Text version
STATEMENT OF WORK (SOW)
FOR
ICP Instrument Install & Training
809TH MAINTENANCE SUPPORT GROUP (MXSG)
Hill Air Force Base
17 Sep 2018
1. BACKGROUND
The Inductively Coupled Plasma Optical Emission Spectrometer (ICP) Instrument is used for the detection of chemical elements. Currently, the 809th Maintenance Support Group (MXSG) is using an
ICP Instrument purchased in 1992 and the technology for this instrument is obsolete. Using the outdated technology has increased the man hours required to complete sample analysis. Therefore, MXSG requires a new ICP Instrument to reduce man hours and increase the range of sample analysis.
2. SCOPE
This SOW defines the scope for the Installation and Training of the new ICP instrument. The following is a summary of the non-personal service and is provided solely for the purpose of revealing the general nature of the work involved. The place of performance will be at the 809th MXSG, building 100 Bay E at Hill Air Force Base.
3. INSTALLATION
3.1. The ICP Instrument shall be installed by qualified factory trained service engineer(s) directly employed by the vendor.
3.2. The contractor shall install the ICP Instrument to Original Equipment Manufacturer (OEM) specifications.
3.3. The contractor shall calibrate the ICP Instrument upon completion of installation.
4. TRAINING
4.1. The contractor shall provide training to Government personnel immediately upon completion of installation.
4.2. The contractor shall provide method creation, basic operation, and instument service/maintenance training for a minimum of two (2) Government operators.
5. OTHER REQUIREMENTS
The contractor shall provide all personnel, support equipment, documentation, and supervision necessary to perform the installation and training.
6. ADDITIONAL INFORMATION
6.1. The point of contact for this contract is Mitchel Smolcha, Subject Matter Expert (MXSG), 586-
4543.
6.2. The contractor shall notify the Contracting Officer, if there are any changes to the scope of work.
6.3. The contractor shall be responsible for any damages to the ICP Instrument during installation.
7. APPLICABLE DOCUMENTS
7.1. SOW
7.2. Purchase Description