Industry_Questions_1.docx
DOCX document 12 KB Posted
- Attached to
- 523 EMXS Shop Equipment Move Federal contract opportunity
- Solicitation number
- FA8224-18-R-0055
About this file
Questions from industry and Government responses.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bld_100_Bay_A_Rms_A100_and_101_Drawing.pdf | ||
| Updated_Solicitation_FA8224-17-R-0055.docx | DOCX document | |
| Bld_100_Bay_A_Rm_103_F22_Drawing.pdf | ||
| Bld_100_Bay_A_Rm_106_Drawing.pdf | ||
| Bld_100_Bay_A_Rm117_Drawing.pdf | ||
| PWS_523_Move_Mod.docx | DOCX document | |
| Shop_Move_PWS.docx | DOCX document | |
| Shop_move_CDRL_1.pdf | ||
| Shop_Move_solicitation.docx | DOCX document | |
| Shop_move_CDRL_3.pdf | ||
| Shop_move_CDRL_2.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Industry Question 1: Could a better drawing be sent out indicating new equipment locations as sheet #9 is unreadable?
Government Response 1: A more legible copy of the drawing has been attached to this solicitation.
Industry Question 2: During site visit it was expressed to install a hose off the discharge air fan and connect hose and run up into attic space, how far are we to run hose in attic space? Does discharge hose connect into anything if so what location?
Government Response 2: There is a catwalk in the attic space and the old duct cutout can be seen from there. The government recommends that the exhaust hose be ran through this cutout and secured by whatever means necessary to allow the shaker exhaust heat to be vented into the Bay A plenum proper. The government recommends a hose length not less than 40’.
Industry Question 3: What type of 8” hose is required connecting to fan discharge?
Government Response 3: A flexible hose rated for at least 300 CFM.
Industry Question 4: Will the Government extend the due date?
Government Response 4: Yes. The proposal submittal date has been extended to 19 October 2018.
Industry Question 5: F22 -page 20 Shaker calls for Supply intake and Plenum returns, is this the Fan section that was shown in bld 5, and inlet would connect to 10” pipe connection at wall bld 100 NE corner rm 102 and discharge hose would run in attic space?
Government Response 5: Yes