FA820626Q0027_0001.pdf

PDF 138 KB Posted

Attached to
Minuteman III ICBM, Cable Assembly Federal contract opportunity
Solicitation number
FA820626Q0027
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

This is an Amendment of Solicitation/Modification of Contract (Standard Form 30) issued by the Department of the Air Force, Directorate of Contracting at Hill Air Force Base, Utah. The amendment modifies solicitation FA820626Q0027 and increases production quantities for Cable Assembly components. Specifically, CLIN 0002 (Cable Assembly - Production) is increased from a quantity of 39 to 49 units of part number 69D49204G1, which is an SPB Connect ECSG P1003 to W4A P2552 connector with standard rubber cable covering and NSN 6150-00-406-2753. The first article (CLIN 0001) remains at 1 unit. The required delivery date for the production articles is 12 July 2027, with F.O.B. Origin and delivery to Hill Air Force Base FB2029. The contracting officer is Justin M Raleigh, and the amendment is effective immediately with an offer receipt deadline extended to 23 March 2026 at 5:00 PM.

The contract includes firm fixed pricing for the cable assemblies and incorporates Contract Data Requirements List (CDRL) items A001 and A002 for First Article test data and Commercial Product Proofs, respectively. FAR clause 52.209-4 (First Article Approval—Government Testing) applies, requiring the contractor to deliver the first article within 120 calendar days and the government to approve or disapprove within 120 calendar days thereafter. All other contract terms and conditions remain unchanged. Supporting documentation includes EDL reports, packaging requirements, transportation data, and a Statement of Work.

View the file

Other files for this federal contract opportunity

Other files attached to Minuteman III ICBM, Cable Assembly, newest first.
File Type Posted
FA820626Q0027_0002.pdf PDF
SOW.pdf PDF
4297032_PKGRQMT_REPORT.pdf PDF
4273352_EDL_REPORT.pdf PDF
FA820626Q0027.pdf PDF
Data_Requirments.pdf PDF
CDRL.pdf PDF
4297033_TRNSPDATA_REPORT.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

J

2. AMENDMENT/MODIFICATION NO.

FA8206-26-Q-0027-0001

3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO.

FD20202600027 01

5. PROJECT NO (If applicable)

FA820626Q0027

6. ISSUED BY CODE

DEPARTMENT OF THE AIR FORCE, DIRECTORATE OF CONTRACTING

AFSC OL H PZACA

6050 GUM LANE BLDG 1215

HILL AIR FORCE BASE UT 84056-5825

BUYER: Justin M Raleigh/PZACA justin.raleigh.1@us.af.mil Phone: (801) 777- 3753

7. ADMINISTERED BY (If other than item 6) CODEFA8206

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE

X

9A. AMENDMENT OF SOLICITATION NO.

FA820626Q0027

9B. DATED (SEE ITEM 11)

5-FEB-2026

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods. ( a ) By completing Items 8 and 15, and returning copies of the amendment; ( b ) By acknowledging receipt of this amendment on each copy of the offer submitted; or ( c ) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. 23-MAR-2026 5:00 PM

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

ROUTINE

15A. NAME AND TITLE OF SIGNER (Type or print)

15B. CONTRACTOR/OFFEROR

BY ________________________________________________________

(Signature of person authorized to sign)

15C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16B. UNITED STATES OF AMERICA

BY ____________________________________________________

(Signature of Contracting Officer)

16C. DATE SIGNED

FACILITY CODE

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

30-105 STANDARD FORM 30 (REV. 10-83)

PRESCRIBED BY GSA

FAR (48 CFR) 53.243

X

X X

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

FA8206-26-Q-0027-0001

Continuation of block 14. DESCRIPTION OF AMENDMENT/MODIFICATION

The purpose of this amendment is to increase the production articles required as follows.

CLIN: From: to:

0002 QTY. 39 QTY. 49

All other terms and conditions remain unchanged.

FA820626Q00270001

PART I THE SCHEDULE

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

Cable Assembly First Article

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 EA

CLIN ACRN ACRN Total

0001 AA

NSN: 6150004062753 AH

CABLE ASSEMBLY,SPEC

SPB Connect ECSG P1003 to W4A P2552 (C) Standard cable, rubber cable covering Manufacturer Part Number 07868 69D49204G1 Priority: R

Inspection: Origin Acceptance: Destination Quality Assurance: Standard Inspection Applicability: None ;

IUID Required: Yes

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A FB2029 ORIGIN

Class I ODS Substance Application/Use Quantity None None None Type / Ship To PACRN Mark For

A FB2029 PAA

Type / Ship To Quantity (U/I) On or Before Req No / Pri

Required Delivery

A FB2029 1 EA 17 JUL 2026

Proposed Delivery

A FB2029 1 EA

TAC: FRS3

Cable Assembly Production

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

49 EA

CLIN ACRN ACRN Total

0002 AA

NSN: 6150004062753 AH

CABLE ASSEMBLY,SPEC

SPB Connect ECSG P1003 to W4A P2552 (C) Standard cable, rubber cable covering Manufacturer Part Number 07868 69D49204G1 Priority: R

Inspection: Origin Acceptance: Origin Quality Assurance: Standard Inspection Applicability: None ;

IUID Required: Yes Physical Item Markings:

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A FB2029 ORIGIN

Class I ODS Substance Application/Use Quantity None None None Type / Ship To PACRN Mark For A FB2029 PAA Account 9 Type / Ship To Quantity (U/I) On or Before Req No / Pri

Required Delivery

A FB2029 49 EA 12 JUL 2027

Proposed Delivery

A FB2029 49 EA

TAC: FRS3

CDRL A001

Item No.

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

Data

FA DATA

CDRL A001

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Type / Ship To Quantity (U/I) IAW 14231 Req No / Pri

Required Delivery

A FB2029 1 LO IAW 14231

Proposed Delivery

A FB2029 1 LO

CDRL A002

Item No.

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

Data

CPP

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Type / Ship To Quantity (U/I) IAW 1423 Req No / Pri

Required Delivery

+ 1423 1 LO IAW 1423

Proposed Delivery

+ 1423 1 LO

SHIP TO / PLACE OF PERFORMANCE

TYPE/CODE: + 1423

MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)

AWARD NUMBER:

TYPE/CODE: + CNOTE

MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)

AWARD NUMBER:

TYPE/CODE: A FB2029

FB2029 OO ALC DDHU CNTRL RCV

CP 385 519 8898

5851 F AVE BLDG 849W

HILL AFB UT 84056

HILL AIR FORCE BASE 49 840565713

USA

MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)

AWARD NUMBER:

PART I THE SCHEDULE

SECTION G

CONTRACT ADMINISTRATION DATA

ACCOUNTING AND APPROPRIATION DATA (AUG 1998)

Accounting and Appropriation Chargeable ACRN Funds Citation Amount Chargeable

AA 97 X4930 .FC04 64 6 47 GH AM133G 01N000 00000 ERRCNP 503000 F03000 $0.00

PSR: K42203 FSR: 001679 DSR: 200612 CIN: F2DCCW6006A1080000AA

ACRN TOTAL $ 0.00

PART II CONTRACT CLAUSES

SECTION I

CONTRACT CLAUSES

52.209-4 FIRST ARTICLE APPROVAL--GOVERNMENT TESTING (SEP 1989)

(IAW FAR 9.308-2(a)(1), FAR 9.308-2(b)(1))

(a) The Contractor shall deliver 1 units(s) of Lot/Item 0001 within 120 calendar days from the date of this contract to the Government at See Line Items for first article tests. The shipping documentation shall contain this contract number and the Lot/Item identification. The characteristics that the first article must meet and the testing requirements are specified elsewhere in this contract.

(b) Within 120 calendar days after the Government receives the first article, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor.

A notice of disapproval shall cite reasons for the disapproval.

(c) If the first article is disapproved, the Contractor, upon Government request, shall submit an additional first article for testing. After each request, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall furnish any additional first article to the Government under the terms and conditions and within the time specified by the Government. The Government shall act on this first article within the time limit specified in paragraph (b) above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests.

(d) If the Contractor fails to deliver any first article on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.

(e) Unless otherwise provided in the contract, the Contractor—

(1) May deliver the approved first article as a part of the contract quantity, provided it meets all contract requirements for acceptance and was not consumed or destroyed in testing; and

(2) Shall remove and dispose of any first article from the Government test facility at the Contractor's expense.

(f) If the Government does not act within the time specified in paragraph (b) or (c) above, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.

(g) The Contractor is responsible for providing operating and maintenance instructions, spare parts support, and repair of the first article during any first article test.

(h) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for

(1) progress payments, or

(2) termination settlements if the contract is terminated for the convenience of the Government.

(i) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the Offeror/Contractor and have been accepted by the Government. The Offeror/Contractor may request a waiver.

(The above Clause/Provision has been modified.)

PART III LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

SECTION J

LIST OF ATTACHMENTS

Form Number Description/File Name Date Number of Pages 4273352_EDL_REPORT.pdf

4297032_PKGRQMT_REPORT.pdf

4297033_TRNSPDATA_REPORT.pdf

CDRL.pdf

Data_Requirments.pdf

SOW.pdf

File details come from the government source that posted it. Updated .