This is an Amendment to Solicitation (Standard Form 30) for federal contract opportunity FA8206-26-Q-0027, issued by the Department of the Air Force, Directorate of Contracting at Hill Air Force Base, Utah. The amendment extends the offer receipt deadline to 5:00 PM MST on March 31, 2026, and establishes evaluation criteria for award consideration. Offers must acknowledge receipt of this amendment prior to the submission deadline through one of three methods: completing items 8 and 15 and returning copies of the amendment, acknowledging receipt on each copy of the offer submitted, or submitting a separate letter or electronic communication that references the solicitation and amendment numbers.
The contract requires the supply of Cable Assembly units (NSN: 6150-00-406-2753) with specifications for SPB Connect ECSG P1003 to W4A P2552 connections with standard rubber cable covering (Manufacturer Part Number 07868 69D49204G1). The solicitation includes one first article unit due by July 17, 2026, and 49 production units due by July 12, 2027, with delivery to Hill Air Force Base, Utah (FB2029). Evaluation for award will be based on three factors in descending order of importance: Price or Cost (1), Past Performance (2), and Schedule (3). The contract includes requirements for first article approval testing per FAR clause 52.209-4, with a 120-calendar-day approval window. Associated deliverables include data requirements documentation (CDRL A001 and A002) submitted in accordance with MIL-STD-1423-1 standards. All other terms and conditions remain unchanged from the original solicitation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA820626Q0027_0001.pdf | ||
| 4273352_EDL_REPORT.pdf | ||
| SOW.pdf | ||
| 4297032_PKGRQMT_REPORT.pdf | ||
| FA820626Q0027.pdf | ||
| Data_Requirments.pdf | ||
| CDRL.pdf | ||
| 4297033_TRNSPDATA_REPORT.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.31-MAR-2026 5:00 PM
ACCOUNTING AND APPROPRIATION DATA (If required)
THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
2. AMENDMENT/MODIFICATION NUMBER
PAGE OF PAGES
5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE
(X)
4. REQUISITION/PURCHASE REQUISITION NUMBER3. EFFECTIVE DATE
1. CONTRACT ID CODE
FA8206-26-Q-0027-0002
DEPARTMENT OF THE AIR FORCE, DIRECTORATE OF CONTRACTING
AFSC OL H PZACA
6050 GUM LANE BLDG 1215
HILL AIR FORCE BASE UT 84056-5825
BUYER: Justin M Raleigh/PZACA justin.raleigh.1@us.af.mil Phone: (801) 777- 3753
FA8206
FD20202600027 01
J
FA820626Q0027
X
FA820626Q0027
5-FEB-2026
XX
X
ROUTINE
FA8206-26-Q-0027-0001
Continuation of block 14. DESCRIPTION OF AMENDMENT/MODIFICATION
The purpose of this amendment is to establish evaluation factors as follows:
For the purposes of award, offers will be evaluated based on the following factors, listed in descending order of importance:
Evaluation Factors: Order of Importance:
Price or Cost 1
Past Performance 2
Schedule 3
Offers will now be accepted until 5:00 PM MST. on 31March2026
All other terms and conditions remain unchanged.
FA820626Q00270001
PART I THE SCHEDULE
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
Cable Assembly First Article
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 EA
CLIN ACRN ACRN Total
0001 AA
NSN: 6150004062753 AH
CABLE ASSEMBLY,SPEC
SPB Connect ECSG P1003 to W4A P2552 (C) Standard cable, rubber cable covering Manufacturer Part Number 07868 69D49204G1 Priority: R
Inspection: Origin Acceptance: Destination Quality Assurance: Standard Inspection Applicability: None ;
IUID Required: Yes
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A FB2029 ORIGIN
Class I ODS Substance Application/Use Quantity None None None Type / Ship To PACRN Mark For
A FB2029 PAA
Type / Ship To Quantity (U/I) On or Before Req No / Pri
Required Delivery
A FB2029 1 EA 17 JUL 2026
Proposed Delivery
A FB2029 1 EA
TAC: FRS3
Cable Assembly Production
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
49 EA
CLIN ACRN ACRN Total
0002 AA
NSN: 6150004062753 AH
CABLE ASSEMBLY,SPEC
SPB Connect ECSG P1003 to W4A P2552 (C) Standard cable, rubber cable covering Manufacturer Part Number 07868 69D49204G1 Priority: R
Inspection: Origin Acceptance: Origin Quality Assurance: Standard Inspection Applicability: None ;
IUID Required: Yes Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A FB2029 ORIGIN
Class I ODS Substance Application/Use Quantity None None None Type / Ship To PACRN Mark For A FB2029 PAA Account 9 Type / Ship To Quantity (U/I) On or Before Req No / Pri
Required Delivery
A FB2029 49 EA 12 JUL 2027
Proposed Delivery
A FB2029 49 EA
TAC: FRS3
CDRL A001
Item No.
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
Data
FA DATA
CDRL A001
Priority: R
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Type / Ship To Quantity (U/I) IAW 14231 Req No / Pri
Required Delivery
A FB2029 1 LO IAW 14231
Proposed Delivery
A FB2029 1 LO
CDRL A002
Item No.
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
Data
CPP
Priority: R
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Type / Ship To Quantity (U/I) IAW 1423 Req No / Pri
Required Delivery
+ 1423 1 LO IAW 1423
Proposed Delivery
+ 1423 1 LO
SHIP TO / PLACE OF PERFORMANCE
TYPE/CODE: + 1423
MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
TYPE/CODE: + CNOTE
MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
TYPE/CODE: A FB2029
FB2029 OO ALC DDHU CNTRL RCV
CP 385 519 8898
5851 F AVE BLDG 849W
HILL AFB UT 84056
HILL AIR FORCE BASE 49 840565713
USA
MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
PART I THE SCHEDULE
SECTION G
CONTRACT ADMINISTRATION DATA
ACCOUNTING AND APPROPRIATION DATA (AUG 1998)
Accounting and Appropriation Chargeable ACRN Funds Citation Amount Chargeable
AA 97 X4930 .FC04 64 6 47 GH AM133G 01N000 00000 ERRCNP 503000 F03000 $0.00
PSR: K42203 FSR: 001679 DSR: 200612 CIN: F2DCCW6006A1080000AA
ACRN TOTAL $ 0.00
PART II CONTRACT CLAUSES
SECTION I
CONTRACT CLAUSES
52.209-4 FIRST ARTICLE APPROVAL--GOVERNMENT TESTING (SEP 1989)
(IAW FAR 9.308-2(a)(1), FAR 9.308-2(b)(1))
(a) The Contractor shall deliver 1 units(s) of Lot/Item 0001 within 120 calendar days from the date of this contract to the Government at See Line Items for first article tests. The shipping documentation shall contain this contract number and the Lot/Item identification. The characteristics that the first article must meet and the testing requirements are specified elsewhere in this contract.
(b) Within 120 calendar days after the Government receives the first article, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor.
A notice of disapproval shall cite reasons for the disapproval.
(c) If the first article is disapproved, the Contractor, upon Government request, shall submit an additional first article for testing. After each request, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall furnish any additional first article to the Government under the terms and conditions and within the time specified by the Government. The Government shall act on this first article within the time limit specified in paragraph (b) above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests.
(d) If the Contractor fails to deliver any first article on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.
(e) Unless otherwise provided in the contract, the Contractor—
(1) May deliver the approved first article as a part of the contract quantity, provided it meets all contract requirements for acceptance and was not consumed or destroyed in testing; and
(2) Shall remove and dispose of any first article from the Government test facility at the Contractor's expense.
(f) If the Government does not act within the time specified in paragraph (b) or (c) above, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.
(g) The Contractor is responsible for providing operating and maintenance instructions, spare parts support, and repair of the first article during any first article test.
(h) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for
(1) progress payments, or
(2) termination settlements if the contract is terminated for the convenience of the Government.
(i) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the Offeror/Contractor and have been accepted by the Government. The Offeror/Contractor may request a waiver.
(The above Clause/Provision has been modified.)
PART III LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J
LIST OF ATTACHMENTS
Form Number Description/File Name Date Number of Pages 4273352_EDL_REPORT.pdf
4297032_PKGRQMT_REPORT.pdf
4297033_TRNSPDATA_REPORT.pdf
CDRL.pdf
Data_Requirments.pdf
SOW.pdf
File details come from the government source that posted it. Updated .