SECTION_L_FA8212_7JUN2022.pdf

PDF 192 KB Posted

Attached to
A-10 POD ASSY MLG Fairing LH & RH 5 YR IDIQ
Solicitation number
FA8212-22-R-0025
Issued by

View the file

Other files

File Type Posted
FA821222R0025_05 Extend RFP to 4AUG2022.pdf PDF
FA821222R0025-04 Update Required Delivery Times.pdf PDF
EDL_015916923_update_with_3_TPRS_REV_8_8JUN2022.pdf PDF
Updated EDL 015922577 Rev 3.pdf PDF
FA8212-22-R-0025-0003 Update SECTION J.pdf PDF
EDL REV LIST FA821222R0025.pdf PDF
FA8212-22-R-0025-0002.pdf PDF
FA8212-22-R-0025-0001.pdf PDF
SECTION_M_FA8212_7JUN2022.pdf PDF
ATTACH_1_V2_6JUN2022.docx DOCX document
EDL 015916923 update with 3 TPRS.pdf PDF
6923FJ_Item_Description.pdf PDF
RFP FA821222R0025 Bids Due 28JUN2022.pdf PDF
EDL REV LIST FD20202200584.pdf PDF
2577FJ_EDL.pdf PDF
2577FJ_IUID.pdf PDF
Attachment 1 Contractor Responsibility Determination Questionnaire.docx DOCX document
Transportation_Funds.pdf PDF
6923FJ_Production_Quality_Requirements.pdf PDF
6923FJ_Procurement_Statements.pdf PDF
2577FJ_Production_Quality_Requirements.pdf PDF
2577FJ_FA_Requirement (2).pdf PDF
Foreign_Disclosure_Review.pdf PDF
2577FJ_Procurement_Statements.pdf PDF
CDRL_A001_FATR.pdf PDF
Packaging_Instructions.pdf PDF
6923FJ_IUID.pdf PDF
2577FJ_Engineering_Instructions.pdf PDF
6923FJ_EDL.pdf PDF
2577FJ_FA_Requirement (1).pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 | 3 P a g e

SECTION L

INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

7JUN2022

A. INTRODUCTION:

1. This section provides guidance for preparing proposals and specific instructions on the required format and content. To assure timely and equitable proposal evaluation, offerors shall propose in accordance with this section and all solicitation requirements (i.e. provisions, clauses, appendices, attachments, forms, etc.). Non-conformance with the instructions provided in this section or the requirements and statements of the solicitation may result in a proposal disqualification (i.e. the offeror was non-responsive to the solicitation requirements).

2. The Government representative identified below shall be the sole points of contact for this acquisition. All questions, comments, and/or concerns shall be directed to the below points of contact.

Procurement Contracting Officer (PCO) Leslie Evans 6050 Gum Lane, Bldg 1215 Hill AFB, UT 84056 EMAIL: Leslie.Evans.1@us.af.mil Tel: 801-888-4549

3. If an offeror believes that the solicitation contains errors, omissions, or is otherwise unsound the offeror shall immediately e-mail the PCO with supporting rationale. Upon consideration the Government may continue, amend, extend, or cancel the solicitation

4. The Government reserves the right to award this effort based on initial proposals, as received,without discussions IAW FAR 52.215-1. However, if the PCO determines that entering intodiscussions is in the best interest of the Government, the PCO may do so.

5. IAW 5.207(c)(16), Synopsis Description, All responsible sources may submit a bid, proposal, or quotation which shall be considered by the agency. In addition, the offeror does not have to be technically qualified in order to submit a bid but, must be technically qualified to receive a contract award per FAR Part 9.202 Policy, “The qualification requirement must be demonstrated before contract award”.

6. Acquisition Type: IAW FAR 6.1 Full & Open Competition (F&OC) – Total Small Business Set-Aside.

7. Contract Type: Firm-Fixed Price (FFP) Production Contract – Single Award One-Time Buy

8. Fund Type: Funded with 97X4930 CSAG-S Working Capital Fund (WCF). Revolving funds do not expire, even when obligated on to a production contract.

9. Projected Acquistion Schedule: Posted Synopsis WED 11MAY2022 – WED 25MAY2022; Posted RFP 26MAY2022 – TUE 28JUN2022; Award within 30 days after RFP close-out date or by 27JUL2022.

10. The contract is scheduled for award within 30 days after the RFP close-out date. Contract award shall not be delayed to qualify new sources due to the timeliness of the acquisition being critical to the mission IAW FAR 9.202, Policy(e)

2 | 3 P a g e

(e) “The contracting officer need not delay a proposed award in order to provide a potential offeror with an opportunity to demonstrate its ability to meet the standards specified for qualification.”

B. PROPOSAL FORMAT:

1. To assure timely and equitable evaluation of proposals, offerors must follow the instructions contained herein.

2. By submission of its offer, the offeror accedes to all solicitation requirements, including terms and conditions, representations and certifications. Failure to properly meet all of the solicitation terms and requirements may result in an offer being determined ineligible for award. Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale.

3. A single award contract will be awarded as an all or none basis; however, the Government reserves the right to award no contract at all.

4. Only one (1) proposal per offeror will be considered. The offeror shall complete the solicitation as part of their bid, including the clause fill-ins, and sign and date the solicitation/RFP and its amendments. The RFP includes the solicitation and all its amendments (if applicable). In doing so, the offeror accedes to the contract terms and conditions as written in the RFP/ bid. The offeror agrees to hold its signed bid/offer firm for 60 days and that their bid constitutes the model contract. Submit one copy via e-mail to the Contracting Officer at leslie.evans.1@us.af.mil.

5. Representations and certification shall normally be certified using ORCA per FAR 52.204-8. However, where specified complete necessary fill-ins and certifications in Sections I through K. Offeror shall submit all pages that require a fill-in.

6. In order to have a complete bid the offeror must have the following in their bid package:

6.1. Formal solicitation/ Request For Proposal (RFP) completed and signed.

6.2. All RFP amendments, page 1 signed.

6.3 Recent/current performance record(s) from Govt source(s) (ie..DCMA office/ Contractor Supplier Risk Report from the Supplier Performance Risk System (SPRS) via Procurement Integrated Enterprise Environment (PIEE.eb.mil).

6.4. Milestone schedules for all the quoted delivery times in a format that clearly demonstrates the delivery times are fair and reasonable and that the original delivery terms can be met. The format must allow the milestone schedules to be attached to SECTION J of the contract.

6.5. Higher level certification AS9100.

6.6. Complete SAR package if not a technically qualified source and one has not already been submitted.

6.7. The offeror shall complete and submit a signed Attachment 1, Contractor Responsibility Determination Questionnaire with supporting documents.

6.1. The offeror may also submit with their bid package:

6.1.1. Manufacturer’s performance record that shows the current on-time delivery (OTD) rate and quality rate. The manufacturer’s record must be current and relevant and must include DoD contracts for similar requirements. In order to have equal information from offeror to offeror the context of the data must be the same. The manufacturer’s OTD and quality rating must be based on the last contractual due-in date and identify if delivery was on-time or if it was late. The manufacturer will list the problems encountered on the identified contracts and their corrective actions that resulted in satisfactory resolution and/or on-time delivery.

7. Based on market research the Contracting Officer has determined there is a high probability of receiving competitive pricing, schedule, and delivery and within scope of the acquisition. Upon examination of the offerors, the Contracting Officer will review this determination and if, in the Contracting Officer's determines adequate competition exist, no additional cost information will be requested and certification under FAR 15.406-2 will not be

3 | 3 P a g e required. However, if at any time during this competition the Contracting Officer determines that adequate competition no longer exists; offerors may be required to submit information to the extent necessary for the Contracting Officer to determine the price is fair and reasonable and/or may extend, amend, or cancel the solicitation. If only one proposal is received the procedures in DFARS 215.371 Only One Offer will be followed.

8. IAW FAR clause 52.211-15, Defense Priority and Allocation Requirements (APR 2008), this requirement has a “DO” rating. DO rated contracts, to include subcontracts, have a higher priority than commercial contracts. The proposed delivery schedule shall factor-in this higher priority rating when quoting delivery schedules.

9. TDP. Offers shall be IAW the current TDP: The qualified manufacturer shall build and deliver on-time serviceable quality A-10 parts to the USAF. To meet the requirement the qualified manufacturer is responsible for reviewing the entire TDP before bidding on the requirement and identifying any discrepancies in the TDP that will prevent the manufacturer from delivering serviceable assets in reasonable time to resolve the discrepancies and bid on-time. RFPs will not be extended for vender issues.

9.1. TDP Access: The PCO is the point of contact for TDP access. The current TDP is attached to SECTION J of the RFP/Contract. The zip files must be downloaded from SAM.gov. To download the zip files from SAM.gov search for the RFP# and e-mail the PCO to approve access request to the controlled data. The request must be for official business only. DoD contractors must provide their CAGE code and if they are interested in bidding on the requirement before the PCO can approve the access request. The PCO is leslie.evans.1@us.af.mil for pre-award and for post-award, the assigned PCO.

10. Potential offerors must be technically qualified to receive the award. IAW DFARS 217.7502, General (b) “Replenishment parts must be acquired so as to ensure the safe, dependable, and effective operation of the equipment”, military aircrafts, and thus the spares are subject to qualification requirements per FAR 17.7, Acquisition of Replenishment Parts and FAR 9.2, Qualification Requirements.

10.1. Potential offerors that are not qualified may submit a Source Approval Request (SAR) per the attached Source Qualification Statement Spares (SQSS). All responsible manufacturers may submit a bid, proposal, or quotation which shall be considered by the agency. The potential offeror must be technically qualified and acceptable in order to receive the award. IAW FAR Part 9.206 -

“(c) If a qualification requirement applies, the contracting officer need consider only those offers identified as meeting the requirement or included on the applicable QPL, QML, or QBL, unless an offeror can satisfactorily demonstrate to the contracting officer that it or its product or its subcontractor or its product can meet the standards established for qualification before the date specified for award.

10.2. Small business challenges do not need to be referred to the Small Business Office Administration per FAR 9.202, Policy (d);

(d) The procedures in subpart 19.6 for referring matters to the Small Business Administration are not mandatory on the contracting officer when the basis for a referral would involve a challenge by the offeror to either the validity of the qualification requirement or the offeror’s compliance with such requirement.

File details come from the government source that posted it. Updated .