DD1423_page_1-Chillers_and_Hydraulic_Hose_Reels-a.pdf

PDF 749 KB Posted

Attached to
Inline Chillers and Auto Hydraulic Hose Reels
Solicitation number
FA822417R0050-SS
Issued by

About this file

Deliverables page 1

View the file

Other files

File Type Posted
DI-MGMT-81605.pdf PDF
PWS,_Inline_Chiller_and_auto_hydraulic_hose_reels_27_Mar_2017_Draft.docx DOCX document
DI-ADMN-81505.pdf PDF
DI-SAFT-81563.pdf PDF
DI-MGMT-81596_Contract_Roster.pdf PDF
DD1423_page_2-Chillers_and_Hydraulic_Hose_Reels.pdf PDF
DI-ENVR-81375.pdf PDF
DI-QCIC-81794.pdf PDF
Sources_Sought.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423, AUG 96

CONTRACT DATA REQUIREMENTS LIST

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER _________________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page ____ of ____ Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref.

DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15. Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13;

Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423 (BACK), AUG 96

addr1_1: OL:H/PZIMA
draft1_1:
reg1_1: 1
repro1_1:
addr1_2: OO-ALC/SE
draft1_2:
reg1_2:
repro1_2: 1
addr1_3: OO-ALC/OBC
draft1_3:
reg1_3:
repro1_3: 2
draft2_1: 1
addr2_1: OO-ALC/OBC
addr2_2:
reg2_1: 1
repro2_1: 1
addr2_3:
draft2_3:
reg2_3:
repro2_3:
addr3_1: 309 AMXG/EN
addr3_2: OO-ALC/OBC
addr3_3:
draft3_1:
reg3_1: 1
repro3_1:
draft3_2:
reg3_2:
repro3_2: 1
draft3_3:
reg3_3:
repro3_3:
addr4_1: 309 AMXG/EN
draft4_1: 2
reg4_1: 3
repro4_1:
addr4_2:
draft4_2:
reg4_2:
repro4_2:
addr4_3:
draft4_3:
reg4_3:
repro4_3:
draft2_2:
repro2_2:
reg2_2:
line_item: 00XX
exhibit: A
xtdp: Off
xtm: Off
othercat: ENVR/QCIC/MGMT
system: In-Line Chiller,auto Hydraulic Hose Reel
ctr_no:
contr:
data_item1: A001
title1: Environmental Health and Safety Plan
sub1:
auth1: DI-ENVR-81375
ref1: PWS Para.6.2, 7.21, and Appendix B
req_ofc1: OL:H/PZIMA
dd250_1: LT
appcode1: D
dist1: A
freq1: ONE/R
asof1: BLOCK 16
firstsub1: BLOCK 16
subsub1: BLOCK 16
group1: NSP
totalprice1:
rmks1: Block 4: Contractor format is acceptable.

Blocks 10, 11, 12, 13: Date of 1st submission: NLT seven days after contract start date. Date of subsequent revision: NLT 30 days after contract modification.

totaldraft1: 0
totalreq1: 1
totalrepro1: 3
data_item2: A002
title2: Quality Control Plan
sub2:
auth2: DI-QCIC-81794
ref2: PWS Paragraph 4.2
req_ofc2: OO-ALC/OBC
dd250_2: LT
appcode2: D
dist2: A
freq2: ONE/R
asof2: BLOCK 16
firstsub2: BLOCK 16
subsub2: BLOCK 16
rmks2: Block 4: Contractor format is acceptable.

Blocks 10, 11, 12, 13: Date of 1st submission: NLT three days after contract start date. Date of subsequent revision: NLT 15 days after contract modification.

group2: NSP
totalprice2:
totaldraft2: 1
totalreg2: 1
totalrepro2: 1
data_item3: A003
title3: Action Item Tracking Log
sub3:
auth3: DI-MGMT-81605
ref3: PWS Paragraph 4.3
req_ofc3: 309 AMXG/EN
dd250_3: LT
appcode3: D
dist3: A
freq3: BLOCK 16
asof3: BLOCK 16
firstsub3: BLOCK 16
subsub3: BLOCK 16
rmks3: The log shall be a living document which is continually updated as needed.
group3: NSP
totalprice3:
totaldraft3: 0
totalreg3: 1
totalrepro3: 1
data_item4: A004
title4: As-Built Data Package
sub4:
auth4:
ref4: PWS Paragraph 4.4
req_ofc4: 309 AMXG/EN
dd250_4: XX
appcode4: A
dist4: A
freq4: BLOCK 16
asof4: BLOCK 16
firstsub4: BLOCK 16
subsub4: BLOCK 16
rmks4: Blocks 10-13: Provide draft 'as-built" drawing package within 30 days of completing the prototype of each PWS Requirement 2.1, 2.2, 2.3. Final copies shall be delivered within 30 days after 2ea of final designs has been installed or following FAS Govt review.
group4:
totalprice4:
totaldraft4: 2
totalreg4: 3
totalrepro4: 0
prep_by:
prep_sign: KIRT EHLERS,309AMXG/EN
prep_date: 14 Mar 2017
app_by:
app_sign: JOHN K. MINNOCH, OO-ALC/OBC
app_date: 14 Mar 17
Page: 1
pages: 2
app: Adobe Professional 7.0
Reset:

File details come from the government source that posted it. Updated .