Req_06302_11712_Statement_of_Work_MBFI_SIB_F22_12_JUL_18_(2).docx

DOCX document 17 KB Posted

Attached to
MBFI SIB
Solicitation number
FA822418Q6302
Issued by

About this file

Statement of Work (SOW)

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK FOR

MULTIPLEX BUS FAULT ISOLATOR (MBFI) F-22 SERIAL INTERFACE BOX (SIB)

MAINTAINER FIELD CAPABILITY ENHANCEMENT PURCHASE

25 June 2018

Prepared By:

Hardware Engineer 309SMXS/520MXDEB Headquarters, Ogden Air Logistics Complex (AFMC) 309th Software Maintenance Group SMXS/MXDEB Hill Air Force Base, Utah 83056-5990

1.0 INTRODUCTION

1.1 PURPOSE

This requirement is to purchase Eleven (11) Multiplex Bus Fault Isolator (MBFI) Serial Interface Box (SIB) test equipment to satisfy the needs of the F‐22 maintainers throughout the world. The F‐22 MBFI SIB is used to read input and output of power voltages from an external bus. The SIB is the central interface between a computer and the adapter cables and aircraft bus.

1.2 This Statement of Work (SOW) defines the contractor tasks and requirements for fabrication, production management, and delivery of MBFI SIBs.

1.3 SPECIAL CONSIDERATIONS

1.3.1 Program and Engineering Management

Overall program and engineering management responsibility and approval resides with the 309th Software Maintenance Group (SMXG). All contractor tasks and requirements covered by this SOW shall be coordinated through the Hill PZIMC Contracting Office. Any changes to this SOW will be incorporated via modification.

1.3.2 Contract Management

Overall contract management responsibility and approval resides with the AFSC OL:H PZIMC Contracting Office. No conversation, recommendation, or direction, whether given directly or implied by Government personnel or representatives that will affect the scope, schedule, or price of the program shall be acted upon by the contractor unless specifically directed in writing by the Contracting Officer (CO).

2.0 REFERENCE DOCUMENTS

MIL-STD-31000A

3.0 CONTRACTOR TASKING AND REQUIREMENTS

The contractor shall accomplish the following tasks and requirements in this document during the manufacture and delivery of the SIBs.

3.1 CONTRACTOR MANAGEMENT

The contractor shall plan, direct, coordinate, monitor, evaluate, and control contractor tasks specified in this Statement of Work. The contractor shall notify the CO of any issues requiring Government action.

3.3 PERFORMANCE REQUIREMENTS

The MBFI SIB shall meet all requirements specified in the following: Part Number 98747‐965852‐10 Manufacturing shall be in accordance with best industry practices. All components shall be current technology and currently available. All SIBs and components shall be manufactured using quality materials and workmanship.

3.4 DELIVERY AND INSTALLATION

The contractor shall deliver complete SIB(s) as a unit. Deliveries shall be made in accordance with (IAW) the following delivery schedule:

· 11 SIB(s) within 90 days after receipt of order (ARO).

4.0 WARRANTY

One year manufacturer’s warranty beginning upon receipt of the product.

5.0 ENVIRONMENTAL COMPLIANCE

Contractor shall comply with federal, state and local environmental laws, and Air Force environmental policies and regulations. Every effort shall be made to eliminate/reduce hazardous and environmentally unacceptable materials. The MBFI SIBs shall present no environmental hazards and shall not use or require known Ozone Depleting Substances (ODSs).

File details come from the government source that posted it.