Product_Description_and_Specification_-_ICP.pdf
PDF 338 KB Posted
- Solicitation number
- FA8224-18-Q-ICP1
About this file
Product Description and Specification
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Safety_Requirements_-_ICP.pdf | ||
| Combined_Synopsis_Solicitation_-_ICP-OES.pdf | ||
| Statement_of_Work_-_ICP.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PURCHASE DESCRIPTION
FOR
Inductively Coupled Plasma Optical Emission Spectrometer
809 MXSS
24 May 2018
809 MXSS/MXDTAB
7278 4th STREET
BLDG. 100, BAY D
ATTN: Mitch Smolcha
HILL AFB UT 84056
1.0. DESCRIPTION OF REQUIREMENTS
The Chemical Flight within the 809th Maintenance Support Squadron (Science and Engineering Lab) is required to purchase an Inductively Coupled Plasma Optical Emission Spectrometer (ICP-
OES) located in building 100 Bay E. The ICP-OES must have axial and radial view capability in the same instrument, have a CCD detector, contain a Rowland Circle optical system with argon purged chamber and have an internal air based cooling system.
1.1. ACCESSORIES AND SPECIFICATIONS
The ICP-OES system must meet the following specifications and possess the following capabilities:
Polychromator
Thermally stabilized to +15%˚C ± 0.5 ˚C
750 mm focal length
Holographic concave master grating: 2 x 3600 grooves/mm, 1 x 1800 g/mm
Grating material Zerodur
MgF2 optical components
Full 1st order wavelength coverage
Wavelength range: 130 (160)1 – 770 nm
Entrance slits width: 15 µm
Detector
32(29)1 linear CCD arrays, fitted continuous order, selected and optimized according to the wavelength range
3648 pixels per array
Optical/pixel resolution: 130 (160)1 – 340 nm 8.5 pm/3 pm, >340 nm 16pm/6pm
Thermally stabilized optical system
Parallel readout architecture
0.75M Roland Circle optical system capable of a resolution of 0.008nm.
On board digital signal processor for each CCD array
Intelligent data acquisition and data reduction system
Dynamic range up to 9 orders of magnitude
Shortest integration time 0.1 ms
Shortest measurement time for one analysis 2 sec
Integration time automatically optimized for each pixel according to signal height
Full spectrum access
Automatic dark current correction
Automatic profile standardization
TCP/IP interface to data processing system
UV System
Gas(Argon) filled hollow section, sealed, no consumable purge gas required
Dual Window entrance optics, easy to maintain
Automatic gas purifying system
Purifying cartridge lifetime 24 months
RF-Generator
LDMOS solid state design
Frequency: 27.12 MHz free running type
RF power output: 0.5 to 2.0 kW
Power efficiency >85%
Automatic plasma ignition
Stand by mode
Fully computer controlled
Air Cooled (No external cooling required)
Sample Introduction System and Torch Unit
Bayonet, single turn mount component holder
Gas connections included in the torch body
Thermostatically insulated sample introduction area
Integrated 70 speed, 4 channel, 12 roller, computer controlled peristaltic pump
Fast pre flush and fast rinse function
Peristaltic pump drain
Multi view instrument…true axial and true radial plasma observation capability
PC System with minimum Intel Dual Core 3.10 GHz processor, 4GB Ram, 500 GB HD, Color LCD Monitor and Laser Printer, Windows 10 and sample processing software compatible with Windows 10
Spectrometer maximum dimensions: (42.1 x 62.3 x 29.8 in)
Footprint maximum: (41.9 x 25.4 in)
Weight: no more than 530 lbs
1.2. CONTRACTUAL REQUIREMENTS
1.2.1. Delivery
The contractor shall deliver the equipment to the following address located at Hill Air Force Base:
809 MXSS/MXDTAB
7278 4th Street Bldg. 100, Bay D Attn: Greg Hardcastle Hill AFB UT 84056-5825
1.2.2. Training and Installation:
The system must be installed by qualified factory trained service engineer(s) directly employed by the vendor. Method creation, basic operation and instrument service/maintenance training, for a minimum of 2 operators, must be provided by the installing engineer upon completion of installation.
All labor, food, travel and accommodation expenses for the service engineer(s) and applications specialist(s) shall be included in proposal.
1.2.3. Warranty
The contractor shall provide a minimum 1 year warranty which warrants all products provided under this contract, under normal use, free from defects in materials and workmanship and that system will perform its design function for a period of no less than one (1) year. Warranty period to start from date of final acceptance of each installed unit/system. Any defects in materials or workmanship or failure of any product or component to perform its designed function during the warranty period shall be fixed by the contactor at no additional cost to the government. Warranty shall include the cost(s) of, parts, shipping, labor and any travel related expenses. Warranty repairs which present a safety hazard are to be repaired within 7 calendar days of notice of failure. Non-safety related warranty repairs are to be fixed within 15 calendar days of notice of failure.
File details come from the government source that posted it.