Integrated Telemetry Analysis System Upgrade (JDAM PO) SOR - 15 Oct 2026_rs.docx
DOCX document 47 KB Posted
- Solicitation number
- FA821327QB002
About this file
This is a Statement of Requirements for an Integrated Telemetry Analysis System (ITAS) upgrade prepared by the Joint Direct Attack Munitions (JDAM) Program Office at Hill Air Force Base, Utah. The government requires six Panasonic Toughbook rugged telemetry controllers with Windows 11 OS, 32GB RAM, 1TB SSD, and OMEGA NExT Software License Bundle featuring video stream processing, multiple data source compatibility, and security features including disabled Wi-Fi and Bluetooth capabilities. Additionally, the procurement includes one Edge2 Compact 1U 2-channel Receiver Decom Telemetry Processing Unit with dual-input RF receiver capabilities, four single-input RF Receiver units, and five 2-channel Bit Sync Decom units with PCM processing up to 50Mbps. All equipment requires IRIG Time Code translation, low-latency audio and CH10 outputs, and includes external power converters and breakout cables.
Delivery is required within 180 days of contract award to two locations: Eglin Air Force Base, Florida, and Hill Air Force Base, Utah. The Statement of Requirements identifies Parraid, LLC as the sole designer and proprietor of the OMEGA NExT Suite, Edge2 processing units, and supporting software, noting that awarding to alternative sources would create unacceptable data integrity risks and mission delays. The related Notice of Intent to Sole Source (FA821327QB002) confirms the government's intent to award solely to Parraid, LLC, with interested parties allowed to submit capability statements by November 13, 2026 at 1200 MST. All vendors must maintain active registration in SAM.gov prior to quote submission.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Requirements
Integrated Telemetry Analysis System (ITAS) Upgrade
15 October 2026
Prepared By AFLCMC/EBHCJ 6034 Dogwood Ave Hill AFB, UT 84056
Controlled by: DAF Controlled by: AFLCMC/EBHCJ CUI Category(ies): Controlled Technical Information Limited Dissemination: FEDCON POC: Anthony Koberstein DISTRIBUTION STATEMENT D. Secondary distribution authorized to the Department of Defense and U.S. DoD contractors only; administrative or operation use and vulnerability information; 19 January 2022. Other requests for this document shall be referred to JDAM Program Office, AFLCMC/EBHTB, 6034 Dogwood Ave, Bldg. 1257 Hill AFB, UT 84056-5816.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
DESTRUCTION NOTICE. Destroy by any method that will prevent disclosure of contents or reconstruction of the document.
1. INTRODUCTION AND PURPOSE:
Joint Direct Attack Munitions (JDAM) Program Office is in need of an Integrated Telemetry Analysis System upgrade. The program office is requesting to purchase the following below as defined.
2. Item/Product Description:
The following items are required for performance under this contract:
2.1 Commercial rugged telemetry controller - integrated laptop, Quantity: 6 ea.
a. Panasonic Toughbook, Windows 11 OS (brand name or equivalent)
· Min Specs: 14" display, 32G Ram, 1TB SSD
· OMEGA NExT Software License Bundle
· NExT-STD-01 Professional (Including, but not limited to)
· Video Stream Processing
· Ch8 1553 Stream Processing
· Analog Stream Processing
· Up to 8 Data Sources
· Ethernet Data Sources
· SSR 100 File Data Sources
· DBS-140 Data Sources
· NPD Packet Inputs
· Configuration API
· Processing API
· Data Client API
· OMEGA NExT Insight data export utility
· OMEGA NExT Clarity and Clarity Builder
· OMEGA Data Environment
· Wi-Fi Capabilities Removed/Disabled
· Bluetooth Capabilities Removed/Disabled
· No Camera Capabilities
· Microphone Capabilities Removed/Disabled
· Guaranteed Parraid Edge2 PCM/Decom Processing Unit Compatibility
· 1-Year Software/Bios Warranty and Software Updates
· 3-Year Hardware Warranty on Laptop and EDGE2
2.2 Edge2 Compact 1U 2-ch Receiver Decom Telemetry Processing Unit w/IRIG Time Code Trans is the Dual-Input RF Receiver, Quantity: 1 ea.
· L-S-C Bands Processing
· PCM/FM, SOQPSK, and BPSK Demods included
· Low Latency Audio, CH10, and TMoIP Outputs
· External AC-DC power converter module
· BNC Breakout cable, and rubber feet
2.3 Edge2 Compact 1U 1-ch Receiver Decom Telemetry Processing Unit w/IRIG Time Code Trans is the Single-Input RF Receiver, Quantity: 4 ea.
(upgraded version of our current X-5000 RF Receiver Decom)
· L-S-C Bands
· PCM/FM, SOQPSK, and BPSK Demods
· Low Latency Audio, CH10, and TMoIP Outputs
· External AC-DC power converter module
· BNC Breakout cable and rubber feet
2.4 Edge2 Compact 1U 2-ch Bit Sync Decom Telemetry Processing Unit w/IRIG Time Code Trans (Dual-Input PCM Databrick), Quantity: 5 ea.
(upgraded version of our current X-5000 PCM Databrick)
· PCM Bit Sync – 50Mbps, NRZ-L/M/s, RNRZ-L codes
· 25Mbps, BIO L/M/S codes
· Low Latency Audio, CH10 and TMoIP outputs
· External AC-DC power converter module
· NBC breakout cable and rubber feet.
3. DELIVERY DATE:
3.1. The proposed delivery date is no later than 180 days from the contract award, with early delivery authorized.
3.2. Shipment Addresses:
ATTN: JDAM / Eglin HGR 71
DODAAC - EY0305
305 W. Choctawhatchee Road Eglin AFB, FL 32542-5701
GLOBAL MUNITION CTL PT EBHM
DoDAAC: FV0001
GLOBAL MUNITION CTL PT EBHM
6043 ELM LN BLDG 1246 CTR LDIV RM 9
HILL AFB UT 84056
4. GROUND RULES AND ASSUMPTIONS
4.1. Government Furnished Equipment (GFE) will be provided as needed/requested through the Government Contracting office.
4.2. Any associated Non-Recurring Engineering (NRE) for obsolescence will be priced separately.
4.3. Parraid, LLC is the sole designer, developer, and proprietor of the OMEGA NExT Suite, OMEGA Data Environment (ODE), and Edge2 PCM/Decom Processing Units powering the ITAS System. Awarding this contract to any other source will incur unacceptable data integrity risks, mission delays, and duplicating software development costs to the government.
5. DELIVERABLES:
5.1 Six (6) CHS-RUGL-003; Commercial rugged telemetry controller - integrated laptops
5.2 One (1) Edge2-2RxD-001; Edge2 Compact 1U 2-ch Receiver Decom Telemetry Processing Unit w/IRIG Time Code Trans
5.3 Four (4) Edge2-1RxD-001; Edge2 Compact 1U 1-ch Receiver 1-ch Decom Telemetry Processing Unit w/IRIG Time Code Trans is the Single-Input RF Receiver
5.4 Five (5) Edge2-2BD-001; Edge2 Compact 1U 2-ch Bit Sync Decom Telemetry Processing Unit w/IRIG Time Code Trans Dual-Input PCM Databrick)
5.5 Two (2) NExT-STD-01; OMEGA-NExT Standard Network Server Software License Bundle w/ unlimited Clarity and Clarity Builder software licenses
5.6 Two (2) NExT-INSIGHT; Data File Export Utility licenses
File details come from the government source that posted it. Updated .