FA821423R7000.pdf
PDF 238 KB Posted
- Solicitation number
- FA8214-23-R-7000
About this file
This is a solicitation for an ICBM Minuteman III missile mishap response team contract. The contractor will provide recovery and remediation services for exercises and real-world incidents involving Minuteman III liquid and solid propulsion assets for the Air Force Nuclear Weapons Center. The contractor must provide personnel, equipment, facilities, transportation, tools, materials, supervision, decontamination capabilities, and other items to perform rapid response, communication, and participation in readiness plans and training exercises. The contractor will integrate with existing Air Force capabilities for communication, control, breathing air, protective equipment, and follow Occupational Safety and Health Administration standards. The period of performance is from August 2023 to July 2028 with option years extending to July 2028. The solicitation includes firm fixed price and time and materials line items for availability, exercises, program management, data, travel, and real world incident response.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| TEP_Worksheet_FOR_EVALUATION_PURPOSES_ONLY.pdf | ||
| MMRT_PWS_2022.pdf | ||
| CDRL_Package.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 1449 (REV.2/2012)
PREVIOUS EDITION IS NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.212
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30 JY
1. REQUISITION NUMBER
F2DCAH8158B102
5. SOLICITATION NUMBER
FA8214-23-R-7000
6. SOLICITATION ISSUE DATE
29 DEC 2022
b. TELEPHONE NUMBER (No collect calls)
(801 ) 586 -3290 ext.
2. CONTRACT NO.
7. FOR SOLICITATION
INFORMATION CALL
3. AWARD/EFFECTIVE DATE
4. ORDER NUMBER
a. NAME
Sarah E Grosvenor
8. OFFER DUE DATE/LOCAL
TIME
3FEB2023 11:59PM
12. DISCOUNT TERMS11. DELIVERY FOR FOB DEST.
UNLESS BLOCK IS MARKED
SEE SCHEDULE
10. THIS ACQUISITION IS UNRESTRICTED SET ASIDE: 100 % FOR:
SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS
HUBZONE SMALL (WOSB)ELIGIBLE UNDER THE WOMEN-OWNED
BUSINESS SMALL BUSINESS PROGRAM
NAICS CODE:
SERVICE-DISABLED EDWOSB 562211
VETERAN-OWNED SIZE STANDARD
SMALL BUSINESS 8 (A) $41.50 :
13a. THIS CONTRACT IS A
RATED ORDER
UNDER DPAS
(15 CFR 700)
13b. RATING
DO: A2 52.211-14, 52.211-15
14. METHOD OF SOLICITATION
RFQ IFB RFP
9. ISSUED BY CODE
DEPARTMENT OF THE AIR FORCE, DIRECTORATE OF CONTRACTING
AFNWC PZBB
6008 WARDLEIGH ROAD BLDG 1580
HILL AIR FORCE BASE UT 84056-5837
BUYER: Sarah E Grosvenor/PZBB sarah.grosvenor@us.af.mil Phone: (801) 586- 3290
15. DELIVER TO CODE
SEE LINE ITEM SCHEDULE
16. ADMINISTERED BY CODE
17a. CONTRACTOR/OFFEROR FACILITY
CODE CODE
18a. PAYMENT WILL BE MADE BY CODE
(SEE ESP CLAUSE 252.232-7003.)
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS
CHECKED.
FA8214
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
ROUTINE
THIS IS A TOTAL SMALL BUSINESS SET-ASIDE.
Subject to the terms and conditions stated herein, the Contractor agrees to hold its offered prices firm for 120 days.
SEE LINE ITEM SCHEDULE
(Attach Additional Sheets as Necessary)
26. AWARD AMOUNT (For Gov’t use only)
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED.
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 1 COPIES TO ISSUING
OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS
SPECIFIED HEREIN.
29. AWARD OF CONTRACT: REF. OFFER DATED - - . YOUR OFFER ON
SOLICITATION (BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED
X X X
X
X X
X
25. ACCOUNTING AND APPROPRIATION DATA SEE FUNDS SCHEDULE
X
SCD:C
EFT:T
Total
STANDARD FORM 1449 (REV. 2/2012) BACK
COMPUTER GENERATED 12/29/2022, 9:47 AM
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
32b. SIGNATURE OF AUTHORIZED GOV’T REPRESENTATIVE
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER
32c. DATE
41c. DATE
33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED
CORRECT FOR
PARTIAL FINAL
37. CHECK NUMBER36. PAYMENT
COMPLETE PARTIAL FINAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC’D (YY/MM/DD) 42d. TOTAL CONTAINERS
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
SEE LINE ITEM SCHEDULE
(Attach Additional Sheets as Necessary)
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
FA8214-23-R-7000
SUPPLIES OR SERVICES AND PRICES/COSTS
AVAILABILITY & MOBILIZATION (Basic)
Item No.
Time & Material Estimated Quantity
U/I Estimated Unit Cost Ceiling Price
1 LO
R429 Service Contract Act Availability/Mobilization in response to a real-world mishap/incident per the Performance Work Statement (PWS).
Hourly Rate: $ Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Invoice Quality Assurance: N/A, This is a Services Contract that has no deliverables. No hardware will be delivered as part of this Contract therefore no NSN can be assigned.
Class I ODS Substance Application/Use Quantity
NONE NONE NONE
Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 1 AUG 2023 31 JUL 2024
Proposed Period of Performance
1 LO
EXERCISES (Basic)
Item No.
Time & Material Estimated Quantity
U/I Estimated Amount Ceiling Price
1 LO
R429
SERVICE CONTRACT ACT
EXERCISES (Basic)
Emergency Support Exercises in Conjunction with the Air Force to Maintain Emergency Response Capabilities per Performance Work Statement (PWS). Estimated Two to Four (2-4) Exercises per Year. Estimated Training Exercises will be One (1) to Seven (7) Days Duration at Various Locations. To Include Labor, Consumable Material and all Equipment.
Hourly Rate $ PPE Replace/LVL B: $ PPE REplace/LVL A Training Suits:
Training Device (Trailer):
Training Device (Tractor):
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Invoice Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity
NONE NONE NONE
Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 1 AUG 2023 31 JUL 2024
Proposed Period of Performance
1 LO
PROGRAM MANAGEMENT (Basic)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
12 MO
R429
SERVICE CONTRACT ACT
EMERGENCY RESPONSE/DISASTER PLANNING/PREPATION
Technical Support Meetings and Exercise Planning Meetings - - Estimated Six (6) Meetings per Year. Estimated Duration is Two and a Half (2.5) Hours each for Two (2) Contracting Personnel per Year. Contractor Shall Support up to Twenty-five (25) Level 3 IPT Meetings per Year. Estimated Duration is One and a Half (1.5) Hour each for Two (2) Contractor Personnel. These Meetings will be at Hill AFB or Other Locations within the Immediate Commuting Area Not To Exceed 60 Miles or as Directed by the Program Manager. Per Performance Work Statement (PWS).
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Invoice Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity
NONE NONE NONE
Place of Perf Quantity (U/I) Beginning
Specified Date Specified Date Req No / Pri
Required Period of Performance
12 MO 1 AUG 2023 31 JUL 2024
Proposed Period of Performance
12 MO
DATA (Basic)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
A001 - Contract Funds Status Report (CFSR) A002 - Labor Hour Performance Report Data In Accordance With Attached DD Form 1423 Exhibit "A".
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: IN ACCORDANCE WITH DD FORM 1423 Quality Assurance: IN ACCORDANCE WITH DD FORM 1423 Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 1 AUG 2023 31 JUL 2024
Proposed Period of Performance
1 LO
TRAVEL (Basic)
Item No.
Time & Material Estimated Quantity
U/I Estimated Amount Ceiling Price
1 LO
R429
SERVICE CONTRACT ACT
All Travel Costs Are In Accordance With FAR 31.205-46 and the Joint Travel Regulations
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Invoice Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity
NONE NONE NONE
Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 EA 1 AUG 2023 31 JUL 2024
Proposed Period of Performance
1 EA
REAL WORLD INCIDENT OPTION - (Basic IAW 52.217-7)
Item No.
Time & Material Estimated Quantity
U/I Estimated Unit Cost Ceiling Price
1 LO
R429
SERVICE CONTRACT ACT
Support for Real-World Missile Mishaps and Incidents per the Performance Work Statement (PWS) to include Labor, Consumable Material, and all Equipment.
Hourly Rate:$
REAL WORLD INCIDENT OPTION - (Basic IAW 52.217-7)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Invoice Quality Assurance: N/A, This is a Services Contract that has no deliverables. No hardware will be delivered as part of this Contract therefore no NSN can be assigned.
Class I ODS Substance Application/Use Quantity
NONE NONE NONE
Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 1 AUG 2023 31 JUL 2024
Proposed Period of Performance
1 LO
In the course of real world missile mishap and incident response and recovery activities, items may become worn, damaged, or the task may require the rental or purchase of a piece of equipment. At the direction of the PM, or authorized representative with approval from the CO, the Contractor shall rent/purchase the required item. All purchases must be authorized by the Contracting Officer prior to the expenditure of funds. Purchased equipment will become the property of the Government.
AVAILABILITY & MOBILIZATION (Option Year 1 IAW FAR 52.217-9)
Time & Material Estimated Quantity
U/I Estimated Unit Cost Ceiling Price
1 LO
R429
SERVICE CONTRACT ACT
Availability/Mobilization in response to a Real-World incident per the Performance Work Statement (PWS).
Hourly Rate: $
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Invoice Quality Assurance: N/A, This is a Services Contract that has no deliverables. No hardware will be delivered as part of this Contract therefore no NSN can be assigned.
Class I ODS Substance Application/Use Quantity
NONE NONE NONE
Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 1 AUG 2024 31 JUL 2025
Proposed Period of Performance
1 LO
EXERCISES (Option Year 1 IAW FAR 52.217-9)
Item No.
Time & Material Estimated Quantity
U/I Estimated Amount Ceiling Price
1 LO
R429
SERVICE CONTRACT ACT
Emergency Support Exercises in Conjunction with the Air Force to Maintain Emergency Response Capabilities per Performance Work Statement (PWS). Estimated Two to Four (2-4) Exercises per Year. Estimated Training Exercises will be One (1) to Seven
(7) Days Duration at Various Locations. To Include Labor, Consumable Material and all Equipment.
Hourly Rate $ PPE Replace/LVL B: $ PPE REplace/LVL A Training Suits:
Training Device (Trailer):
Training Device (Tractor):
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Invoice Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity
NONE NONE NONE
Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 1 AUG 2024 31 JUL 2025
Proposed Period of Performance
1 LO
PROGRAM MANAGEMENT (Option Year 1 IAW FAR 52.217-9)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
12 MO
R429
SERVICE CONTRACT ACT
EMERGENCY RESPONSE/DISASTER PLANNING/PREPATION
Technical Support Meetings and Exercise Planning Meetings - - Estimated Six (6) Meetings per Year. Estimated Duration is Two and a Half (2.5) Hours each for Two (2) Contracting Personnel per Year. Contractor Shall Support up to Twenty-five (25) Level 3 IPT Meetings per Year. Estimated Duration is One and a Half (1.5) Hour each for Two (2) Contractor Personnel. These Meetings will be at Hill AFB or Other Locations within the Immediate Commuting Area Not To Exceed 60 Miles or as Directed by the Program Manager. Per Performance Work Statement (PWS).
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Invoice Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity
NONE NONE NONE
Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
12 MO 1 AUG 2024 31 JUL 2025
Proposed Period of
12 MO
DATA (Option Year 1 IAW FAR 52.217-9)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
12 MO
A001 - Contract Funds Status Report (CFSR) A002 - Labor Hour Performance Report Data In Accordance With Attached DD Form 1423 Exhibit "A".
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: IN ACCORDANCE WITH DD FORM 1423 Quality Assurance: IN ACCORDANCE WITH DD FORM 1423 Type / Ship To Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Delivery
12 MO 1 AUG 2024 31 JUL 2025
Proposed Delivery
TRAVEL (Option Year 1 IAW FAR 52.217-9)
Time & Material Estimated Quantity
U/I Estimated Amount Ceiling Price
1 EA
R429
SERVICE CONTRACT ACT
All Travel Costs Are In Accordance With FAR 31.205-46 and the Joint Travel Regulation
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Invoice
Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity
NONE NONE NONE
Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 EA 1 AUG 2024 31 JUL 2025
Proposed Period of Performance
1 EA
REAL WORLD INCIDENT OPTION - (Option Year 1 IAW 52-217-7)
Item No.
Time & Material Estimated Quantity
U/I Estimated Unit Cost Ceiling Price
1 LO
R429
SERVICE CONTRACT ACT
Support for Real-World Missile Mishaps and Incidents per the Performance Work Statement (PWS) to include Labor, Consumable Material, and all Equipment.
Hourly Rate: $ Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Invoice Quality Assurance: N/A, This is a Services Contract that has no deliverables. No hardware will be delivered as part of this Contract therefore no NSN can be assigned.
Class I ODS Substance Application/Use Quantity
NONE NONE NONE
Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 1 AUG 2024 31 JUL 2025
Proposed Period of Performance
1 LO
In the course of real world missile mishap and incident response and recovery activities, items may become worn, damaged, or the task may require the rental or purchase of a piece of equipment. At the direction of the PM, or authorized representative with approval from the CO, the Contractor shall rent/purchase the required item. All purchases must be authorized
AVAILABILITY & MOBILIZATION (Option Year 2 IAW FAR 52.217-9)
Time & Material Estimated Quantity
U/I Estimated Unit Cost Ceiling Price
1 LO
R429
SERVICE CONTRACT ACT
Availability/Mobilization in response to a Real-World incident per the Performance Work Statement (PWS).
Hourly Rate: $ Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Invoice Quality Assurance: N/A, This is a Services Contract that has no deliverables. No hardware will be delivered as part of this Contract therefore no NSN can be assigned.
Class I ODS Substance Application/Use Quantity
NONE NONE NONE
Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 1 AUG 2025 31 JUL 2026
Proposed Period of Performance
1 LO
EXERCISES (Option Year 2 IAW FAR 52.217-9)
Item No.
Time & Material
EXERCISES (Option Year 2 IAW FAR 52.217-9)
Estimated Quantity
U/I Estimated Amount Ceiling Price
1 LO
R429
SERVICE CONTRACT ACT
Emergency Support Exercises in Conjunction with the Air Force to Maintain Emergency Response Capabilities per Performance Work Statement (PWS). Estimated Two to Four (2-4) Exercises per Year. Estimated Training Exercises will be One (1) to Seven
(7) Days Duration at Various Locations. To Include Labor, Consumable Material and all Equipment.
Hourly Rate $ PPE Replace/LVL B: $ PPE REplace/LVL A Training Suits:
Training Device (Trailer):
Training Device (Tractor):
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Invoice Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity
NONE NONE NONE
Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 1 AUG 2025 31 JUL 2026
Proposed Period of Performance
1 LO
PROGRAM MANAGEMENT (Option Year 2 IAW FAR 52.217-9)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
12 MO
R429
SERVICE CONTRACT ACT
PROGRAM MANAGEMENT (Option Year 2 IAW FAR 52.217-9)
EMERGENCY RESPONSE/DISASTER PLANNING/PREPATION
Technical Support Meetings and Exercise Planning Meetings - - Estimated Six (6) Meetings per Year. Estimated Duration is Two and a Half (2.5) Hours each for Two (2) Contracting Personnel per Year. Contractor Shall Support up to Twenty-five (25) Level 3 IPT Meetings per Year. Estimated Duration is One and a Half (1.5) Hour each for Two (2) Contractor Personnel. These Meetings will be at Hill AFB or Other Locations within the Immediate Commuting Area Not To Exceed 60 Miles or as Directed by the Program Manager. Per Performance Work Statement (PWS).
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Invoice Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity
NONE NONE NONE
Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
12 MO 1 AUG 2025 31 JUL 2026
Proposed Period of Performance
12 MO
DATA (Option Year 2 IAW FAR 52.217-9)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
12 MO
A001 - Contract Funds Status Report (CFSR) A002 - Labor Hour Performance Report Data In Accordance With Attached DD Form 1423 Exhibit "A".
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: IN ACCORDANCE WITH DD FORM 1423 Quality Assurance: IN ACCORDANCE WITH DD FORM 1423
Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri Required Period of Performance
12 MO 1 AUG 2025 31 JUL 2026
Proposed Period of
TRAVEL (Option Year 2 IAW FAR 52.217-9)
Time & Material Estimated Quantity
U/I Estimated Amount Ceiling Price
1 LO
R429
SERVICE CONTRACT ACT
All Travel Costs Are In Accordance With FAR 31.205-46 and the Joint Travel Regulation.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Invoice Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity
NONE NONE NONE
Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 1 AUG 2025 31 JUL 2026
Proposed Period of
REAL WORLD INCIDENT OPTION - (Option Year 2 IAW 52-217-7)
Item No.
Time & Material Estimated Quantity
U/I Estimated Unit Cost Ceiling Price
1 LO
R429
SERVICE CONTRACT ACT
Support for Real-World Missile Mishaps and Incidents per the Performance Work Statement (PWS) to include Labor, Consumable Material, and all Equipment.
Hourly Rate: $ Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Invoice Quality Assurance: N/A, This is a Services Contract that has no deliverables. No hardware will be delivered as part of this Contract therefore no NSN can be assigned.
Class I ODS Substance Application/Use Quantity
NONE NONE NONE
Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 1 AUG 2025 31 JUL 2026
Proposed Period of Performance
1 LO
In the course of real world missile mishap and incident response and recovery activities, items may become worn, damaged, or the task may require the rental or purchase of a piece of equipment. At the direction of the PM, or authorized representative with approval from the CO, the Contractor shall rent/purchase the required item. All purchases must be authorized
AVAILABILITY & MOBILIZATION (Option Year 3 IAW FAR 52.217-9)
Time & Material
AVAILABILITY & MOBILIZATION (Option Year 3 IAW FAR 52.217-9)
Estimated Quantity
U/I Estimated Unit Cost Ceiling Price
1 LO
R429
SERVICE CONTRACT ACT
Availability/Mobilization in response to a Real-World incident per the Performance Work Statement (PWS).
Hourly Rate: $ Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Invoice Quality Assurance: N/A, This is a Services Contract that has no deliverables. No hardware will be delivered as part of this Contract therefore no NSN can be assigned.
Class I ODS Substance Application/Use Quantity
NONE NONE NONE
Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 1 AUG 2026 31 JUL 2027
Proposed Period of Performance
1 LO
EXERCISES (Option Year 3 IAW FAR 52.217-9)
Item No.
Time & Material Estimated Quantity
U/I Estimated Amount Ceiling Price
1 LO
R429
SERVICE CONTRACT ACT
Emergency Support Exercises in Conjunction with the Air Force to Maintain Emergency Response Capabilities per Performance Work Statement (PWS). Estimated Two to Four (2-4) Exercises per Year. Estimated Training Exercises will be One (1) to Seven
(7) Days Duration at Various Locations. To Include Labor, Consumable Material and all Equipment.
EXERCISES (Option Year 3 IAW FAR 52.217-9)
Hourly Rate $ PPE Replace/LVL B: $ PPE REplace/LVL A Training Suits:
Training Device (Trailer):
Training Device (Tractor):
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Invoice Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity
NONE NONE NONE
Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 1 AUG 2026 31 JUL 2027
Proposed Period of Performance
1 LO
PROGRAM MANAGEMENT (Option Year 3 IAW FAR 52.217-9)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
12 MO
R429
SERVICE CONTRACT ACT
EMERGENCY RESPONSE/DISASTER PLANNING/PREPATION
Technical Support Meetings and Exercise Planning Meetings - - Estimated Six (6) Meetings per Year. Estimated Duration is Two and a Half (2.5) Hours each for Two (2) Contracting Personnel per Year. Contractor Shall Support up to Twenty-five (25) Level 3 IPT Meetings per Year. Estimated Duration is One and a Half (1.5) Hour each for Two (2) Contractor Personnel. These Meetings will be at Hill AFB or Other Locations within the Immediate Commuting Area Not To Exceed 60 Miles or as Directed by the Program Manager. Per Performance Work Statement (PWS).
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Invoice Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity
NONE NONE NONE
Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
12 MO 1 AUG 2026 31 JUL 2027
Proposed Period of Performance
12 MO
DATA (Option Year 3 IAW FAR 52.217-9)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
A001 - Contract Funds Status Report (CFSR) A002 - Labor Hour Performance Report Data In Accordance With Attached DD Form 1423 Exhibit "A".
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: IN ACCORDANCE WITH DD FORM 1423 Quality Assurance: IN ACCORDANCE WITH DD FORM 1423 Type / Ship To Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Delivery
1 LO 1 AUG 2026 31 JUL 2027
Proposed Delivery
TRAVEL (Option Year 3 IAW FAR 52.217-9)
Item No.
Time & Material Estimated Quantity
U/I Estimated Amount Ceiling Price
1 LO
R429
SERVICE CONTRAT ACT
All Travel Costs Are In Accordance With FAR 31.205-46 and the Joint Travel Regulations
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Invoice Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity
NONE NONE NONE
Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 1 AUG 2026 31 JUL 2027
Proposed Period of Performance
1 LO
REAL WORLD INCIDENT OPTION - (Option Year 3 IAW 52-217-7)
Item No.
Time & Material Estimated Quantity
U/I Estimated Unit Cost Ceiling Price
1 LO
R429
SERVICE CONTRACT ACT
Support for Real-World Missile Mishaps and Incidents per the Performance Work Statement (PWS) to include Labor, Consumable Material, and all Equipment.
Hourly Rate: $
REAL WORLD INCIDENT OPTION - (Option Year 3 IAW 52-217-7)
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Invoice Quality Assurance: N/A, This is a Services Contract that has no deliverables. No hardware will be delivered as part of this Contract therefore no NSN can be assigned.
Class I ODS Substance Application/Use Quantity
NONE NONE NONE
Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 1 AUG 2026 31 JUL 2027
Proposed Period of Performance
1 LO
In the course of real world missile mishap and incident response and recovery activities, items may become worn, damaged, or the task may require the rental or purchase of a piece of equipment. At the direction of the PM, or authorized representative with approval from the CO, the Contractor shall rent/purchase the required item. All purchases must be authorized
AVAILABILITY & MOBILIZATION (Option Year 4 IAW FAR 52.217-9)
Time & Material Estimated Quantity
U/I Estimated Unit Cost Ceiling Price
1 LO
R429
SERVICE CONTRACT ACT
Availability/Mobilization in response to a Real-World incident per the Performance Work Statement (PWS).
Hourly Rate: $
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Invoice Quality Assurance: N/A, This is a Services Contract that has no deliverables. No hardware will be delivered as part of this Contract therefore no NSN can be assigned.
Class I ODS Substance Application/Use Quantity
NONE NONE NONE
Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 1 AUG 2027 31 JUL 2028
Proposed Period of Performance
1 LO
EXERCISES (Option Year 4 IAW FAR 52.217-9)
Item No.
Time & Material Estimated Quantity
U/I Estimated Amount Ceiling Price
1 LO
R429
SERVICE CONTRACT ACT
Emergency Support Exercises in Conjunction with the Air Force to Maintain Emergency Response Capabilities per Performance Work Statement (PWS). Estimated Two to Four (2-4) Exercises per Year. Estimated Training Exercises will be One (1) to Seven
(7) Days Duration at Various Locations. To Include Labor, Consumable Material and all Equipment.
Hourly Rate $ PPE Replace/LVL B: $ PPE REplace/LVL A Training Suits:
Training Device (Trailer):
Training Device (Tractor):
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Invoice Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity
NONE NONE NONE
Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 1 AUG 2027 31 JUL 2028
Proposed Period of Performance
1 LO
PROGRAM MANAGEMENT (Option Year 4 IAW FAR 52.217-9)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
12 MO
R429
SERVICE CONTRACT ACT
EMERGENCY RESPONSE/DISASTER PLANNING/PREPATION
Technical Support Meetings and Exercise Planning Meetings - - Estimated Six (6) Meetings per Year. Estimated Duration is Two and a Half (2.5) Hours each for Two (2) Contracting Personnel per Year. Contractor Shall Support up to Twenty-five (25) Level 3 IPT Meetings per Year. Estimated Duration is One and a Half (1.5) Hour each for Two (2) Contractor Personnel. These Meetings will be at Hill AFB or Other Locations within the Immediate Commuting Area Not To Exceed 60 Miles or as Directed by the Program Manager. Per Performance Work Statement (PWS).
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Invoice Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity
NONE NONE NONE
Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
12 MO 1 AUG 2027 31 JUL 2028
Proposed Period of
DATA (Option Year 4 IAW FAR 52.217-9)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
A001 - Contract Funds Status Report (CFSR) A002 - Labor Hour Performance Report Data In Accordance With Attached DD Form 1423 Exhibit "A".
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: IN ACCORDANCE WITH DD FORM 1423 Quality Assurance: IN ACCORDANCE WITH DD FORM 1423 Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 1 AUG 2027 31 JUL 2028
Proposed Period of
TRAVEL (Option Year 4 IAW FAR 52.217-9)
Time & Material Estimated Quantity
U/I Estimated Amount Ceiling Price
1 LO
R429
SERVICE CONTRACT ACT
All Travel Costs Are In Accordance With FAR 31.205-46 and the Joint Travel Regulations
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Invoice Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity
NONE NONE NONE
Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 1 AUG 2027 31 JUL 2028
Proposed Period of Performance
1 LO
REAL WORLD INCIDENT OPTION - (Option Year 4 IAW 52-217-7)
Item No.
Time & Material Estimated Quantity
U/I Estimated Unit Cost Ceiling Price
1 LO
R429
SERVICE CONTRACT ACT
Support for Real-World Missile Mishaps and Incidents per the Performance Work Statement (PWS) to include Labor, Consumable Material, and all Equipment.
Hourly Rate: $ Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Invoice Quality Assurance: N/A, This is a Services Contract that has no deliverables. No hardware will be delivered as part of this Contract therefore no NSN can be assigned.
Class I ODS Substance Application/Use Quantity
NONE NONE NONE
Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 1 AUG 2027 31 JUL 2028
Proposed Period of
In the course of real world missile mishap and incident response and recovery activities, items may become worn, damaged, or the task may require the rental or purchase of a piece of equipment. At the direction of the PM, or authorized representative with approval from the CO, the Contractor shall rent/purchase the required item. All purchases must be authorized
SHIP TO / PLACE OF PERFORMANCE
TYPE/CODE: B 1423
IAW DD FORM 1423
MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
CONTRACT CLAUSES
252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS (SEP 2011)
(IAW DFARS 203.171-4(a), DFARS 212.301(f)(ii))
252.203-7003 AGENCY OFFICE OF THE INSPECTOR GENERAL (AUG 2019)
(IAW DFARS 203.1004(a), DFARS 212.301(f)(iii))
252.204-7018 PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE
TELECOMMUNICATIONS EQUIPMENT OR SERVICES (JAN 2021)
(IAW DFARS 204.2105(c))
252.205-7000 PROVISION OF INFORMATION TO COOPERATIVE AGREEMENT HOLDERS
(DEC 1991)
(IAW DFARS 205.470, DFARS 212.301(f)(x))
52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR
EXECUTIVE ORDERS -- COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
(OCT 2022)
(IAW FAR 12.301(b)(4))
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
(1) 52.203-19,Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (NOV 2021) (Section 1634 of Pub. L. 115-91).
(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (NOV 2021) (Section 89(a)(1)(A) of Pub. L. 115-232).
(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015)
(5) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).
(6) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77, 108-78 (19 U.S.C.
3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
[Contracting Officer check as appropriate.] __X __ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (JUN 2020), with
Alternate I (NOV 2021)(41 U.S.C. 4704 and 10 U.S.C. 2402).
__X __ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (NOV 2021) (41 U.S.C.
3509).
__ __ (3) 52.203-15, Whistleblower Protections Under the American Recovery and Reinvestment
Act of 2009 (Jun 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)
__X __ (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) (Pub. L. 109-282) (31 U.S.C. 6101 note).
(5) [Reserved] __ __ (6) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).
__ __ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts
(Oct 2016) (Pub. L. 111-117, section 743 of Div. C).
__X __ (8) 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors
Debarred, Suspended, or Proposed for Debarment (NOV 2021) (31 U.S.C. 6101 note).
__X __ (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018) (41 U.S.C. 2313).
____ (10) [Reserved} __ __ (11) (i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (OCT 2022)(15 U.S.C.
657a).
__ __ (11) (ii) Alternate I (MAR 2020) of 52.219-3.
__ __ (12) (i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns
(OCT 2022) (if the offeror elects to waive the preference, it shall so indicate in its offer)(15 U.S.C. 657a).
__ _ (12) (ii) Alternate I (MAR 2020) of 52.219-4.
(13) [Reserved]
__X __ (14) (i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2020)(15 U.S.C. 644).
__ __ (14) (ii) Alternate I (MAR 2020) OF 52.219-6.
__ __ (15) (i) 52.219-7, Notice of Partial Small Business Set-Aside (NOV 2020)(15 U.S.C. 644).
__ __ (15) (ii) Alternate I (MAR 2020) of 52.219-7.
__X __ (16) 52.219-8, Utilization of Small Business Concerns (Oct 2022) (15 U.S.C. 637(d)(2) and (3)).
(17) (i) 52.219-9, Small Business Subcontracting Plan (OCT 2022) (15 U.S.C. 637(d)(4)).
__ __ (17) (ii) Alternate I (Nov 2016) of 52.219-9.
__ __ (17) (iii) Alternate II (Nov 2016) of 52.219-9.
__ __ (17) (iv) Alternate III (JUN 2020) of 52.219-9.
(17) (v) Alternate IV (SEP 2021) of 52.219-9.
__ (18) (i) 52.219-13, Notice of Set-Aside of Orders (MAR 2020) (15 U.S.C. 644(r)).
__ (18) (ii) Alternate I (MAR 2020) of 52.219-13.
__ (19) 52.219-14, Limitations on Subcontracting (OCT 2022)(15 U.S.C. 657s).
__ __ (20) 52.219-16, Liquidated Damages—Subcontracting Plan (SEP 2021) (15 U.S.C.
637(d)(4)(F)(i)).
__ __ (21) 52.219–27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (OCT
2022) (15 U.S.C. 657f).
__X __ (22) (i) 52.219-28, Post-Award Small Business Program Rerepresentation (OCT 2022) (15
U.S.C. 632(a)(2)).
(22) (ii) Alternate I (MAR 2020) of 52.219-28.
__ __ (23) 52.219-29, Notice of Set-Aside for, or Sole-Source Award to, Economically
Disadvantaged Women-Owned Small Business Concerns (OCT 2022) (15 U.S.C.
637(m)).
__ __ (24) 52.219-30, Notice of Set-Aside for, or Sole-Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (OCT 2022) (15 U.S.C. 637(m)).
(25) 52.219-32, Orders Issued Directly Under Small Business Reserves (MAR 2020) (15 U.S.C.
644(r)).
(26) 52.219-33, Nonmanufacturer Rule (SEP 2021) (15 U.S.C. 657s).
__ __ (27) 52.222-3, Convict Labor (June 2003)(E.O. 11755).
__ __ (28) 52.222-19, Child Labor—Cooperation with Authorities and Remedies (JAN 2022) (E.O.
13126).
__X __ (29) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).
__X __ (30) (i) 52.222-26, Equal Opportunity (Sept 2016) (E.O. 11246
(30) (ii) Alternate I (Feb 1999) of 52.222-26.
__X __ (31) (i) 52.222-35, Equal Opportunity for Veterans (JUN 2020)(38 U.S.C. 4212).
(31) (ii) Alternate I (July 2014) of 52.222-35.
__X __ (32) (i) 52.222-36, Equal Opportunity for Workers with Disabilities (JUN 2020) (29 U.S.C. 793).
(32) (ii) Alternate I (July 2014) of 52.222-36.
__X __ (33) 52.222-37, Employment Reports on Veterans (JUN 2020)(38 U.S.C. 4212).
__X __ (34) 52.222-40, Notification of Employee Rights Under the National Labor relations Act (Dec
2010) E.O. 13496).
__X __ (35) (i) 52.222-50, Combating Trafficking in Persons (NOV 2021) (22 U.S.C. chapter 78 and
E.O. 13627).
__ __ (35) (ii) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).
__ __ (36) 52.222-54, Employment Eligibility Verification (MAY 2022). (E. O. 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial products or commercial services as prescribed in FAR 22.1803.)
__ __ (37) (i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA-Designated Items (May 2008)(42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
__ _ (37) (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
__X __ (38) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (June 2016) (E.O. 13693).
__ __ (39) 52.223-12, Maintenance, Service, repair, or Disposal of Refrigeration Equipment and Air Conditioners (June 2016) (E.O.13693).
__ _ (40) (i) 52.223-13, Acquisition of EPEAT®-Registered Imaging Equipment (Jun 2014) (E.O.s 13423 and 13514).
__ _ (40) (ii) Alternate I (Oct 2015) of 52.223-13.
__ _ (41) (i) 52.223-14, Acquisition of EPEAT®-Registered Televisions (Jun 2014) (E.O.s 13423 and
13514).
__ _ (41) (ii) Alternate I (Jun 2014) of 52.223-14.
__ __ (42) 52.223-15, Energy Efficiency in Energy-Consuming Products (MAY 2020) (42.U.S.C.
8259b).
__ __ (43) (i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products (Oct 2015)
(E.O.s 13423 and 13514).
__ _ (43) (ii) Alternate I (Oct 2015) of 52.223-16.
__X __ (44) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (JUN
2020) (E.O.13513).
__X __ (45) 52.223-20, Aerosols (Jun 2016) (E.O. 13693) __X __ (46) 52.223-21, Foams (Jun 2016) (E.O. 13693).
__X __ (47) (i) 52.224-3, Privacy Training (Jan 2017) (5 U.S.C. 552a).
___ (47) (ii) Alternate I, (Jan 2017) of 52.244-3.
__ __ (48) 52.225-1, Buy American--Supplies (NOV 2021) (41 U.S.C. chapter 83).
__ __ (49) (i) 52.225-3, Buy American--Free Trade Agreements--Israeli Trade Act (NOV 2021) (41
U.S.C. chapter 83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L. 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43).
__ _ (49) (ii) Alternate I (JAN 2021) of 52.225-3.
__ _ (49) (iii) Alternate II (JAN 2021) of 52.225-3.
__ _ (49) (iv) Alternate III (JAN 2021) of 52.225-3.
__ __ (50) 52.225-5, Trade Agreements (OCT 2019) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).
__ X __ (51) 52.225-13, Restrictions on Certain Foreign Purchases (FEB 2021) (E.O.s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of Treasury).
__ __ (52) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).
__ __ (53) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007)(42 U.S.C. 5150).
__ __ (54) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov
2007)(42 U.S.C. 5150).
__X __ (55) 52.229–12, Tax on Certain Foreign Procurements (FEB 2021).
__ __ (56) 52.232-29, Terms for financing of Purchases of Commercial Products and Commercial
Services (NOV 2021)(41 U.S.C. 4505, 10 U.S.C. 2307(f)).
__ __ (57) 52.232-30, Installment Payments for Commercial Products and Commercial Services
(NOV 2021)(41 U.S.C. 4505, 10 U.S.C. 2307(f)).
__X __ (58) 52.232-33, Payment by Electronic Funds Transfer—System for Award Management (Oct
2018) (31.U.S.C. 3332).
__ __ (59) 52.232-34, Payment by Electronic Funds Transfer—Other than System for Award
Management (Jul 2013)(31.U.S.C. 3332).
__ __ (60) 52.232-36, Payment by Third Party (May 2014) (31 U.S.C. 3332).
__ __ (61) 52.239-1, Privacy or Security Safeguards (Aug 1996) (5 U.S.C. 552a).
__ __ (62) 52.242-5, Payment to Small Business Subcontractors (Jan 2017) (15 U.S.C. 637(d)(13)).
__ __ (63) (i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (NOV 2021)
(46 U.S.C. 55305 and 10 U.S.C. 2631).
__ _ (63) (ii) Alternate I (Apr 2003) of 52.247-64.
(63) (iii) Alternate II (NOV 2021) of 52.247-64.
(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
[Contracting Officer check as appropriate.] __X __ (1) 52.222-41, Service Contract Labor Standards (Aug 2018) (41 U.S.C. chapter 67).
__X __ (2) 52.222-42, Statement of Equivalent Rates for Federal Hires (May 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).
__ __ (3) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards--Price
Adjustment (Multiple Year and Option Contracts) (Aug 2018) (29 U.S.C. 206 and 41 U.S.C. chapter 67).
__X __ (4) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards - Price Adjustment (May 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).
__ __ (5) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment—Requirements (May 2014) (41 U.S.C. chapter 67).
__ __ (6) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services—Requirements (May 2014)(41 U.S.C. chapter 67).
__X __ (7) 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026 (JAN 2022).
__X __ (8) 52.222-62, Paid Sick Leave Under Executive Order 13706. (Jan 2022) (E.O. 13706).
__ __ (9) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations. (JUN 2020) (42
U.S.C. 1792).
(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, as defined in FAR 2.101, on the date of award of this contract and does not contain the clause at 52.215-2, Audit and Records--Negotiation.
(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor's directly pertinent records involving transactions related to this contract.
(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.
(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.
(e)(1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c) and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in paragraphs (e)(1) of this paragraph in a subcontract for commercial products or commercial services. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause—
(i) 52.203-13, Contractor Code of Business Ethics and Conduct (NOV 2021) (41 U.S.C. 3509).
(ii) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(iii) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (NOV 2021) (Section 1634 of Pub. L.
115-91).
(iv) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (NOV 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).
(v) 52.219-8, Utilization of Small Business Concerns (Oct 2022) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds the applicable threshold specified in FAR 19.702(a) on the date of subcontract award, the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.
(vi) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).
(vii) 52.222-26, Equal Opportunity (Sep 2016) (E.O. 11246).
(viii) 52.222-35, Equal Opportunity for Veterans (JUN 2020) (38 U.S.C. 4212).
(ix) 52.222-36, Equal Opportunity for Workers with Disabilities (Jun 2020) (29 U.S.C. 793).
(x) 52.222-37, Employment Reports on Veterans (JUN 2020) (38 U.S.C. 4212).
(xi) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496). Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.
(xii) 52.222-41, Service Contract Labor Standards (Aug 2018), (41 U.S.C. chapter 67).
(xiii) X (A) 52.222-50, Combating Trafficking in Persons (NOV 2021) (22 U.S.C. chapter 78 and E.O. 13627). (B) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 E.O. 13627).
(xiv) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (May 2014) (41 U.S.C. chapter 67.)
(xv) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Requirements (May 2014) (41 U.S.C. chapter 67)
(xvi) 52.222-54, Employment Eligibility Verification (MAY 2022) (E. O. 12989).
(xvii) 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026
(JAN 2022).
(xviii) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2022) (E.O. 13706).
(xix) (A) 52.224-3, Privacy Training (Jan 2017) (5 U.S.C. 552a). (B) Alternate I (Jan 2017) of 52.224-3.
(xx) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008;
10 U.S.C. 2302 Note).
(xxi) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations. (JUN 2020) (42 U.S.C.
1792). Flow down required in accordance with paragraph (e) of FAR clause 52.226-6.
(xxii)52.247-64, Preference for Privately-Owned U.S. Flag Commercial Vessels (NOV 2021) (46 U.S.C. 55305 and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64.
(2) While not required, the Contractor may include in its subcontracts for commercial products and commercial services a minimal number of additional clauses necessary to satisfy its contractual obligations.
52.219-14 LIMITATIONS ON SUBCONTRACTING (DEVIATION 2021-O0008) (SEP 2021)
(IAW Deviation 2021-O0008)
(a) This clause does not apply to the unrestricted portion of a partial set-aside.
(b) Definition. “Similarly situated entity,” as used in this clause, means a first-tier subcontractor, including an independent contractor, that—
(1) Has the same small business program status as that which qualified the prime contractor for the award (e.g., for a small business set-aside…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .