Q AND A PART 2 FA822225QROSA.docx

DOCX document 14 KB Posted

Attached to
ROSA-FI Feed Waveguide Fabrication
Solicitation number
FA822225QROSA
Issued by

About this file

This is a Questions and Answers document (Part 2) for solicitation FA822225QROSA that addresses a technical clarification about a specific waveguide component. The Q&A clarifies that part G120-TBD, which is a 6" 90-degree E-Bend waveguide component, is considered a standard WR section that does not require a specific drawing.

The related solicitation is for ROSA-FI Feed Waveguide Fabrication for the Department of the Air Force Materiel Command Air Force Sustainment Center at Hill AFB, Utah. It is a sole-source requirement for 13 waveguide components including E-bends, H-bends, straight sections, and a directional coupler, plus associated documentation. Delivery is required within 18 weeks ARO. Proposals are due by 1700 Mountain Time on February 14th, 2025, with award to be made on a Lowest Price Technically Acceptable (LPTA) basis. Questions are due by February 6th, 2025, at 1500 Mountain Time.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA822225QROSA

Questions and Answers Part 2 Q: After looking through the drawings, there is a request for a G120-TBD part and there is no drawing for it or specification to build it. Can you clarify what is to be done with it?

(Reference: G120-TBD - 6” 90° E-Bend going up to AZ Rotary Joint - Rigid E-Bends - WR187CPRF to WR187CPRF A: For that part referenced below, this is a standard 6”x 6” E-Bend. There is not a specific drawing as it’s considered a standard WG section.

File details come from the government source that posted it. Updated .