive material (#150 grit) or power polishing.
• Apply Rapid Activator No. 3 per AP/TS 5.8, Section 1, 4.1.2 to prepare the surface.
3.2 Cadmium Plating Process
The contractor shall:
• Perform Brush Cadmium Plating using the Rapid Electroplating Process in accordance with AP/TS 5.8, Section 1, 5.0.
• Ensure plating meets the required thickness of 0.0003-0.0005 inches for bare steel and 0.0003-
0.001 inches for repair areas.
• Maintain plating rate at approximately 0.0005 inches per 4 square inches per 40-50 seconds.
• Conduct plating adhesion and thickness testing per ASTM B-571.
• Follow operator certification requirements as outlined in AP/TS 5.8, Section 3.
3.3 Inspection and Quality Assurance
The contractor shall:
• Conduct visual and dimensional inspections to confirm plating thickness meets SAE AMS-QQ-P- 416 Type I, Class 2 requirements.
• Provide a Process Completion Certification (CDRL A002) with each plated component.
• Notify the Government Program Manager (PM) and Procurement Contracting Officer
(PCO) immediately if an asset is suspected to be Beyond Economical Repair (BER).
3.4 Operator Certification
• All personnel performing Cadmium Plating must be certified annually as required by AP/TS 5.8, Section 3.
• Operators must pass adhesion, thickness, and workmanship testing using certification samples per
AMS-QQ-P-416.
• Certification results shall be documented and submitted to the Government.
3.5 Packaging and Delivery
The government will perform pick and delivery within 50 miles of Hill Air Force Base, due to the nature of the equipment and associated risks.
The contractor shall:
• Package components per MIL-STD-2073 to prevent damage during transit.
• Clearly label components with part number, contract number, plating specification, and inspection results
• Notify the Government when ready for pickup.
4.0 Deliverables
The contractor shall provide:
• Plated components per task order specifications.
• Inspection reports detailing plating thickness and adhesions. [CDRL A001]
• Process Completion Certification. [CDRL A002]
5.0 Period of Performance
This is a five year Blanket Purchase Agreement (BPA). Work shall be completed within 21 days of receipt of each order.
6.0 Place of Performance
All work shall be performed at the contractor’s facility, with quality inspections and acceptance at:
526 EMXS/CLEA
5832 H Ave BLD 843 Bay L Hill, AFB UT 84056
7.0 Parts List for Cadmium Plating
Drawing Number
LF MG LCC MG Component Title
401323 X
Bed Plate 501290 X
AC & DC Motor Frame
501332 X
Alternator Frame 501345 X
Control Cabinet Enclosure
301346 X
Control Cabinet Panel 1005299 X Bed Plate 1005306 X
Control Cabinet Enclosure
1005312 X
AC & DC Motor Frame 1005729
X Motor Framed Machined Assembly
8.0 Government-Furnished Property (GFP)
The Government will provide:
• Technical drawings and plating specifications.
• Component parts requiring cadmium plating.
• Inspection and testing criteria.
Government Furnished Property (GFP) will be issued via hand receipt to the contractor when repairs are needed. The contractor shall safeguard all GFP placed into the contractor’s care.
The contractor shall record and report promptly (within one hour) to the contracting officer or 526 EMXS/MXDPAA all available facts relating to each instance of damage to Government property.
9.0 Quality Assurance & Compliance
• The contractor shall implement a Quality Control Plan (QCP) to ensure all plating meets required specifications.
• The Government reserves the right to perform on-site inspections at any stage of the plating process.
• Any non-conforming components shall be reworked at no additional cost to the Government.
10.0 Security & Safety
• The contractor shall comply with AFMAN 91-203 for workplace safety.
11.0 Points of Contact
Government POC:
Brooke Melillow, Supervisor, 526 EMXS/MXDMA Email: brooke.melillow.1@us.af.mil | DSN: 586-1751
Kathy Hill, 526 EMXS/CLEA Email: kathy.hill.2@us.af.mil | DSN: 777-0612
| 1.0 Scope |
| 2.0 Applicable Documents |
| 3.0 Requirements |
| 3.1 Surface Preparation |
| 3.2 Cadmium Plating Process |
| 3.3 Inspection and Quality Assurance |
| 3.4 Operator Certification |
| 3.5 Packaging and Delivery |
| 4.0 Deliverables |
| 5.0 Period of Performance |
| 6.0 Place of Performance |
| 7.0 Parts List for Cadmium Plating |
| 8.0 Government-Furnished Property (GFP) |
| 9.0 Quality Assurance & Compliance |
| 10.0 Security & Safety |
| 11.0 Points of Contact |
| Government POC: |
File details come from the government source that posted it. Updated .