Industry_Questions_1.docx

DOCX document 12 KB Posted

Attached to
523 EMXS Shop Equipment Move Federal contract opportunity
Solicitation number
FA8224-18-R-0055
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

Questions from industry and Government responses.

View the file

Other files for this federal contract opportunity

Other files attached to 523 EMXS Shop Equipment Move, newest first.
File Type Posted
Bld_100_Bay_A_Rms_A100_and_101_Drawing.pdf PDF
Updated_Solicitation_FA8224-17-R-0055.docx DOCX document
Bld_100_Bay_A_Rm_103_F22_Drawing.pdf PDF
Bld_100_Bay_A_Rm_106_Drawing.pdf PDF
Bld_100_Bay_A_Rm117_Drawing.pdf PDF
PWS_523_Move_Mod.docx DOCX document
Shop_Move_PWS.docx DOCX document
Shop_move_CDRL_1.pdf PDF
Shop_Move_solicitation.docx DOCX document
Shop_move_CDRL_3.pdf PDF
Shop_move_CDRL_2.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Industry Question 1: Could a better drawing be sent out indicating new equipment locations as sheet #9 is unreadable?

Government Response 1: A more legible copy of the drawing has been attached to this solicitation.

Industry Question 2: During site visit it was expressed to install a hose off the discharge air fan and connect hose and run up into attic space, how far are we to run hose in attic space? Does discharge hose connect into anything if so what location?

Government Response 2: There is a catwalk in the attic space and the old duct cutout can be seen from there. The government recommends that the exhaust hose be ran through this cutout and secured by whatever means necessary to allow the shaker exhaust heat to be vented into the Bay A plenum proper. The government recommends a hose length not less than 40’.

Industry Question 3: What type of 8” hose is required connecting to fan discharge?

Government Response 3: A flexible hose rated for at least 300 CFM.

Industry Question 4: Will the Government extend the due date?

Government Response 4: Yes. The proposal submittal date has been extended to 19 October 2018.

Industry Question 5: F22 -page 20 Shaker calls for Supply intake and Plenum returns, is this the Fan section that was shown in bld 5, and inlet would connect to 10” pipe connection at wall bld 100 NE corner rm 102 and discharge hose would run in attic space?

Government Response 5: Yes