ARTS-V1 CLS Sources Sought Question List_11 April 2024.xlsx

XLSX spreadsheet 11 KB Posted

Attached to
Advanced Radar Threat System Variant 1 (ARTS-V1) Contractor Logistics Support (CLS)
Solicitation number
FA8210-24-ARTS_V1-CLS
Issued by

About this file

This document is a Sources Sought notice for the Advanced Radar Threat System Variant 1 (ARTS-V1) Contractor Logistics Support (CLS) contract opportunity from the Department of the Air Force Materiel Command Lifecycle Management Center.

The government is seeking information from potential vendors to determine if this effort can be competed and/or set-aside for small businesses. The scope of work includes depot maintenance support and spares management for three ARTS-V1 systems to be fielded at the Nevada Test and Training Range and the Joint Pacific Alaska Range Complex. Interested parties are requested to provide business information, small business status, any teaming arrangements, and responses to specific questions related to the Statement of Work. This is an information gathering exercise only and does not constitute a solicitation. The government will use the responses to determine the best acquisition strategy. Responses are due by the date specified in the posting.

View the file

Other files

File Type Posted
ARTS-V1 CLS Sources Sought Question List_8 May 2024.xlsx XLSX spreadsheet
Sources Sought Synopsis for ARTS-V1 CLS - 14 Mar 24.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Question NumberDocumentSection/ParagraphPage NumberQuestion/CommentGovernment Response
1.CUI SOW2.1.3 and 2.4.63 and 9What is your vision of where AF-owned spare LRUs will be stored, plus your vision of whether the CLS management of those spares is expected to include full-time on-site presence of a CLS person(s) at the ARTS-V1 operating locations?Can the sources sought be priced both ways? One with the contractor on site to provide timely availability of of spare units, minimizing impact to mission and pilots training. And the other with utilizing the logistics process already in place at the ranges to ship and receive the LRUs.
2.CUI SOW1.2.1What is the Period of Performance for this overall? What is the support PoP for the existing system and the two systems to be delivered in FY26? i.e. if the delivery of qty 2 systems is FY26, does GTRI (incumbent) have a 1-year warranty and required CLS support would start in FY27?Since we are currently under ICS, and the USAF is committed to maintain a minimum of 1 yr ICS post delivery of the last system, ICS period could be extended until September 2028 so the Gov is looking for CLS starting Sept 2028 under a 5 yr plan with options afterwards.

File details come from the government source that posted it. Updated .