PWS Fuselage Finite Element Model (FEM)

View the file

Other files

File Type Posted
FA822311R3002_______0002.pdf PDF
FA822311R3002_______0001.pdf PDF
FA822311R3002.pdf PDF
PWS_STRESS_20_June_2011.pdf PDF
AFPAC.pdf PDF
PWS_Basic_20_June_2011.pdf PDF
CDRLs_20_June_2011.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

For the:

T-38 Fuselage Finite Element Model (FEM)

Phase VIII: T-38 FEM Sustainment and Improvement

20 June 2011

Prepared by:

Michael P. Blinn

OO-ALC/GHMEJ

(801) 586-3047 michae 1.bIinn@hill.af.mil

OGDEN AIR LOGISTICS CENTER

AIRCRAFT SUSTAINMENT GROUP

ENGINEERING DIVISION

STRUCTURAL INTEGRITY AND ANALYSIS SECTION

HILL AIR FORCE BASE, UTAH 84056

mailto:inn@hill.af.mil

PLI{}'ORMANCE WORK STATEMENT

TABLE OF CONTENTS

Page

LIST OF TABLES ii REC 0 RD OF REVIS IONS......................................................................................................... iii

1 DESCRIPTI 0 N OF SERVI CES 1

1.1 Services Provided by Northrop Grumman Technical Services 1

I .2 Scope I

2 SERVI CE SUMMARY 2

3 GOVERNMENT FURNISHED PROPERTY AND SERVICES 2

3.1 Modification Drawings, Finite Element Models, and Reports Provided 2

3.1.1 T-38C Modification Drawings 2

3.1.2 T-38 Finite Element Models 2

3.1.3 Reports 2

3.2 Security and Access to Government Facilities and Equipment

3.2.1 Security Clearance .4

3.2.2 Access to Government Facilities .4

3.2.3 Access to Government Equipment .4

4 GENERAL INFO RMA TI0 N .4

4.1 General Requirements .4

4.2 Technical Objectives and Goals 4

4.3 Spec ific Requirements 5

4.3.1 Contractor Services 5

4.3.2 Integrated Management Support 7

4.3.3 Management Systems Requirements 7

4.3.4 Validation Program 7

4.3.5 Maintainability Program 7

5 APPENDICES AND ATT ACHMENTS 8

5.1 Applicable Documents 8

5. I .1 Document Avai lability and Del ivery: 8

5.2 Applicable CDRLs 8

5.2.1 CDRL List: 8

5.2.2 Contractor Reporting: 8

A C R 0 NYMS AND ABBREVIA TI0 NS 9

ATTACHMENT ONE: LIST OF APPLICABLE DOCUMENTS Al-l

ATTACHMENT TWO: APPLICABLE CDRLS A2-1

T-38 Fuselage FEM - Phase VIll Last Rev. Date: 20 June 2011

PcKFORMANCE WORK STATEMENT

LIST OF TABLES

Page

Table 1: Service Summary for Phase VIII of the T-38 FEM 3 Table 2: CDRL List for the T-38 FEM (Phase VIII) A2-l ii T-38 Fuselage FEM - Phase VIII Last Rev. Date: 20 June 20 II

PL,{fORMANCE WORK STATEMENT

RECORD OF REVISIONS

REV DATE PAGE(S) SECTION REASON FOR REVISIONAFFECTED AFFECTED

- nla nla Original PWS date of release

20Jun II iii T-38 Fuselage FEM - Phase VlII Last Rev. Date: 20 June 2011

PbKFORMANCE WORK STATEMENT

1 DESCRIPTlON OF SERVICES

The following Performance Work Statement (PWS) provides a description of the required contractor services in support of the T-38 Aircraft Structural Integrity Program (ASIP), T-38 System Program Office (SPO), Air Education and Training Command (AETC), and other commands.

This contractual effort is limited to Phase VIII of the Finite Element Model (FEM) program and the required engineering efforts are binding towards meeting the Phase VllI requirements.

Additional follow-on efforts are merely mentioned to depict the SPO's overall program scheme and to ensure current efforts are considered by the contractor to facilitate integration towards required follow-on efforts and options.

Phase VIII, in and of itself, is of value to the T-38 ASIP's FEM program for the purpose of continual improvement of the overall T-38 sustainment efforts, regardless whatever future efforts are accomplished.

1.1 Services Provided by Northrop Grumman Technical Services

1.1.1 Engineering analysis to support T-38 FEM program (see Section 1.2).

1.1.2 Conduct Phase VllI program kick-off meeting by 30 days ARO and present updated FEM plan

1.1.3 Provide quarterly technical status reports, and monthly cost, schedule, and performance reports (CDRLs A026 and A039, Attachment Two).

1.1.4 Provide "level of effort engineering" on-site and off-site support; this includes (but is not limited to) analysis in support ofT-38 FEM improvement requirements, with [mal completion by 30 September 2012 (CDRL A039 and A045, Attachment Two).

1.1.5 Provide final engineering reporting that documents the finite element modeling and analysis activities; provide updated [mite element model files; completion date of 30 September 2012 (CDRL A045, and A090, Attachment Two).

1.2 Scope

This PWS specifies the Phase VIII tasks towards sustaining and improving the T-38C (pMP-equipped) fuselage FEM (as developed in Phases [ through VII of this program), and [mal presentation of the updated model to the Govemment. This tasking includes the associated program management, engineering, and technical support required for this program. It should be noted that the complete FEM program will use a multi-phased approach as follows: Phase I -preliminary FEM development (complete); Phase II - idealized FEM development (complete);

Phase III - FEM validation and final reporting; and Phases IV through VII - FEM sustainment

T-38 Fuselage FEM - Phase VIII Last Rev. Date: 20 lun II

PJ:.KFORMANCE WORK STATEMENT

and improvement. Additional phases (e.g., Phase IX) will be considered by the Government on a yearly basis, and will be discussed with the contractor before the conclusion of Phase VII.

2 SERVICE SUMMARY

Table I describes the Service Summary (SS) for the tasks as outlined in this PWS. Most of the efforts as described in this PWS will be engineering services and program management related.

3 GOVERNMENT FURNISHED PROPERTY AND SERVICES

3.1 Modification Drawings, Finite Element Models, and Reports Provided

3.I.I T-38C Modification Drawings The Government will provide the contractor with all the required T-38C and PMP modification drawings, not previously delivered in Phase I through VII. The intention here is for the contractor to have all the required configuration baseline data readily available, assisting in the development of the T-38C FEM.

3. I .2 T-38 Finite Element Models The Government will provide the contractor with all the available T-38 FEMs, not previously delivered in Phase I through VII.

3.1.3 Reports

The Government will provide the contractor with all the necessary Government Technical Orders (TOs), Time Compliant Technical Orders (TCTOs), and contractor reports, required to accomplish the tasks as detailed in this PWS (see also Ref. 7-10, Attachment One, for additional information on reporting).

2 T-38 Fuselage FEM - Phase VlII Last Rev. Date: 20 lun 11

PtoKFORMANCE WORK STATEMENT

Table 1 - Service Summary for Phase VIII ofthe T-38 FEM

Performance Objectives PWS Performance Threshold Reference (Minimum Acceptable)

Engineering Technical Activities: 1.1.1, 1.1.4, For engineering analyses (or assessments or Contractor to provide support 4.3.1.1 studies): All actions accomplished as required engineering analyses, assessments, and through with no more than one disapproval by the research towards the T-38 FEM's 4.3.1.4; Government for technical discrepancies per development and improvement. 4.3.4.1, technical document/report. Any necessary Contractor to provide modeling and 4.3.5.1 corrections must be made within 30 days of engineering activities to a validated, Government notification; the flow of analysis must functional FEM ready for be logical, the analysis steps must be shown in implementation. sufficient detail such that an entry-level engineer can follow and a journeymen engineer can recreate; the input values/units to the model must be cited; the mathematics must be free from significant errors; the results/conclusions must be clearly identified; and the implications of the result/conclusion must be clearly stated.

Computer Modeling Activities: 1.1.4,4.3.1.1, Contractor to provide final version of the T-38 Contractor to provide modeling and 4.3.1.3, FEM as required with no more than one engineering activities to a validated, 4.3.1.4, disapproval by the Government for technical functional FEM ready for 4.3.4.1, discrepancies, and 100% compatible with the implementation. Contractor to assist in 4.3.5.1 computer systems at Hill AFB. The tolerance for the compatibility of the contractor the Phase Vll FEM validation efforts shall be ±10 model to the Government system, percent, with the results subject to final addressing Government related Government approval. Any necessary corrections technical questions to support their must be made within 30 days of government modeling activities. notification.

On-Site FEM Support at Hill AFB: 1.1.1, 1.1.4, Final version of the contractor updates to the T-38 Contractor to provide limited on-site 4.3.1.2 FEM is to be delivered as required, with no more support for integration and updating of through than one disapproval by the Government for the FEM systems (Government's and 4.3.1.4; technical discrepancies. Any necessary corrections contractor's); to assist in the integration 4.3.2.1, must be made within 30 days of Government of the FEM software. 4.3.4. I, notification. Contractor to prove compatibility by

4.3.5.1 on-site visits to Hill AFB. On-site support can coincide with formal technical reviews.

Technical Documentation: Contractor 1.1.3, 1.1.5, The T-38 FEM user's manual shall be 100% to generate timely, error free FEM 1.1.7,1.1.8, complete. All actions accomplished are to be technical, management, and all other 4.3.1.1 delivered with no more than one disapproval by reporting and documentation; includes through the Government for technical and financial activities such as monthly fmancial 4.3.1.4; discrepancies per each technical, financial, and reporting, meeting minutes, updates to 4.3.2.1, other documentation. Contractor shall submit all the software (e.g., users manual), and 4.3.2.2, 5.2.1, documentation as identified in the attached the final Phase VIII report. 5.2.2 CDRLs. Any necessary corrections must be made within 30 davs of Government notification.

3 T-38 Fuselage FEM - Phase VIII Last Rev. Date: 20 lun II

Pl::KFORMANCE WORK STATEMENT

3.2 Security and Access to Government Facilities and Equipment

3.2.1 Security Clearance

The efforts required for this task are UNCLASSIFIED and will not require Contractor personnel to obtain a security clearance. Contractor personnel shall abide by all Air Force rules, procedures, and standard of conduct. Contractors requiring access to Air Force Automated Information Systems (AIS) shall have background investigations and security awareness training completed prior to the start of contract performance. When the period of performance is complete and/or the contractor personnel leave work on this project, they will return all access cards and base identification badges within five days.

3.2.2 Access to Government Facilities

Access to Government facilities is limited. Therefore, the contractor shall coordinate the need, time, and personnel requiring access to Government facilities with the Government Program Manager (PM), at least one week prior to need. The Government PM or designated representative will coordinate between the contractor and base personnel as required.

3.2.3 Access to Government Equipment

The Government PM will assist the contractor in obtaining the necessary clearance for access to Government equipment, as the program dictates.

4 GENERALINFO~TION

4.1 General Requirements

General requirements for the Aircraft Structural Integrity Program (ASIP) are given in Air Force Instruction 63-1001 and Air Force Policy Directive 63-10 (see Ref. I and 2, Attachment One).

In addition, ASIP is detailed in MiI-STD-1530C (see Ref. 5, Attachment One).

4.2 Technical Objectives and Goals

The T-38 fuselage has undergone significant structural modifications over the last 20 years to extend its life to 2020 and beyond. Some of these modifications include the steel dorsal longeron replacement, new bulkheads, and the inclusion of auxiliary air intakes. These modifications change the internal loads, mass distribution, and stresses in the T-38 fuselage, thereby raising concern as to the applicability of earlier stress analyses for use on the current configuration T-38. Further, these modifications have not been integrated into a unified analysis model to determine their effects on the overall strength and internal loads of the fuselage. To address these issues, an updated, comprehensive FEM is needed for maintaining the long-term health and reparability of the aircraft.

The purpose of Phase VII of this program is to sustain and improve upon the FEM of the T-38 fuselage, empennage, and wing developed during Phases I through VII, then to make a final

4 T-38 Fuselage FEM - Phase VIII Last Rev. Date: 20 Jun 11

Pc,{fORMANCE WORK STATEMENT report of the work performed to the Government. The updated and integrated Phase VIII FEM will continue to improve the accuracy of the loads and stress analysis of the aircraft, also allowing for more accurate damage tolerance analyses (DTAs). In addition, the FEM information can be used to evaluate the legacy T-38 stress reports, currently used for structural analyses.

4.3 Specific Requirements

4.3. I Contractor Services

The contractor shall provide the appropriate engineering, program management, and technical services as required for this PWS. Limited travel will be required to meet the goals of this effort.

4.3.1.1 T-38 FEM Program - Phase VIII: As part of the Phase I effort, a contractor report entitled "T-38 Finite Element Analysis - T-38 Fuselage Program Plan," report NOR 04- 100, April 2005 revision, was written to defme the contractor plan for the PWS for Phases I through III (see Ref. 19, Attachment One). As a logical follow-on of the efforts of the first three phases (plus three subsequent phases), Phase VIII will follow the aforementioned NOR 04-100 program plan, as approved by the Government.

Improvement and sustainment modeling activities will be accomplished, with the T-38 fuselage finite element and validation models refined to reflect the T-38C, PMP-equipped configuration aircraft. Areas of refinement shall include all fatigue critical locations and other adjacent structure as deemed necessary. Final government approval of all refinement locations required. In addition to validation against the full scale fuselage test, the model will be improved by validating against current FLDR data. All final deliverables are due 12 months ARO contract award (CDRLs A026, A039, A045, and A090, Attachment Two).

4.3.1.1.1 Data Compatibility: All contractor FEM/FEA work shall be fully compatible and usable when loaded onto OO-ALC/GHMEJ's FEMIFEA assets. At the present time, 558 ACSGIENJ has PATRAN 2008 (Rl), NASTRAN 2008 (Rl), and a MSFT Windows based operating system (CDRL A090, Attachment Two).

4.3.1.1.2 Data Analysis: Data modeling and analysis techniques for Phase I through III are fully addressed in NOR 04-100, April 2005 revision, and the initial requirements also detailed in the Phase I SOW (see Ref. 20 and 7, Attachment One, respectively). All reporting of the data analysis shall be according to the guidelines of the Service Summary (see Table I) and Para. 5.2.2 of this PWS (CDRLs A026, A039 and A045, Attachment Two).

4.3.1.1.3 Data Documentation: Data for the modeling and analysis (FEMlFEA) documentation activities for Phase I through III are fully addressed in the NOR 04-100, April 2005 revision, and the initial requirements also detailed in the Phase I SOW (see Ref. 19, and 7, Attachment One, respectively). An updated FEM is required in Phase VIII, and

5 T-38 Fuselage FEM - Phase VIll the final version is a deliverable entitled, "T-38 Aircraft FEM on CD-ROM - Phase VIII" and "T-38 FEM Validation Model - Phase VIII" (CDRL A090, Attachment Two). Update to one report is required for Phase VIII: "T-38 Aircraft FEM - Phase VIII Report" (CDRL A045, Attachment Two). Guidelines for reporting are further identified in Table 1, the Service Summary.

4.3.1.2 Formal Evaluations: The following formal evaluations are to be supported by the Contractor:

4.3.1.2.1 Preliminary Program Review: A preliminary program review for the contractor to present their refilled "way ahead" for Phase VIII, and further discuss the anticipated challenges with the tasks as described in this PWS, shall be held no later than one month ARO contract award. The contractor shall provide a PPT document as well as present minutes of the meeting in the most appropriate quarterly report (CDRL A039, Attachment Two).

4.3.1.2.2 Mid-course Evaluations and Status updates: As a minimum, monthly status updates and information exchanges between the Government and NGC will be conducted.

These can be accomplished via teleconferencing. Minutes will be maintained by the Government. CDRL reporting is not required. Performance and cost reporting must be submitted monthly. The performance and cost reports shall provide current status and projected requirements of funds, man-hours, and work completion. The first performance and cost report shall be delivered one month ARO contract award and monthly thereafter. Each performance and cost report is due by the 15th of each month (CDRL A026, Attachment Two).

4.3.1.2.3 Final Program Review: A final review to present the final results and discuss the outcomes of the T-38 FEM program shall be held at the conclusion of the program (CDRL A039, Attachment Two).

4.3.1.3 Contractor Travel: The following are the contractor travel requirements:

4.3.1.3.1 Preliminary Program Review Trip: The contractor is authorized one trip for a maximum two people (minimum one engineer) for up to two days to Hill AFB, Utah, to present the T-38 FEM - Phase VIII "way ahead," and further discuss the program's anticipated challenges.

4.3.1.3.2 Final Program Review Trip: The contractor is authorized one trip for a maximum two people (minimum one engineer) for up to three days to Hill AFB, Utah, to present the T-38 FEM - Phase VIII final results, and discuss the possible additional phases.

Activities shall include working with Hill AFB engineers on the T-38 FEM, and ensuring compatibility of the contractor and Government modeling systems.

6 T-38 Fuselage FEM - Phase VIII

PbRFORMANCE WORK STATEMENT

4.3.1.3.3 Miscellaneous Program Support Trips: The contractor is authorized two miscellaneous trips for a maximum two people (minimum one engineer) for up to five days (each trip) to any of the following locations: 1) Hill AFB, 2) Randolph AFB (to support the depot activities), or 3) Southwest Research Institute (SwRI), San Antonio, TX (for model validation activities). These trips are intended to provide the contractor flexibility in supporting the T-38 FEM program efforts; as such, there are no firm requirements. Trips shall be documented in the quarterly reports (CDRL A039, Attachment Two).

4.3.1.4 Government Site Visits: The contractor shall provide for up to three site visits by Government representatives. These visits are intended to provide the Government with training on the use and configuration of the FEM.

4.3.2 Integrated Management Support

4.3.2.1 Contractor Program Manager: For all tasks required by this PWS, the contractor shall identify and maintain a program manager (PM). The program manager shall have a defined and direct line of authority and responsibility over all aspects of the work effort. The contractor's work progress, status and any corrective action shall be documented (CDRL A039, Attachment Two).

4.3.2.2 Contractor Interim Reporting: The contractor shall submit quarterly technical status reports on the T-38 FEM program's progress (CDRLs A026 and A039, Attachment Two). Reports shall be relatively error free and technically correct, as per the guidelines of Table 1.

4.3.3 Management Systems Reguirements

Management systems requirements are to be provided by the contractor.

4.3.4 Validation Program

4.3.4.1 FEM Validation: The T-38 FEM shall be validated using deflection and strain gage measurements made during the full-scale fuselage fatigue test at Southwest Research Institute (SwRI). Strain gage data are currently available for use in validating the T-38 FEM. The tolerance for final FEM validation shall be ±10 percent, with the results subject to final Government approval. See Table I for additional guidelines on FEM reliability.

4.3.5 Maintainability Program

4.3.5.1 FEM Maintainability: The contractor is responsible for operating, validating, verifying, and maintaining the FEMs and the associated documentation. This includes

7 T-38 Fuselage FEM - Phase VIII

PJ::KFORMANCE WORK STATEMENT

retammg current and Government compatible versions of the software used for FEMIFEA activities.

4.3.5.2 Continuation of Essential DoD Contractor Services During Crisis: The contractor is responsible for ensuring provisions are in place to continue to provide the essential services of this program in times of crisis. The contractor shall work with the Government to defme those essential services, with these services defmed in the first quarterly report (CDRL A039, Attachment Two).

5 APPENDICES AND ATTACHMENTS

5.1 Applicable Documents

5.1.1 Document Availabilitv and Delivery:

If the Government deems appropriate, the contractor may use other applicable documents. Also, the contractor shall request necessary documents from the Government, as required. In turn, the Government shall supply all required TOs and TCTOs for the contractor to perform the tasks of this PWS.

5.2 Applicable CDRLs

5.2.1 CDRL List:

The deliverable products (CDRL list) for this PWS are presented in Table 2 (see Attachment Two). The FEMIFEA related f1les (CDRL A090, Attachment Two) shall be compatible with the most recent version software as discussed in Para. 4.3.1.2 (Data Compatibility), and fully compatible with the OO-ALC/GHMEJ computer system (see also Table I).

Note: See DD Form 1423 for further details.

5.2.2 Contractor Reporting:

The contractor shall submit reports in accordance with the DIDs specified in DD form 1423 (CDRLs A026, A039, and A045, Attachment Two) with the following stipulations. Tables, figures, drawings, etc. shall be placed immediately following their reference in the main body of the text (i.e. same page if possible or on the next page).

Reports shall be submitted in a hard cover 3-ring binder. This will facilitate the report revision by allowing addition/replacement of individual pages without having to submit a completely new report. One copy (of the number required in the DD Form 1423) of the final report shall be submitted in electronic form in both Microsoft Word for Windows and Adobe Acrobat (.pdt) format to the T-38 ASIP Manager at OO-ALC/GHMEJ. Any necessary corrections shall be made within 30 days of Government notification.

8 T-38 Fuselage FEM - Phase VIll Last Rev. Date: 20 Jun II

ACSTRSEQ

AETC

AF

AFB

AirStats

ARO

ASIMIS

ASIP

DoD

DTA

FCL

FEA

FEM

FMM

FEM

FS

IATP

lAW

IFF

IMIS

ISIDR

Mgr.

MSCINASTRAN

MSFT

NGC

NGTS

NOR

OEM

OO-ALC

Para.

PBESC

PWS

PM

PMP

QA

Ref.

Sect.

SIN

SPM

PJ::,KFORMANCE WORK STATEMENT

ACRONYMS AND ABBREVIATIONS

- Aircraft Stress Sequence Program

- Air Education and Training Command

- Air Force

- Air Force Base

- flight loads post-processing software

- after receipt of order

- Aircraft Structural Integrity Monitoring Information System

(Tinker AFB, OK)

- Aircraft Structural Integrity Program

- Department of the Defense

- damage tolerance analysis

- fatigue critical location

- finite element analysis

- finite element model

- fine mesh model (finite element)

- flight loads data recorder

- fuselage station

- Individual Aircraft Tracking Program

- in accordance with

- Introduction to Fighter Fundamentals

- Integrated Maintenance Information System (Boeing, St. Louis)

- Instrumentation System/Installation Description Report

- Manager

- finite element computer program maintained by the MacNeal-Schwendler Corporation

- Microsoft

- Northrop Grumman Corporation -Northrop Grumman Technical Services

- Northrop

- Original Equipment Manufacturer

- Ogden Air Logistics Center

- paragraph

- Performance Based Engineering Services Contract

- Performance Work Statement

- Program Manager -Propulsion Modernization Program

- Quality Assurance

- reference

- section

- serial number

- System Program Manager

9 T-38 Fuselage FEM - Phase VIll

SPO

SS

SUPT

SwRI

TBD

TCTO

TO

USAF

WS

PbKFORMANCE WORK STATEMENT

ACRONYMS AND ABBREVIATIONS (CONT)

- System Program Office

- Service Swnmary

- Specialized Undergraduate Pilot Training

- Southwest Research Institute

- to be determined

- Time Compliant Technical Order

- Technical Order

- United States Air Force

- Wing Station

10 T-38 Fuselage FEM - Phase VIII

ATTACHMENT ONE: LIST OF APPLICABLE DOCUMENTS

Department of Defense (DoD) Specifications

I) Air Force Instruction 63-100 I, "Aircraft Structural Integrity Program," 18 April 2002.

2) Air Force Policy Directive 63-10, "Aircraft Structural Integrity," I November 1997.

Department of Defense (DoD) Standards

3) MIL-HDBK-5E, "Metallic Materials and Elements for Aerospace Vehicle Structures,"

June 1987.

4) MIL-STD-152IB, "Technical Reviews and Audits for Systems, Equipment, and

Computer Software," (Canceled 10 APR 1995).

5) MIL-STD-1530C, "Aircraft Structural Integrity Program," November 2005.

6) MIL-STD-1840B, "Automated Interchange ofTechnicallnformation."

Other DoD Documents

7) Statement of Work, "T-38 Fuselage Finite Model (Aft ofFS 284) - Phase I: Background

Information and Preliminary FEM Development," 23 February 2004.

8) Performance Work Statement, "Phase II: T-38 Idealized FEM Development and

Preliminary Integration," 16 June 2005.

9) Performance Work Statement, "Phase III: T-38 FEM Validation and Final Reporting," 28

October 2005.

10) Performance Work Statement, "Phase IV: T-38 FEM Sustainment and Improvement," 23

April 2007.

Other Publications

II)NAI 57-41, "T-38 Basic Loads."

12)NAI 57-55, "T-38 Wing Stress Analysis," November 1966.

13)NAI 57-57, ''T-38 Fuselage Stress Analysis, Vol. I through III," 1959-60.

14)NAI 57-58, "T-38 Vertical Tail Section Properties and Stress Analysis," August 1958.

15)NAI 57-59, "T-38 Horizontal Tail Section Properties and Stress Analysis," January 1963.

AI-I T-38 Fuselage FEM - Phase VlIl

PJ:.KFORMANCE WORK STATEMENT

16)NOR 99-105, "T-38 Wing Life Improvement Program Phase II, Stress Analysis Report."

17) NOR 99-107, "T-38 Wing Life Improvement Program Phase II, -33 Finite Element

Model Description and Internal Loads Report," May 2005.

18)NOR 00-101, "T-38 Wing Life Improvement Program Phase III, Durability and Damage

Tolerance Analysis," June 2000.

19)NOR 02-101, "T-38 Wing Life Improvement Program Phase VI, Loads Application

Report."

20) NOR 04-100, "T-38 Finite Element Analysis - T-38 Fuselage Program Plan," November

2004 (revised April 2005).

21) SwRI 06-5898, "AETC T-38 SUPT Maneuver and Stress Spectra," May 1994.

22) SwRI 06-6611, "T-38 Forward Fuselage Stress Analysis, NASTRAN Idealization

Report," June 1997.

23) SwRI 06-6611, "T-38 Forward Fuselage Stress Analysis, NASTRAN Validation Report,"

November 1997.

24) SwRI 06-6723, "AETC T-38 IFF Maneuver and Stress Spectra," May 1997.

25) SwRI 06-7278, "Revised T-38 Durability and Damage Tolerance Update Ground Rules

Report," December 1998.

26) SwRI 18-11896, T-38 DADTA Update - Ground Rules Report," September 2006.

27) SwRI 18-8353, "T-38 Wing Stress Analysis Idealization Report," June 2000.

28) SwRI 18-8353, "T-38 Wing Stress Analysis Validation Report," June 2000.

29) SwRI 18-1334, "T-38 SUPT/IFF Coupon Analysis Results," March 2001.

30) SwRI 18-8674, "T-38 Longeron Splice Fine Mesh Model Integration."

Note: If the Government deems appropriate, the contractor may use other applicable documents.

AI-2 T-38 Fuselage FEM - Phase VIII

PcKFORMANCE WORK STATEMENT

ATTACHMENT TWO: APPLICABLE CDRLS

Table 2 - CDRL List for the T-38 FEM (phase VIII)

PWS Paragraph CDRL CDRL Description DID 1.1.2, 1.1.5, 1.1.8, A026 Performance and Cost Report DI-FNCL-80912 4.3.1.1,4.3.1.1.2, 4.3.1.2.2,4.3.2.2,5.2.2 1.1.2, 1.1.4, 1.1.5, 1.1.8, A039 Contractor's Status Reports DI-MGMT-80227 4.3.1.1,4.3.1.1.2, 4.3.1.2.1,4.3.1.2.3, 4.3.1.3.3,4.3.2.1, 4.3.2.2,4.3.5.2,5.2.2 1.1.3,1.1.4,1.1.5,1.1.7, A045 Technical Report - Studies/Services: DI-MISC-80508A 4.3.1.1,4.3.1.1.2, - T-38 Aircraft FEM - Phase VIII 4.3.1.1.3,5.2.2 Report 1.1.5,4.3.1.1, A090 Computer Software Product End DI-MCCR-80700 4.3.1.1.1,4.3.1.1.3, Items:

5.2.1 - T-38 Aircraft Idealization FEM on DVD - Phase Vlll (Updated Version)

- T-38 Aircraft Validation Mode/- Phase VIII (Updated Version)

A2-] T-38 Fuselage FEM - Phase VIII

File details come from the government source that posted it. Updated .