ATTACH_1_V2_6JUN2022.docx

DOCX document 15 KB Posted

Attached to
A-10 POD ASSY MLG Fairing LH & RH 5 YR IDIQ
Solicitation number
FA8212-22-R-0025
Issued by

View the file

Other files

File Type Posted
FA821222R0025_05 Extend RFP to 4AUG2022.pdf PDF
FA821222R0025-04 Update Required Delivery Times.pdf PDF
EDL_015916923_update_with_3_TPRS_REV_8_8JUN2022.pdf PDF
Updated EDL 015922577 Rev 3.pdf PDF
FA8212-22-R-0025-0003 Update SECTION J.pdf PDF
EDL REV LIST FA821222R0025.pdf PDF
FA8212-22-R-0025-0002.pdf PDF
FA8212-22-R-0025-0001.pdf PDF
SECTION_M_FA8212_7JUN2022.pdf PDF
SECTION_L_FA8212_7JUN2022.pdf PDF
EDL 015916923 update with 3 TPRS.pdf PDF
6923FJ_Item_Description.pdf PDF
RFP FA821222R0025 Bids Due 28JUN2022.pdf PDF
EDL REV LIST FD20202200584.pdf PDF
2577FJ_EDL.pdf PDF
2577FJ_IUID.pdf PDF
Attachment 1 Contractor Responsibility Determination Questionnaire.docx DOCX document
Transportation_Funds.pdf PDF
6923FJ_Production_Quality_Requirements.pdf PDF
6923FJ_Procurement_Statements.pdf PDF
2577FJ_Production_Quality_Requirements.pdf PDF
2577FJ_FA_Requirement (2).pdf PDF
Foreign_Disclosure_Review.pdf PDF
2577FJ_Procurement_Statements.pdf PDF
CDRL_A001_FATR.pdf PDF
Packaging_Instructions.pdf PDF
6923FJ_IUID.pdf PDF
2577FJ_Engineering_Instructions.pdf PDF
6923FJ_EDL.pdf PDF
2577FJ_FA_Requirement (1).pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 1: Contractor Responsibility Determination Questionnaire (To be completed by offeror and submitted with bid) Mandatory Minimum Standards to Receive DoD Contracts (Version 2, 6JUN2022)

IAW FAR 9.104-1 General standards. To be determined responsible, a prospective contractor must-

(a) Have adequate financial resources to perform the contract, or the ability to obtain them (see 9.104-3(a));

How is the offeror in compliance?

(b) Be able to comply with the proposed delivery schedule taking into consideration the current market conditions and all the existing and future commitments.

On-time delivery is a major acquisition problem in supporting our warfighters with A-10 spares on-time. In order to be a responsible DoD contractor the offeror must comply with their delivery schedules. How will the offeror ensure compliance to their proposed delivery schedule(s)? At the minimum, the offeror shall provide as part of the bid the milestone schedule for each proposed delivery times that demonstrates compliance. The milestone schedules is part of the proposal schedule and thus, shall be attached to SECTION J of the contract.

Current performance record(s) from Govt source(s) (ie..DCMA office/ Contractor Supplier Risk Report from the Supplier Performance Risk System (SPRS) via Procurement Integrated Enterprise Environment (PIEE.eb.mil).

(c) Have a satisfactory performance record (see 9.104-3 (b) and subpart 42.15). A prospective contractor shall not be determined responsible or nonresponsible solely on the basis of a lack of relevant performance history, except as provided in 9.104-2;

In order to evaluate if the offeror has satisfactory performance record the offer shall submit current performance record(s) from Govt source(s) (ie..DCMA office/ Contractor Supplier Risk Report from the Supplier Performance Risk System (SPRS) via Procurement Integrated Enterprise Environment (PIEE.eb.mil). If the manufacturer disagrees with Govt’s record the offeror should submit their own record for consideration for similar requirements by listing the problems encountered on the identified contracts and the corrective actions that resulted in complying with the proposed delivery schedule(s).

(d) Have a satisfactory record of integrity and business ethics (for example, see subpart 42.15). The offeror shall provide information to support compliance to this standard.

(e) Have the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety programs applicable to materials to be produced or services to be performed by the prospective contractor and subcontractors). (See 9.104-3(a).)

The offeror shall provide information to support compliance to this standard.

(f) Have the necessary production, construction, and technical equipment and facilities, or the ability to obtain them (see 9.104-3(a)) to deliver serviceable assets; and The offeror shall provide information to support compliance to this standard.

(g) Be otherwise qualified and eligible to receive an award under applicable laws and regulations (see also inverted domestic corporation prohibition at 9.108).

If the acquisition is set-aside to small businesses this includes complying with the limits of subcontracting (see FAR 19.602-1(a)). Please note the NMR class waiver for NAICS code 336413 only applies to Drones and Aircraft Launching equipment.

I, _____________ certify that I have reviewed and attest to meeting all the above standards in order to receive a DoD contract.

NAME, POSITION TITLE, DATE

File details come from the government source that posted it. Updated .