This performance work statement outlines a contract for spare parts management and repair services for LM-STAR test stations. The contractor shall repair spare assets identified in Appendix B of the document to their original equipment manufacturer specifications and fully functional condition at their facility. The contractor shall also provide spare parts management, which includes storage and tracking of inventory, maintaining spare parts in a functional state, and shipping parts to and from Hill Air Force Base within 72 hours of a request. The contractor must also submit quarterly status reports and develop a quality control plan. The scope of work involves repairing existing spare parts for LM-STAR test stations to support EMXG at Hill Air Force Base.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 8203-LM STAR PWS_2 Mar 2021.docx | DOCX document | |
| Combo Solicitation- LM Star- UPDATED 2March2021.docx | DOCX document | |
| Combo Solicitation- LM Star- UPDATED.docx | DOCX document | |
| CDRL A001 12Nov2020.pdf | ||
| LM-STAR QASP 17 SEPT 20.docx | DOCX document | |
| PWS_LM STAR_11 Jan 2021.pdf | ||
| Combo Solicitation- LM Star.docx | DOCX document | |
| CDRL A002 12Nov2020.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE-BASED STATEMENT OF WORK
FOR
SPARE MANAGMEMENT AND REPAIR CONTRACT
FOR THE
LM- STAR TEST STATION
523EMXS/MXDPBB
23 February 2021
TABLE OF CONTENTS
SECTION PAGE
| 1 | DESCRIPTION OF SERVICES | 3 | ||||
| 2 | SCOPE | 3 | ||||
| 3 | BASIC SERVICES | 3 | ||||
| 4 | SERVICE SUMMARY | 4 | ||||
| 5 GENERAL INFORMATION | 4 | |||||
| 6 APPENDICES | 6 |
1.0 DESCRIPTION OF SERVICES
This performance work statement (PWS) establishes the requirement(s) to repair and provide management of spare assets of the LM –STAR test stands (see Appendix B) in support of EMXG. The contractor shall ensure all spare LM-STAR asset(s) listed in Appendix B are repaired to OEM specifications and stored in fully working order until Hill AFB request delivery to exchange for a repairable asset. Government will not provide OEM specifications. Contractors shall have access and appropriate data rights to OEM specifications. All work will be done at the contractor’s facility.
2.0 SCOPE
2.1 The contractor shall provide upfront repair of LM-STAR spare assets identified in (Appendix B) to a fully function state to OEM specifications.
2.2 The contractor shall provide spare management to include storage/Tracking and maintaining LM-STAR spare assets.
3.0 BASIC SERVICES
3.1 Spare Asset Repair (CLIN 0001)
3.1.1 The contractor shall repair LM-STAR spares assets identified as unserviceable assets (F condition) in Appendix B, to a fully functional state to OEM specifications. Status of these repairs shall be documented in the Quarterly Status Report. (CDRL A001)
3.2 Spare Asset Managment (CLIN 0002)
3.2.1 Storage/Tracking:
3.2.1.1 The Contractor shall store spare assets for the government and shall provide a detailed inventory with serial numbers for each spare asset removed /received. The inventory list will be approved by the Government Representative (GR, as defined in paragraph 5.8) and will be included in the Quarterly Status Report to be submitted to the GR and the COR by the fifth (5th) business day of each quarter. (CDRL A001)
3.2.2 Maintaining Spare assets:
3.2.2.1 Contractor shall maintain spare assets identified in inventory to a fully functional state and to OEM specification and provide them to the Government upon request.
3.2.2.2 The GR will notify the contractor via phone or email when repairs are needed. The contractor shall respond to the GR via phone or email within 24 hours of notification.
3.2.2.3 The Contractor shall arrange to have any requested assets shipped and received at Hill AFB within 72 hours of initial request.
3.2.2.4 The contractor shall be responsible to repair LM-STAR test stand components removed from test stand and ensure spare assets in inventory are repaired and fully functional.
3.2.2.5 The contractor shall be responsible for shipping or the delivery of LM-STAR spare assets to and from Hill AFB.
3.2.2.6 If contractor is in question of a repair or equipment status and feels that a functional test is needed, the contractor shall coordinate with GR to have a functional test performed on the LM-STAR stand.
3.3 Initial equipment purchases
3.2.1 The contractor shall make a one time purchase of the following items and incorporate them into the government’s spare parts inventory, at which point they will be stored / maintained like the rest of the inventory.
· 2 ea. Vicor PFC MINI PM3-04-2829-2
· 1 ea. Vicor PFC MINI PM2-03-2678-2
· 1 ea. Vicor PFC MINI PM2-03-2828-2
· 2 ea. Elgar TW5550-1 (alternate part number: 641517G3)
4.0 Service Summary
| Performance Objective |
| PWS Para |
| Performance Threshold |
| The contractor shall repair LM-STAR spares assets identified as unserviceable assets (F condition) in Appendix B, to a fully functional state to OEM specifications. |
| 3.1.1 |
| Status of these repairs shall be documented in the Quarterly Status Report. (CDRL A001) The quarterly status report shall be submitted to the GR and COR by the fifth (5th) business day of each quarter. |
| The contractor shall respond to a request for service or repair. |
| 3.2.2.2 |
| The contractor shall respond to GR within 24 hours of notification. |
| The Contractor Shall arrange to have any requested assets shipped and received at Hill AFB within 72 hours of initial request. |
| 3.2.2.3 |
| The serviceable asset shall be delivered within 72 hours of notification. |
| The Contractor shall store spare assets for the government and shall provide a detailed inventory with serial numbers for each spare asset removed /received. The inventory list will be approved by the GR and will be included in the Quarterly Status Report |
| 3.2.1.1 |
| The list shall be submitted to the GR and COR by the fifth (5th) business day of each quarter. (CDRL A001) |
| The Contractor shall provide a complete Quality Control Plan to the CO to ensure the requirements of this contract are provided as specified within this PWS. (A002) |
| 5.7.7 |
| The Quality Control Plan shall be provided to the CO within 10 business days of contract award (CDRL A002) |
5.0 General Information
5.1 Shipping and Receiving.
The government will be responsible for shipping the initial and replacement assets listed in Appendix B from Hill AFB to the contractor’s facility.
5.2 Delivery
5.2.1 The contractor shall be required to transport government assets between Hill AFB and the contractor’s facility and shall be responsible for all transportation and shipping costs.
7274 Wardleigh Rd Bldg 5, Bay P Hill AFB, Utah 84056
5.3 Contractor Manpower Reporting
5.3.1 The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for logistics and consulting services via a secure data collection site. The contractor is required to completely fill in all required data fields at http://www.sam.gov
5.3.2 Reporting inputs will be for the labor executed during the period of performance for each Government fiscal year (FY), which runs 1 October through 30 September. While inputs may be reported any time during the FY, all data shall be reported no later than 31 October of each calendar year. Contractors may direct questions to the CMRA help desk.
5.3.3 Uses and Safeguarding Information: Information from the secure web site is considered to be proprietary in nature when the contract number and Contractor identity are associated with direct labor hours and direct labor dollars. At no time will any data be released to the public with the Contractor name and Contract number associated with the data. User Manuals: Data for Air Force service requirements must be input at the Air Force CMRA link: User manuals for Government personnel and Contractors are available at the Army CMRA link at http://www.ecmra.mil
5.4 Compliance with Laws and Regulations
5.4.1 The Contractor shall be knowledgeable of and comply with all applicable Interstate, Federal, State, and Local laws, regulations, and requirements regarding environmental protection.
5.5 Material Storage and Use
5.5.1 The Contractor shall follow manufacturer’s guidelines for control of humidity, temperature, cleanliness, and materials handling. This includes hazardous materials.
5.7 Quality Control Plan
5.7.1 The Contractor shall establish a complete Quality Control Plan (QCP) via a Quality Management Program to ensure the requirements of this Contract are provided as specified. The Contractor's quality management program shall comply with the minimum quality management systems elements specified in the American National Standards Institute (ANSI), American Standards Organization (ASO), and International Standard Organization (ISO) family of standards (CDRL A002).
5.8 Quality Assurance
5.8.1 Upon award the CO will appoint the COR in the Procurement Integrated Enterprise Environment (PIEE), Joint Appointment Module (JAM).
5.8.2 The COR is responsible for providing continuous technical oversight of the Contractor’s performance. The COR(s) or alternate(s) will inform the Contractor when discrepancies occur and will request corrective action. The services to be performed by the Contractor during the period of this contract are at all times and places subject to review by the CO or authorized representative(s).
5.9 Government Representative (GR). The GR for this effort is defined as a Wage Leader or above.
6.0 Appendices
A. Acronyms and Abbreviations List B. Government Furnished Equipment C. Safety Appendix for Off Base Work
APPENDIX A
ACRONYMS AND ABBREVIATIONS LIST
| Acronym/Abbreviation |
| Definition |
| AFMC |
| Air Force Material Command |
| CA |
| Contract Administrator |
| CO |
| Contracting Officer |
| COR |
| Contracting Officer Representative |
| GR |
| Government Representative |
| OEM |
| Original Equipment Manufacturer |
| PWS |
| Performance Work Statement |
| QA |
| Quality Assurance |
| QC |
| Quality Control |
| QCP |
| Quality Control Plan |
APPENDIX B
GOVERNMENT FURNISHED EQUIPMENT
A. Spares Inventory
| PART NUMBER |
| Nomenclature |
| QTY |
| 70-0123-000 |
| CONVERTER, LEVEL |
| 1 |
| 407808-001 |
| WAVEFORM SYNTH |
| 1 |
| 408151-001 |
| MDL,3152B WAVEFORM SYNTH |
| 1 |
| 6415175G1 |
| ASSET,ALTERED,MARWAY |
| 1 |
| 6415175G5 |
| PROGRAMMABLE ELECTRONIC LOAD |
| 3 |
| 6454602P1 |
| SWITCH,ETHERNET HUB |
| 1 |
| 6454908G1 |
| ASSET, ALTERED COMPUTER |
| 2 |
| 70-0056-010 |
| INTERFACE,RS232/422/ |
| 2 |
| 70-0058-003 |
| 16 BIT, 16CH WAVEFORM |
| 2 |
| 70-0112-000 |
| CCA,48 CHAN DIO |
| 1 |
| 70-0123-000 |
| CONVERTER, LEVEL |
| 2 |
| 70-0185-001 |
| INTERFACE SWITCH VXI |
| 1 |
| 70-0185-003 |
| INTERFACE SWITCH, VXI |
| 2 |
| 70-0185-022 |
| INTERFACE, SWITCH, VXI |
| 2 |
| 70-0186-001 |
| INTERFACE SWITCH VXI |
| 2 |
| 777178-01 |
| CONTROLLER, SLOT ZERO |
| 1 |
| AI-710-00 |
| AI-7 CCA |
| 1 |
| B10-001-200 |
| CCA,BOUNDARY SCAN |
| 2 |
| DI-050-02 |
| CCA, DI SERIES, 50MHZ, 64CH |
| 3 |
| DI-050-30 (1 ea. Unserviceable S/N: 302E7CF, 1 ea. Serviceable s/n 3047FDB) |
| CCA, DI SERIES |
| 2 |
| E1412A |
| MULTIMETER,DIGITAL |
| 2 |
| E8305A-H11 |
| PULSE GENERATOR |
| 1 |
| LM9905-0707B |
| DIGITIZER,VXI |
| 2 |
| MPD411359-001 |
| POWER DISTR UNIT, CE |
| 1 |
| R-2461-CD |
| COUNTER,UNIVERSAL |
| 1 |
| RFP-C1LAN-000-001B |
| REFLEX CONTROLLER |
| 2 |
| RFP-D2050-025-1G1B |
| MODULE, 50V REFLEX POWER SUPPLY |
| 2 |
| RFP-D2120-8A3-1G1B |
| 120V/8A DC POWER SUPPLY |
| 2 |
| RFP-D2450-2A3-1G1B |
| 450V/2A DC POWER SUPPLY |
| 2 |
| RFP-M0000-REC-1E00 |
| MAINFRM, RECESSED, 90 DEG CONN |
| 2 |
| SGA400X15C-1CAABI |
| POWER SUPPLY, DC, 400V, 15A |
| 2 |
| UCP31015-5 |
| CONTROL PANEL, UNIVER |
| 2 |
| VXI1553-T-2-RC |
| MODULE,VXI,1553 A/B DUAL |
| 1 |
| PM3-04-2829-2 |
| Vicor PFC MINI |
| 2 |
| PM2-03-2678-2 |
| Vicor PFC MINI |
| 1 |
| PM2-03-2828-2 |
| Vicor PFC MINI |
| 1 |
TW5550-1 (alternate part number: 641517G3)
| Elgar |
| 2 |
APPENDIX C
SAFETY AND HEALTH STATEMENT
Safety and Health While performing work under this contract the contractor shall comply with all applicable federal, state and local regulations regarding occupational safety and health. The contractor shall notify the Contracting Officer (CO), within one (1) hour of all mishaps or incidents at or exceeding $2,000 (material + labor) in damage to DOD property during the execution of the contract.
Mishap notifications shall contain, as a minimum, the following information:
a. Contract, Contract Number, Name and Title of Person(s) Reporting
b. Date, Time and exact location of accident/incident
c. Brief Narrative of accident/incident (Events leading to accident/incident)
d. Cause of accident/incident, if known
e. Estimated cost of accident/incident (material and labor to repair/replace)
f. Nomenclature of equipment and personnel involved in accident/incident
g. Corrective actions (taken or proposed)
h. Other pertinent information
If requested by the designated CO, the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the Procuring Safety Office. Contractors will not dispose of contract data related to a mishap until notified to do so by the CO.